Código Recurso Unidad Precio S/. Parcial S/.

MANO DE OBRA

0101010003 OPERARIO hh 171.2787 8.13 1,392.50


0101010004 OFICIAL hh 493.5396 6.88 3,395.55
0101010005 PEON hh 2,550.2674 5.63 14,358.01
0101030000 TOPOGRAFO hh 44.8002 8.13 364.23

19,510.29
MATERIALES

02030300010003 MOVILIZACION Y DESMOVILIZACION glb 1.0000 7,222.07 7,222.07


02040100010002 ALAMBRE NEGRO RECOCIDO N° 16 kg 20.0000 4.00 80.00
02041200010005 CLAVOS PARA MADERA CON CABEZA DE 3" kg 22.0000 4.00 88.00
02041200010015 CALAMINA DE 0.83m x 1.83m x 2.7mm pza 66.0000 14.80 976.80
0204120004 CLAVOS PARA CALAMINA kg 20.0000 4.20 84.00
0207030001 HORMIGON m3 0.1000 60.00 6.00
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.5000 24.50 12.25
02130300010002 YESO EN BOLSA DE 25kg bol 3.3600 12.00 40.32
0231000005 MADERA 2" X 3" p2 330.0000 4.00 1,320.00
0231000006 TABLONES DE MADERA 2" X 6" p2 400.0000 4.00 1,600.00
0231010001 MADERA TORNILLO p2 55.6160 4.20 233.59
0231010004 ROLLIZO DE EUCALIPTO DE 3 m 30.0000 3.00 90.00
0240020001 PINTURA ESMALTE gal 3.3600 35.00 117.60
0255100003 MECHA LENTA m 2,306.5050 2.30 5,304.96
0255100004 ANFO kg 494.2515 7.50 3,706.89
0255100005 CORDON DETONANTE m 2,965.5090 3.00 8,896.53
0255100007 FULMINANTE und 1,647.5050 2.50 4,118.76
0255100008 DINAMITA kg 329.5010 34.50 11,367.78
0271050141 ARPILLERA m 100.0000 1.50 150.00
0290130022 AGUA m3 52.0910 8.86 461.53
0290150029 CARTEL DE OBRA 2.40X3.60 MTS und 1.0000 325.00 325.00
0290230061 BARRENO DE PERFORACION 3'-5-7' X 7/8'' (JUEGO) jgo 6.5900 869.00 5,726.71

51,928.79
EQUIPOS

0301000023 NIVEL TOPOGRAFICO hm 44.8002 10.00 448.00


0301000024 TEODOLITO Y MIRAS hm 44.8002 7.50 336.00
0301000025 GUANTES DE CUERO par 15.0000 7.00 105.00
03010400010008 BOTAS DE SEGURIDAD par 15.0000 30.00 450.00
03011000060002 RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 hm 4.5319 135.59 614.48
03011400020002 ton
MARTILLO NEUMATICO DE 29 kg hm 79.0142 15.00 1,185.21
03011400060004 COMPRESORA NEUMATICA 93 HP 335-375 PCM hm 52.6543 67.80 3,569.96
03011800020001 TRACTOR DE ORUGAS DE 190-240 HP hm 973.5889 211.86 206,264.54
0301200002 MOTONIVELADORA de 125 HP hm 4.5319 152.54 691.30
0301220012 VOLQUETE 10m3 hm 8.9598 110.17 987.10
0301330009 CASCO AMARILLLO und 15.0000 20.00 300.00
0301330010 CASCO BLANCO und 3.0000 25.00 75.00
03013500030003 LENTES DE PROTECCION PERSONAL und 15.0000 10.00 150.00
0301400005 CHALECOS DE SEGURIDAD und 15.0000 30.00 450.00
0301420002 PROTECTOR DE OIDO und 15.0000 5.00 75.00
0301420003 RESPIRADOR CONTRA POLVO und 20.0000 5.00 100.00
03014700010013 RESPIRADOR CONTRA
WINCHA DE DOBLE POLVO
CARRIL 60MTS und 1.2096 67.80 82.01
215,883.60

287,322.68

288187.89
865.21
CRONOGRAMA DE UTILIZACION DE MANO DE OBRA
ENTIDAD : MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN
: "CREACION TROCHA CARROZABLE HUAMANMARCA - ACCESO PUENTE CAYARA, DISTRITO DE HUAMBALPA,
PROYECTO : PROVINCIA DE VILCAS HUAMAN - AYACUCHO"
COMPONENTE : : INFRAESTRUCTURA
UBICACIÓN : : CCHOCCEBAMBA
PLAZO EJEC. : 02 MESES

MES 01 MES 02
Nº DESCRIPCION UNID. CANT. P. U. TOTAL
CANT. TOTAL CANT. TOTAL

1 OPERARIO hh 171.28 8.13 1,392.50 93.23 757.94 78.05 634.56

2 OFICIAL hh 493.54 6.88 3,395.55 268.63 1,848.20 224.91 1,547.35

3 PEON hh 2,550.27 5.63 14,358.01 0.50 7,815.06 0.50 6,542.95

4 TOPOGRAFO hh 44.80 8.13 364.23 384.33 198.25 550.60 165.98

TOTAL 19,510.29 10,619.45 8,890.84

PORCENTAJE DE AVANCE MENSUAL 100.00% 54.43% 45.57%

PORCENTAJE DE AVANCE ACUMULADO 100.00% 54.43% 100.00%


CRONOGRAMA DE ADQUISICION DE MATERIALES
Uni MES 01 MES 02
Nº DESCRIPCION CANT. P. U. TOTAL
d % CANT. TOTAL CANT. TOTAL
1 MOVILIZACION Y DESMOVILIZACION glb 1.00 7,222.07 7,222.07
### 0.50 3,611.00 0.50 3,611.07
2 ALAMBRE NEGRO RECOCIDO N° 16 kg 20.00 4.00 80.00
### 20.00 80.00 -
3 CLAVOS PARA MADERA CON CABEZA DE 3" kg 22.00 4.00 88.00
### 22.00 88.00 -
4 CALAMINA DE 0.83m x 1.83m x 2.7mm pza 66.00 14.80 976.80
### 66.00 976.80 -
5 CLAVOS PARA CALAMINA kg 20.00 4.20 84.00 20.00 84.00 -
6 HORMIGON m3 0.10 60.00 6.00 0.10 6.00 -
7 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.50 24.50 12.25 0.50 12.25 -
8 YESO EN BOLSA DE 25kg bol 3.36 12.00 40.32
### 3.36 40.32 -
9 MADERA 2" X 3" p2 330.00 4.00 1,320.00
### 330.00 1,320.00 -
10 TABLONES DE MADERA 2" X 6" p2 400.00 4.00 1,600.00
### 400.00 1,600.00 -
11 MADERA TORNILLO p2 55.62 4.20 233.59 55.62 233.59 -
12 ROLLIZO DE EUCALIPTO DE 3 m 30.00 3.00 90.00 30.00 90.00 -
13 PINTURA ESMALTE gal 3.36 35.00 117.60
### 3.36 117.60 -
14 MECHA LENTA m 2,306.51 2.30 5,304.96 2,306.51 5,304.96
15 ANFO kg 494.25 7.50 3,706.89 494.25 3,706.89
16 CORDON DETONANTE m 2,965.51 3.00 8,896.53 2,965.51 8,896.53
17 FULMINANTE und 1,647.51 2.50 4,118.76
### 1,647.51 4,118.76
18 DINAMITA kg 329.50 34.50 11,367.78 329.50 11,367.78
19 ARPILLERA m 100.00 1.50 150.00 100.00 150.00 -
20 AGUA m3 52.09 8.86 461.53 39.11 346.50 12.98 115.03
21 CARTEL DE OBRA 2.40X3.60 MTS und 1.00 325.00 325.00 1.00 325.00 -
22 BARRENO DE PERFORACION 3'-5-7' X 7/8'' (JUEGO) jgo 6.59 869.00 5,726.71
### 6.59 5,726.71

TOTAL 51,928.79 9,081.06 42,847.73

PORCENTAJE DE AVANCE MENSUAL 100.00% 17.49% 82.51%

PORCENTAJE DE AVANCE ACUMULADO 100.00% 17.49% 100.00%


CRONOGRAMA DE UTILIZACION DE EQUIPO MECANICO

UNI MES 01 MES 02


Nº DESCRIPCION CANT. P. U. TOTAL
D. CANT. TOTAL CANT. TOTAL

1 NIVEL TOPOGRAFICO hm 44.80 10.00 448.00 18.14 181.44 26.66 266.56

2 TEODOLITO Y MIRAS hm 44.80 7.50 336.00 18.14 136.08 26.66 199.92

3 GUANTES DE CUERO par 15.00 7.00 105.00 6.08 42.53 8.93 62.48

4 BOTAS DE SEGURIDAD par 15.00 30.00 450.00 6.08 182.25 8.93 267.75

5 RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9hm 4.53 135.59 614.48 1.84 248.86 2.70 365.62

6 MARTILLO NEUMATICO DE 29 kg hm 79.01 15.00 1,185.21 32.00 480.01 47.01 705.20

7 COMPRESORA NEUMATICA 93 HP 335-375 PCM hm 52.65 67.80 3,569.96 21.32 1,445.83 31.33 2,124.13

8 TRACTOR DE ORUGAS DE 190-240 HP hm 973.59 211.86 206,264.54 ### 83,537.14 579.29 122,727.40

9 MOTONIVELADORA de 125 HP hm 4.53 152.54 691.30 1.84 279.98 2.70 411.32

10 VOLQUETE 10m3 hm 8.96 110.17 987.10 3.63 399.78 5.33 587.32

11 CASCO AMARILLLO und 15.00 20.00 300.00 6.08 121.50 8.93 178.50

12 CASCO BLANCO und 3.00 25.00 75.00 1.22 30.38 1.79 44.63

13 LENTES DE PROTECCION PERSONAL und 15.00 10.00 150.00 6.08 60.75 8.93 89.25

14 CHALECOS DE SEGURIDAD und 15.00 30.00 450.00 6.08 182.25 8.93 267.75

15 PROTECTOR DE OIDO und 15.00 5.00 75.00 6.08 30.38 8.93 44.63
RESPIRADOR CONTRA POLVO
16 RESPIRADOR CONTRA POLVO und 20.00 5.00 100.00 8.10 40.50 11.90 59.50
RESPIRADOR CONTRA POLVO
17 WINCHA DE DOBLE CARRIL 60MTS und 1.21 67.80 82.01 0.49 33.21 0.72 48.80

TOTAL 215,883.60 87,432.86 128,450.74

PORCENTAJE DE AVANCE MENSUAL 100.00% 40.50% 59.50%

PORCENTAJE DE AVANCE ACUMULADO 100.00% 40.50% 100.00%


CRONOGRAMA DE ADQUISICION DE HERRAMIENTAS MANUALES
MES 01 MES 02
Nº DESCRIPCION UNID. CANT. P.U. TOTAL
CANT. TOTAL CANT. TOTAL
1 PICOS DE PUNTA C/MANGO UNID. 50.00 32.00 1,600.00 1.25 320.00 1.88 960.00

2 PALAS TIPO CUCHARA UNID. 50.00 32.00 1,600.00 1.25 320.00 1.88 960.00

3 BARRETAS D=1" GRANDES UNID. 10.00 120.00 1,200.00 0.25 240.00 0.38 720.00
4 CARRETILLA TIPO BUOGUIE UNID. 10.00 220.00 2,200.00 0.25 440.00 0.38 1,320.00

5 LLANTA PARA CARRETILLA C/R UNID. 50.00 30.00 1,500.00 1.25 300.00 1.88 900.00
6 INFLADOR UNID. 2.00 30.00 60.00 0.05 12.00 0.08 36.00

7 KIT PARCHE DE CAMARA UNID. 20.00 15.00 300.00 0.50 60.00 0.75 180.00

8 COMBAS DE 12 Lb. UNID. 5.00 122.00 610.00 0.13 122.00 0.19 366.00
9 CINCEL UNID. 5.00 34.70 173.50 0.13 34.70 0.19 104.10

10 MACHETES UNID. 10.00 35.00 350.00 0.25 70.00 0.38 210.00


11 ARCO DE SIERRA UNID. 3.00 24.15 72.44 0.08 14.49 0.11 43.47

12 HOJA DE SIERRA UNID. 60.00 5.00 301.09 1.50 60.22 2.26 180.65
13 BALDES DE 18 Lt UNID. 30.00 8.00 240.00 0.75 48.00 1.13 144.00
14 MARTILLO UNID. 5.00 35.00 175.00 0.13 35.00 0.19 105.00

15 ALICATE UNID. 2.00 30.00 60.00 0.05 12.00 0.08 36.00


16 LLAVE INGLESA UNID. 1.00 80.00 80.00 0.03 16.00 0.04 48.00
17 MANGUERA DE 100 m UNID. 5.00 350.00 1,750.00 0.13 350.00 0.19 1,050.00
18 WINCHA DE 50 m UNID. 5.00 150.00 750.00 0.13 150.00 0.19 450.00
19 FLEXOMETRO STANLEY DE 5m UND 5.00 20.00 100.00 0.13 20.00 0.19 60.00

21 PISONES PREFABRICADOS UNID. 10.00 50.00 500.00 0.25 100.00 0.38 300.00
22 DISCO DE MADERA 4 1/4 UNID. 5.00 30.00 150.00 0.13 30.00 0.19 90.00
23 BOTAS DE JEBE par 40.00 30.00 1,200.00 1.00 240.00 1.50 720.00

24 WANTES DE JEBE par 50.00 10.00 500.00 1.25 100.00 1.88 300.00
25 DISCO DE CORTE METAL 4 1/4 UNID. 3.00 38.78 116.34 0.08 23.27 0.11 69.80

TOTAL 15,588.37 3,117.67 9,353.02

PORCENTAJE DE AVANCE MENSUAL 100.00% 20.00% 60.00%

PORCENTAJE DE AVANCE ACUMULADO 100.00% 20.00% 80.00%