Equipment, Systems and Processes

Schlumberger Public
Mark E. Teel
Client-Relations Manager
SRC Schlumberger Rosharon Center
2 Initials
The Life of Oil and Gas Wells and Reservoirs
Seismic Exploration Development Formation Well Casing and
Exploration Drilling Drilling Evaluation Testing Cementing

Complete Monitor and Workover Stimulate Plug and


Manage Interventions Abandon

3 Initials
5/15/2012
Oil and Gas Drilling Rigs

4 Initials
5/15/2012
How deep is deep?

500 m
(1640 ft)
301 m
(988 ft)

5 CAP
6 Initials
5/15/2012
7 Initials
5/15/2012
8 Initials
5/15/2012
9 Initials
5/15/2012
Identifying Needs and Challenges

•So, How deep


are we going?

Deeper than
ever!

Empire
State
Building

10 CAP
11 Initials
5/15/2012
How deep are we going below the seafloor?

12 CAP
13 Initials
5/15/2012
How deep are we going below the seafloor?

14 CAP
15 Initials
5/15/2012
Subsea – Intervention and Safety Systems
– Offshore fields are increasingly
developed “subsea” with
wellheads on the seafloor.
– Anchored rigs or dynamically
positioned drillships are used
for drilling, testing and well
completion activities.
– Safe well access, emergency
shut-in and disconnects are a
huge challenge.
– SRC develops technology to safely
shut-in, disconnect from and
reconnect to a subsea wellhead.
Well
Completions

Wellbore Architecture

17 Initials
5/15/2012
Packers
• ANCHOR production tubing inside cemented casing
• SEAL to isolate the tubing-casing annulus and act as a
pressure barrier between formation, or reservoir pressure,
and upper wellbore annulus or between multiple zones
• PROTECT upper steel casing from erosion, corrosion:
H2O, H2S, CO2

18, Completion Basics


15-May-12
Multilateral Wells and Wellbore Junctions

Strength
Solids Exclusion
Hydraulic Pressure Isolation
Lateral access
Define technique, coiled tubing, wireline, rig
Size and type of tools for intervention
What is a well completion?

• Equipment installed and procedures performed in oil or gas


wellbores to facilitate flowing from—production—or pumping
into—injection—subsurface formations after drilling, running
steel casing and cementing the primary casing or liner in place.

• Production tubing and other equipment components of a well


completion help transport hydrocarbons to surface in an
efficient cost-effective, controlled, measured, and safe manner.

20, Completion Basics


15-May-12
Well Completions
• Conveyance, or transport, into and out of …
• Data acquisition …
• Flow control and flow management …
• Communication and data transmission …
• SAFETY !

Completion installations can be:


temporary for well testing or
permanent for long-term production
— “life of a well, field, or reservoir”
Perforate

Oilwell Perforating

• Wireline conveyed
• TCP—
Tubing Conveyed
perforating

22 Initials
5/15/2012
Explosive Shaped-Charges

TCP Tubing-Conveyed Perforating


24 Initials
5/15/2012
25 Initials
5/15/2012
Shaped Charge Animation (to 30 microseconds)
Shaped Charge Animation (to 140 microseconds)
28 Initials
5/15/2012
Cased, Cemented and Perforated
• The most common type of well completion
• Selective production, stimulation and zonal isolation
• Pressure control and safety
• Multiple individual zones completed in a single wellbore

29, Completion Basics


15-May-12
30 Initials
5/15/2012
PERF Lab Testing Capabilities
PV-93 Test (2008) PV-94 Test#001 (2009)
Well Classifications
• Wellbore and reservoir interaction
– Steel cased, cemented and perforated
– Openhole, or barefoot
– Standalone screens, gravel and frac packs
– Vertical, high-angle, and horizontal
• Flowing method
– Natural flow
– Artificial lift
• Number of completed zones
– Single
– Multiple
32, Completion Basics
15-May-12
Completions tubulars and equipment-plumbing

33, Completion Basics


15-May-12
34 Initials
5/15/2012
Well
Completions

Wellbore Architecture

35 Initials
5/15/2012
Packers
• ANCHOR production tubing inside cemented casing
• SEAL to isolate the tubing-casing annulus and act as a
pressure barrier between formation, or reservoir pressure,
and the upper wellbore annulus or between multiple zones
• PROTECT upper steel casing from erosion, corrosion:
H2O, H2S, CO2
• Available in different types:
– Permanent
– Retrievable
Single, dual or triple string, multi-ported, sealbore

36, Completion Basics


15-May-12
X-Series Retrievable Production Packers

XHP

XMP
Openhole Sandface Completions
• Advantages
– Maximizes area open to flow
– Decreases pressure drop, or pressure drawdown
– Minimizes formation damage from cementing,
perforating and completion fluids and operations
• Disadvantages
– Lack of pressure containment and selective control
– Possible borehole instability and risk of hole collapse

38, Completion Basics


15-May-12
Mechanical Screens and ICD Inflow Control Devices

39, Completion Basics


15-May-12
Swellable Openhole Packers
41 Initials
5/15/2012
Well
Completions

Sand-Control Completions and Pumping

42 Initials
5/15/2012
Zones to be completed
• When more than one zone will be
producing at the same time
• When zones are prepared to produce
at different periods of time without
need of major intervention (workover)
• May need: dual, triple strings, sliding
sleeves, permanent control valves
• Remedial workovers difficult when
more than one tubing is used

43, Completion Basics


15-May-12
Sequential Production with a
Packer and Single Tubing String

Zone 2: 1000 psi

Zone 1: 1500 psi

44, Completion Basics


15-May-12
Sequential Production with a
Packer and Single Tubing String

Zone 2: 1000 psi

Zone 1: 1500 psi

45, Completion Basics


15-May-12
Commingled Production with a
Packer and Single Tubing String

Zone 2: 1000 psi

Zone 1: 1500 psi

46, Completion Basics


15-May-12
Packers and Sliding Sleeves or Valves
and Single Tubing String

Zone 2: 1000 psi

Zone 1: 1500 psi

47, Completion Basics


15-May-12
Sliding Sleeves
• Provide communication tubing-annulus
• Used to circulate wells
• To produce selectively different zones
• Reduced internal diameters

48, Completion Basics


15-May-12
Flow Management: Two Production Zones

– Dual producing zones, formations or reservoirs


– Drilling, well-construction and well-completions savings

49, Completion Basics


15-May-12
Flow Management: Accelerated Production
and Optimal Reserve Recovery
Intelligent Completions – benefits and history

• Cumulative Oil Production and Flow Strategy Comparison


0.7

0.6

0.5

0.4

0.3

0.2

0.1

100 200 300 400 500 600 700


Days
Sequentia Uncontrolled Controlled
l Commingled Commingled
Flow Management –
Permanent Downhole Flow-Control Valves
Oseberg

 B-38 is the 2nd well


drilled exclusively in
the Ness formation
Subsurface Safety
Valve  Ness target contribution
≈70,000 B/D–350,000 B/D
9-5/8 in. QUANTUM (field)
production packer

Completion string
Flow control valve
7 in. QUANTUM 1 per zone
isolation
packers
Phase 1 – Prove the Value SPE 71677 & 107117
Case study : Multiple zones selective wells - Norway (2000 – 2001)

D epth
m TVD MSL 4 00 0 5000 6000

B -38 A , b o ret *
30 /9-B -39 T 3*

S H E T LA N D G P .


-25 0 0 B -38 B , p lan -25 00

Production was declining


B -38 A T 2 , b o re t*


D raup ne F m .
?

Schlumberger Confidential
H ea ther F m .

TD
B
38
AT
2 ?
In tra H e a th e r sa n d ,
p a rtly ce m e n te d
Require to produce
Tarb ert F m .
untapped reserves
Zone 1
B 3 8A T 2, p lan *
M id d le Ta rb e rt c o a l

-26 0 0
OW C GM UN1
UN1
TD
B
38
A
-26 00  Not “continuous”
reservoirs
T1
N ess F m . U N 2 co a l
T2
OWC GM
LN 35
LN35

T3
Zone 2 T5
To p L N 3 5 c o a l  Required long reach and
LN 2 T4

R a n./E tive F m highly deviated



LN 35

-27 0 0
O se berg F m
-27 00
O W C U N 1 /L N 3 5 G S
@ 2701.5 m T V D M S L Required to control gas
coning and water
L N 1 co al

G A M M A M A IN

D U N LIN G P .
L e g en d :
GAMM A SOU TH
Zone 3 breakthrough.
*th e w ells a re projected onto the cross-section
T A R G E TS : m TVDM SL m TVDR KB m M D
T1 2610 .0 2668 .0 56 16,5
T2 2617 .5 2675 .5 4000
58 36,8 50 00 6 00 0
K ilo m e te r
T3 2663 .8 2721 .8 61 80,0
0 0 .2 0 .4 0 .6 0 .8 1 .0 V e rtical disp lace m ent from O F C
T4 2670 .4 2728 .4 65 59,7
T5 2655 .9 2713 .9 67 81,8
Phase 1 – Prove the Value SPE 71677 & 107117
Case study : Multiple zones selective wells - Norway (2000 – 2001)

► Long reach & highly deviated Monobore wells


■ 9-5/8” Casing with 7” liner though reservoir
► 9-5/8” Production and 7” Isolation packers

Schlumberger Confidential
Production
► TRFC-HN remotely operated flow control valves
packer
■ Hydraulic control lines to surface
■ Intervention capability
► Pressure & temperature monitoring

9 5/8” Casing

3 ½” Flow Control 3 ½” Flow Control


Valve 7” Liner Valves
55 Initials
5/15/2012
Expansion joints
• Allow thermal expansion and
contraction of tubing string
between fixed points
• Allows tubing disconnection and
reconnection of upper completion
with sealing
• Composed of a assembly with
elastomer seal and wiper rings,
depending on downhole conditions

56, Completion Basics


15-May-12
57 Initials
5/15/2012
Pump-Out Plugs
• Base component of production tubing
string, many times for hydraulically
set packers
• Guide re-entry of intervention tools
into tubing once seat and ball are
expended
• Allow for easy liner top entry in high-
angle wells

58, Completion Basics


15-May-12
59 Initials
5/15/2012
Reentry Guide
• Component in the production tubing
• Guide reentry of intervention tools
back into tubing
• Allow for easy liner top entry in
high-angle wells

60, Completion Basics


15-May-12
61 Initials
5/15/2012
Landing Profile Nipples and Locks
• Allow landing and locking of multiple
accessories in the tubing string for:
– Flow control
– Plugging devices
– Many different profiles
– Basic types: No-go and selective

62, Completion Basics


15-May-12
63 Initials
5/15/2012
Completion Accessories-Chemical Injection
DCIN - Features

Schlumberger Private
• New generation of chemical injection mandrels
• One piece body (no welds)
• Limited leak paths
• Internal check system
• Proven supplier of check valves
• Checks can be tested to full working pressure installed in to the
mandrel
• Optional profile

64 CAP
65 Initials
5/15/2012
Control-Line Clamps and Protectors
•Purpose
– Protect control line
– Support control line

•Features
– Location on tubing couplings
– Lightly grip control line
– Multiple line capability
– Upset for Large O.D. assemblies.
– Various types and sizes of lines.

66, Completion Basics


15-May-12
Flow Control: FIV Formation Isolation Valve

● Bi-directional ball valve to provide a


Safety Barrier during the well completion
program
● Rig time savings via remote actuation
● Improve and enhance reliability and
operability
Mechanical / Ball Module
New Mechanical
Next Generation FIV Section
New Ball Section
Actuation Module
Contingency Opening
n-Trigger Tool
S-Trigger
n-Trigger API Debris Testing
MFIV-II
Mechanical Ball

Shifting tool interface Barrier


Holds valve open/close - Rotates
open/close
 Same mechanical and ball sections as FIV-II
 Same shifting tools as FIV-II
 Extensions 3ft, 6ft or 9ft, same as for FIV-II
FIV-II

3 major sections to an isolation valve:

TripSaver Mechanical Ball

Remote Shifting tool Barrier


(interventionless) interface
opening feature - Rotates
Holds valve open/close
open/close
Flow Control –
Surface-Controlled Subsurface Safety Valves
Primary purpose
– Emergency well-control device
– Prevent: (Piper Alpha)
personnel, environmental,
equipment, and reserve losses
Secondary purpose
– Downhole flow control
allow for wellhead maintenance
serve as a secondary barrier
Safety Valve Construction

Power Source Power Source Closure Mechanism


[Opening Force] [Closing Force]

Hydraulic Piston Power Spring Flapper

Surface Controlled Subsurface Safety Valve (SCSSV)


Standard Spring‐Type Design
Flapper Closure
Piston Bore Hydraulic Piston Flowtube

Production 
Tubing Pressure
Power Spring
Flow Tube and Flapper Closure Mechanisms
Surface-Controlled Subsurface Safety Valves

• SCSSV Applications:
– Government/country regulations
– Offshore and onshore wells
– Environmentally sensitive wells
– H2S /C02 containing wells

74, Completion Basics


15-May-12
Monitor and
Intelligent Completions Manage

Reservoir Monitoring & Control….


Real time production optimization

75 Initials
5/15/2012
Reservoir Energy—Pressure

Water drive Gas drive Solution-gas drive


76 Initials
5/15/2012
Artificial Lift Technologies

77 Initials
Gas lift valves
5/15/2012
Electrical submersible pumps
Natural Flow or Artificial Lift

• Natural flow: Enough reservoir


pressure to bring fluids to surface
• Artificial lift: Add energy to the fluid
– Electrically driven, mechanical
positive-displacement beam pumps
– ESP electric submersible pumps
– Gas lift (re-injecting produced gas)

78, Completion Basics


15-May-12
Side-Pocket Mandrels
• Annulus-tubing communication
device in an artificial-lift completion
• A valve is located to allow gas to

Schlumberger Public
enter the tubing to lift the oil
• More than one are installed in a well

79, Completion Basics


15-May-12
PRODUCED FLUID CONSTANT FLOW GAS LIFT WELL
PRESSURE (PSI)
0 1000 2000
INJECTION GAS
0

FL
OW
ING
1000

TU
BIN
GP
CASING PRESSURE WHEN
WELL IS BEING GAS LIFTED

RE
Gas lift

SS
2000
valves

UR
EG
RA
DIE
3000

NT
DEPTH (FT TVD)
4000

5000
OPERATING GAS LIFT
VALVE

6000

SIBHP
7000

FBHP
Downhole ESP Electrical Submersible Pump

High Efficiency
Pump

Motor

Impeller
Diffuser

Intake
82 Initials
5/15/2012
Completion Components
1

10

• Subsurface safety valves 11

12

13

14

• Packers
19

2 70m 10-3/4"
15

13Cr Csg. to 16
Shoe

3 18

• Sliding sleeves
20

Critical Dimension
21

4 22

23

24

• Expansion joints

Target Cut Zone


25

26

47

5 27

• Chemical-injection valves
28

29

30

• Flow-control valves
6
31

32

47

33

34

35

• Permanent monitoring gauges


7 36

37

8 38

• Side-pocket mandrels or ESP


39

40a

40b

• Landing profile nipples


41

10 45

42

43

• Wireline reentry guide


44

45

46

G04-0032a

• Formation Isolation Valve


17

11

12
83, Completion Basics
15-May-12 13
Stimulate

Stimulation, Pumping Services

Fracturing

Acidizing
84 Initials
5/15/2012
Workover
Interventions
Assisting Production From
Pressure-Depleted Reservoirs

Fire Flood –In flooding


Water situ combustion
85 Initials
5/15/2012
Abandonment

P&A Plug and Abandon

86 Initials
5/15/2012
Four Life Stages of Reservoir Development

Stage
Stage
3 Stage
41 2
Development
Exploration
Late Life
Delineation

Achieving
Starting
Water Determine
production
full
to reduce
production
the risk
the
reservoir
Depleted pressure
Refine
Choose
reservoir
extent
the right
model
point
Intervention
ReservoirDetermine
monitoring
Locatereservoir
potential
Stimulation
Continue
reservoir
properties
reducing the
riskFlow assistance
Determine
reservoir
model

87 Initials Further
5/15/2012
reduce risk
88 Initials
5/15/2012
Focus on Technology and the Reservoir Life Cycle

Exploration Appraisal Development Production

+
Cash Flow

0
_ Time

Reservoir Optimization
Traditional Development