1.
1.Poor in plaster finishing
- Low skill worker
Minor defect
2 2.Defective concrete, spalling or
loose plaster at wall
- Falling off of plaster
Bleeding
1
2.
1. Exposed Ground Beam
- Poor levelling of plastering
works
- Design of ground beam is not
Minor defect suitable
1 2
3.
1. Insufficient of urinal cubicle
- Caused due to one of the
cubicle was damaged.
- The maintenance work of
Minor defect cubicle is under progress
4.
1.No thermal protection
- Poor inspection during
construction.
- The architect did not follow the
Major defect proper requirement of building
services.
5.
1.Hazard around construction
site
- Scaffolding are not detached
after the construction work is
Major defect complete
- The excess of building material
are not managed properly