PROJECT: Wind Power Generation Facility

No. Description Unit Quantity Remarks

2 TEMPORARY JETTY L120m x W33.653m


2-1 Steel Sheet Pile (SY390) Type IVw (L=43.50m) nos 304.000
a Material Supply tons 82.430
b Driving Works m 4,408.000
2-2 Waller, C-150x150x9x12.5 lm 183.600
a Material Supply tons 11.317
b Installation Works m 605.200
2-3 Tie Rod (SS490, Ø55mm @ 1200) nos 154.000
a Material Supply tons 42.918
1 Tie Rod (SS490, Ø55mm) tons 41.757
2 Steel Plate (200 x 200 x 12mm) tons 1.161
3 Nut, M55 nos 308.000
b Installation Works m 154.000
2-4 Anchor Pile, H-350x350x12x19 (L=6.00m) nos 154.000
a Material Supply tons 126.588
b Driving Works m 924.000
2-5 Permanent Jetty , H-350x350x12x19 (L=39.70m) nos 153.000
a Material Supply tons 832.152
b Driving Works m 6,074.100
2-6 Coping Beam (800 x 1800) lm 185.706
a Concrete m3 267.417
b Formworks m2 668.542
c Rebar tons 13.951
d RSB Flare Welding D13 Stirrups m 248.000
2-7 Permanent Jetty Top Slab (20m x 40m x 0.50m) m2 800.000 Span @ 5.0m Interval
a Concrete m3 341.158
b Formworks m2 170.000
c Rebar tons 47.412
2-8 Sand Filling (G.L. El.-4.00m to El.+1.70m) m3 16,198.576
2-9 Access Concrete Pavement (L13.653m x W15m) m2 204.795
a Concrete Pavement (t=300mm) m3 61.439
b Base Course (t=200mm) m3 40.959
c Crusher Run (t=200mm) m3 40.959
2-10 Bollard (35T) set 7.000
a Material Supply set 7.000
b Installation Works set 7.000
2-11 Fender (V-Type, SA-800H) set 11.000
a Material Supply set 11.000
b Installation Works set 11.000
2-12 Dredging (El.-4.30m) m3 74,141.290
PROJECT: Wind Power Generation Facility

QUANTITY CALCULATION
TOTAL
No. Description Unit Quantity Length Width Thickness Area Volume Unit Weigth
No. Length Area Volume Weight
(m) (m) (m) (m2) (m3) (kg/m)
(m) (m2) (m3) (tons)
2 TEMPORARY JETTY L120m x W33.653m
2-1 Steel Sheet Pile (SY390) Type IVw (L=43.50m) nos 304.000
a Material Supply tons 82.430 304 4,408.000
Side tons 28.742 106 14.500 18.700 1,537.000 28.742
Front tons 53.688 198 14.500 18.700 2,871.000 53.688
b Driving Works m 4,408.000
2-2 Waller, C-150x150x9x12.5 lm 183.600
a Material Supply tons 11.317 605.200
Side tons 2.416 4 32.300 18.700 129.200 2.416
Front tons 8.901 4 119.000 18.700 476.000 8.901
b Installation Works m 605.200
2-3 Tie Rod (SS490, Ø55mm @ 1200) nos 154.000
a Material Supply tons 42.918
1 Tie Rod (SS490, Ø55mm) tons 41.757 154 2,233.000
Side tons 15.184 56 14.500 18.700 812.000 15.184
Front tons 26.573 98 14.500 18.700 1,421.000 26.573
2 Steel Plate (200 x 200 x 12mm) tons 1.161 308 0.200 0.200 0.012 7,850.000 0.148 1.161
3 Nut, M55 nos 308.000
b Installation Works m 154.000
2-4 Anchor Pile, H-350x350x12x19 (L=6.00m) nos 154.000
a Material Supply tons 126.588 154 924.000
Side tons 46.032 56 6.000 137.000 336.000 46.032
Front tons 80.556 98 6.000 137.000 588.000 80.556
b Driving Works m 924.000
2-5 Permanent Jetty , H-350x350x12x19 (L=39.70m) nos 153.000
a Material Supply tons 832.152 153 39.700 137.000 6,074.100 832.152
b Driving Works m 6,074.100
2-6 Coping Beam (800 x 1800) lm 185.706 185.706
a Concrete m3 267.417
Side m3 94.617 2 32.853 0.800 1.800 65.706 94.617
Front m3 172.800 1 120.000 0.800 1.800 120.000 172.800
b Formworks m2 668.542 2 185.706 1.800 668.542
c Rebar tons 13.951
1 Longitudinal Bar tons 10.515 19 185.706 2.980 3,528.414 10.515
2 Stirrups tons 3.437 620 5.330 1.040 3,304.600 3.437
d RSB Flare Welding D13 Stirrups m 248.000 1240 0.200 248.000
2-7 Permanent Jetty Top Slab (20m x 40m x 0.50m) m2 800.000
a Concrete m3 341.158
Top Slab m3 336.530 1 20.000 33.653 0.500 336.530
H-Beam Coping m3 4.628 153 0.550 0.550 0.100 4.628
b Formworks m2 170.000
Longitudinal m2 80.000 4 40.000 0.500 80.000

2 of 25
PROJECT: Wind Power Generation Facility

QUANTITY CALCULATION
TOTAL
No. Description Unit Quantity Length Width Thickness Area Volume Unit Weigth
No. Length Area Volume Weight
(m) (m) (m) (m2) (m3) (kg/m)
(m) (m2) (m3) (tons)
Transverse m2 90.000 9 20.000 0.500 90.000
c Rebar tons 47.412
Longitudinal Bar D22 tons 23.751 200 39.850 2.980 7,970.000 23.751
Transverse Bar D22 tons 23.661 400 19.850 2.980 7,940.000 23.661
2-8 Sand Filling (G.L. El.-2.00m to El.+1.70m) m3 16,198.576
A-1: Whole Area (El.-2.00 to El.+1.70m) m3 14,941.932 1 120.000 33.653 3.700 14,941.932
A-2: Whole Area (El.-2.00 to El.-4.00m) m3 1,800.000 1 120.000 7.500 2.000 1,800.000
Deduct Permanent Jetty m3 -400.000 -1 40.000 20.000 0.500 -400.000
Deduct Concrete Pavement m3 -143.357 -1 15.000 13.653 0.700 -143.357
2-9 Access Concrete Pavement (L13.653m x W15m) m2 204.795 1 15.000 13.653 204.795
a Concrete Pavement (t=300mm) m3 61.439 1 0.300 204.795 61.439
b Base Course (t=200mm) m3 40.959 1 0.200 204.795 40.959
c Crusher Run (t=200mm) m3 40.959 1 0.200 204.795 40.959
2-10 Bollard (35T) set 7.000
a Material Supply set 7.000
b Installation Works set 7.000
2-11 Fender (V-Type, SA-800H) set 11.000
a Material Supply set 11.000
b Installation Works set 11.000
2-12 Dredging (El.-4.30m) m3 74,141.290 74,141.290
El.-4.30m 40,599.494
El.-4.00m 0.300 37,975.819 39,287.657 11,786.297
El.-3.00m 1.000 27,658.541 32,817.180 32,817.180
El.-2.00m 1.000 15,585.604 21,622.073 21,622.073
El.-1.00m 1.000 245.877 7,915.740 7,915.740

3 of 25
PROJECT:Wind Power Generation Facility

No. Description

2 TEMPORARY JETTY (L120m x W33.653m)


2-1 Steel Sheet Pile (SY390) Type IVw (L=43.50m)

PLAN

SECTION

2-2 Waller, C-150x150x9x12.5

4 of 25
PROJECT:Wind Power Generation Facility

No. Description

5 of 25
PROJECT:Wind Power Generation Facility

No. Description

2-3 Tie Rod (SS490, Ø55mm @ 1200)

SIDE

FRONT

PLAN

SECTION

2-4 Anchor Pile, H-350x350x12x19 (L=6.00m)

6 of 25
PROJECT:Wind Power Generation Facility

No. Description

PLAN

SECTION

7 of 25
PROJECT:Wind Power Generation Facility

No. Description

2-5 Permanent Jetty , H-350x350x12x19 (L=39.70m)

PLAN

SECTION

2-6 Coping Beam (800 x 1800)

8 of 25
PROJECT:Wind Power Generation Facility

No. Description

PLAN

SECTION

9 of 25
PROJECT:Wind Power Generation Facility

No. Description

2-7 Permanent Jetty Top Slab (20m x 40m x 0.50m)

PLAN

SECTION

2-8 Sand Filling (G.L. El.-2.00m to El.+1.70m)

A-1

10 of 25
PROJECT:Wind Power Generation Facility

No. Description

A-1

A-2

SECTION

11 of 25
PROJECT:Wind Power Generation Facility

No. Description

2-9 Access Concrete Pavement (L13.653m x W15m)

ACCESS

PLAN

SECTION

2-10 Bollard (35T)

12 of 25
PROJECT:Wind Power Generation Facility

No. Description

PLAN

SECTION

2-11 Fender (V-Type, SA-800H)

PLAN

13 of 25
PROJECT:Wind Power Generation Facility

No. Description

SECTION

2-12 Dredging (El.-4.30m)

14 of 25
Description

15 of 25
Description

16 of 25
Description

SIDE

17 of 25
Description

18 of 25
Description

19 of 25
Description

20 of 25
Description

DETAIL

21 of 25
Description

A-2

22 of 25
Description

23 of 25
Description

24 of 25
Description

25 of 25

Potrebbero piacerti anche