Sei sulla pagina 1di 2

POWER GRID CORPORATION OF INDIA LIMITED DOC NO.

:MR/CF/WT/09/R-0 DATED: 01/08/07


CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF WAVE TRAP EQUIPMENT IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

I REGION :

II DATE OF III DATE OF


I ERECTION : ENERGISATION :

IV DETAILS OF EQUIPMENT :

LOA NO :

MAKE :

TYPE :

SL NO. : R - PHASE : Y - PHASE : B - PHASE :

YEAR OF
MANUFACTURE :

FEEDER NAME :

V RATING :

VOLTAGE RATING :

mH RATING :

CURRENT RATING : BAND WIDTH :

VI DETAILS : CHECKLIST / TESTING

SL. DESCRIPTION STATUS REMARK


NO YES NO RECORD DEFICIENCIES, IF ANY
1 EQUIPMENT IS FREE FROM DIRT / DUST
FOREIGN MATERIALS ETC.

2 EQUIPMENT IS FREE FROM ALL VISIBLE


DEFECTS ON PHYSICAL INSPECTION

3 SUPPORT STRUCTURES HAS BEEN


PROVIDED WITH DOUBLE EARTH

4 ALL NUTS AND BOLTS ARE TIGHTENED


CORRECTLY AS PER SPECIFIED TORQUE

5 PERMANENT LAVELLING AND


IDENTIFICATION IS DONE

6 LEVELLING AND ALIGNMENT OF STRUCTURE


AND BASE FRAME IS CHECKED

7 ALL INSULATORS & LINE MATCHING UNIT


ARE FREE FROM ANY PHYSICAL DEFECTS

8 TIGHTNESS OF NUTS / BOLTS OF TERMINAL


1 OF 2 WAVE TRAP
POWER GRID CORPORATION OF INDIA LIMITED DOC NO. :MR/CF/WT/09/R-0 DATED: 01/08/07
CORPORATE OPERATION SERVICES SUB STATION :
BAY NO :
PRE-COMMISSIONING OF WAVE TRAP EQUIPMENT IDENTIFICATION NO :
COMMISSIONING FORMATS DATE OF TESTING :

CONNECTORS ARE CHECKED

SL. DESCRIPTION STATUS REMARK


NO YES NO RECORD DEFICIENCIES, IF ANY

9 ERECTION COMPLETION CERTIFICATE ALONG


WITH LIST OF OUTSTANDING ACTIVITIES
REVIEWED

10 CHECK THAT THE TUNING UNIT AND


ARRESTOR ARE PROPERLY TIGHTENED
AND FREE FROM ANY DAMAGE

VII INSULATION RESISTANCE MEASUREMENT :

SL. NO BETWEEN MEGGER PHASE PERMISSIVE


R-PHASE Y-PHASE B-PHASE VALUE
1 UPPER TEMINAL 5000 V 1000 M.OHM
AND EARTH
2 LA OF THE 500 V 1 M.OHM
WAVE TRAP

VIII CONTACT RESISTANCE MEASUREMENT


THE VALUE SHOULD NOT MORE THAN 5 MICRO-OHMS PER CONNECTOR / JOINT

SL. NO ACROSS PHASE


R-PHASE Y-PHASE B-PHASE
1 UPPER TEMINAL MICRO OHMS
2 BOTTOM TEMINAL MICRO OHMS

IX FINAL DOCUMENTATION REVIEW :

A FINAL DOCUMENT OF PRE-COMMISSIONING CHECKS


REVIEWED AND APPROVED YES NO

B DOCUMENTS REGARDING SPARES, EQUIPMENT, O & M


MANNUALS ETC AVAILABLE AT SITE FOR O & M
PURPOSE YES NO

C AFTER MODIFICATION, IF ANY, "AS BUILT DRAWINGS"


ARE AVAILABLE AT SITE YES NO

SIGNATURE : SIGNATURE : SIGNATURE : SIGNATURE :


NAME : NAME : NAME : NAME :
DESIGNATION : DESIGNATION : DESIGNATION : DESIGNATION :
ORGANISATION : ORGANISATION :
( SUPPLIER REPRESENTATIVE ) ( ERECTION AGENCY ) (POWERGRID SITE I/C)( POWERGRID COMM TEAM )

2 OF 2 WAVE TRAP