Sei sulla pagina 1di 3

Identification

1. Expenses associated with running a business that can’t be linked to creating or producing a product or
service
2. In this form of contract, the contractor cannot profit by any increase in cost.
3. works constructed for governmental agencies
4. Are passed whereby means are provided for a compulsory review of the contractor’s profits
5. Works constructed by private parties, partnership or corporations

Multiple Choice

1. Contractor has to be paid with the actual cost of the construction work with a specified percentage.
a. Cost plus percentage b. Cost plus fixed percentage c. Cost Plus Overhead d. Cost by Increase
2. If the cost of the work increases above that of estimate, _____ of the additional cost is paid by the owner
a. Half b. all c. none d. one fourth
3. If the work is completed behind the time, a corresponding _____ is made in the premium paid.
a. Deduction b. Addition c. Completion d. Loan
4. No departure from the contract requirements can be legally permitted.
a. Private Works b. Public Works c. Bidding d. Law Contract
5. Verbal acceptance of a proposal may consummate the contract.
a. Private Works b. Public Works c. Bidding d. Law Contract

True or False

1. In cost plus overhead, every increase in cost increases the amount payable to the contractor
2. If the cost of the work increases above that of estimate, all the additional cost is paid by the owner
3. Contracts for Cost Plus a Fixed Sum will secure the greatest returns to himself by the most expenditure of
time and money for the owner
4. Contractors also sometimes agree among themselves on the party to whom the award shall be made.
5. The negotiations which are important prior to the awarding of a construction contract will vary

Matching Type

1. Works for governmental agencies

2. Works constructed by private parties, partnership or corporations

3. Secure the greatest returns to himself

4. The contractor receives a certain agreed sum

5.Eliminated during the national war

Identification
1. Overhead expenses
2. Contracts for Cost Plus a Fixed Sum
3. Public works
4. Renegotiation Laws
5. Private Works

Multiple Choice
1. A
2. A
3. A
4. B
5. A

True or False
1.False
2.False
3. False
4. True
5. True

Matching Type
1. Public Works
2. Private Works
3. Contracts for COst Plus a Fixed Sum
4. Contracts for Cost Plus a Variable Premium
5. Letter of Intent

Identification

1. This Act shall be known as the “New Electrical Engineering Law.”


2. Refers to planning, specifying, coordinating layouting of electrical equipment in power plants,
substations and the like
3. Is any waterborne unit which is designed and built to have an electric plant.
4. Supervise and regulate the practice of electrical engineering in the Philippines
5. RA 544 is also known as ________________.

Multiple Choice

1. New Electrical Engineering Law was signed by:


a. Fidel Ramos b. Gloria Macapagal c. Ejercito Estrada d. Diosdado Macapagal
2. Applicants for Registered Electrical Engineer Examination should be _____ of age.
a. 21 b. 22 c. 18 d.20
3. Applicants for Registered Master Electrician should be ______ of age.
a. 21 b. 22 c. 18 d.20
4. An Act Professionalizing The Practice Of Civil Engineering In The Philippines is Senate Bill ___.
a. 2770 b. 2775 c. 2760 d. 2765
5. Senate Bill in the previous number was introduced by _____.
a. Manny Pangilinan b. Panfilo Lacson c. Ejercito Estrada d. Juan Ponce Enrile

True or False

1. “Kw” refers to the installed capacity of a alternating current (A.C) electric plant.
2. Board members should be at least thirty (30) years of age for electrical engineers.
3. The passing general weighted average rating shall be seventy percent (70%) with no grade below fifty
percent (50%) in any group of subjects
4. RA 554 was signed Feb 24, 1995.
5. March 21, 2011, Estrada passed Senate Bill 2765.

Matching Type

1. Establishment or a system for the production and modification of electric energy.


2. Any building, room or separate place which houses or encloses electric supply equipment
3. Refers to the choice of electrical systems.
4. installed capacity of an alternating current (A.C.)
5. installed capacity of a direct current (D.C)

Identification
1. RA 7920
2. Power Plant Design
3. watercraft
4. Board of Electrical ENgineering
5.Civil Engineering law

Multiple Choice
1.A
2.A
3.C
4.A
5.B

True or false
1.False
2.False
3. True
4. False
5.False

Matching Type
1.Electric Plant
2.Substation
3.Electrical System Design
4.Kva
5. kw