top op OF PEON CO PO

1204.4 175438.92 102383.25 80800.5 0.00 0.00

240.88 35087.784 20476.65 16160.1 0 0

0.2 0.2 0.2 0.2 0.2 0.2

0.4483 0.4483 0.4483 0.4483 0.4483 0.4483

132.893496 19357.9304 11296.9678 8915.52717 0 0


359827.07

198516.595

0.4483
PRESUPUESTO ANALITICO DE COSTO DIRECTO

PROYECTO: CREACION DEL CENTRO CIVICO DEL DISTRITO DE ANDABAMBA, ACOBAMBA-HUANCAVELICA.


UBICACIÓN : ANDABAMBA - ACOBAMBA - HUANCAVELICA
FECHA : AGOSTO 2012
Cadena Mod. Especificaciòn del Gasto Und. Cant. PRESUPUESTO
de Gast Aplic. P. Unit. P. Parc. Sub total
6.5.11 APLICACIONES DIRECTAS 359,827.07
10 Retribuciones y Compromisos a Plazo Fijo 198,516.59
Personal de Obra

1.6058333 TOPOGRAFO mes 5.00 132.89 664.47


233.9081667 OPERARIO mes 5.00 19357.93 96789.65
170.6507500 OFICIAL mes 5.00 11296.97 56484.84
179.3965833 PEON mes 5.00 8915.53 44577.64

11 Obligaciones del Empleador 37,889.79


ESSALUD(9%) 0.09 359827.07 32384.44
Accidentes de Trabajo (1.53%) 0.0153 359827.07 5505.35

13 Gastos Variables y Ocasionales 123,420.69


vacaciones truncas glb. 0.10 359827.07 35982.71
CTS glb. 0.15 359827.07 53974.06
Bonificaciones
Refrigerio y movilidad glb. 0.05 359827.07 17991.35
Zona de emergencia glb. 0.01 359827.07 3598.27

AFP 3.30% GLB 0.033 359827.07 11874.29

BIENES Y SERVICIOS 1,132,931.15


29 Materiales de construcciòn 950,915.45

ACERO CONSTRUCCION CORRUGADO KG 2.56 45,615.45 116,814.44


ACERO CORRUGADO 0 3/8" KG 4.20 14.46 60.22
ACERO DE REFUERZO FY=4200 GRADO 60 KG 2.56 985.92 2,524.69
AFIRMADO M3 55.00 43.57 2,396.39
AGUA M3 2.00 174.73 356.90
ALAMBRE GALVANIZADO # 12 KG 6.84 78.72 539.20
ALAMBRE NEGRO RECOCIDO # 16 KG 3.80 2,635.14 10,099.90
ALAMBRE NEGRO RECOCIDO # 8 KG 4.20 825.06 3,463.61
ALAMBRE TW # 12 AWG M 1.36 225.19 306.69
ALMACEN CERCADO M2 56.00 45.00 2,520.00
ARENA FINA M3 90.00 205.27 18,475.79
ARENA GRUESA M3 90.00 261.56 23,540.39
ARTEFACTO FLUORESCENTE 4X14W UND 94.91 50.00 4,745.50
BALDOSA ACUSTICA 1.22*0.61 M2 25.33 200.73 5,085.05
BARNIZ MARINO GLN 36.00 1.61 57.89
BISAGRA CAPUCHINA PLOMA 3 1/2" X 3 1/2" PAR 4.30 288.00 1,238.40
BLOQUE HUECO DE ARCILLA DE 15X30X25 CM UND 2.40 10,381.30 24,915.11
BRIDA DE ACERO DE 3/4" PZA 12.30 1.00 12.30
CABLE DE COBRE DESNUDO DURO 4 AWG M 8.30 20.00 166.00
CABLE DE RED M 0.60 166.40 99.84
CABLE TW # 14 AWG 2.5 MM2 M 0.83 2,171.93 1,801.65
CAJA DE DESAGUE DE 12"X24" UND 52.00 6.00 312.00
CAJA OCTOGONAL GALV. 4" X 2 1/8 " UND 1.40 104.00 145.60
CAJA OCTOGONAL GALV. LIVIANA 4"x4"x2 1/2 UND 1.40 100.00 140.00
CAJA RECTANG GALV 4"X2 1/8" UND 1.40 138.00 193.20
CARBON VEGETAL KG 5.45 12.00 65.40
CASETA ADICIONAL TECHADA ALMACEN M2 15.00 32.00 480.00
CASETA OFICINA M2 18.00 32.00 576.00
CASETA SUPERVISION M2 20.00 32.00 640.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 19.80 7,150.94 141,600.47
CERAMICO COLOR OSCURO DE .30 X .30 M2 46.80 72.12 3,375.43
CERAMICO TIPO PIEDRA NORDICA 40 X 40 CMS. M2 58.50 1,086.47 63,563.46
CERRADURA EXTERIOR DE DOS GOLPES UND 48.00 72.00 3,456.00
CERROJO DE BRONCE DE 3" PZA 8.60 20.00 172.00
CINTA AISLANTE RLL 4.50 20.40 91.80
CLAVOS DE ACERO DE 2" PZA 0.60 1,967.90 1,180.74
CLAVOS PARA MADERA C/C 1 1/2 " KG 4.40 28.25 124.31
CLAVOS PARA MADERA C/C 2" KG 4.40 4.25 18.65
CLAVOS PARA MADERA C/C 3" KG 3.80 748.50 2,833.66
CLAVOS PARA MADERA C/C 3/4" KG 4.40 48.18 216.80
CLAVOS Y PERNOS KG 82.81 19.68 1,629.42
CODO DE 450 PVC SAL DE 3" UND 3.50 8.00 28.00
CODO DE 90 PVC SAL DE 2" UND 2.00 24.00 48.00
CODO DE 90 PVC SAL DE 3" UND 3.50 2.00 7.00
CODO DE 90 PVC SAL DE 4" UND 5.30 24.00 127.20
CODO DE 90°C/R PVC SAP P/AGUA DE 1/2" UND 2.10 186.84 392.58
CODO DE 900 SP PVC SAP P/AGUA DE 3/4" UND 1.90 8.00 15.20
COLA SINTETICA FULLER GLN 56.40 8.49 478.86
CONECTOR RJ11 UND 1.20 58.80 70.56
CONECTOR RJ45 UND 3.10 16.00 49.60
CONECTORES DE COMPRESION DE COBRE 35MM2 PZA 12.60 2.00 25.20
CONEXION A CAJA PVC SAP 3/4" PZA 9.30 200.00 1,860.00
CONEXIONES A CAJA PVC SEL 3/4" PZA 9.30 312.00 2,901.60
CONTRAZOCALO DE CEDRO BOLEAD. 3/4"X2" M 8.45 581.99 4,915.85
CRUZETAS BOL 7.40 6.87 50.83
CURVA LIVIANO PVC SEL P/INST. ELECT 5/8" UND 1.00 18.00 18.00
CURVA PVC SAP LUZ 3/4" PZA 0.70 66.89 49.23
CURVAS PVC SEL 3/4" PZA 0.70 312.00 218.40
FOCOS AHORRADORES PZA 7.50 43.00 322.50
FRAGUA CREMA KG 6.10 551.72 3,365.43
FULMINANTE VERDE CAL 22 UND 4.14 157.43 651.37
GIGANTOGRAFIA UND 263.11 1.00 263.11
HORMIGON M3 55.00 175.83 9,680.20
IMPRIMANTE GLN 18.40 277.13 5,099.14
INODORO TQUE. BAJO NORMAL COLOR C/A. UND 138.70 24.00 3,328.80
INTERRUP.DE BAKELITA 250 V - 15A PZA 4.00 104.00 416.00
JABONERA C/ASA P/BANO 15x15 COLOR UND 29.00 18.00 522.00
LADRILLO CORRIENTE 6 x 12 x 24 CM UND 0.50 57,590.10 28,795.05
LAJA DE PIEDRA M2 28.00 293.62 8,221.42
LAVATORIO 23"X17" 2 GRIF.4" COLOR C/A UND 29.00 18.00 522.00
LIJA PARA MADERA UND 1.50 6.43 9.65
MADERA CEDRO DE PUCALLPA CEPILLADA P2 5.20 418.40 2,175.62
MADERA EUCALIPTO ROLLIZO P2 2.00 1,453.96 2,907.93
MADERA TORNILLO P2 3.70 5,887.07 21,811.65
MADERA TORNILLO CEPILLADA P2 4.20 377.04 1,583.65
MADERA TORNILLO INC.CORTE P/ENCOFRADO P2 4.50 13,731.02 61,806.94
MANIJA DE BRONCE PARA PUERTAS PZA 18.00 72.00 1,296.00
MOVILIZACION Y DESMOVILIZACION GLB 8,077.22 1.00 8,077.22
NIVEL DIA 25.00 4.82 120.44
OCRE KG 9.50 126.69 1,203.61
OCRE ROJO KG 9.60 109.41 1,050.34
PAPELERA C/EJE 15x15 BLANCA UND 35.00 24.00 840.00
PEGAMENTO PARA PVC 1/4 GLN UND 15.00 3.24 48.71
PEGAMENTO PARA PVC AGUA FORDUIT GLN 28.00 1.44 36.95
PEGAMENTO PLASTICO P/PVC CCP GLN 53.00 1.28 67.84
PERFIL 8MM PZA 3.90 68.69 267.89
PERFIL DE ALUMINIO 2" X 2.14 MTS PZA 47.60 85.20 4,055.69
PERFILES DE LIVIANO 15/16" M 16.35 787.16 12,870.07
PERNOS HEXAGONALES DE 3/4" x 3 1/2" PZA 0.70 9.00 6.30
PIEDRA CHANCADA DE 1/2" M3 120.00 451.29 54,155.13
PIEDRA CHANCADA DE 3/4" M3 110.00 7.26 799.43
PIEDRA GRANDE DE 8" M3 30.00 29.53 885.90
PIEDRA MEDIANA DE 6" M3 30.00 16.55 496.44
PINTURA AL OLEO MATE GLN 35.00 41.39 1,448.62
PINTURA ESMALTE SINTETICO GLN 32.00 0.43 13.82
PINTURA LATEX GLN 22.35 180.31 4,011.96
PLACA DE SALIDA DE TELEVISION Y TELEFONO UND 6.30 34.00 214.20
PLANCHA DE POLICARBONATO M2 47.62 56.07 2,669.89
PUERTA DE ALUMINIO M2 222.00 212.59 47,195.42
RAMAL TEE DOBLE C/REDUC PVC SAL 4" A 2" UND 8.60 2.00 17.20
RAMAL TEE SIMPLE PVC SAL DE 2" UND 8.00 155.84 1,246.72
REGISTRO DE BRONCE DE 4" UND 6.50 24.00 156.00
REGLA DE MADERA P2 2.50 16.53 42.76
RODON DE MADERA 3/4" x 3/4" M 5.33 581.99 3,102.07
SOLDADURA CELLOCORD KG 8.60 213.66 1,837.47
SOLDADURA CELLOCORD 3/32" KG 10.40 10.99 114.34
SPOT LIGTH CROMADO UND 12.30 11.00 135.30
SUMIDERO CROMADO DE 3" UND 4.50 2.00 9.00
SUMIDERO DE BRONCE DE 2" UND 2.50 12.00 30.00
TABLERO GABINETE METAL BARRA BRONCE 12 POLOS PZA 67.90 6.00 407.40
TABLERO GEN. C/FUSIBLES DE 4 CIRCUITOS UND 85.00 3.00 255.00
TAPA C/MARCO FºFº DE DESAGUE 12" X 24" PZA 55.00 6.00 330.00
TAPA DE CONCRETO DE 0.4 X 0.4 X 0.10 M UND 25.20 1.00 25.20
TAPA METALICA DE 30 X 30 UND 85.00 1.00 85.00
TAPA SIN MARCO F° GAL. P/VALVULA PZA 35.00 1.00 35.00
TAPAPOROS DE MADERA ACABADA C/BARNIZ O LACA GLN 25.00 1.79 44.70
TEE SANITARIA SIMP C/REDUC PVC SAL 4"A2" UND 12.30 12.00 147.60
TEE SANITARIA SIMPLE PVC SAL DE 4" UND 8.00 24.00 192.00
TEODOLITO DIA 55.00 4.82 264.96
THOR GEL KG 42.00 10.00 420.00
TIZA BOL 1.60 12.04 24.08
TOMACORRIENTE SIMPLE PLANO BAKELITA UND 4.00 100.00 400.00
TRATAMIENTO DE AREAS VERDES EST 3,500.00 21.03 73,605.00
TRIPLAY DE 4'x8'x 8 mm PLN 22.00 36.74 808.48
TRIPLAY DE 8 MM M2 12.30 8.64 106.27
TRIPLAY LUPUNA DE 4'x8'x 4 mm PLN 16.00 34.09 545.43
TUB. PVC SAL P/DESAGUE DE 2" M 1.50 169.32 254.55
TUB. PVC SAL P/DESAGUE DE 3" M 3.90 2.00 7.80
TUB. PVC SAL P/DESAGUE DE 4" M 3.50 190.53 667.53
TUB. PVC SAP P/INST. ELECT. DE 1" M 1.90 5.00 9.50
TUB. PVC SAP PRESION C-10 C/R. 3/4" x 5m UND 2.80 23.23 65.04
TUB. PVC SAP PRESION C-10 EC DE 3/4" x5m UND 15.20 28.00 425.60
TUB. PVC SAP PRESION P/AGUA C-10 R. 1/2" M 1.33 255.23 339.68
TUB. PVC SEL P/INST. ELECT. DE 5/8" x 3m UND 4.90 48.50 237.65
TUBERIA PVC SAL 2" M 2.80 15.00 42.00
TUBO ALUMINIO CUADRADO 2"x2" x0.08" PZA 73.20 41.23 3,017.85
TUBO PVC SAL 3" M 3.25 81.77 265.96
TUBO PVC SAP (LUZ) (E/C) 3/4" X 3 M. PZA 4.72 215.38 1,015.34
TUBO PVC SEL (E/C) 3/4" X 3.00 M. PZA 4.72 306.00 1,444.32
UNION PVC SEL 3/4" PZA 1.00 100.00 100.00
UNION SIMPLE PRESION PVC SAP (LUZ) 3/4" PZA 0.95 205.10 196.92
URINARIO PICO COLOR UND 68.00 11.00 748.00
VALVULA CHECK DE BRONCE DE 3/4" UND 8.60 3.00 25.80
VALVULA COMPUERTA DE BRONCE DE 2" UND 85.00 1.00 85.00
VALVULA COMPUERTA DE BRONCE ROS. DE 1/2" UND 15.00 12.00 180.00
VALVULA FLOTADORA 3/4" C/BOLA DE COBRE UND 12.00 2.00 24.00
VARILLA DE COBRE 3/4 X 8' UND 289.90 1.00 289.90
VENTANA DE ALUMINIO 14" X 24" M2 122.40 520.97 63,766.21
VIDRIOS LAMINADOS 6 MM. P2 7.60 6409.80 48714.48
PRESUPUESTO ANALITICO DE COSTO DIRECTO

PROYECTO: CREACION DEL CENTRO CIVICO DEL DISTRITO DE ANDABAMBA, ACOBAMBA-HUANCAVELICA.


UBICACIÓN : ANDABAMBA - ACOBAMBA - HUANCAVELICA
FECHA : AGOSTO 2012
Cadena Mod. Especificaciòn del Gasto Und. Cant. PRESUPUESTO
de Gast Aplic. P. Unit. P. Parc. Sub total

30 Bines de Consumo 10,000.11


Herramientas
HERRAMIENTAS MANUALES EST. 1.00 10,000.11 10000.11

37 Alquiler de Bienes 83,780.04


ANDAMIO METAL TABLAS-ALQUILER EST 15.00 32.39 486.32
CAMION VOLQUETE 4x2 140-210 HP 6 M3. HM 85.00 485.54 41,267.62
CARGADOR RETROEXCAVADOR 62 HP 1 YD3 HM 185.00 75.47 13,958.33
CARGADOR S/LLANTAS 80-95 HP 1.5-1.75 YD3 HM 185.00 60.72 11,243.38
COMPACTADOR VIBR. TIPO PLANCHA 5.8 HP HM 17.30 26.81 462.52
COMPACTADOR VIBR. TIPO PLANCHA 7 HP HM 25.00 33.91 849.04
ELECTROBOMBA 2 HP P/AGUA UND 749.00 1.00 749.00
MEZCLADORA CONCRETO TAMBOR 18HP 11P3 HM 22.00 405.25 8,915.02
MEZCLADORA CONCRETO TROMPO 8 HP 9 P3 HM 17.50 5.70 99.78
SOLDADORA ELECT. MONOF. ALTERNA 225 AMP. HM 6.50 496.82 3,226.74
VIBRADOR DE CONCRETO 4 HP 1.35" HM 8.50 24.87 211.43
VIBRADOR DE CONCRETO 4 HP 2.40" HM 8.50 271.82 2,310.86
39 Otros Servicios de Terceros 88,235.55
FLETE GLB 1.0000 88,235.55 88,235.55

TOTAL S/ 1,492,758.22
DESAGREGADO DEL PRESUPUESTO ANALITICO GASTOS GENERALES

PROYECTO: CREACION DEL LOCAL COMUNAL DEL POBLADO DE SAN ANTONIO DE PINCHA
UBICACIÓN : VILCAS HUAMAN - VILCAS HUAMAN - AYACUCHO
FECHA : MARZO 2015
Cadena Mod. Especificaciòn del Gasto Und. Cant. PRESUPUESTO
de Gast Aplic. P. Unit. P. Parc. Sub total
BIENES Y SERVICIOS 10,154.04
20 Viàticos y asignaciones 400.00
Residente de Obra mes 2.00 200.00 400.00
Personal Administrativo mes 2.00 0.00 0.00

22 Vestuario mes 2.00 0.00 0.00 0.00

24 Alimentos para personal mes 2.00 0.00 0.00 0.00

27 Servicios no Personales 9,000.00


Ing. Residente de Obra mes 2.00 2700.00 5400.00
Capataz mes 2.00 1800.00 3600.00
Topógrafo mes 2.00 0.00 0.00
Asistente mes 2.00 0.00 0.00
Administrador mes 2.00 0.00 0.00
Almacenero mes 2.00 0.00 0.00

30 Bines de Consumo 269.47


Materiales de Oficina y Escritorio mes 2.00 100.00 200.00
Copia, revelado y legalizaciones Glb. 1.00 69.47 69.47

32 Pasajes y Gastos de Transporte 0.00


Camioneta mes 2.00 0.00 0.00
Transporte de personal mes 2.00 0.00 0.00

37 Alquiler de bienes 0.00


Teodolito mes 2.00 0.00 0.00
Nivel mes 2.00 0.00 0.00

39 Otros Servicios de Terceros 484.57


Placa Recordatiria Unid. 1.00 484.57 484.57
Diseño de mezcla 100, 140, 175, 210 kg/cm2 Unid. 2.00 0.00 0.00
Pruebas de cantera Unid. 0.00 0.00 0.00
Pruebas de compactación Unid. 2.00 0.00 0.00

TOTAL GASTOS GENERALES (GG) TOTAL S/ 10,154.04

GASTOS GENERALES=(GG/CD)x100 % 10.00

10,154.04
DESAGREGADO DEL PRESUPUESTO ANALITICO DE SUPERVISION

PROYECTO: CREACION DEL CENTRO CIVICO DEL DISTRITO DE ANDABAMBA, ACOBAMBA-HUANCAVELICA.


UBICACIÓN : ANDABAMBA - ACOBAMBA - HUANCAVELICA
FECHA : AGOSTO 2012
Cadena Mod. Especificaciòn del Gasto Und. Cant. PRESUPUESTO
de Gast Aplic. P. Unit. P. Parc. Sub total
10 Retribuciones y Compromisos a Plazo Fijo 0.00

BIENES Y SERVICIOS 9,349.51


20 Viàticos y asignaciones 0.00
Movilidad y Viaticos Supervisor mes 5.00 0.00 0.00

23 Combustible 0.00
Combustible y Lubricantes glb 5.00 0.00 0.00

27 Servicios no Personales 0.00


Evaluador de expediente técnico glb 1.00 0.00 0.00

30 Bines de Consumo 0.00


Materiales de Oficina y Escritorio Mes 5.00 0.00 0.00
Copia y revalado supervisor glb 1.00 0.00 0.00
Otros

32 Pasajes y Gastos de Transporte 6,000.00


Camioneta supervisor Mes 5.00 1200.00 6000.00

33 Servicios de Consultoria 3,349.51


Ing. Supervisor mes 1.00 3349.51 3349.51
Asistente mes 5.00 0.00 0.00
Secretaria mes 5.00 0.00 0.00
Topógrafo mes 5.00 0.00 0.00
Ayudante de topógrafo mes 5.00 0.00 0.00
Peón mes 5.00 0.00 0.00

37 Alquiler de bienes 0.00


Teodolito mes 5.00 0.00 0.00
Nivel mes 5.00 0.00 0.00

39 Otros Servicios de Terceros 0.00


Prueba de compactación Unid. 5 0.00 0.00
Diseño de mezcla 100, 140, 175, 210 kg/cm2 Unid. 12.00 0.00 0.00
Pruebas de cantera Unid. 0.00 0.00 0.00

SUPERVISION DE OBRA TOTAL S/ 9,349.51

SUPERVISION DE OBRA=(SUPER/CD+GG)x100 % 10.00

3,349.51
PRESUPUESTO ANALITICO POR OBJETO DEL GASTO

PROYECTO: CREACION DEL CENTRO CIVICO DEL DISTRITO DE ANDABAMBA, ACOBAMBA-HUANCAVELICA.

UBICACIÓN : ANDABAMBA - ACOBAMBA - HAUNCAVELICA


FECHA : AGOSTO 2012
Cadena Mod. Especificaciòn del Gasto COSTO
de Gast Aplic. PARCIAL SUB TOTAL TOTAL
6.00 GASTOS DE CAPITAL
6.5 INVERSIONES
6.5.11 APLICACIONES DIRECTAS 359,827.07
6.5.11 10 RETRIBUCIONES Y COMPLEMENTOS A PLAZO FIJO 198516.59

11 OBLIGACIONES DEL EMPLEADOR 37889.79


ESSALUD (9%) 32384.44
ACCIDENTES DE TRABAJO (1.53%) 5505.35

13 GASTOS VARIABLES Y OCACASIONALES 123420.69


BONIFICACIONES 21589.62
VACACIONES TRUNCAS 35982.71
CTS 53974.06
AFP 3.30% 11874.29

BIENES Y SERVICIOS 1,152,434.70


20 VIATICOS Y ASIGNACIONES 400.00

22 VESTUARIO 0.00

23 COMBUSTIBLE 0.00

24 ALIMENTOS PARA PERSONAL 0.00

27 SERVICIOS NO PERSONALES 9000.00

29 MATERIALES DE CONSTRUCCION 950915.45

30 BIENES DE CONSUMO 10269.58

32 PASAJES Y GASTOS DE TRANSPORTE 6000.00

33 SERVICIOS DE CONSULTORIA 3349.51

37 ALQUILER DE BIENES 83780.04

39 OTROS SERVICIOS DE TERCEROS 88720.12

TOTAL S/ 1,512,261.77