THE ODISHA STATE POLICE HOUSING & WELFARE CORPORATION LTD. BHUBANESWAR - 22
FORM NO.- 11

FORM OF DEVIATION STATEMENT


1 NAME OF THE WORK.- MARINE POLICE STATION AT PARADEEP, DIST.-
JAGATSINGHPUR.
2 AGREEMENT NO.- 770, DATE. 05. 05. 2016
SRI MANOJ KUMAR NAYAK, AT./PO.- NUA BAZAR, PARADEEP.
3 NAME OF THE CONTRACTOR.-
DIST.- JAGATSINGHPUR
Sl. Page Agreement
Item MB No. Unit. Qnty. Amount (Rs)
No No. Rate (Rs.)
1 2 3 4 5 6 7 8 9
1 Agreement Item (Civil Works)
2 Earthwork Excavation in hard soil including cost of all materials completed. ( Ground Floor ) ###
R/A -1 do 1138/CTC 129 Cum.
R/A -2 do 1232/CTC 18 Cum. -
R/A -3 do 1232/CTC 96 Cum.
TOTAL Cum. - 116.10 -
3
Providing & laying of PCC. work with (1:4:8) including cost of all materials completed. (Ground Floor) ###

R/A 1 do 1138/CTC 131 Cum.


R/A 2 do 1232/CTC 19 Cum. -
R/A 3 do 1232/CTC 97 Cum. -
TOTAL - 4,129.19 -
4 Providing & laying of BW. with (1:6) in F/P. including cost of allmaterials completed. (Ground Floor) ###

R/A 1 do 1138/CTC 134 Cum.


R/A 2 do 1232/CTC 23 Cum. -
R/A 3 do 1232/CTC 100 Cum. -
TOTAL - 4,480.23 -
5 Providing & laying of BW. With (1:6) in ###
Super Structure including cost of all
materials completed. ( Ground Floor)

R/A -1 do 1138/CTC 137 Cum.


R/A -2 do 1232/CTC 26 Cum. -
R/A -3 do 1232/CTC 102 Cum. -
TOTAL - 4,513.23 -
6 First Floor
R/A -1 do 1138/CTC 137 Cum. ###
R/A -2 do 1232/CTC 27 Cum.
R/A -3 do 1232/CTC 102 Cum. -
TOTAL - 4,674.52 -
7 Second Floor
R/A -2 do 1232/CTC 27 Cum. ###
R/A -3 do 1232/CTC 103 Cum. -
TOTAL - 4,860.00 -
8 Providing & laying of BW. With (1:4) in ###
S/S. including cost of all materials
completed.( First Floor )
R/A -1 do 1138/CTC 137 Cum.
R/A -2 do 1232/CTC 28 Cum.
Page 2 MB Statement A

R/A -3 do 1232/CTC 103 Cum. -


TOTAL - 4,915.33 -
9 Rcc. work with M-20 grade concrete ###
including cost of all materials completed. (
Ground Floor )
R/A 1 do 1138/CTC 133 Cum.
R/A 2 do 1232/CTC 21 Cum. -
R/A 3 do 1232/CTC 99 Cum. -
TOTAL - 5,237.67 -
10 First Floor
R/A-1 do 1138/CTC 134 Cum. ###
R/A 2 do 1232/CTC 22 Cum.
R/A 3 do 1232/CTC 99 Cum. -
TOTAL Cum. - 5,289.99 -
11 Second Floor
R/A-2 do 1232/CTC 22 Cum. ###
R/A-3 do 1232/CTC 99 Cum. -
TOTAL Cum. - 5,350.16 -
Providing, fixing & C/S. of Rcc. work for plinth band & column footing including cost of
###
12 all materials completed.( Ground Floor )
R/A 1 do 1138/CTC 132 Sqm.
R/A 2 do 1232/CTC 21 Sqm. -
R/A 3 do 1232/CTC 98 Sqm. -
TOTAL - 95.37 -

Providing, fixing & C/S. of Rcc. work for Lintel including cost of all materials completed. ###
13 (Ground Floor)
R/A -1 do 1138/CTC 138 Sqm.
R/A -2 do 1232/CTC 29 Sqm. -
R/A -3 do 1232/CTC 103 Sqm. -
TOTAL - 229.38 -
14 FIRST FLOOR
R/A -1 do 1138/CTC 138 Sqm. ###
R/A -2 do 1232/CTC 29 Sqm.
R/A -3 do 1232/CTC 104 Sqm. -
TOTAL - 275.25 -
Providing, fixing & C/S. of Rcc. work for griders, beams & columns including cost of all ###
materials completed. (Ground Floor)
15
R/A -1 do 1138/CTC 134 Sqm.
R/A -2 do 1232/CTC 23 Sqm. -
R/A -3 do 1232/CTC 100 Sqm. -
TOTAL - 530.57 -
16 FIRST FLOOR
R/A -1 do 1138/CTC 135 Sqm.
R/A -2 do 1232/CTC 24 Sqm.
R/A -3 do 1232/CTC 100 Sqm. -
TOTAL - 636.69 -
Providing, fixing & C/S of Rcc. work for Wall & Fins including cost of all materials
17 completed. (Ground floor) ###
R/A -1 do 1138/CTC 136 Sqm.
R/A -2 do 1232/CTC 26 Sqm. -
R/A -3 do 1232/CTC 102 Sqm. -
TOTAL - 451.90 -
18 Providing, fixing & C/S of Rcc. work for Roof Slab, Staircase, chajja etc. including cost of
all materials completed. (Ground floor) ###
R/A -1 do 1138/CTC 135 Sqm.
R/A -2 do 1232/CTC 24 Sqm. -
R/A -3 do 1232/CTC 101 Sqm. -
TOTAL - 349.67 -
Page 3 MB Statement A

19 FIRST FLOOR
R/A -1 do 1138/CTC 136 Sqm.
R/A -2 do 1232/CTC 24 Sqm. -
R/A -3 do 1232/CTC 101 Sqm. -
TOTAL - 419.61 -
20 Second Floor
R/A -2 do 1232/CTC 25 Sqm.
R/A -3 do 1232/CTC 101 Sqm. -
TOTAL - 503.53 -
Supplying & filling the Sand in F/P and over area including cost of all materials completed. ###
21 ( Ground floor )
R/A -1 do 1138/CTC 130 Cum.
R/A -2 do 1232/CTC 19 Cum.
R/A -3 do 1232/CTC 97 Cum. -
TOTAL - 448.58 -
22 12 mm. CP with (1:6) over BW. Including cost of all materials completed. ( Ground ###
Floor )
R/A -2 do 1232/CTC 33 Sqm.
R/A -3 do 1232/CTC 107 Sqm. -
TOTAL - 98.92 -
23 First Floor ###
R/A -2 do 1232/CTC 34 Sqm.
R/A -3 do 1232/CTC 107 Sqm. -
TOTAL - 102.23 -
24 Second Floor ###
R/A -2 do 1232/CTC 34 Sqm.
R/A -3 do 1232/CTC 107 Sqm. -
TOTAL - 105.71 -
25 12 mm. CP. With (1:4) over Rcc. work including cost of all materials completed. ( Ground ###
Floor )
R/A -2 do 1232/CTC 36 Sqm.
R/A -3 1232/CTC 109 Sqm. -
TOTAL - 108.26 -
26 First Floor ###
R/A -2 do 1232/CTC 37 Sqm.
R/A -3 do 1232/CTC 109 Sqm. -
TOTAL - 110.59 -
27 Second Floor ###
R/A -2 do 1232/CTC 37 Sqm.
R/A -3 do 1232/CTC 109 Sqm. -
TOTAL - 112.99 -
28 16 mm. CP with (1:6) over BW. Including cost of all materials completed. ( Ground ###
Floor )
R/A-2 do 1232/CTC 35 Sqm.
R/A-3 do 1232/CTC 108 Sqm. -
TOTAL - 138.62 -
29 First Floor ###
R/A -2 do 1232/CTC 35 Sqm.
R/A -3 do 1232/CTC 108 Sqm. -
TOTAL - 141.60 -
30 Second Floor ###
R/A -2 do 1232/CTC 35 Sqm.
R/A -3 do 1232/CTC 108 Sqm. -
TOTAL - 144.67 -
31 One Coat cement washing over plaster surface including cost of all materials completed. ###
( Ground Floor )
R/A -3 1232/CTC 134 Sqm.
TOTAL - 12.64 -
32 FIRST FLOOR ###
R/A -3 do 1232/CTC 134 Sqm.
Page 4 MB Statement A

TOTAL - 12.88 -
33 Second Floor ###
R/A -3 do 1232/CTC 134 Sqm.
TOTAL - 13.13 -
34 Two coats of Cement painting including cost of all materials completed (Ground Floor ) ###

R/A -2 do 1232/CTC 49 Sqm.


R/A -3 do 1232/CTC 136 Sqm.
TOTAL - 27.16 -
35 First Floor ###
R/A -3 do 1232/CTC 136 Sqm.
TOTAL - 27.58 -
36 Second Floor ###
R/A -3 do 1232/CTC 136 Sqm.
TOTAL - 28.01 -
37 Providing & fixing of ( 2.5"x5" ) Sal wood chowkath for Door/Window frames including ###
cost of all materials completed. (First Floor )
R/A -2 do 1232/CTC 31 Cum. ###
R/A -3 do 1232/CTC 105 Cum. -
TOTAL - 98,143.61 -
38 First Floor
R/A -2 do 1232/CTC 31 Cum. ###
R/A -3 do 1232/CTC 105 Cum. -
TOTAL - 98,143.61 -
39 Second Floor
R/A -2 do 1232/CTC 31 Cum. ###
R/A -3 do 1232/CTC 105 Cum. -
TOTAL - 98,143.61 -
40 12 mm. CP (1:4) over BW. With cement punning including cost of all materials ###
completed. ( Ground Floor )
R/A -2 do 1232/CTC 36 Sqm.
R/A -3 do 1232/CTC 108 Sqm. -
TOTAL - 124.44 -
41 Supplying fitting fixing of MS Grills, Grill gate etc. including cost of all materials ###
completed (Ground Floor)
R/A -3 do 1232/CTC 114 Kg.
TOTAL - 79.13 -
42 First Floor ###
R/A-3 do 1232/CTC 115 Kg.
TOTAL - 79.13 -
43 Providing &Fixing of glazed Ceramic wall tiles in wall skirting, dado including cost of all ###
materials completed. (First Floor)
R/A -2 do 1232/CTC 40 Sqm. ###
R/A -3 do 1232/CTC 112 Sqm. -
TOTAL - 957.08 -
Page 5 MB Statement A

44 Supplying, providing & fixing of Floor Tiles in flooring with cement mortar (1:1) including
cost of all materials complited. (Ground Floor) ###
R/A -2 do 1232/CTC 40 Sqm. ###
R/A -3 do 1232/CTC 111 Sqm. -
TOTAL - 1,026.12 -
45 First Floor
R/A -2 do 1232/CTC 40 Sqm. ###
R/A -3 do 1232/CTC 112 Sqm. -
TOTAL - 1,038.79 -
46 Cutting, bending, binding of Steel for Rcc. work including cost of all materials completed. (
Ground Floor )
R/A -1 do 1138/CTC 131 Qntl.
R/A -2 do 1232/CTC 20 Qntl. -
R/A -3 do 1232/CTC 97 Qntl. -
TOTAL - 6,538.02 -
47 First Floor ###
R/A -1 do 1138/CTC 132 Qntl.
R/A -2 do 1232/CTC 20 Qntl.
R/A -3 do 1232/CTC 98 Qntl. -
TOTAL - 6,552.26 -
48 Second Floor ###
R/A -2 do 1232/CTC 20 Qntl.
R/A -3 do 1232/CTC 98 Qntl. -
TOTAL - 6,567.21 -
49 Providing Antitermite treatment including cost of all materials completed. ###
R/A -2 do 1232/CTC 33 Sqm.
R/A -3 do 1232/CTC 107 Sqm. -
TOTAL - 46.00 -
50 Providing & fixing of Pin headed glass including cost of all materials completed. ###
(Ground Floor)
R/A -3 do 1232/CTC 75 Sqm.
TOTAL - 368.29 -
51 First Floor
R/A -3 do 1232/CTC 75 Sqm.
TOTAL - 368.29 -
52 Drip course mould plaster (1.4) including cost of all materials completed. (Ground Floor) ###

R/A-2 do 1232/CTC 37 Rmt.


R/A-3 do 1232/CTC 110 Rmt. -
TOTAL - 6.76 -
53 First Floor ###
R/A-2 do 1232/CTC 38 Rmt.
R/A-3 do 1232/CTC 110 Rmt. -
TOTAL - 7.01 -
54 Second Floor ###
R/A-2 do 1232/CTC 38 Rmt.
R/A-3 do 1232/CTC 110 Rmt. -
TOTAL - 7.27 -
55 Providing & fixing of 4" dia P.V.C rain water pipe including cost of all materials ###
completed. (Ground Floor)
R/A -2 do 1232/CTC 43 Rmt.
R/A -3 do 1232/CTC 115 Rmt. -
TOTAL - 342.70 -
56 First Floor
R/A -2 do 1232/CTC 43 Rmt.
R/A -3 do 1232/CTC 115 Rmt. -
TOTAL - 342.70 -
Page 6 MB Statement A

57 Supplying, providing & fixing of FRP door with frame including cost of all materials ###
completed. (First Floor)
R/A -2 do 1232/CTC 42 Sqm.
R/A -3 do 1232/CTC 113 Sqm. -
TOTAL - 4,246.04 -
58 Supplying & fixing of WI. Clamps including cost of all materials completed. ( Ground ###
Floor )
RA -2 do 1232/CTC 32 No. ###
RA -3 do 1232/CTC 106 No. -
TOTAL - 56.19 -
59 First Floor
RA -2 do 1232/CTC 32 No. ###
RA -3 do 1232/CTC 106 No. -
TOTAL - 56.19 -
60 Second Floor
RA -2 do 1232/CTC 32 No. ###
RA -3 do 1232/CTC 32 No. -
TOTAL - 56.19 -
61 25mm thick grading concrete (1:2:2) including cost of all materials completed. (Ground ###
Floor)

R/A -2 do 1232/CTC 30 Sqm.


R/A -3 do 1232/CTC 104 Sqm. -
TOTAL - 234.03 -
62 First Floor
R/A -2 do 1232/CTC 30 Sqm.
R/A -3 do 1232/CTC 104 Sqm. -
TOTAL - 246.90 -
63 Second Floor
R/A -2 do 1232/CTC 30 Sqm.
R/A -3 do 1232/CTC 104 Sqm. -
TOTAL - 261.70 -
64 Making the Plinth protection with side brick masonary work, sand filling, khoa ramming ###
CC. with (1:2:4) including cost of all materials completd. (Ground Floor)
RA -2 do 1232/CTC 39 Sqm. ###
RA -3 do 1232/CTC 111 Sqm. -
TOTAL - 1,810.17 -
65 Supplying, fitting & fixing of 4'0" dia Rcc. Well ring including cost of all materials ###
completed. (Ground Floor)
RA -1 do 1138/CTC 130 Rmt. ###
RA -2 do 1184/CTC 109 Rmt. -
RA -3 do 1232/CTC 96 Rmt. -
TOTAL - 1,750.00 -
66 Providing & fixing of MS. Baluster hand railing including cost of all materials completed. ###
( Ground Floor)
R/A -2 do 1232/CTC 42 Rmt.
R/A -3 do 1232/CTC 114 Rmt. -
TOTAL - 1,600.00 -
67 First Floor ###
R/A -2 do 1232/CTC 42 Rmt.
R/A -3 do 1232/CTC 114 Rmt. -
TOTAL - 1,600.00 -
68 Two coats of Anti-fungal water proofing weather coat painting including cost of all ###
materials completed. (Ground Floor)
R/A -3 do 1232/CTC 135 Sqm.
TOTAL - 57.59 -
69 FIRST FLOOR ###
R/A -3 1232/CTC 135 Sqm.
TOTAL - 58.92 -
70 Second FLOOR ###
R/A -3 1232/CTC 135 Sqm.
Page 7 MB Statement A

TOTAL - - -
Page 8 MB Statement A

71 Providing & Fixing of Industrial Chequre tile for floooring including cost of all materials ###
completed. ( Ground Floor )
R/A -2 do 1232/CTC 39 Sqm.
R/A -3 do 1232/CTC 111 Sqm. -
TOTAL - 588.68 -
72 Providing & fixing of Paisal wood Paneled shutter including cost of all materials ###
completed. (Ground Floor)
R/A -2 do 1232/CTC 41 Sqm.
R/A -3 do 1232/CTC 113 Sqm. -
TOTAL - 5,568.44 -
73 First Floor
R/A -2 do 1232/CTC 41 Sqm.
R/A -3 do 1232/CTC 113 Sqm. -
TOTAL - 5,568.44 -
74 second Floor
R/A -2 do 1232/CTC 41 Sqm.
R/A -3 do 1232/CTC 113 Sqm. -
TOTAL - 5,568.44 -
75 Two coats of Enamel painting over Wooden & Iron works including cost of all materials
completed. (Ground Floor)
R/A -3 do 1232/CTC 137 Sqm. ###
TOTAL - 94.71 -
76 First Floor ###
R/A -3 do 1232/CTC 137 Sqm. ###
TOTAL - 96.73 -
77 Second Floor ###
R/A -3 do 1232/CTC 137 Sqm. ###
TOTAL - 98.81 -
78 One coat of primering over newly plaster surface icluding cost of all materials completed. ###
( Ground Floor )

R/A -3 do 1232/CTC 94 Sqm.


TOTAL - - -
79 First Floor ###
R/A -3 1232/CTC 94 Sqm.
TOTAL - - -
80 Second Floor ###
R/A -3 1232/CTC 94 Sqm.
TOTAL - - -
###
81 One coat of primering over Wooden & MS. work icluding cost of all materials completed. ###
( Ground Floor)
R/A-3 do 1232/CTC 94 Sqm.
TOTAL - - -
82 First Floor ###
R/A-3 do 1232/CTC 94 Sqm.
TOTAL - - -
83 Second Floor ###
R/A-3 do 1232/CTC 94 Sqm.
TOTAL - - -

(PH Works)
84 Supplying all materials and labour T & P fitting and joining of the following CPVC. Pipe.

85 RA-3 a) 15mm dia CPVC. Pipe 1232/CTC 121 Rmt. 125.58 -


86 RA-3 b) 20mm dia CPVC. Pipe 1232/CTC 121 Rmt. 170.40 -
Page 9 MB Statement A

87 RA-3 c) 25 mm dia CPVC. Pipe 1232/CTC 121 Rmt. 227.79 -


88 RA-3 c) 40 mm dia CPVC. Pipe 1232/CTC 121 Rmt. 437.53 -
89 Cutting hole through brick work with finishing for
taking GI/Pvc. Pipes & fitting etc.all complete. 1232/CTC 122 No. 32.06 -
( a ) 250 mm. thick BW.
90 Supplying, providing & fixing on wall face unplasticised Pvc. Pipes & fittings with all
materials and labour T & P etc. complete.
91 a) 110 mm dia U-PVC. SWR pipe 1232/CTC 122 Rmt. 248.78 -
92 b) 110 mm dia single junction with door 1232/CTC 123 No. 260.46 -
93 c) 110 mm dia Plain Bend 1232/CTC 123 No. 149.67 -
94 d) 110 mm dia bend with door. 1232/CTC 123 No. 182.43 -
95 e) 110 mm dia P & S' Trap. 1232/CTC 124 No. 273.87 -
96 f) 110 mm dia Off set. 1232/CTC 124 No. 217.79 -
97 g) 110 mm Cowel. 1232/CTC 124 No. 48.47 -
98 Providing,fitting and fixing of water closet.( Including WC. & EWC. Type. )
99 a) 580X425/Orissa Pan . 1232/CTC 124 No. 2,558.54 -
100 b) 550X400 mm wash basin 1232/CTC 125 No. 1,935.41 -
101 c) Low level cictern 1232/CTC 125 No. 1,062.31 -
102 Supplying fitting & fixing of the
following brass & Pvc. Ball valve.
103 a) 40mm dia full-way Valve. 1232/CTC 126 No. 716.86 -
104 b) 25mm dia full -way valve. 1232/CTC 126 No. 596.10 -
105 Supplying, fitting & fixing of Cromiun
plated cock in water supply line.
106 a) 15 mm dia C.P Bib cock. 1232/CTC 126 No. 742.21 -
107 b) 15 mm. dia CP. Angle stop cock. 1232/CTC 127 No. 860.60 -
108 c) 15mm dia C.P Conceal stop cock 1232/CTC 127 No. 1,090.60 -
109 Providing and fitting,fixing the following bath room fixture.
110 a) CP. Revolving Shower with Arm. 1232/CTC 127 No. 669.52 -
111 b) 125 mm soap case C.P 1232/CTC 128 No. 213.94 -
112 c) 600 X 12 mm CP. shelf with all fixture. 1232/CTC 128 No. 554.28 -
113 d) 600 X 25mm C.P Towel rail 1232/CTC 129 No. 595.14 -
114 e) 600 X 450 mm Mirror with Pvc. Frame. 1232/CTC 129 No. 1,062.03 -
115 Supplying all materials labour T & P laying U-PVC 4kg/cm2 pipe.
116 a)160 mm dia class-3(0.60 mpa ) Pipe 1232/CTC 130 Rmt. 581.37 -
117 Providing water tank (Fibre) ISI Triple
1232/CTC 116 Ltr. 11.11 -
layer
118 Construction of Inspection Chamber
119 (3' 0'' X 3' 0'' ) size. 1232/CTC 116 No. 8,742.32 -
120 Construction of Septic tank with soak pit
121 a) 50 Users 1232/CTC. 115 Set. 85,000.00 -
122 APPROACH ROAD
123 Earthwork Excavation in hard soil including cost of all materials completed. ( Ground ###
Floor )

R/A 2 do 1232/CTC 45 Cum.


R/A 3 do 1232/CTC 117 Cum. -
TOTAL - 116.10 -
124 Providing & laying of PCC. work with (1:4:8) including cost of all materials completed.
###
(Ground Floor)
R/A 2 do 1232/CTC 46 Cum.
R/A-3 do 1232/CTC 118 Cum. -
TOTAL - 4,129.19 -
Page 10 MB Statement A

125 Providing & laying of BW. with (1:6) in F/P. including cost of allmaterials completed. ###
(Ground Floor)
R/A 2 do 1232/CTC 47 Cum.
R/A 3 do 1232/CTC 118 Cum. -
TOTAL - 4,480.23 -
126 Rcc. work with M-20 grade concrete including cost of all materials completed. ( Ground ###
Floor )
R/A 2 do 1232/CTC 47 Cum.
R/A 3 do 1232/CTC 118 Cum. -
TOTAL - 5,237.67 -
127 Providing, fixing & C/S. of Rcc. work for plinth band & column footing including cost of
all materials completed.( Ground Floor ) ###

R/A 2 do 1232/CTC 48 Sqm.


R/A 3 do 1232/CTC 119 Sqm. -
TOTAL - 95.37 -
128 Supplying & filling the Sand in F/P and over area including cost of all materials completed. ###
( Ground floor )
R/A -2 do 1232/CTC 46 Cum.
R/A -3 do 1232/CTC 117 Cum. -
TOTAL - 448.58 -
129 12 mm. CP with (1:6) over BW. Including cost of all materials completed. ( Ground ###
Floor )
R/A -2 do 1232/CTC 48 Sqm.
R/A -3 do 1232/CTC 119 Sqm. -
TOTAL - 98.92 -
130 Two Coats of Cement painting over Plaster surfaces including cost of all all materials ###
completed. (GF)
R/A -2 do 1232/CTC 49 Sqm.
R/A -3 do 1232/CTC 119 Sqm. -
TOTAL - 27.16 -
External PH. Works.
131 Cost of Pvc. ( ASTM Schedule -80 ) pipe -
705.00
125 mm. dia. 1232/CTC 130 Rmt.
132 Cost of Pvc. ( ASTM Schedule -80 ) pipe -
201.00
50 mm. dia. 1232/CTC 131 Rmt.
133 Drilling of Tube well up to 305 Mtr. With -
650.00
all complete. 1232/CTC 130 Rmt.
134 50 mm. Pvc. Pipe made to ASTM-D-1785 -
215.00
filter. 1232/CTC 132 Rmt.
135 Tape line Tape. 1232/CTC 132 No. 20.00 -
136 Supplying, fitting and fixing of -
Submersible Pump with all accessories. 45,000.00
(Water cooling type)
1232/CTC 133 No.
137 Pvc. Cone. 1232/CTC x qd No. 450.00 -
138 Pvc. RS. ( 150 mmx 50 mm. ) 1232/CTC 132 No. 250.00 -
139 Bentonite Powder. 1232/CTC 133 No. 30,000.00 -
140 Gravels. 1232/CTC 133 No. 16,000.00 -
141 Sluting of Casing Pipe. 1232/CTC 133 No. 4,000.00 -
142 Plug Cutter. 1232/CTC 133 No. 200.00 -
TOTAL -
LESS AS PER AGREEMENT 2.11% 2.11% -
NET AMOUNT -
Page 11 Deviation Marine PS. Paradeep

THE ODISHA STATE POLICE HOUSING & WELFARE CORPORATION LTD. BHUBANESWAR - 22
FORM NO.- 11

FORM OF DEVIATION STATEMENT


1 NAME OF THE WORK.- MARINE POLICE STATION AT PARADEEP, DIST.- JAGATSINGHPUR.
2 AGREEMENT NO.- 770, DATE. 05. 05. 2016
3
NAME OF THE CONTRACTOR.- SRI MANOJ KUMAR NAYAK, AT./PO.- NUA BAZAR, PARADEEP. DIST.- JAGATSINGHPUR
Qnty as
Itemize

SL. per Revised


Item Unit Rate Amount Rate Amount Less Excess Reasons
No. Agreemen Qnty
t
1 2 3 4 5 6 7 8 9.00 10 11 12
A 1 Agreement Item (Civil Works)

Earthwork Excavation in hard soil including


Practically measurement has been
2 cost of all materials completed. Cum - 116.10 - 0.00 116.10 - -
taken.
( Ground Floor )

Providing & laying of PCC. work with


3 (1:4:8) including cost of all materials Cum - 4,129.19 - 0.00 4129.19 - - do
completed. (GROUND FLOOR)

Providing & laying of BW. with (1:6) in F/P. Estimate done in C/C method.
4 including cost of allmaterials completed. Cum - 4,480.23 - 0.00 4480.23 - - Actual measurement taken as per
( GROUND FLOOR) drawing.

25 mm. thick DPC. With (1:2:4) over wall top Estimate done in C/C method.
5 including cost of all materials completed. Sqm - 4,480.23 - 0.00 4480.23 - - Actual measurement taken as per
( GROUND FLOOR) drawing.

Providing & laying of BW. With (1:6) in


6 Super Structure including cost of all Cum - 4,513.23 - 0.00 4513.23 - - do
materials completed. ( GROUND FLOOR)

7 FIRST FLOOR Cum - 4,674.52 - 0.00 4674.52 - - do

8 SECOND FLOOR Cum - 4,860.00 - 0.00 4860.00 - - do


Page 12 Deviation Marine PS. Paradeep

Providing & laying of BW. With (1:4) in Estimate done in C/C method.
9 Super Structure including cost of all Cum - 4,915.33 - 0.00 4915.33 - - Actual measurement taken as per
materials completed. ( First Floor ) drawing.

Rcc. work with M-20 grade concrete


10 including cost of all materials completed. Cum - 5,237.67 - 0.00 5237.67 - - do
( Ground Floor )

11 FIRST FLOOR Cum - 5,289.99 - 0.00 5289.99 - - do

12 SECOND FLOOR Cum - 5,350.16 - 0.00 5350.16 - - do

Providing, fixing & C/S. of Rcc. work for


13 Plinth band & column Footing including Sqm - 95.37 - 0.00 95.37 - - do
cost of all materials completed.

Providing, fixing & C/S. of Rcc. work for


Site measurement has been taken as
14 Lintel including cost of all materials Sqm - 229.38 - 0.00 229.38 - -
per drawing.
completed.( Ground Floor )

15 FIRST FLOOR Sqm - 275.25 - 0.00 275.25 - - do

Providing, fixing & C/S. of Rcc. work for


griders, beams & columns including cost of Actual measurement has been taken
16 Sqm - 530.57 - 0.00 530.57 - -
all materials completed. (GROUND Drwaing & Design
FLOOR)

17 FIRST FLOOR Sqm - 636.69 - 0.00 636.69 - - do

Providing, fixing & C/S of Rcc. work for


Physically measurement has been
18 Walls & Fins including cost of all materials Sqm - 451.90 - 0.00 451.90 - -
taken Drwaing & Design
completed. (Ground Floor)

Providing, fixing & C/S of Rcc. work for


Roof Slab, Staircase, chajja etc. including Physically measurement has been
19 Sqm - 349.67 - 0.00 349.67 - -
cost of all materials completed. (GROUND taken Drwaing & Design
FLOOR)

20 FIRST FLOOR Sqm - 419.61 - 0.00 419.61 - - do

21 SECOND FLOOR Sqm - 503.53 - 0.00 503.53 - - - do


Page 13 Deviation Marine PS. Paradeep

Supplying & filling the Sand in F/P and over


Practically measurement has been
22 area including cost of all materials completed( Cum. - 448.58 - 0.00 448.58 - -
taken.
GROUND FLOOR )

12 mm. CP with (1:6) over BW. Including


Physically measurement has been
23 cost of all materials completed. ( GROUND Sqm - 98.92 - 0.00 98.92 - -
taken as per Drwaing & Design.
FLOOR )

24 FIRST FLOOR Sqm - 102.23 - 0.00 102.23 - - do


25 SECOND FLOOR Sqm - 105.71 - 0.00 105.71 - - do

12 mm. CP. With (1:4) over Rcc. work


Physicallyl measurement has been
26 including cost of all materials completed. Sqm - 108.26 - 0.00 108.26 - -
taken as per Drwaing & Design.
( GROUND FLOOR )

27 FIRST FLOOR Sqm - 110.59 - 0.00 110.59 - - do


28 SECOND FLOOR Sqm - 112.99 - 0.00 112.99 - - do

16 mm. CP with (1:6) over BW. Including


Physically measurement has been
29 cost of all materials completed. ( GROUND Sqm - 138.62 - 0.00 138.62 - - -
taken as per Drwaing & Design.
FLOOR )

30 FIRST FLOOR Sqm - 141.60 - 0.00 141.60 - - do

31 SECOND FLOOR Sqm - 144.67 - 0.00 144.67 - - do

Providing & applying Priming one coat


with any approved primer on new work to
32 -
given an even shade including cost of all Physically measurement has been
materials completed. taken as per Drwaing & Design.

33 A ) GROUND FLOOR Sqm - 33.69 - 33.69 - -

34 B) FIRST FLOOR Sqm - 34.79 - 34.79 - - do

35 C) SECOND FLOOR Sqm - 35.95 - 35.95 - - do

One coat of Cement Washing over Plaster


Physically measurement has been
32 surfaces including cost of all materials Sqm - 12.64 - 0.00 12.64 - -
taken as per Drwaing & Design.
completed. (GROUND FLOOR)

33 FIRST FLOOR Sqm - 12.88 - 0.00 12.88 - - do

34 SECOND FLOOR Sqm - 13.13 - 0.00 13.13 - - do

Two coats of Cement painting over new


Physically measurement has been
35 work including cost of all materials Sqm - 27.16 - 0.00 27.16 - -
taken as per Drwaing & Design.
completed.( Ground Floor )

36 FIRST FLOOR Sqm - 27.58 - 0.00 27.58 - - do

37 SECOND FLOOR Sqm - 28.01 - 0.00 28.01 - - do


Page 14 Deviation Marine PS. Paradeep

Providing & fixing of ( 2.5"x5" ) Sal wood


chowkath for Door/Window frames including
38 Cum. - 98,143.61 - 0.00 98143.61 - - - As per drawing & Estimate.
cost of all materials completed.
(FIRST FLOOR )

39 FIRST FLOOR Cum - 98,143.61 - 0.00 98143.61 - - - do

40 SECOND FLOOR Cum - 98,143.61 - 0.00 98143.61 - - - do

12 mm. CP. With (1:4) over Brick work with


Physically measurement has been
41 cement punning including cost of all materials Sqm - 124.44 - 0.00 124.44 - -
taken as per Drwaing & Design.
completed.( GROUND FLOOR )

Supplying fitting fixing of MS Grills, Grill


Physically weighment has been
42 gate etc. including cost of all materials Kg. - 79.13 - 0.00 79.13 - -
taken.
completed. ( GROUND FLOOR )

43 FIRST FLOOR Kg. - 79.13 - 0.00 79.13 - - do

Providing &Fixing of glazed Ceramic wall


Practically measurement has been
44 tiles in wall skirting, dado including cost of Sqm - 957.08 - 0.00 957.08 - -
taken from site.
all materials completed. (FIRST FLOOR)

Supplying, providing & fixing of Floor tiles


in flooring with cement mortar (1:1) including Practically measurement has been
45 Sqm - 1,026.12 - 0.00 1026.12 - -
cost of all materials complited. (GROUND taken from site.
FLOOR)

46 FIRST FLOOR Sqm - 1,038.79 - 0.00 1038.79 - - do

Supplying, providing & fixing of Vitrified


tiles flooring in cement mortar ( 1:4) and
47 filling joint with white cement of approved Sqm -
quality including cost of all materials Practically measurement has been
complited. taken from site.

48 A ) GROUND FLOOR Sqm - 997.00 - 997.00 - -

Cutting, bending, binding of Steel for Rcc.


Physically measurement has been
47 work including cost of all materials Qntl - 6,538.02 - 0.00 6538.02 - -
taken from site.
completed.( GROUND FLOOR )

48 FIRST FLOOR Qntl - 6,552.26 - 0.00 6552.26 - - do

49 SECOND FLOOR Qntl - 6,567.21 - 0.00 6567.21 - - do


Providing Antitermite treatment with
approved chemical with all cost conveyance
Actual measurement has been taken
50 and taxes etc. to foundation trench and inside Sqm - 46.00 - 0.00 46.00 - - -
as per Drwaing & Design
of floor including labour & of all materials
completed as per EIC.
Page 15 Deviation Marine PS. Paradeep

Supplying, fitting & fixing of 4 mm. thick pin


Physically measurement has been
51 headed glass including cost of all materials Sqm - 368.29 - 0.00 368.29 - -
taken from site.
completed. (Ground Floor )

52 FIRST FLOOR Sqm - 368.29 - 0.00 368.29 - - do

Drip course mould plaster (1.4) including cost


Physically measurement has been
53 of all materials completed. (GROUND Rmt. - 6.76 - 0.00 6.76 - -
taken from site.
FLOOR)

54 FIRST FLOOR Rmt. - 7.01 - 0.00 7.01 - - do


55 SECOND FLOOR Rmt. - 7.27 - 0.00 7.27 - - - do

Providing & fixing of 4" dia P.V.C rain


Physically measurement has been
56 water pipe including cost of all materials Rmt - 342.70 - 0.00 342.70 - -
taken from site.
completed. (GROUND FLOOR)

57 FIRST FLOOR Rmt - 342.70 - 0.00 342.70 - - - do

Supplying, providing & fixing of FRP door


Physically measurement has been
58 with frame including cost of all materials Sqm - 4,246.04 - 0.00 4246.04 - -
taken from site.
completed (First Floor)

One coat of priming with approved primer


over new wood work including cost of
59 -
brushes, materials, labour T&P etc. all Physically measurement has been
complete as per direction of EIC. taken from site.

60 GROUND FLOOR Sqm. - 33.44 - 33.44 - -

61 FIRST FLOOR Sqm. - 34.10 - 34.10 - - do


62 SECOND FLOOR Sqm. - 34.78 - 34.78 - - - do

Supplying & fixing of WI. Clamps including


Physically measurement has been
59 cost of all materials completed. ( Ground No. - 56.19 - 0.00 56.19 - - -
taken from site.
Floor )

60 FIRST FLOOR No. - 56.19 - 0.00 56.19 - - - do

61 SECOND FLOOR No. - 56.19 - 0.00 56.19 - - - do

25mm thick grading concrete (1:2:2)


Physically measurement has been
62 including cost of all materials completed. Sqm - 234.03 - 0.00 234.03 - - -
taken as per work done.
(Ground Floor)

63 FIRST FLOOR Sqm - 246.90 - 0.00 246.90 - - do


64 SECOND FLOOR Sqm - 261.70 - 0.00 261.70 - - do
Page 16 Deviation Marine PS. Paradeep

Providing & fixing of green granite including


65 rubbing & polishing with cost of all materials, -
Physically measurement has been
labour T & P etc. complete.
taken as per work done.

66 GROUND FLOOR Sqm - 2,000.00 - 2,000.00 - -

Making the Plinth protection with side brick


masonary work, sand filling, khoa ramming Physically measurement has been
65 Sqm - 1,810.17 - 0.00 1810.17 - -
CC. with (1:2:4) including cost of all taken as per work done.
materials completd.(Ground Floor)

Supplying, fitting & fixing of 4'0" dia Rcc.


All foundation has done 4'0" Rcc.
66 Well ring including cost of all materials Rmt. - 1,750.00 - 0.00 1750.00 - -
Well ring instead of 3'0" dia.
completed. (Ground Floor)

Supplying, fitting & fixing of 3'0" dia Rcc.


67 Well ring including cost of all materials Rmt. - 1,350.00 - - 1350.00 - - work has not done.
completed. (Ground Floor)

Providing & fixing of MS. Baluster hand


Physically measurement has been
68 railing including cost of all materials Rmt - 1,600.00 - 0.00 1600.00 - -
taken as per work done.
completed. ( GROUND FLOOR )

69 FIRST FLOOR Sqm - 1,600.00 - 0.00 1600.00 - - do

Two coats of Anti-fungal water proofing


Physically measurement has been
70 weather coat painting including cost of all Sqm - 57.59 - 0.00 57.59 - -
taken as per work done.
materials completed. (GROUND FLOOR)

71 FIRST FLOOR Sqm - 58.92 - 0.00 58.92 - - do

Providing & Fixing of Industrial Chequre tile


Practically measurement has been
72 for floooring including cost of all materials Sqm - 588.68 - 0.00 588.68 - -
taken.
completed.(GROUND FLOOR )

Providing & fixing of Paisal wood Paneled


shutter including cost of all materials
73 Sqm - 5,568.44 - 0.00 5568.44 - - As Per Drawing & Estimate.
completed. (GROUND
FLOOR)

74 FIRST FLOOR Sqm - 5,568.44 - 0.00 5568.44 - - As Per Drawing & Estimate.
75 SECOND FLOOR Sqm - 5,568.44 - 0.00 5568.44 - - As Per Drawing & Estimate.

Two coats of Enamel painting over Wooden


Physically measurement has been
76 & Iron works including cost of all materials Sqm - 94.71 - 0.00 94.71 - - -
taken as per work done.
completed. (GROUND FLOOR)

77 FIRST FLOOR Sqm - 96.73 - 0.00 96.73 - - - do


78 SECOND FLOOR Sqm - 98.81 - 0.00 98.81 - - do
Page 17 Deviation Marine PS. Paradeep

B 79 Electrical Works - - - do
80 Concealed wiring to Angle holder points
with ISI marked 1.5 sq.mm( current carrying As per site requirement with respect
capacity min 13 Amp.s) 650/1100 volt pvc No. - 851.80 - 12.00 851.80 10,221.60 (10,221.60)
to Drawing & Design.
insulated single core (stranded ) unsheathed
copper conductor in 19 mm. dia. extra super
81 quality polythene
Concealed wiring pipeto Tubeincluding supply with
light points & (10,179.60) 10,179.60
fixing
ISI of 10Amp.modular
marked 1.5 sq.mm( current switch with face
carrying
plate mounted
capacity min 13on required
Amp.s) size modular
650/1100 volt pvc box No. - 848.30 - 12.00 848.30 10,179.60 do
on face plate
insulated singlefixed
coreinside the wall
(stranded including
) unsheathed
supply of
copper ceiling rose
conductor in 19mounted
mm. dia.onextra 3 mm. super
82 thick bakelite
quality
Concealed polythene cover
wiring toon
pipe appropriate
including
Portico size iron
lightsupply
points & (853.25) 853.25
boardISI
fixing
with duly painted
of marked 1.5orsq.mm(
10Amp.modular RJ box (ceiling
switch
current with )face
fixed
carrying
inside mounted
plate
capacity themin
wall13with
on 1.0sq.mm(
required
Amp.s) current
size modular
650/1100 volt pvc box No. - 853.25 - 1.00 853.25 853.25 do
carrying
on
insulated capacity
face plate
singlefixed min
core 11 Amp.s)
inside the wall
(stranded 650/1100
including
) unsheathed
volt pvcof
supply
copper insulated
ceiling rose
conductor single
in coredia.
19mounted
mm. (stranded
onextra
3 mm. )
super
83 unsheathed
thick
quality bakelite
Concealed copper
polythene cover
wiring toconductor
pipeon including
Calling as earth
appropriate
Bell size iron
supply
points &with (1,855.86) 1,855.86
continuity
board
fixing duly wire including
painted
of 10Amp.modular
ISI marked 1.5 sq.mm( all
or RJcurrent
box connections
(ceiling
switch with)face
carrying as
fixed
per instruction
inside
plate
capacity themin
mounted of
wall13with
on Electrical
1.0sq.mm(
required
Amp.s) Engineer-in-
size
650/1100 current
modular
volt pvc box No. - 927.93 - 2.00 927.93 1,855.86 do
charge.
on face All
carrying
insulated plate switches
capacity
singlefixed min
core & 11
inside ceiling
Amp.s) roses
the wall
(stranded are ISI
650/1100
including
) unsheathed
marked.
volt pvcof
supply
copper alongwith
insulated
ceiling rose
conductor in brand
single mentioned
core
19mounted
mm. (stranded
dia.onextra at super
3 mm. below.
)
84 [Make-
unsheathed
thick (a)Switch,
bakelite
quality polythene
Concealed copper
cover
wiring pipe ceiling
conductor
on rose,as
appropriate
including
to Ceiling angle
earth holder,
pointsiron
Fansupply size &with (16,116.48) 16,116.48
bell
fixing
ISI push
continuity
board dulyswitch,
wire
painted batten
including
of 10Amp.modular
marked 1.5 sq.mm( holder
all
or RJcurrent
box etc?
connections
(ceiling
switch with
carryingAnchor
)face as
fixed
Roma/legrand/
per
plateinstruction
inside
capacity themin
mounted Havells
of
wall13with
on required
Amp.s) Crabtree
Electrical
1.0sq.mm( size
650/1100 ,(b)
Engineer-in-
current
modular Wires
volt pvcbox- No. - 1,343.04 - 12.00 1,343.04 16,116.48 do
Finolex/RR/Polycab
charge.
on face All
carrying
insulated switches
capacity
plate
singlefixed min
core ,(stranded
& (c)
11
inside all
theother
ceiling
Amp.s) roses
wall materials
are ISI
650/1100
including
) unsheathed
ISI
volt mark]
marked.
pvc
supply of
copper alongwith
insulated
ceiling rose
conductor brand
single mentioned
core
in 19mounted (stranded
mm. dia.onextra at super
3 mm. below.
)
85 [Make-
unsheathed
thick
quality
Concealed (a)Switch,
bakelite copper
polythene cover
wiring ceiling
conductor
pipe
to on rose,
including
Security as
appropriate angle
earth
Light holder,
size
supply iron
&
points (4,139.05) 4,139.05
bell
fixing
with push
continuity
board duly
ISI switch,
wire
painted
of marked batten
including
10Amp.modular
1.5 RJholder
orsq.mm( all
box etc?
connections
(ceiling
switch
current withAnchor
)face as
fixed
carrying
Roma/legrand/
per
plateinstruction
inside
capacity themin
mounted Havells
of
wall13with
on required
Amp.s) Crabtree
Electrical
1.0sq.mm( size
650/1100 ,(b)
Engineer-in-
current
modular Wires
volt pvcbox- No. - 827.81 - 5.00 827.81 4,139.05 do
Finolex/RR/Polycab
charge.
on face All
carrying
insulated switches
capacity
plate
singlefixed min
core ,(stranded
& (c)
11
inside all
theother
ceiling
Amp.s) roses
wall materials
are ISI
650/1100
including
) unsheathed
ISI mark]
marked.
volt
supply
copperpvcof alongwith
insulated
ceiling rose
conductor in brand
single mentioned
core
19mounted
mm. (stranded
dia.onextra at super
3 mm. below.
)
86 [Make-
unsheathed
quality
Concealed (a)Switch,
thick bakelite copper
polythene cover
wiring ceiling
conductor
pipe
to on rose,
including
Bulk head asangle
appropriate earth
supply
points holder,
size iron
&
with
bell
fixingpush
continuity
board dulyswitch,
wire
painted batten
including
of 10Amp.modular
ISI marked 1.5 sq.mm( holder
all
or RJcurrent
box etc?
connections
(ceiling
switch with
carryingAnchor
)face as
fixed
Roma/legrand/
per
plateinstruction
inside
capacity themin
mounted Havells
of
wall13with
on required
Amp.s) Crabtree
Electrical
1.0sq.mm( size
650/1100 ,(b)
Engineer-in-
current
modular Wires
volt pvcbox- No. - 859.18 - 3.00 859.18 2,577.54 (2,577.54) do
Finolex/RR/Polycab
charge.
on face All
carrying
insulated switches
capacity
plate
singlefixed min
core ,(stranded
& (c)
11
inside all
theother
ceiling
Amp.s) roses
wall materials
are ISI
650/1100
including
) unsheathed
ISI
voltmark]
marked.
supply
copperpvcof alongwith
insulated
ceiling rose
conductor in brand
single mentioned
core
19mounted
mm. (stranded
dia.onextra at super
3 mm. below.
)
87 [Make-
unsheathed
thick (a)Switch,
bakelite
quality polythene
Concealed copper
cover
wiring pipe ceiling
conductor
on rose,as
appropriate
including
to exhaust angle
earth holder,
point iron
fansupplysize &
with (2,408.85) 2,408.85
bell
fixing
ISI push
continuity
board dulyswitch,
wire
painted batten
including
of 10Amp.modular
marked 1.5 sq.mm( holder
all
or RJcurrent
box etc?
connections
(ceiling
switch with
carryingAnchor
)face as
fixed
Roma/legrand/
per
plateinstruction
inside
capacity themin
mounted Havells
of
wall13with
on required
Amp.s) Crabtree
Electrical
1.0sq.mm( size
650/1100 ,(b)
Engineer-in-
current
modular Wires
volt pvcbox- No. - 802.95 - 3.00 802.95 2,408.85 do
Finolex/RR/Polycab
charge.
on face All
carrying
insulated switches
capacity
plate
singlefixed min
core ,(stranded
& (c)
11
inside all
theother
ceiling
Amp.s) roses
wall materials
are ISI
650/1100
including
) unsheathed
ISI
volt mark]
marked.
pvc
supply of
copper alongwith
insulated
ceiling rose
conductor brand
single mentioned
core
in 19mounted (stranded
mm. dia.onextra at super
3 mm. below.
)
88 [Make-
unsheathed
thick
quality
Concealed (a)Switch,
bakelite copper
polythene cover
wiring ceiling
conductor
pipe
to on rose,
10including
amp asangle
appropriate earth
supply
Modular holder,
size iron
&
Socket (8,581.80) 8,581.80
bell
board
fixing
Point push
continuity
dulyswitch,
wire batten
including
painted
of 10Amp.modular
with ISI marked or RJ holder
1.5 all
box
sq.mm etc?
connections
(ceiling
switch withAnchor
)face
( current as
fixed
Roma/legrand/
per
plateinstruction
inside
carrying thecapacity
mounted Havells
ofmin
wall with
on 13Crabtree
Electrical
1.0sq.mm(
required size
Amp.s) ,(b)
Engineer-in-
current
modular Wires
650/1100 box- No. - 572.12 - 15.00 572.12 8,581.80 As per Drawing & Design.
Finolex/RR/Polycab
charge.
pvcAll
carrying
on face
volt plate switches
capacity
fixedmin
insulated , (c)
&
single11
inside all
theother
ceiling
Amp.s)
core roses
wall materials
are )ISI
650/1100
including
(stranded
ISI mark]
marked.
volt
supplypvcofalongwith
unsheathed insulated
ceiling
copper rosebrand
single mentioned
core
mounted
conductor (stranded
inon193mm. at below.
mm. ) dia.
89 [Make-
unsheathed
thick super
extra
Supplying (a)Switch,
bakelite coverceiling
copper
&quality
fixing conductor
onone
polythene
of rose,asangle
appropriate
pipe
modular earth holder,
size
including
Box iron
with (135.74) 135.74
bell
Facepush
continuity
board
supply & switch,
duly
plate wire
painted
fixing ofbatten
including
including RJholder
or all box
10Amp.modular etc? switch
all connections
(ceiling
accessories Anchor as&
) fixed
and
Roma/legrand/
per instruction
inside
socket the
with
connections. wall Havells
faceofplate
with
Make Crabtree
Electrical
1.0sq.mm(
mounted
anchor, Roma/ ,(b)required
Engineer-in-
current
on Wires - No. - 135.74 - 1.00 135.74 135.74 do
Finolex/RR/Polycab
charge.
carrying
size All switches
capacity
modular box min
on ,
& (c)
11
face all
ceilingother
Amp.s)
plate
Legrand/Great white/HPL/Havels, Crabtree. roses materials
are
theISI
650/1100
inside wall
ISI
voltmark]
marked.
with 0.75alongwith
pvc insulated
sq.mm ( singlebrandcore
current mentioned
(stranded
carrying at below.
)
capacity
[Make-
unsheathed
min (a)Switch,
7 Amp.s) copper ceiling
conductor
650/1100 rose,
volt asangle
pvc earth holder,
insulated
bell push
coreswitch,
continuity
single wire batten
including
(stranded holder etc?copper
all connections
) unsheathed Anchor as
Roma/legrand/
per instruction
conductor Havells Crabtree
of continuity
as earth Electrical wire,(b)
Engineer-in-Wires -
including
Finolex/RR/Polycab
charge.
all All switches
connections as per , (c)
& all other
ceiling
instructionroses materials
ofare ISI
ISI mark]alongwith
marked.
Electrical brand mentioned
Engineer-in-charge. at below.
All switches
Page 18 Deviation Marine PS. Paradeep

90 Supplying & fixing of electrical operated, (21,437.72) 21,437.72


double mounted type single phase 200/250
Volt 6000 RPM 50 HZ, 3 MILE RANGE No. - 21,437.72 - 1.00 21,437.72 21,437.72 do
SIREN including supply of all materials and
construction of SIREN Shed/Siren Base.
91 Supply and fixing of 8 way BDB consists of (13,661.07) 13,661.07
1 No. 63 Amp. DP MCB & 6 Nos. of 6-32
Amp. SPMCB including all accessories and Set - 4,553.69 - 3.00 4,553.69 13,661.07 do
connections.[Make-MCB/MCCB-
(a)Legrand/Schinder/L&T/ABB (b) Volt neter,
92 Ameter-AE/CAPPA.
Supply and fixing of 8- © wayAllBDB
other acessories
consists of
1ISINo.
mark.
12 Amp. DP MCB & 6 Nos. of 20
Amp. SPMCB including all accessories and Set - 3,271.64 - 3,271.64 - - - do
connections.[Make-MCB/MCCB-
(a)Legrand/Schinder/L&T/ABB (b) Volt neter,
93 Ameter-AE/CAPPA.
Supply and fixing of 63 - ©Amp.Four
All other acessories
pole MCB (21,017.69) 21,017.69
ISI
-01 mark.
No. with 63 Amp. 415 Volt Cut Out-03
Nos. with Copper Bus bar & indicator etc. Set - 21,017.69 - 1.00 21,017.69 21,017.69 do
including all accessories and connections as
per instruction of Electrical Engineer-in-
94 charge.[Make-MCB/MCCB-
Supply and fixing of 4' x 28 wt. T5 patty
(a)Legrand/Schinder/L&T/ABB
type (b) Volt neter,
tube light fittings [copper ballast] As per site requirement with respect
Ameter-AE/CAPPA
complete set with lamp, (c), connecting
all other acessories
wire and No. - 1,631.30 - 27.00 1,631.30 44,045.10 (44,045.10)
to Drawing & Design.
ISIaccessories
all mark] refer to catalouge No -
Crompton [Model no- T5LK 1114] / Bajaj
95 [Model and
Supply no- BTIR
fixing 128,
of 4 xCode-160483]
24 wt. T5 energy/Philips (48,338.90) 48,338.90
including
saving fixing
l light and connections
fitting as percover
with bulb, choke,
instruction wire,
connecting of Electrical Engineer-in-charge..
GI. bracket clamp, nut bolt No. - 9,667.78 - 5.00 9,667.78 48,338.90 do
and all accessories refer to catalouge No -
Crompton code T5SHO424EB IP 65/MAKE
96 HPL CODE
Supply HPLT5STAL424
& fixing of BULK HEAD /Philips (3,305.10) 3,305.10
including
FITTINGfixing and connections
including all accessories as refer
per to
instructionno.
catalouge ofMake
Electrical Engineer-in-charge..
- Cropton code No. - 1,101.70 - 3.00 1,101.70 3,305.10 do
ICBH10/Make PHILIPS /Code
NXC101/Make-HPL Code H1BHO10008S
97 and connections
Supply and fixingasofper
400instruction
mm sweep of EIC.
wall (9,549.52) 9,549.52
mounted fan with connecting wire and all
accessoriesrefer to catalouge No - Usha No. - 2,387.38 - 4.00 2,387.38 9,549.52 As per Drawing & Design.
[Model-MIST AIR ULTRA] / Crompton
[Model- WM HIGH FLO] etc. including
98 hangingand
Supply andfixing
connections
of 300 as mmper instruction
sweep exhaust (5,743.53) 5,743.53
of Electrical
fan Engineer-in-charge.
with connecting wire and all accessories
refer to catalouge No- Khaitan [Model-Euro] / No. - 1,914.51 - 3.00 1,914.51 5,743.53 do
Usha[Model-Turbojet Dlx] / Cromton
[Model-Tranair/Transair reversable] including
99 fixing and connections as per instruction of (377.70) 377.70
Supply & fixing of 18 SWG, 2" deep 8"x6"
Electrical Engineer-in-charge
GI Board with 3 mm. bake light cover
No. - 125.90 - 3.00 125.90 377.70 do
including all accessories & connection.
( Make National / Royalam )
100 Supply & fixing of CALLING BELL ( Ding (248.02) 248.02
Dong ) including all accessories and
No. - 124.01 - 2.00 124.01 248.02 do
connection as per instruction of EIC. ( Make
Anchor/Cona )
Page 19 Deviation Marine PS. Paradeep

101 Concealed wiring to submain with two runs


of ISI marked 2.5 sq.mm , 650 / 1100 volt. As per site requirement with respect
Pvc insulated single core (stranded ) Mtr. - 140.24 - 240.00 140.24 33,657.60 (33,657.60)
to Drawing & Design.
unsheathed copper conductor in 19 mm. dia.
extra super quality polythene pipe with 1.0
102 sq.mm ( current
Concealed wiringcarrying
to submain capacity
withmin two7 runs (37,869.15) 37,869.15
Amp.s)
of 650/1100
ISI marked 6.0 volt
sq.mm, pvc (insulated single
current carrying
core (stranded
capacity min 31) unsheathed
Amp.s) 650 copper
/1100conductor
volt. Pvc Mtr. - 229.51 - 165.00 229.51 37,869.15 do
as earth continuity
insulated single core wire from BDB?s
(stranded [L] to
) unsheathed
switch boards
copper conductor andin separate
19 mm.5 dia. Amp.socket
extra super
103 points
Supplyincluding
quality and fixingallpipe
polythene ofconnections as per 38
with 1.5including
earthing sq.mm (9,552.70) 9,552.70
(instruction
current
mm. of Electrical
dia.carrying
3 mtr. capacity
long G.IEngineer-in-
min 11 Amp.s)
pipe[Heavy charge ,
[Make-
650 /1100
Duty].The (a)volt.
Wires
pipe - Finolex/RR/Polycab
Pvc
shall insulated
have 12 mm. single core, (b)
dia. No. - 4,776.35 - 2.00 4,776.35 9,552.70 As per estimate & agreement.
all other materials
(stranded
perforated ) holes atISI
unsheathed 15 mark]
cmcopper
centre conductor
to centreas up
earth
to 2.5continuity
mtrs height wire
from from F.D.B. and
the bottom to L.D.B.
fitted
104 (Light)
with
Supply &
a 38
and M.D.B.
mm.fixingdia.to Basement
ofG.I
subflange atPanel
earthing Board
thewith
top with
No-8 & (5,310.00) 5,310.00
Basement
provision
bare copper panel
of holes
wire to as
LDB
for including
making
earth all wireof
connection
Continuity
connections
earth
from continuity
Main as per
pannel instruction
wire,complete
board to earth of
withElectrical
masonry
electrode Rft. - 53.10 - 100.00 53.10 5,310.00 As per Drawing & Design.
Engineer-in-
work
insidefor
theearth charge [Make-
pit chamber.The
wall/ground (a) Wires
to a depth earth
of 50 - mm.
pit shall
Finolex/RR/Polycab
have
and an alternative
make good of the , wall/ground
(b)of
layer all105
other
mm. materials
charcoal
including
105 ISI
and mark]
50 mm.
all connections.
Supply salt upofto 1200
and fixing a depth mm of sweep
465 mm. ACand (26,744.16) 26,744.16
rest shall
ceiling fanbewith
filledstar
with charcoal
5 rated to a further
connecting wire
depth
and allofaccessories
2035 mm. refer The earth pit should
to catalouge No - No. - 2,228.68 - 12.00 2,228.68 26,744.16 do
maintain aModel-Mentor/Astro/Newtech]
Khaitan[ minium clearance 1.5 mtr. from /
building & 2 mtr. in between
Usha [Model-Technix flair] / two earth pit and
Crompton
106 as per instruction
[Model-High
Supply speed
and fixing of Electrical
ofplus] Engineer-in-
etc. holder
18 watt. including type
charge.
hanging
CFL lamp andfor
connections
the installed as angle
per instruction
holder .
of Electrical Engineer-in-charge. No. - 228.43 - 10.00 228.43 2,284.30 (2,284.30) As per Field measurement.
[Make-CG/Philips/Bajaj]

107 Supply and fixing of 2 x 18 watt. CFL (1,775.66) 1,775.66


decorative portico light fittings with all
accessories refer to catalouge No- No. - 1,775.66 - 1.00 1,775.66 1,775.66 As per Drawing & Design.
Crompton[Model-COC211 EB] / Bajaj
[Model no- BCSC 218 CFL W2EB, Code-
108 530758] / Philips and connections as per (655.70) 655.70
Supply & fixing of 18 SWG, 2" deep 4"x 4"
instruction of Electrical Engineer-in-charge .
GI Board with 3 mm. bake light cover
No. - 65.57 - 10.00 65.57 655.70 do
including all accessories & connection.
( Make National / Royalam )
109 Supply & fixing of 18 SWG, 2" deep 6"x 4" (194.08) 194.08
GI Board with 3 mm. bake light cover
No. - 97.04 - 2.00 97.04 194.08 do
including all accessories & connection.
( Make National / Royalam )
110 Supply & fixing of 18 SWG, 2" deep 8"x (381.52) 381.52
10" GI Board with 3 mm. bake light cover
No. - 190.76 - 2.00 190.76 381.52 do
including all accessories & connection.
( Make National / Royalam )
111 Supply & fixing of 18 SWG, 2" deep 10"x (578.78) 578.78
12" GI Board with 3 mm. bake light cover
No. - 289.39 - 2.00 289.39 578.78 do
including all accessories & connection.
( Make National / Royalam )
Page 20 Deviation Marine PS. Paradeep

112 Supply,laying & testing of 3.5 core, 25 (19,705.00) 19,705.00


sq.mm PVC insulated , PVC sheathed
aluminium armoured power cable of 1100 Mtr. - 394.10 - 50.00 394.10 19,705.00 do
volt grade through under ground / surface as
per the site requirement including all
113 accessorieswiring
Concealed and connections
to Tube light withpoints
makingwith (13,022.24) 13,022.24
good
ISI the damages
marked caused
1.5 sq.mm( and ascarrying
current per direction
of Engineer-in-charge
capacity min 13 Amp.s) from Head Main
650/1100 to
volt pvc No. - 813.89 - 16.00 813.89 13,022.24 do
M.D.B (Light)
insulated single[Make- (a) Wires
core (stranded - Finolex/
) unsheathed
Polycab/RR/KEI
copper conductor ,in(b)19allmm.other materials
dia. ISI
extra super
114 mark] polythene
Supply
quality & fixing ofpipe Twoincluding
module supply
Box with& (814.44) 814.44
face
fixingplate including all accessories
of 10Amp.modular switch with andface
connections.
plate mounted Make- Anchorsize modular box
on required No. - 135.74 - 6.00 135.74 814.44 do
Roma/Legrand/Great
on face plate fixed inside the wall including
white/HPL/Havels/Crabtree,.
supply of ceiling rose mounted on 3 mm.
115 thick bakelite
Supply & fixing cover on appropriate
of Three module size Boxiron
with (894.10) 894.10
boardplate
face dulyincluding
painted orall RJaccessories
box (ceiling ) fixed
and
inside the wall
connections. with Anchor
Make- 1.0sq.mm( current No. - 178.82 - 5.00 178.82 894.10 do
carrying capacity min 11 Amp.s) 650/1100
Roma/Legrand/Great
volt pvc insulated single core (stranded )
white/HPL/Havels/Crabtree,.
116 unsheathed
Supply & fixingcopper of conductor
Four module as earth
Box with (1,498.42) 1,498.42
continuity
face plate wire including
including all connections
all accessories and as
per instruction
connections. of Electrical
Make- Anchor Engineer-in- No. - 214.06 - 7.00 214.06 1,498.42 do
charge. All switches & ceiling roses are ISI
Roma/Legrand/Great
marked. alongwith brand mentioned at below.
white/HPL/Havels/Crabtree,.
117 [Make- (a)Switch,
Concealed wiring toceiling rose,Modular
20 amp angle holder, (3,013.08) 3,013.08
bell
Socketpush switch,
Point withbatten holder6.0
ISI marked etc? Anchor
sq.mm
(Roma/legrand/
current carryingHavells
capacityCrabtree
min 31,(b) Wires -
Amp.s) No. - 1,506.54 - 2.00 1,506.54 3,013.08 do
Finolex/RR/Polycab , (c) all single
650/1100 volt pvc insulated other materials
core
ISI mark] ) unsheathed copper conductor in 19
(stranded
118 Supply
mm. dia.&extra
fixingsuper
of Eight
qualitymodule
polythene Boxpipe
with (757.06) 757.06
face platesupply
including including all accessories
& fixing and
of 20Amp.modular
connections.
switch & socketMake- withAnchor
face plate mounted on No. - 378.53 - 2.00 378.53 757.06 do
Roma/Legrand/Great
required size modular box on face plate fixed
white/HPL/Havels/Crabtree,.
inside the wall with 1.5 sq.mm ( current
119 carrying
Supply &capacity
fixing ofmin 13 Amp.s)
Twelve module650/1100
Box (2,443.44) 2,443.44
volt pvc
with faceinsulated single core
plate including (stranded )and
all accessories
unsheathed copper
connections. Make-conductor
Anchor as earth No. - 407.24 - 6.00 407.24 2,443.44 do
continuity wire including all connections as
Roma/Legrand/Great
per instruction of Electrical Engineer-in-
white/HPL/Havels/Crabtree,.
120 charge. All
Supply switches
& fixing and sockets
of Sixteen are ISI
module Box (505.13) 505.13
marked
with facealongwith brand mentioned
plate including at below.
all accessories and .
[Make- (a)Switch,socket
connections. Make- Anchor etc? Anchor No. - 505.13 - 1.00 505.13 505.13 do
Roma/legrand/
Roma/Legrand/GreatHavells Crabtree ,(b) Wires -
Finolex/RR/Polycab , (c) all other materials
white/HPL/Havels/Crabtree,.
121 ISI mark] (1,033.56) 1,033.56
Supply & fixing of Blank Plate including all
accessories and connections. Make- Anchor
No. - 28.71 - 36.00 28.71 1,033.56 do
Roma/Legrand/Great
white/HPL/Havels/Crabtree,.
122 Concealed wiring to TELEPHONE points (1,660.64) 1,660.64
with ISI marked 0.5 sq.mm2 Pair Telephone
cable in 19 mm. dia extra super quality No. - 830.32 - 2.00 830.32 1,660.64 do
polythene pipe including supply fixing of
Telephone Jack and complete in all respect
including with use of clip in type modular
Page 21 Deviation Marine PS. Paradeep

123Concealed wiring to COMPUTER points (3,120.86) 3,120.86


with ISI marked 1.5 sq.mm ( 3/20 SWG )
650/1100 volt pvc insulated single core No. - 1,560.43 - 2.00 1,560.43 3,120.86 do
unsheathed copper conductor in 19 mm. dia.
extra super quality polythene pipe including
124 supply & fixing
Concealed wiringofto10Amp.modular
Batten Holder switch Points (1,620.00) 1,620.00
with ISI facemarked
plate mounted
1.5 sq.mm( on required size
current carrying
modular min
capacity box on face plate650/1100
13 Amp.s) fixed inside voltthe
pvc No. - 810.00 - 2.00 810.00 1,620.00 do
wall including
insulated singlesupply of ceiling) rose
core (stranded mounted
unsheathed
on 3 mm.
copper thick bakelite
conductor in 19 mm. coverdia.on extra
appropriate
super
125 size
quality ironpolythene
Concealed board
wiringduly
to painted
pipe orPOINT
including
SIREN RJsupply
box (ceiling
&
with (1,014.17) 1,014.17
) fixed
fixing
ISI markedinside
of 1.5the wall with
10Amp.modular
sq.mm( 1.0sq.mm(
switch
current current
with face
carrying
carrying
plate
capacity capacity
mounted
min 13on min 11 650/1100
required
Amp.s) Amp.s) 650/1100
size modularvolt pvc box No. - 1,014.17 - 1.00 1,014.17 1,014.17 do
INVERTER
voltfacepvcplate Wiring
insulated singleincluding
core 1.5
(stranded sq. )mm
on
insulated fixed
single coreinside the wall
(stranded including
) unsheathed
sub main
unsheathed wiring
copper 135 mtr. 2.5 Sq. mm sub
supply
copper of ceiling
conductor inconductor
rose 19mounted
mm. dia. asonearth
3 mm.
extra super
main
continuitywiring 10 Mtr.
wirecover &
including 15 Amp. Socket
all connections point
126 thick
quality bakelite
polythene on including
pipe appropriate supply &as
size iron (9,932.46) 9,932.46
1perno.instruction
with 15 Amp. Top -1 no.Engineer-in-
of Electrical in 19 mm. dia
board
fixing duly painted
of 10Amp.modular or RJ box (ceiling
switch with)face
fixed
extra
charge. super quality
Allwall
switches polythene
& ceiling pipe including
inside
plate the
mounted with 1.0sq.mm(
on required sizeroses
modularare ISI
current box No. - 9,932.46 - 1.00 9,932.46 9,932.46 do
supply fixing of suitable 11 board
marked. alongwith brand fixed at
mentioned inside
below.
carrying
on capacity
face plate fixedmininside Amp.s)
the wall 650/1100
including
the wall(a)Switch,
[Make- including all connections
ceiling rose, as per
angle holder,
volt
supply pvcofinsulated single
ceiling rose core
mounted (stranded
on 3 mm. )
instruction
bell push of Electrical
switch, batten EIC.
holderMake (A) Wire-
unsheathed
thick bakelitecopper
cover conductor
on asetc?
appropriate earth Anchor
size iron - -
C 127 PH Works
Finolex/
Roma/legrand/
continuity
board
RR/ Great
dulywire
white/all
Havells HPL/ Havels.
or RJCrabtree
including
painted ,(b) Wires
boxconnections
(ceiling
(B)
as-
) fixed
- -
All other materials in, ISI
Finolex/RR/Polycab (c) Mark.
alllabour
other materials
128 per instruction
inside
Supplying the wall of Electrical
with
all materials1.0sq.mm(
and Engineer-in-
current
T&P - - -
ISI mark]
charge.
carrying
fitting All
and switches
capacity
joining of&
min 11
the ceiling
Amp.s) roses
following are ISI
650/1100
CPVC.
marked. -
volt
Pipe. pvc alongwith brandcore
insulated single mentioned
(stranded at below.
)
[Make- (a)Switch,
unsheathed copper ceiling
conductor rose,asangle
earth holder,
129 bell push switch,
continuity batten holder
wire including etc? Anchor
all connections as - 125.58 - 0.00 125.58 - Physical measurement has been
Roma/legrand/
per instruction Havells
of Crabtree
Electrical ,(b) Wires -
Engineer-in- -
a) 15 mm dia CPVC. Pipe Rmt taken from site.
Finolex/RR/Polycab
charge. All switches & , (c) all other
ceiling roses materials
are ISI
130 ISI mark]
marked. - 170.40 - 0.00 170.40 - - do
b) 20 mmalongwith
dia CPVC. brand
Pipe. mentioned at below. Rmt
131 [Make- (a)Switch, ceiling rose, angle holder, - 227.79 - 0.00 227.79 -
c) 25push
bell mm switch,
dia CPVC.batten Pipeholder etc? Anchor Rmt - do
132 Roma/legrand/ Havells Crabtree ,(b) Wires - - 437.53 - 0.00 437.53 - - do
d) 40 mm dia CPVC., Pipe
Finolex/RR/Polycab (c) all other materials Rmt
133 Cutting
ISI mark] hole through brick work with - 32.06 - 0.00 32.06 - -
finishing for taking GI/Pvc. Pipes & fitting
etc.all complete. ( a ) 250 mm. thick BW. - As per field measurement.
No
134 Supplying, providing & fixing on wall face - - -
unplasticised Pvc. Pipes & fittings with all
materials and labour T & P etc. complete. -

135 - 248.78 - 0.00 248.78 - - As per field measurement.


a) 110 mm dia U-PVC. SWR pipe Rmt
136 - 260.46 - 0.00 260.46 - - - do
b) 110 mm dia single junction with door No
137 - 149.67 - 0.00 149.67 - - - do
c) 110 mm dia Plain Bend No
138 - 182.43 - 0.00 182.43 - - - do
d) 110 mm dia bend with door. No
139 - 273.87 - 0.00 273.87 - - - do
e) 110 mm dia P & S' Trap. No
140 - 217.79 - 0.00 217.79 - - - do
f) 110 mm dia Off set. No
141 - 48.47 - 0.00 48.47 - - - do
g) 110 mm Cowel. No
Page 22 Deviation Marine PS. Paradeep

142 Providing,fitting and fixing of water closet. - - -


( Including WC. & EWC. Type. ) -

143 a) 580X425/Orissa Pan . - 2,558.54 - 0.00 2558.54 - - - As per field measurement.


No
144 b) 550X400 mm wash basin - 1,935.41 - 0.00 1935.41 - - - do
No
145 - 1,062.31 - 0.00 1062.31 - - - do
c) Low level cictern No
146 Supplying fitting & fixing of the following - - -
-
brass & Pvc. Ball valve.
147 a) 40mm dia full-way Valve. - 716.86 - 0.00 716.86 - - - As per site requirement
No
148 b) 25mm dia full -way valve. - 596.10 - 0.00 596.10 - - - do
No
149 Supplying, fitting & fixing of Cromiun plated - -
cock in water supply line. -

150 a) 15 mm dia C.P Bib cock. - 742.21 - 0.00 742.21 - - - As per site requirement
No
151 b) 15 mm. dia CP. Angle stop cock. - 860.60 - 0.00 860.60 - - - do
No
152 c) 15mm dia C.P Conceal stop cock - 1,090.60 - 0.00 1090.60 - - do
No
153 Providing and fitting,fixing the following bath - - -
-
room fixture.
154 a) CP. Revolving Shower with Arm. - 669.52 - 0.00 669.52 - - - As per Estimate & Agreement
No
155 b) 125 mm soap case C.P - 213.94 - 0.00 213.94 - - - do
No
156 c) 600 X 12 mm CP. shelf with all fixture. - 554.28 - 0.00 554.28 - - - do
No
157 d) 600 X 25mm C.P Towel rail - 595.14 - 0.00 595.14 - - - do
No
158 e) 600 X 450 mm Mirror with Pvc. Frame. - 1,062.03 - 0.00 1062.03 - - - do
No
159 Supplying all materials labour T & P laying - - -
-
U-PVC 4kg/cm2 pipe.
160 a)160 mm dia class-3(0.60 mpa ) Pipe - 581.37 - 0.00 581.37 - - As per site measurement.
Rmt
161 Providing water tank (Fibre) ISI Triple layer Lit - 11.11 - 0.00 11.11 - - - As per Estimate & Agreement
162 Construction of Inspection Chamber - - -
163 (3' 0'' X 3' 0'' ) size. No - 8,742.32 - 0.00 8742.32 - - As per site requirement
164 - - - -
Construction of Septic tank with soak pit
165 a) 50 Users - 85,000.00 - 0.00 85000.00 - - - As per Estimate & Agreement
No
166 APPROACH ROAD - - - -

In estimate it was separately


Earthwork Excavation in hard soil including
provisioned but in the aggrement
167 cost of all materials completed. ( Ground Cum - 116.10 - 0.00 116.10 - -
same is included with RCC well ring
Flor )
fixing.
Page 23 Deviation Marine PS. Paradeep

Providing & laying of PCC. work with


168 (1:4:8) including cost of all materials Cum - 4,129.19 - 0.00 4129.19 - - As per actual measurement
completed. (GROUND FLOOR)

Providing & laying of BW. with (1:6) in F/P. Cenre line method in estimate but
169 including cost of allmaterials completed. Cum - 4,480.23 - 0.00 4480.23 - - actual quantity measurement has
( GROUND FLOOR) been entered in M.B

Rcc. work with M-20 grade concrete


Actual measurement as per Drwaing
170 including cost of all materials completed. Cum - 5,237.67 - 0.00 5237.67 - -
& Design
( Ground Floor )

Providing, fixing & C/S. of Rcc. work for


Actual measurement as per Drwaing
171 Plinth band & column Footing including Sqm - 95.37 - 0.00 95.37 - -
& Design
cost of all materials completed.

Supplying & filling the Sand in F/P and over


Actual measurement as per Drwaing
172 area including cost of all materials completed( Cum. - 448.58 - 0.00 448.58 - -
& Design
GROUND FLOOR )

12 mm. CP with (1:6) over BW. Including


Actual measurement as per Drwaing
173 cost of all materials completed. ( GROUND Sqm - 98.92 - 0.00 98.92 - -
& Design
FLOOR )

Two coats of Cement painting over new


Physical measurement has been
174 work including cost of all materials Sqm - 27.16 - 0.00 27.16 - -
taken from site.
completed.( Ground Floor )
175 External PH. Works. - - -

Cost of Pvc. ( ASTM Schedule -80 ) pipe 125


176 Rmt. - 705.00 - 0.00 705.00 - - As per field measurement
mm. dia.

Cost of Pvc. ( ASTM Schedule -80 ) pipe 50


177 Rmt. - 201.00 - 0.00 201.00 - - do
mm. dia.

Drilling of Tube well up to 305 Mtr. With all


178 Rmt. - 650.00 - 0.00 650.00 - - do
complete.

50 mm. Pvc. Pipe made to ASTM-D-1785


179 Rmt. - 215.00 - 0.00 215.00 - - do
filter.

180 Tape line Tape. No. - 20.00 - 0.00 20.00 - - do

Supplying, fitting and fixing of Submersible


181 Pump with all accessories. (Water cooling No. - 45,000.00 - 0.00 45000.00 - - - As per Estimate & Agreement
type)

182 Pvc. Cone. No. - 450.00 - 0.00 450.00 - - - do


183 Pvc. RS. ( 150 mmx 50 mm. ) No. - 250.00 - 0.00 250.00 - - - do

184 Bentonite Powder. No. - 30,000.00 - 0.00 30000.00 - - - do

185 Gravels. No. - 16,000.00 - 0.00 16000.00 - - - do


Page 24 Deviation Marine PS. Paradeep

186 Sluting of Casing Pipe. No. - 4,000.00 - 0.00 4000.00 - - - do

187 Plug Cutter. No. - 200.00 - 0.00 200.00 - - - do


TOTAL = ( A + B + C ) - 404,832.37 (404,832.37) 312,046.23

Less 10.59% as per Agreement


10.59% - 42,871.75 -
- 361,961.00
Net

Net amount of veriation i.e., Excess Less (361,961.00)


or less
Percentage of deviation/variation in Less #DIV/0! %
comparison to original contract price

Signature of Signature of Signature of Signature of Signature of

APM (Elect.) APM Dy. Manager Accountant Joint Manager

Signature of GM Signature of Chief Engineer Deviation statement For Rs. 5,57,878.00 .


. being 10.82% percent less

.
than the agreement value is accepted

Accepting Authority
Page 25 Check List A

Special note/Check list towards sanction of Deviation pertaining to Building/Road portion of


work as per OPWD code volume -1, Para-3.5.31 and 6.3.17

1 Name of the work.- Marine Police Station, Paradeep, Dist.- Jagatsinghpur.


CA. No.- POL. -2005-9075
Scheme - Costal Security Scheme. ( Phase-1)
2 Name of the Agency/Contractor.- Sri Manoj Kumar Nayak. At./Po.- Nuabazar, Paradeep. Dist.-
Jagatsighpur.

3 (a) A/A. No. & Date ( Attested Xerox copy of


Administrative Approval order to be attached )
Yes.
(b) Details of original A/A. Amount.-
Civil cost.- Rs. 3,979,170.03
EI. (Internal)- Rs. 412,664.82
PH. (Internal)- Rs. 336,556.94
EI. (External)- LS. Rs. 739,119.00
PH. (External)- Rs. 387,905.00
MIS. CC. Road Rs. 652,251.00
Probate / Departmental charges.- Rs. 494,582.74
TOTAL Rs. 7,002,249.53
Rounded up to Rs. 7,002,200.00
4 Till to date position of allotment received, expenditure incurred and balance amount of allotments available with the Division.
(Furnish the information financial year wish)

Sl. Balance Amount


Financial Year Allotment Received Expenditure Incurred Remarks
No. Available
1 2 3 4 5 6 7 8 9

5 (a) Amount of actual payment made to the concerned agency / contractor through different running towards executing of this
work. Till to date position of payment made to the contractor ( i.e up to submission of this Deviation statement ) to be
furnished in the ....

Total Amount Cumulative Measurements recorded vide Remarks


Sl. Voucher No. & Reference of
of the running Amount of
No. date Running bill Date of
bill running bill MB. No. Page No.
Measurement
1 2 3 4 5 6 7 8 9

1 R/A. 1 2,047,008.00 2,047,008.00 1138/CTC 141 23. 11. 2016

2 R/A. 2 1,831,349.00 3,878,357.00 1232/CTC 51 10. 02. 2017

3 R/A. 3 423,663.00 4,302,020.00 1232/CTC 139 10. 05. 2017

(b) Whether any amount is kept pending towards approval of deviation statement by the higher authorites.

6 Agreement No. 770 / dt. 05. 05. 2016

7 Supplementary Agreement No. -


(Copy of the same may be attached) No.
Page 26 Check List A

8 Actual amount of work put to tender.- Rs. 5,768,547.00

9 Actual agreement value of the work.- Rs. 5,157,658.00


10 Value of the work done under original Agreement.- Rs. 361,961.00

11 Value of the work done under Supplementary.- No.

12 Total value of the work done.(both original &


supplementary Agreement) -
Rs. 361,961.00
13 Amount of Net deviation of the work. (Furnish deviation
statement in two sets along with original work.-
Rs. -361,961.00
14 Percentage of excess / less deviation.- #DIV/0! % Less

15 Date of commencement of the work.- Dt. 09. 05. 2016

16 Stipulated date of complettion of the work.- Dt. 09. 01. 2017 (Handed over dt. 05.08.2017)
17 (a) Whether the work is completed in all respect if so,
completion certificate may be attached.- Yes.
(b) Whether the building is handed over to concerned
department for their functioning if so, furnish the
copy.-
Yes.

18 If not, state the present position of the work.- Handed Over.

19 Whether the deviation amount exceeds 10% then the


original agreement value.- No.
20 If it exceeds more than 10% detailed reasoning along with
technical report may be attached.-
No.
21 Permission from competent authority to go ahead with the
works to be furnished.- No.
22 Is the deviation is due to change of site / design, if so,
copy of the approval order for such changes may be.- No.
23 Whether EOT. Has been granted up to the required extent,
if so, a copy of the same may be furnished.- NA
24 Whether the deviation is due to extra quantities of work
done.- Yes.
25 (a) Whether the deviation is due to extra items of work
done.- No.
(b) If deviation is due to extra items of work, whether
the.- No.
26 Authority approved the tender.-
(Furnish the copy of the Letter No. & date of the same.)

27 Authority accepted the tender.-


(Furnish the copy of the Letter No. & date of the
same.)

(a) Tender accepted amount.- Rs. 5,157,658.00

(b) Amount put to tender.- Rs. 5,768,547.00

(c) Percentage of Excess / Less in comparison to the


estimate cost.- 10.59% Less

(d) Corresponding Schedule of rates adopted while


commanding the tender.- Yes.
Page 27 Check List A

28 Whether R.A.A is required.- No.

29 (a) If so, what is the present position of R.E ? No.

(b) Whether R.A.A is obtained ? if so, furnish the xerox


copy of R.A.A order of the work.- No.
30 Nos. of contractor participated in the original tender.-

31 (a) Whether the relative position of the tenderer is


changed due to such deviation.-

(b) Relative position of the tenderer basing upon the


deviated quantities.- (Furnish the copy of the relative
position of tender)

Sl. Total Amount (As per present


Name of the Participant Tenders Position of Tenderer
No deviation Qnty.)
1 2 3 4

32
Reason of Deviation. - Furnish details along with all
technical report and other supporting documents to prove
the reasons for Deviation.-
Yes.
33
Whether the case is Recommended by the Executive
Engineer concerned.-

34 Whether the case is Recommended by the Superintending


Engineer concerned.-
Page 28 Check List A

All the columns are to be filled in properly. No column is remained blank. The same may be filled up "NOT APPLICABLE" or N.A.
Approved vide letter No. B I W/D 20/2003-31800, Dt. 23.07.2003 of Chief Engineers, Buildings, Odisha, Bhubaneswar.
Page 29 of 94
1.Name of work - MARINE POLICE STATION AT PARADEEP, DIST.- JAGATSINGHPUR.
2.Agreement No - 770, DATE. 05. 05. 2016

3.Contractors name SRI MANOJ KUMAR NAYAK, AT./PO.- NUA BAZAR, PARADEEP. DIST.- JAGATSINGHPUR
Agree Quantity as
ment Revised
Item of Work per Rate Amount Rate Amount Less Excess Reason
Sl No. Qty
Agreement

Electrical Work
79 As per site requirement with respect
13.00 851.80 11,073.40 12.00 851.80 10,221.60 851.80 -
Angle Holder Point to Drawing & Design.
80 12.00 848.30 10,179.60 12.00 848.30 10,179.60 - - do
Tube Light Point
81 1.00 853.25 853.25 1.00 853.25 853.25 - - do
portic light point
82 2.00 927.93 1,855.86 2.00 927.93 1,855.86 - - do
Calling Bell Point
83 Concealed wiring to ceiling fan Point 12.00 1,343.04 16,116.48 12.00 1,343.04 16,116.48 - - do
84 Concealed wiring to security light point 5.00 827.81 4,139.05 5.00 827.81 4,139.05 - - do
85 Concealed wiring to Bulkhead point 3.00 859.18 2,577.54 3.00 859.18 2,577.54 - - do
86 Concealed wiring to Exhaust fan point 3.00 802.95 2,408.85 3.00 802.95 2,408.85 - - do
87 Concealed wiring to 10 AMP Modular
Socket Point. 15.00 572.12 8,581.80 15.00 572.12 8,581.80 - - As per Drawing & Design.

88 Supply and fixing of one module box with


face plate 1.00 135.74 135.74 1.00 135.74 135.74 - - do

89 Supply and fixing of Electrically operted


single phase syran 1.00 21,437.72 21,437.72 1.00 21,437.72 21,437.72 - - do

90 Supply and fixing of 8 way BDB 3.00 4,553.69 13,661.07 3.00 4,553.69 13,661.07 - - do
91 Supply and fixing of 63 AMP ,4P MCB main
switch with 63 AMP .cut out including all 1.00 21,017.69 21,017.69 1.00 21,017.69 21,017.69 - - do
accessories and connection.

92 Supply and fixing 4' 0''*28 watt decorative As per site requirement with respect
type light fitting 28.00 1,631.30 45,676.40 27.00 1,631.30 44,045.10 1,631.30 -
to Drawing & Design.
93 Supply and fixing of 4'X28 watt T-5 fitting
with lamp. 5.00 9,667.78 48,338.90 5.00 9,667.78 48,338.90 - - do

94 Supply and fixing of bulk head fitting 3.00 1,101.70 3,305.10 3.00 1,101.70 3,305.10 - - do
95 Supply and fixing of 400 mm. wall mounted
fan. 4.00 2,387.38 9,549.52 4.00 2,387.38 9,549.52 - - As per Drawing & Design.

96 Supply and fixing of exhaust fan 3.00 1,914.51 5,743.53 3.00 1,914.51 5,743.53 - - do
97 Supply and fixing of 8*6 GI board 3.00 125.90 377.70 3.00 125.90 377.70 - - do
98 Supply and fixing of Calling Bell (ding 2.00 124.01 248.02 2.00 124.01 248.02 - - do
dong).
99 Concealed wiring to sub main two runs of ISI As per site requirement with respect
marjed 2.5 sq .mm 270.00 140.24 37,864.80 240.00 140.24 33,657.60 4,207.20 -
to Drawing & Design.
Page 30 of 94

100 Concealed wiring to sub main two runs of ISI


marjed 6.00 sq .mm 165.00 229.51 37,869.15 165.00 229.51 37,869.15 - - do

101 Supply and fixing of earthing. 2.00 4,776.35 9,552.70 2.00 4,776.35 9,552.70 - - As per estimate & agreement.
102 Supply and fixing of sub earthing with No- 8
bare copper wire. 100.00 53.10 5,310.00 100.00 53.10 5,310.00 - - As per Drawing & Design.

103 Supply and fixing of 1200 mm sweep AC


ceiling fan. 12.00 2,228.68 26,744.16 12.00 2,228.68 26,744.16 - - do

104 Supply and fixing of 18 watt.Holder type


CFL light fitting. 15.00 228.43 3,426.45 10.00 228.43 2,284.30 1,142.15 - As per Field measurement.

105 Supply and fixing of portico light fitting . 1.00 1,775.66 1,775.66 1.00 1,775.66 1,775.66 - - As per Drawing & Design.
106 4'' x 4" GI. Board. 10.00 65.57 655.70 10.00 65.57 655.70 - - do
107 6" x 4" GI. Board. 2.00 97.04 194.08 2.00 97.04 194.08 - - do
108 8" x 10" GI. Board. 2.00 190.76 381.52 2.00 190.76 381.52 - - do
109 10" x 12" GI. Board. 2.00 289.39 578.78 2.00 289.39 578.78 - - do
110 Supply and fixing of 3.5 core 25 sq. mm AL
armoud cabel 50.00 394.10 19,705.00 50.00 394.10 19,705.00 - - do

111 Concealed wiring to Tube light point. 16.00 813.89 13,022.24 16.00 813.89 13,022.24 - - do
112 Fixing of Two modular Box with face plate. 6.00 135.74 814.44 6.00 135.74 814.44 - - do
113 Fixing of Three module Box with face plate. 5.00 178.82 894.10 5.00 178.82 894.10 - - do
114 Fixing of Four module Box with face plate. 7.00 214.06 1,498.42 7.00 214.06 1,498.42 - - do
115 Concealed wiring to 20 AMP Modular
Socket Point. 2.00 1,506.54 3,013.08 2.00 1,506.54 3,013.08 - - do

116 Fixing of Eight module Box with face plate. 2.00 378.53 757.06 2.00 378.53 757.06 - - do
117 Fixing of Twelve module Box with face 6.00 407.24 2,443.44 6.00 407.24 2,443.44 - - do
plate.
118 Fixing of Sixteen module Box with face 1.00 505.13 505.13 1.00 505.13 505.13 - - do
plate.
119 Fixing of Blank plate. 36.00 28.71 1,033.56 36.00 28.71 1,033.56 - - do
120 Concealed wiring to Telephone Point 2.00 830.32 1,660.64 2.00 830.32 1,660.64 - - do
121 Concealed wiring to Computer Point. 2.00 1,560.43 3,120.86 2.00 1,560.43 3,120.86 - - do
122 Concealed wiring to Batten holder Point. 2.00 810.00 1,620.00 2.00 810.00 1,620.00 - - do
123 Concealed wiring to Sirent Point. 1.00 1,014.17 1,014.17 1.00 1,014.17 1,014.17 - - do
124 Inverter wiring. 1.00 9,932.46 9,932.46 1.00 9,932.46 9,932.46 - - do
TOTAL 412,664.82 404,832.37 7832.45 -

APM. OPHWC. CTC. ( Elect. )


Page 31 of 94
Page 32 of 94

228..666
0
THE ODISHA STATE POLICE HOUSING & WELFARE CORPORATION LTD. BHUBANESWAR - 22
FORM NO.- 11

1 Name of the Work.- OFFICE-CUM-RESIDENCE OF SDPO. AT JAGATSINGHPUR.

2 Agreement No.- 707, Date. 27. 01. 2016


3 Name of the Contractor.- Sri Sunakar Behera, At.- Chahapada, Po.- Mahanga, Dist.- Cuttack.
Sl. Page Agreement
Item MB No. Unit. Qnty. Amount (Rs)
No No. Rate (Rs.)
1 2 3 4 5 6 7 8 9
1 Agreement Item (Civil Works)
2 Earthwork Excavation in hard soil including cost of all materials completed. ( Ground Floor ) ###
R/A -1 do 1182/CTC 2 Cum. -
TOTAL Cum. - 89.02 -
3 Providing & laying of PCC. work with (1:4:8) including cost of all materials completed. (Ground Floor) ###
R/A 1 do 1182/CTC 8 Cum. -
TOTAL - 3,724.33 -
4 Providing & laying of BW. with (1:6) in F/P. including cost of allmaterials completed. (Ground Floor) ###
R/A 1 do 1182/CTC 34 Cum. -
TOTAL - 3,772.54 -
5 Providing & laying of BW. With (1:6) in Super Structure including cost of all materials ###
completed. ( Ground Floor)
R/A -1 do 1182/CTC 80 Cum. -
R/A -2 do 26 Cum. -
TOTAL - 3,805.54 -
6 First Floor
R/A -2 do 1182/CTC 107 Cum. - ###
do 142 Cum. -
TOTAL - 3,928.92 -
7 Second Floor
R/A -2 do 1182/CTC 153 Cum. - ###
R/A -3 do 1182/CTC 103 Cum. -
TOTAL - 4,073.58 -
8 Providing & laying of BW. With (1:4) in S/S. including cost of all materials completed.( First ###
Floor )
R/A -1 do 1182/CTC 82 Cum. -
do 1182/CTC 28 Cum. -
do 1182/CTC 103 Cum. -
TOTAL - 4,045.45 -
9 FIRST FLOOR
R/A -2 do 1182/CTC 120 Cum. - ###
TOTAL - 4,168.83 -
10 Rcc. work with M-20 grade concrete including cost of all materials completed. ( Ground Floor ) ###
R/A 1 do 1182/CTC 30 Cum. -
do 1182/CTC 77 Cum. -
do 1182/CTC Cum. -
TOTAL - 4,959.28 -
11 First Floor
R/A-2 do 1182/CTC 103 Cum. - ###
do 1182/CTC 119 Cum. -
do 1182/CTC 140 Cum. -
TOTAL Cum. - 4,998.74 -
12 Second Floor
R/A-2 do 1182/CTC 148 Cum. - ###
TOTAL Cum. - 5,045.01 -
Providing, fixing & C/S. of Rcc. work for plinth band & column footing including cost of all
###
13 materials completed.( Ground Floor )
R/A 1 do 1182/CTC 23 Sqm. -
TOTAL - 83.38 -
Providing, fixing & C/S. of Rcc. work for Lintel including cost of all materials completed. ###
14 (Ground Floor)
R/A -1 do 1182/CTC 60 Sqm. -
TOTAL - 197.63 -
15 FIRST FLOOR
R/A -2 do 1182/CTC 117 Sqm. - ###
TOTAL - 237.16 -
Providing, fixing & C/S. of Rcc. work for griders, beams & columns including cost of all ###
materials completed. (Ground Floor)
16
R/A -1 do 1182/CTC 26 Sqm. -
do 1182/CTC 67 Sqm. -
TOTAL - 438.57 -
17 FIRST FLOOR
R/A -2 do 1182/CTC 102 Sqm. -
do 1182/CTC 122 Sqm. -
TOTAL - 526.29 -
18 SECOND FLOOR
R/A -2 do 1182/CTC 147 Sqm. -
TOTAL - 631.54 -
19
Providing, fixing & C/S of Rcc. work for Roof Slab, Staircase, chajja etc. including cost of all
materials completed. (Ground floor) ###
R/A -1 do 1182/CTC 70 Sqm. -
TOTAL - 297.49 -
20 FIRST FLOOR
R/A -2 do 1182/CTC 126 Sqm. -
do 24 Sqm. -
TOTAL - 356.99 -
21 Second Floor
R/A -2 do 1182/CTC 149 Sqm. -
do 1182/CTC 101 Sqm. -
TOTAL - 428.39 -
Supplying & filling the Sand in F/P and over area including cost of all materials completed. ###
22 ( Ground floor )
R/A -1 do 1182/CTC 5 Cum. -
TOTAL - 506.32 -
23 12 mm. CP with (1:6) over BW. Including cost of all materials completed. ( Ground Floor ) ###
R/A -3 do 1182/CTC 176 Sqm. -
TOTAL - 84.93 -
24 First Floor ###
R/A -3 do 1182/CTC 180 Sqm. -
do 107 Sqm. -
TOTAL - 87.49 -
25 Second Floor ###
R/A -3 do 1182/CTC 182 Sqm. -
TOTAL - 90.20 -
26 12 mm. CP. With (1:4) over Rcc. work including cost of all materials completed. ( Ground ###
Floor
R/A -3) 1182/CTC 192 Sqm. -
TOTAL - 90.85 -
27 First Floor ###
R/A -3 do 1182/CTC 195 Sqm. -
TOTAL - 92.65 -
28 Second Floor ###
R/A -3 do 1182/CTC 196 Sqm. -
TOTAL - 94.51 -
29 16 mm. CP with (1:6) over BW. Including cost of all materials completed. ( Ground Floor ) ###
R/A-3 do 1182/CTC 185 Sqm. -
TOTAL - 116.75 -
30 First Floor ###
R/A -3 do 1182/CTC 187 Sqm. -
TOTAL - 119.04 -
31 Second Floor ###
R/A -3 do 1182/CTC 189 Sqm. -
TOTAL - 121.41 -
32 One coat of primering over newly plaster surface icluding cost of all materials completed. ###
( Ground Floor )
R/A -4 do 1377/CTC 45 Sqm. -
TOTAL - 33.69 -
33 First Floor ###
R/A -4 1377/CTC 46 Sqm. -
TOTAL - 34.79 -
34 Second Floor ###
R/A -4 1377/CTC 46 Sqm. -
TOTAL - 35.95 -
35 Two coats of Anti-fungal water proofing weather coat painting including cost of all materials ###
completed. (Ground Floor)
R/A -4 do 1377/CTC 47 Sqm. -
TOTAL - 45.65 -
36 FIRST FLOOR ###
R/A -4 1377/CTC 47 Sqm. -
TOTAL - 46.84 -
37 SECOND FLOOR ###
R/A -3 1377/CTC 47 Sqm. -
TOTAL - 48.10 -
38 One Coat cement washing over plaster surface including cost of all materials completed. ###
( Ground Floor )
R/A -4 1377/CTC 42 Sqm. -
TOTAL - 11.54 -
39 FIRST FLOOR ###
R/A -4 do 1377/CTC 43 Sqm. -
TOTAL - 11.72 -
40 Second Floor ###
R/A -4 do 1377/CTC 43 Sqm. -
TOTAL - 11.91 -
41 Two coats of Cement painting over a coat of cement washing including cost of all materials
completed. (Ground Floor)
R/A -4 do 1377/CTC 49 Sqm. - ###
TOTAL - 21.21 -
42 First Floor ###
R/A -4 do 1377/CTC 49 Sqm. - ###
TOTAL - 21.53 -
43 Second Floor ###
R/A -4 do 1377/CTC 50 Sqm. - ###
TOTAL - 21.86 -
44 Providing & fixing of ( 2.5"x5" ) Sal wood chowkath for Door/Window frames including cost of ###
all materials completed. (Ground Floor )
R/A -3 do 1182/CTC 171 Cum. -
TOTAL - 89,418.48 -
45 First Floor
R/A -3 do 1182/CTC 172 Cum. -
TOTAL - 89,418.48 -
46 Providing & fixing of Paisal wood Paneled shutter including cost of all materials completed. ###
(Ground Floor)
R/A -3 do 1377/CTC 8 Sqm. -
TOTAL - 5,126.53 -
47 First Floor
R/A -3 do 1377/CTC 9 Sqm. -
TOTAL - 5,126.53 -
48 Two coats of Enamel painting over Wooden & Iron works including cost of all materials
completed. (Ground Floor)
R/A -4 do 1377/CTC 54 Sqm. - ###
TOTAL - 74.10 -
49 First Floor ###
R/A -4 do 1377/CTC 54 Sqm. - ###
TOTAL - 75.66 -
50 Second Floor ###
R/A -4 do 1377/CTC 54 Sqm. - ###
TOTAL - 77.28 -
51 Supplying fitting fixing of MS Grills, Grill gate etc. including cost of all materials completed ###
(Ground Floor)
R/A -4 do 1182/CTC 172 Kg. -
TOTAL - 100.43 -
52 First Floor ###
R/A-4 do 1377/CTC 13 Kg. -
TOTAL - 100.43 -
53 Providing &Fixing of glazed Ceramic wall tiles in wall skirting, dado including cost of all ###
materials completed. (Ground Floor)
R/A -3 do 1377/CTC 5 Sqm. -
TOTAL - 819.46 -
54 First Floor
R/A -3 do 1377/CTC 5 Sqm. -
TOTAL - 833.52 -
55 Supplying, providing & fixing of Floor Tiles in flooring with cement mortar (1:1) including cost
of all materials complited. (Ground Floor) ###
R/A -4 do 1377/CTC 31 Sqm. -
TOTAL - 883.67 -
56 First Floor
R/A -3 do 1377/CTC 32 Sqm. -
TOTAL - 893.46 -
57 Cutting, bending, binding of Steel for Rcc. work including cost of all materials completed.
( Ground Floor ) ###
R/A -1 do 1182/CTC 19 Qntl. -
do 1182/CTC 56 Qntl. -
TOTAL - 6,461.19 -
58 First Floor ###
R/A -2 do 1182/CTC 98 Qntl. -
do 1182/CTC 113 Qntl. -
do 1182/CTC 138 Qntl. -
TOTAL - 6,472.06 -
59 Second Floor ###
R/A -2 do 1182/CTC 145 Qntl. -
do 1182/CTC 150 Qntl. -
TOTAL - 6,483.55 -
60 Supplying, providing & fixing of Vitrified Tiles in flooring with cement mortar (1:1) including
cost of all materials complited. (Ground Floor) ###
R/A -3 do 1377/CTC 6 Sqm. -
TOTAL - 997.00 -
61 First Floor
R/A -3 do 1377/CTC 7 Sqm. -
TOTAL - 1,001.41 -
62 Providing Antitermite treatment including cost of all materials completed. ###
R/A -2 do 1232/CTC 33 Sqm. -
TOTAL - 46.00 -
63 Providing & fixing of Pin headed glass including cost of all materials completed. ###
(Ground Floor)
R/A -4 do 1377/CTC 41 Sqm. -
TOTAL - 346.55 -
64 First Floor
R/A -4 do 1377/CTC 41 Sqm. -
TOTAL - 346.55 -
65 Drip course mould plaster (1.4) including cost of all materials completed. (Ground Floor) ###
R/A-3 do 1182/CTC 197 Rmt. -
TOTAL - 5.74 -
66 First Floor ###
R/A-3 do 1182/CTC 198 Rmt. -
TOTAL - 5.92 -
67 Second Floor ###
R/A-3 do 1182/CTC 198 Rmt. -
TOTAL - 6.11 -
68 Providing & fixing of 4" dia P.V.C rain water pipe including cost of all materials completed. ###
(Ground Floor)
R/A -3 do 1377/CTC 11 Rmt. -
TOTAL - 330.62 -
69 First Floor
R/A -3 do 1377/CTC 11 Rmt. -
TOTAL - 330.62 -
70 Supplying, providing & fixing of FRP door with frame including cost of all materials completed. ###
(First Floor)
R/A -3 do 1377/CTC 9 Sqm. -
TOTAL - 3,800.00 -
71 First Floor
R/A -3 do 1377/CTC 9 Sqm. -
TOTAL - 3,800.00 -
72 One coat of primering over Wooden & MS. work icluding cost of all materials completed. ###
( Ground Floor)
R/A-4 do 1377/CTC 52 Sqm. -
TOTAL - 33.44 -
73 First Floor ###
R/A-4 do 1377/CTC 53 Sqm. -
TOTAL - 34.10 -
74 Second Floor ###
R/A-4 do 1377/CTC 53 Sqm. -
TOTAL - 34.78 -
75 Supplying & fixing of WI. Clamps including cost of all materials completed. ( Ground Floor ) ###
RA -3 do 1377/CTC 7 No. -
TOTAL - 41.50 -
76 First Floor
RA -3 do 1377/CTC 8 No. -
TOTAL - 41.50 -
77 25mm thick grading concrete (1:2:2) including cost of all materials completed. (First Floor) ###
R/A -3 do 1182/CTC 141 Sqm. -
do 1182/CTC 104 Sqm. -
TOTAL - 222.05 -
78 Second Floor
R/A -3 do 1182/CTC 166 Sqm. -
TOTAL - 236.83 -
79 Third Floor
R/A -3 do 1377/CTC 12 Sqm. -
TOTAL - 253.83 -
80 Making the Plinth protection with side brick masonary work, sand filling, khoa ramming CC. ###
with (1:2:4) including cost of all materials completd. (Ground Floor)
RA -3 do 1377/CTC 12 Sqm. -
TOTAL - 1,623.67 -
81 Supplying, providing & fixing of Green granite in Kitchen slab including cost of all materials
complited. (Ground Floor) ###
R/A -3 do 1377/CTC 10 Sqm. -
TOTAL - 2,000.00 -
82 Supplying, fitting & fixing of 4'0" dia Rcc. Well ring including cost of all materials completed. ###
(Ground Floor)
RA -1 do 1182/CTC 3 Rmt. - ###
TOTAL - 1,750.00 -
83 Providing & fixing of MS. Baluster hand railing including cost of all materials completed. ###
( Ground Floor)

R/A -4 do 1377/CTC 56 Rmt. -


TOTAL - 1,600.00 -
84 First Floor ###
R/A -4 do 1377/CTC 55 Rmt. -
TOTAL - 1,600.00 -
85 Providing & Fixing of Chequre tile for floooring including cost of all materials completed. ###
( Ground Floor )
R/A -3 do 1377/CTC 40 Sqm. -
TOTAL - 711.70 -
(PH Works) -
86 Supplying all materials and labour T & P fitting and joining of the following CPVC. Pipe. -
87 RA-4 a) 40 mm dia CPVC. Pipe 1377/CTC 57 Rmt. - 448.50 -
88 RA-4 b) 25 mm dia CPVC. Pipe 1377/CTC 58 Rmt. 0 261.63 -
89 RA-4 c) 20 mm dia CPVC. Pipe 1377/CTC 59 Rmt. 0 168.19 -
90 RA-4 d) 15 mm dia CPVC. Pipe 1377/CTC 60 Rmt. 0 149.50 -
91 Supplying, providing & fixing on wall face unplasticised Pvc. Pipes & fittings with all materials
- -
and labour T & P etc. complete.
92 RA-4 a) 110 mm dia U-PVC. SWR pipe 1377/CTC 61 Rmt. - 391.69 -
93 RA-4 b) 110 mm dia single junction with door 1377/CTC 62 No. - 388.70 -
94 RA-4 c) 110 mm dia bend with door. 1377/CTC 62 No. - 269.10 -
95 RA-4 d) 110 mm dia P & S' Trap. 1377/CTC 63 No. - 547.17 -
96 RA-4 e) 110 mm dia floor' Trap. 1377/CTC 63 No. - 547.17 -
97 f) 110 mm dia Plain Bend 1377/CTC 64 No. - 239.20 -
98 g) 110 mm Cowel. 1377/CTC 65 No. - 74.75 -
99 Providing,fitting and fixing of water closet.( Including WC. & EWC. Type. ) -
100 a) 580X425/Orissa Pan . 1377/CTC 65 No. - 2,093.00 -
101 c) 550X400 mm wash basin. 1377/CTC 65 No. - 2,803.13 -
102 e) Low level cistern. 1377/CTC 66 No. - 1,972.20 -
103 Supplying fitting & fixing of the following brass & Pvc. Ball valve. -
104 a) 40mm dia full-way Valve. 1377/CTC 66 No. - 3,289.00 -
105 b) 25mm dia full -way valve. 1377/CTC 66 No. - 1,794.00 -
106 Supplying, fitting & fixing of Cromiun plated cock in water supply line. -
107 a) 15 mm dia C.P Bib cock. 1377/CTC 67 No. - 941.85 -
108 b) 15 mm. dia CP. Angle stop cock. 1377/CTC 67 No. - 1,008.00 -
109 c) 15mm dia C.P Conceal stop cock 1377/CTC 67 No. - 1,270.75 -
110 Providing and fitting,fixing the following bath room fixture. -
111 a) CP. Revolving Shower with Arm. 1377/CTC 68 No. - 822.25 -
112 b) 600 X 12 mm CP. shelf with all fixture. 1377/CTC 68 No. - 441.03 -
113 c) 600 X 450 mm Mirror with Pvc. Frame. 1377/CTC 68 No. - 1,339.52 -
114 d) 125 mm soap case C.P 1377/CTC 68 No. - 299.00 -
115 e) 600 X 25mm C.P Towel rail 1377/CTC 69 No. - 702.65 -
116 Supplying all materials labour T & P laying U-PVC 4kg/cm2 pipe. -
117 a)160 mm dia (4 kg/cm2 ) Pipe(IS- 1377/CTC -
4985/2000) - 747.50
70 Rmt.
118 b)110 mm dia (4 kg/cm2 ) Pipe(IS- 1377/CTC -
4985/2000) - 328.90
70 Rmt.
119 Construction of Inspection Chamber -
120 a) (3' 0'' X 3' 0'' ) size. 1377/CTC 71 No. - 8,000.00 -
121 0 1377/CTC 71 No. - 7,000.00 -
122 Construction of Septic tank with soak pit
123 a) 30 Users 1377/CTC 71 Set. - 60,000.00 -
124 Providing & fixing of Pvc. water tank 1377/CTC
71 Ltr. - 14.35 -
(Fibre) ISI Triple layer.
TOTAL -
LESS AS PER AGREEMENT 12.30% ###
NET AMOUNT -
THE ODISHA STATE POLICE HOUSING & WELFARE CORP
FO
1 Name of the Work.- OFFICE-CUM-RESIDENCE OF SDPO. AT JAGA
FORM OF DEVIAT
CA. No.- POL. 2014 - 0221 ,
2 Agreement No.- 707, Date. 27. 01. 2016

3 Name of the Contractor.- Sri Sunakar Behera, At.- Chahapada, Po.- Mahanga
Itemize

SL Qnty as per
Item Unit Rate Amount
No Agreement

1 2 3 4 5 6
A 1 Agreement Item (Civil Works)

Earthwork Excavation in hard soil


2 including cost of all materials Cum 89.01 -
completed. ( Ground Floor )

Providing & laying of PCC. work


with (1:4:8) including cost of all
3 Cum 4063.55 -
materials completed. (GROUND
FLOOR)

Providing & laying of BW. with


(1:6) in F/P. including cost of
4 Cum 4253.27 -
allmaterials completed. ( GROUND
FLOOR)

Providing & laying of BW. With


(1:6) in Super Structure including
5 Cum 4,286.27 -
cost of all materials completed.
(GROUND FLOOR)

6 B) FIRST FLOOR Cum 4,409.65 -


7 C) SECOND FLOOR Cum 4,554.31 -
Providing & laying of BW. With
(1:4) in Super Structure including
8 Cum 4,527.09 -
cost of all materials completed.
(GROUND FLOOR)
9 B) FIRST FLOOR Cum 4,650.47 -
Rcc. work with M-20 grade concrete
10 including cost of all materials Cum 5,310.35 -
completed. ( GROUND FLOOR )

11 FIRST FLOOR Cum 5,349.81 -


12 SECOND FLOOR Cum 5,396.08 -

Providing, fixing & C/S. of Rcc. work


for Plinth band & column Footing
13 Sqm 89.61 -
including cost of all materials
completed. ( GROUND FLOOR )

Providing, fixing & C/S. of Rcc. work


for Lintel including cost of all
14 Sqm 210.94 -
materials completed.( GROUND
FLOOR )

15 B) FIRST FLOOR Sqm 253.13 -

16 C) SECOND FLOOR Sqm 303.75 -

Providing, fixing & C/S. of Rcc. work


for griders, beams & columns
17 including cost of all materials Sqm 455.28 -
completed. A)
GROUND FLOOR

18 B ) FIRST FLOOR Sqm 546.33 -

19 B ) SECOND FLOOR Sqm 655.60 -

Providing, fixing & C/S of Rcc. work


for Roof Slab, Staircase, chajja etc.
20 Sqm 314.54 -
including cost of all materials
completed. (GROUND FLOOR)

21 B ) FIRST FLOOR Sqm 377.45 -

22 B ) SECOND FLOOR Sqm 452.94 -

Supplying & filling the Sand in F/P


and over area including cost of all
23 Cum. 526.72 -
materials completed ( GROUND
FLOOR )
12 mm. CP with (1:6) over BW.
24 Including cost of all materials Sqm 85.36 -
completed. A ) GROUND FLOOR

25 B) FIRST FLOOR Sqm 87.92 -

26 C) SECOND FLOOR Sqm 90.63 -

6 mm. CP. With (1:4) over Rcc. work


27 including cost of all materials Sqm 91.12 -
completed. A ) GROUND FLOOR

28 B) FIRST FLOOR Sqm 92.92 -


29 C) SECOND FLOOR Sqm 94.78 -

16 mm. CP with (1:6) over BW.


30 Including cost of all materials Sqm 117.27 -
completed. ( GROUND FLOOR )

31 B) FIRST FLOOR Sqm 119.56 -

32 C) SECOND FLOOR Sqm 121.93 -

Providing & applying Priming one


coat with any approved primer on
33 new work to given an even shade Sqm 34.31 -
including cost of all materials
completed. A ) GROUND FLOOR

34 B) FIRST FLOOR Sqm 35.41 -

35 C) SECOND FLOOR Sqm 36.57 -

Two coats of Anti-fungal water


proofing weather coat painting
36 Sqm 70.27 -
including cost of all materials
completed. A ) GROUND FLOOR

37 B) FIRST FLOOR Sqm 71.46 -

38 C) SECOND FLOOR Sqm 72.72 -


Two coats of plastic Emulsion
painting over new work including
39 Sqm 54.90 -
cost of all materials completed.
A ) GROUND FLOOR

40 B) FIRST FLOOR Sqm 55.61 -

41 C) SECOND FLOOR Sqm 56.35 -

Finishing wall surface of walls with


cement based wall putty work
42 including cost of all materials Sqm 48.36 -
completed. A)
GROUND FLOOR

43 B) FIRST FLOOR Sqm 48.98 -

44 C) SECOND FLOOR Sqm 49.62 -

One coat of Cement Washing over


Plaster surfaces including cost of all
45 Sqm 11.56 -
materials completed. A ) GROUND
FLOOR

46 B) FIRST FLOOR Sqm 11.74 -

47 C) SECOND FLOOR Sqm 11.93 -

Providing & fixing of ( 2.5"x5" ) Sal


wood chowkath for Door/Window
48 frames including cost of all materials Cum. 90,173.61 -
completed. A ) GROUND
FLOOR

49 B) FIRST FLOOR Cum 90,173.61 -

50 C) SECOND FLOOR Cum 90,173.61 -

Providing & fixing of Paisal wood


Paneled shutter including cost of all
51 materials completed. Sqm 5,183.49 -
A ) GROUND FLOOR

52 B) FIRST FLOOR Sqm 5,183.49 -


53 C) SECOND FLOOR Sqm 5,183.49 -

Two coats of Enamel painting over


Wooden & Iron works including cost
54 Sqm 75.84 -
of all materials completed. A )
GROUND FLOOR

55 B) FIRST FLOOR Sqm 77.40 -

56 C) SECOND FLOOR Sqm 79.02 -

One coat of priming with approved


primer over new wood work
57 including cost of brushes, materials, Sqm. 34.47 -
labour T&P etc. all complete as per
direction of EIC. A) Ground Floor

58 FIRST FLOOR Sqm. 35.13 -

59 SECOND FLOOR Sqm. 35.81 -

Supplying fitting fixing of MS Grills,


Grill gate etc. including cost of all
60 Kg. 86.63 -
materials completed. ( GROUND
FLOOR )
61 A ) GROUND FLOOR Kg. 86.63 -

Supplying fitting , fixing of of


stainless seel hand railing in
62 Kg. 317.33 -
Staircase including cost of all
materials completed. A) Ground Floor

63 B) FIRST FLOOR Kg. 317.33 -

Providing &Fixing of glazed


Ceramic wall tiles in wall skirting,
64 Sqm 862.91 -
dado including cost of all materials
completed. A ) GROUND FLOOR

65 B) FIRST FLOOR Sqm 876.97 -


Supplying, providing & fixing of
Vitrified tiles flooring in cement
mortar ( 1:4) and filling joint with
66 Sqm 1,057.69 -
white cement of approved quality
including cost of all materials
complited. A ) GROUND FLOOR

67 B) FIRST FLOOR Sqm 1,062.10 -

Cutting, bending, binding of Steel for


Rcc. work including cost of all
68 Qntl 6,470.52 -
materials completed. (GROUND
FLOOR)

69 FIRST FLOOR Qntl 6,481.39 -

70 SECOND FLOOR Qntl 6,492.88 -

Providing Antitermite treatment


71 including cost of all materials Sqm 35.00 -
completed. A ) GROUND FLOOR

Supplying, fitting & fixing of 4 mm.


thick pin headed glass including cost
72 Sqm 368.29 -
of all materials completed.
A ) GROUND FLOOR

73 B) FIRST FLOOR Sqm 368.29 -


74 Drip course mould plaster (1.4)
including cost of all materials Rmt. 5.77 -
completed. GROUND FLOOR
75 FIRST FLOOR Rmt. 5.95 -
76 SECOND FLOOR Rmt. 6.14 -
77 Providing & fixing of 4" dia P.V.C
rain water pipe including cost of all
Rmt. 330.63 -
materials completed. GROUND
FLOOR
78 FIRST FLOOR Rmt. 330.63 -
79 SECOND FLOOR Rmt. 330.63 -

Supplying, providing & fixing of FRP


door with frame including cost of all
80 Sqm 3,800.00 -
materials completed . GROUND
FLOOR
81 FIRST FLOOR Sqm 3,800.00 -
Supplying & fixing of WI. Clamps
82 including cost of all materials No. 43.10 -
completed. GROUND FLOOR

83 FIRST FLOOR No. 43.10 -

84 SECOND FLOOR No. 43.10 -

25mm thick grading concrete (1:2:2)


85 including cost of all materials Sqm 202.71 -
completed. (Ground Floor)

86 SECOND FLOOR Sqm 214.05 -


87 SECOND FLOOR Sqm 227.34 -

Making the Plinth protection with


side brick masonary work, sand
88 filling, khoa ramming CC. with Sqm 1,780.84 -
(1:2:4) including cost of all materials
completd.(Ground Floor)

Supplying, providing & fixing of


Industrial Chequre tiles in flooring
89 Sqm 719.59 -
with cement mortar (1:4) including
cost of all materials complited.

Supplying, fitting & fixing of 4'0" dia


90 Rcc. Well ring including cost of all Rmt. 1,750.00 -
materials completed. (Ground Floor)

TOTAL CIVIL COST " A " -


B 91 Electrical Works
92 Concealed wiring to different Points
with ISI marked 1.5 Sq. mm copper
93 wire.
Angle holder Points.
No. 950.00 -

94 Tube light Points. No. 950.00 -


95 Portico Light. No. 950.00 -
96 Calling Bell point. No. 950.00 -
97 Bulk Head Points. No. 950.00 -
98 Concealed wiring to Security Light
points with ISI marked 1.5
sq.mm( current carrying capacity min No. 1,000.00 -
13 Amp.s) 650/1100 volt pvc
insulated single core (stranded )
99 unsheathed
Concealed wiring coppertoconductor
Ceiling Fan in 19
mm. dia. extra super
Points points with ISI marked 1.5 quality polythene
pipe
sq.mm(including
currentsupply carrying & capacity
fixing of min No. 1,150.00 -
10Amp.modular
13 Amp.s) 650/1100 switch voltwithpvcface
plate mounted on required
insulated single core (stranded size)
100 modular
unsheathed box
Concealed wiring on face plate
coppertoconductor fixed
exhaust fan in inside
19
the wall
mm. dia.
point including
withextra supply
super quality
ISI marked of ceiling
1.5 polythene
rose
pipe mounted
sq.mm( currenton
including 3 mm.
supply
carrying & thick
fixingbakelite
capacity of min No. 950.00 -
cover on
10Amp.modular appropriate
13 Amp.s) 650/1100 volt pvc switch size iron
with board
face
duly
plate painted
mounted
insulated singleor on
RJ box
required
core (ceiling
(stranded size)) fixed
inside
modular the
unsheathed boxwall with
on face
copper plate fixed in inside
101 Concealed wiring toconductor
10 Amp. 19
1.0sq.mm(
the wall current
including
mm. dia. extra super carrying
supply
quality of capacity
ceiling
Modular Socket Point withpolythene
ISI
min
rose 11
pipe Amp.s)
mounted
including on 650/1100
3 mm.
supply volt
& thick
fixing pvc
bakelite
of No. 750.00 -
marked 1.5 sq.mm ( current carrying
insulated
cover on
10Amp.modular single
appropriate core
switch (stranded
size iron
with )
board
face
capacity min 13 Amp.s) 650/1100
unsheathed
duly painted
platepvcmounted copper
or on conductor
RJsingle
box
required (ceiling
sizeas) earth
fixed
volt insulated core
continuity
inside thebox wire including all
102 modular
(stranded
Concealed )wall onwith
face
unsheathed
wiring to 20plate
copper
Amp.fixed inside
connections
1.0sq.mm( as per instruction of
Modular Socket Point withcapacity
the wall
conductor current
including
in 19 mm. carrying
supplydia. of
extraceiling
ISIsuper
Electrical
min
rose 11
mounted Engineer-in-charge.
Amp.s) on650/1100
3pipe
mm. volt
thick All
pvc
bakelite No. 1,200.00 -
quality
marked polythene
1.5 sq.mm including
( current carrying
switches
insulated & ceiling
single roses are ISI
cover
supply
capacityon&min fixing 13 core
appropriate (stranded
size 650/1100
of 10Amp.modular
Amp.s) )
iron board
marked.
unsheathed alongwith brand mentioned
volt pvc insulated single core ) earth
duly
switchpainted
& copper
socketor RJ conductor
box
with (ceiling
face plateas fixed
at below.
continuity
inside theon [Make-
wire (a)Switch,
including all ceiling
103 mounted
(stranded
Concealed )wall with
required
unsheathed size modular
copper
rose, angle wiring
connections
1.0sq.mm( holder,
as
current per
to
bellSubmain
pushcapacity
instruction
carrying
with
switch,
ofwith
box
Two on
conductor
runsface inplate
19
of ISI inside
mm.
marked dia. the wall
extra
1.5 sq. super
batten
min 11 holder
Electrical Amp.s) etc? Anchorvolt
Engineer-in-charge.
650/1100 All
pvc
0.75 sq.mm
quality( current
mm. polythene( current carrying
pipe including
carrying capacity ,(b) min Mtr. 90.00 -
Roma/legrand/
switches
insulated &single Havells
ceiling core roses Crabtree
are
(stranded ISI) volt
capacity
supply
13 Amp.s)&min fixing 7 Amp.s)
650/1100 650/1100
of 10Amp.modular
volt pvc
Wires
marked. - Finolex/RR/Polycab , as
(c)earth
all
unsheathed
pvc
switch
insulated &alongwith
insulated copper
socket
single single
with
core brand
conductor
core mentioned
face(stranded
(stranded plate ) )
other
at materials
below. on
continuity [Make-
wire ISI mark]
(a)Switch,
including ceiling
104 unsheathed
mounted
Concealed copper
required
wiring size all
conductor
toconductor
Submain modular as
in 19
withearth
rose,
mm.
Two angle
connections
continuity
box ondia.
runsface holder,
extra
of as
wire
plate per
super
ISI bell
inside
marked push
instruction
including the
quality all switch,
wall
4.0 of
sq.with
polythene
batten
0.75 holder
Electrical
connections
sq.mm
pipe including
mm. as
( etc?
per
current
( current supply Anchor
Engineer-in-charge. fixingAll
instruction
carrying
carrying&capacity ofmin Mtr. 145.00 -
Roma/legrand/
switches
Electrical
capacity
10Amp.modular
13 Amp.s) &
min650/1100 Havells
ceiling
7 Amp.s) roses
Engineer-in-charge.
switch Crabtree
are socket,(b)
ISI
650/1100
& pvc
volt All volt
Wires
marked.
switches
pvc
with - Finolex/RR/Polycab
faceandalongwith
insulated
insulated platesockets
single single brand
corecore
mounted are ISIon
(stranded , (c)
mentioned ) all)
marked.
(stranded
required
other
at materials
below.
alongwith
unsheathed
size modular [Make-
copper
boxISI(a)Switch,
brand on mark]
mentioned
conductor
face plate ceiling
at19
as earth
inside
105 Concealed wiring toconductor
Submain inwith
rose,
below.
mm.
Two angle
continuity
the wall
dia.
runs[Make-
with holder,
wire
extra
of 0.75
super
ISI bell
sq.mm
marked push
(a)Switch,socket
includingquality all
(6.0switch,
current etc?
polythene
sq.
batten
Anchor
pipe holder
connections
carrying as
capacity etc?
Roma/legrand/ per Anchor
min
mm. ( current carrying capacityofmin
including supply 7
& Havells
instruction
Amp.s)
fixing Mtr. 195.00 -
Roma/legrand/
Crabtree
Amp.s),(b)
Electrical
650/1100
10Amp.modular
13 volt Havells
Wires
pvc
650/1100 - volt
Engineer-in-charge.
insulated
switch Crabtree
& pvc All,(b)
single
socket
Wires
core
with - Finolex/RR/Polycab
Finolex/RR/Polycab
switches
faceand
(stranded
insulated platesockets
single ) mounted
core , (c)
are ISI
unsheathed all , (c)
other) all
marked.
on copper
(stranded required
other materials
materials
alongwith
conductor
size modular ISI
as ISI
mark]
brand
earth
box on mark]
mentioned
continuity
face at25sq.
wire
105 unsheathed
Supplying &copper
testing of 3.5plate
conductor core ininside
19
below.
including
the wall
mm.
mm. dia.
PVC.[Make-
withall
extra (a)Switch,socket
connections
0.75
super
Insulated sq.mm
quality
PVC. as per
( current etc?
polythene
Anchor
instruction Roma/legrand/
of Electrical Havells
Engineer-in- Mtr. 285.00 -
carrying
pipe capacity
including
Sheathed min &
supply
aluminium 7armoured
Amp.s)
fixing of
Crabtree
charge.
650/1100
10Amp.modular
power ,(b)
volt Wires
cable . switch &sockets
All switches
pvc - and
insulated single
socket are
106 Finolex/RR/Polycab
ISI
with marked.
core (stranded
Supplyface and plate
fixing ,
alongwith
) mounted
unsheathed(c)
of 10 way all other
brand
on copper
required
materials
mentioned
conductor
size modular ISIat
as mark]
below.
earth
box
BDB(LDB) consists of 1 No. on [Make-
continuity
face plate wire
inside
63
(a)Switch,socket
including
the wall
Amp. DP withall
MCB etc?
connections
0.75&sq.mm Anchor
6 Nos.(of as per
current
10 Set 4,000.00 -
Roma/legrand/
instruction
carrying
Amp. capacity
SPMCB Havells
of Electrical
&min2 N0s. 7 Crabtree
Engineer-in-
Amp.s)
of 25 Amp. ,(b)
Wires
charge.
650/1100
SPMCB - All
Finolex/RR/Polycab
switches
volt andaccessories
pvc insulated
including all sockets, (c)are
single all
other
ISI materials
marked. ISI mark]
alongwith
coreconnections.[Make-MCB/MCCB-
and (stranded ) unsheathed copper brand
mentioned as
conductor at earth
below.continuity
(a)Legrand/Schinder/L&T/ABB [Make- wire (b)
(a)Switch,socket
including
Volt neter,all etc? Anchor
connections
Ameter-AE/CAPPA. as per- ©
Roma/legrand/
instruction
All Havells
of Electrical
other acessories ISI Crabtree
Engineer-in-
mark. ,(b)
Wires - All
charge. Finolex/RR/Polycab
switches and sockets , (c)areall
107 Supply and fixing of 63 Amp. Rotary
Triple pole MS. with Copper Bus
bar & indicator etc. including all Set 17,150.00 -
accessories and connections as per
instruction of Electrical Engineer-in-
108 charge.[Make-MCB/MCCB-
Supply and fixing of 18 watt. holder
(a)Legrand/Schinder/L&T/ABB
type CFL lamp for the installed (b)
angle
Volt No. 200.00 -
holder .[Make-CG/Philips/Bajaj] all
neter, Ameter-AE/CAPPA , (c)
other acessories ISI mark]
109 Supply and fixing of 4' x 28 wt. T5
patty type tube light fittings [copper
ballast] complete set with lamp , No. 900.00 -
connecting wire and all accessories
refer to catalouge No - Crompton
110 [Model and
Supply no- T5LK
fixing of1114]
1 x /36
Bajaj
[Model no- BTIR
wt.CFL/PLL 128,
single barCode-
street light
160483]with
fitting /Philips
bulb,including
choke, coverfixing and No. 2,500.00 -
connectionswire,
connecting as per GI.instruction of
bracket clamp,
Electrical
nut bolt andEngineer-in-charge..
all accessories refer to
111 catalouge
Supply andNo - Crompton
fixing of 1200codemm sweep
T5SHO424EB
AC Ceiling fanIPwith65/MAKE HPLwire
connecting
CODE HPLT5STAL424 /Philips
and all accessoriesrefer to catalouge No. 2,000.00 -
including
No - Ushafixing and connections
[Model-MIST AIR as
per instruction
ULTRA] of Electrical
/ Crompton [Model-Engineer-
WM
112 in-charge..
HIGH FLO]
Supply etc. including
and fixing of 300 mm hanging
sweep
and connections
exhaust fan withasconnecting
per instruction of
wire and
Electrical Engineer-in-charge.
all accessories refer to catalouge No- No. 2,150.00 -
Khaitan [Model-Euro] / Usha[Model-
Turbojet Dlx] / Cromton [Model-
113 Tranair/Transair
Supply & fixingreversable]
of Callingincluding
Bell
fixing andall
including connections
accessoriesasreferper to
instructionno.
catalouge ofMake
Electrical Engineer-in-
- Cropton code No. 150.00 -
charge
ICBH10/Make PHILIPS /Code
NXC101/Make-HPL Code
113 H1BHO10008S
Supply & fixingand of 2connections
x 18 Watt as
per instruction
CFL. Decorative of EIC.
Portico Light
fittings including all accessories refer No. 2,000.00 -
to catalouge no. Make - Cropton code
ICBH10/Make PHILIPS /Code
114 NXC101/Make-HPL
Supply & fixing of BULK Code HEAD
H1BHO10008S
FITTING and connections
including as
all accessories
per instruction
refer to catalouge of EIC.
no. Make - Cropton No. 965.00 -
code ICBH10/Make PHILIPS /Code
NXC101/Make-HPL Code
115 H1BHO10008S
Supply and fixing and
of connections
earthing as
per instruction of EIC.
including 38 mm. dia. 3 mtr. long
G.I pipe[Heavy Duty].The pipe shall No. 4,000.00 -
have 12 mm. dia. perforated holes at
15 cm centre to centre up to 2.5 mtrs
height from the bottom and fitted with
a 38 mm. dia. G.I flange at the top
with provision of holes for making
connection of earth continuity
wire,complete with masonry work for
116 Supply and fixing of sub earthing
with No-8 bare copper wire as earth
Continuity wire from Main pannel Rft. 40.00 -
board to earth electrode inside the
wall/ground to a depth of 50 mm. and
make good of
TOTAL the wall/groundCOST " B "
ELECTRICAL -
including all connections.
C 117 PH Works -
118 Supplying all materials and labour T -
& P fitting and joining of the
following CPVC. Pipe.

119 448.50 -

a) 40 mm dia CPVC. Pipe Rmt


120 b) 25 mm dia CPVC. Pipe Rmt 261.63 -
121 c) 20 mm dia CPVC. Pipe. Rmt 168.19 -
122 d) 15 mm dia CPVC. Pipe Rmt 149.50 -
123 Supplying, providing & fixing on wall -
face unplasticised Pvc. Pipes &
fittings with all materials and labour
T & P etc. complete.

124 a) 110 mm dia U-PVC. SWR pipe Rmt 391.69 -


125 b) 110 mm dia single junction with No 388.70 -
door

126 c) 110 mm dia bend with door. No 269.10 -

127 547.17 -
d) 110 mm dia P & S' Trap. No
128 547.17 -
e) 110 mm dia floor' Trap. No
129 239.20 -
f) 110 mm dia Plain Bend No
130 239.20 -
g) 110 Off sets. No
131 g) 110 mm Cowel. No 74.75 -
132 Providing,fitting and fixing of water -
closet.( Including WC. & EWC. Type.
)

133 a) 580X425/Orissa Pan . No 2,093.00 -

b) EWC. Commod P/S Trap with seat


134 cover. No 2,242.50 -
135 c) 550X400 mm wash basin. Set 2,803.13 -
136 d) Stainless steel Kitchen Sink. Set 6,524.18 -
137 e) Low level cistern. Set 1,972.20 -
Supplying fitting & fixing of the -
138 following brass & Pvc. Ball valve.
139 a) 40mm dia full-way Valve. 3,289.00 -
No
140 b) 25mm dia full -way valve. 1,794.00 -

No
141 Supplying, fitting & fixing of
Cromiun plated cock in water supply
line.
142 a) 15 mm dia C.P Bib cock. 941.85 -
No
143 b) 15 mm. dia CP. Angle stop cock. No 1,008.00 -
144 c) 15mm dia C.P Conceal stop cock 1,270.75 -
No
145 Providing and fitting,fixing the -
following bath room fixture.

146 a) CP. Revolving Shower with Arm. 822.25 -


No
147 b) 600 X 12 mm CP. shelf with all 441.03 -
fixture. No
148 c) 600 X 450 mm Mirror with Pvc. 1,339.52 -
Frame. No
149 d) 125 mm soap case C.P 299.00 -
No
150 e) 600 X 25mm C.P Towel rail 702.65 -
No
151 Supplying all materials labour T & P -
laying U-PVC 4kg/cm2 pipe.
152 a)160 mm dia (4 kg/cm2 ) Pipe(IS- 525.00 -
4985/2000)
Rmt
153 b)110 mm dia (4 kg/cm2 ) Pipe(IS- 328.90 -
4985/2000) Rmt
154
Construction of Inspection Chamber

155 a) (3' 0'' X 3' 0'' ) size. No 8,000.00 -


156 Construction of Septic tank with soak -
pit
157 a) 30 Users 60,000.00 -
No
158 Providing & fixing of Pvc. water tank
Lit 14.35 -
(Fibre) ISI Triple layer.
TOTAL PH. & SANITARY COST " C " -
TOTAL = ( A + B + C ) -

Less 7.95% as per Agreement 7.95% -


Net -

Net amount of veriation i.e., Less -


Excess or less
Percentage of deviation/variation in
comparison to original contract Less #DIV/0!
price

Signature of Signature of Signature of


APM (Elect.) APM ( Civil ) Dy. Manager

Signature of GM Signature of Chief Engineer


LFARE CORPORATION LTD. BHUBANESWAR - 22
FORM NO.- 11
OF
M SDPO. AT JAGATSINGHPUR.
OF DEVIATION STATEMENT
Scheme - STATE PLAN 2014 - 15

pada, Po.- Mahanga, Dist.- Cuttack.

Revised
Rate Amount Less Excess
Qnty

7 8 9 10 11

- - - -

4,063.55 - -

4,253.27 - -

4,286.27 - -

4,409.65 - -
4,554.31 - -

4,527.09 - -

4,650.47 - -
5,310.35 - -

5,349.81 - -
5,396.08 - -

89.61 - -

210.94 - -

253.13 - -

303.75 - -

455.28 - -

546.33 - -

655.60 - -

314.54 - -

377.45 - -

452.94 - - -

526.72 - -
85.36 - -

87.92 - -

90.63 - -

91.12 - -

92.92 - -
94.78 - -

117.27 - -

119.56 - -

121.93 - -

34.31 - -

35.41 - -

36.57 - -

70.27 - -

71.46 - -

72.72 - -
54.90 - -

55.61 - -

56.35 - -

48.36 - -

48.98 - -

49.62 - -

11.56 - - -

11.74 - -

11.93 - -

90,173.61 - - -

90,173.61 - - -

90,173.61 - -

5,183.49 - -

5,183.49 - -
5,183.49 - -

75.84 - -

77.40 - -

79.02 - -

34.47 - -

35.13 - -

35.81 - -

86.63 - -

86.63 - -

317.33 - -

317.33 - -

862.91 - - -

876.97 - -
1,057.69 - -

1,062.10 - -

6,470.52 - -

6,481.39 - -

6,492.88 - -

35.00 - -

368.29 - -

368.29 - -

5.77 - -

5.95 - -
6.14 - -

330.63 - -

330.63 - -
330.63 - -

3,800.00 - -
3,800.00 - -

43.10 - - -

43.10 - - -

43.10 - -

202.71 - -

214.05 - -
227.34 - -

1,780.84 - - -

719.59 - - -

1,750.00 - - -

-
- -

- - -

- 950.00 - - -

- 950.00 - - -
- 950.00 - - -
- 950.00 - - -
- 950.00 - - -
- 1,000.00 - - -

- 1,150.00 - - -

- 950.00 - - -

- 750.00 - - -

- 1,200.00 - - -

- 90.00 - -

- 145.00 - -

- 195.00 - -

- 285.00 - -

- 4,000.00 - - -
- 17,150.00 - - -

- 200.00 - - -

- 900.00 - - -

- 2,500.00 - - -

- 2,000.00 - - -

- 2,150.00 - - -

- 150.00 - - -

- 2,000.00 - - -

- 965.00 - - -

- 4,000.00 - - -
- 40.00 - -

- -

- - -

- -

448.50 -

261.63 - -
168.19 - -
149.50 - -

- -

391.69 - -
388.70 - -

269.10 - -

547.17 - - -
547.17 - - -
239.20 - - -
239.20 - -
74.75 - -
- -

2,093.00 - - -

2,242.50 - - -
2,803.13 - - -
6,524.18 - - -
1,972.20 - - -

- -

3,289.00 - - -
1,794.00 -

-
- -

941.85 -
-

1,008.00 - - -
1,270.75 - - -
-
- -

822.25 -
- -

441.03 -
- -

1,339.52 -
- -

299.00 - - -
702.65 - - -
-
- -
525.00 -
-

328.90 -
-

- -

8,000.00 - - -

- -

60,000.00 -
- -

14.35 - - -

-
- - -
-
-

Signature of Signature of
Accountant Joint Manager

Deviation statement For

Rs. 0.00
being 10.57% percent less than the
agreement value is accepted.
Accepting Authority
ESWAR - 22

Reasons

12

Field measurement has been


taken.

Field measurement has been


taken.

Field measurement has been


taken.

do
do

do
Field measurement has been
taken.

do
do

Site measurement has been


taken as per drawing.

do

do

Site measurement has been


taken as per drawing.

do

do

Physically measurement has


been taken Drwaing & Design

do

do

Field measurement has been


taken.
Physically measurement has
been taken as per Drwaing &
Design.

Estimate done in Centre line


method, physical measurement
has been recorded

do

Physical measurement has


been recorded as per Drwaing
& Design.

do
do
Estimate done in Centre line
method, Physically
measurement has been taken
as per Drwaing & Design.
do

do

Physically measurement has


been taken as per Drwaing &
Design.

do

do

Physically measurement has


been taken as per Drwaing &
Design.

do

do
Physically measurement has
been taken as per Drwaing &
Design.

do

do

Physically measurement has


been taken as per Drwaing &
Design.

do

do

Physically measurement has


been taken as per Drwaing &
Design.

do

do

Field measurement has been


taken.

do
MS. Sheet door has been
provided as per instruction of
user authority.

Field measurement has been


taken.

do
MS. Sheet door has been
provided as per instruction of
user authority.

Field measurement has been


taken as per Drawing.

do

do

Physically measurement has


been taken from site.

do

do

Physically weighment has been


taken.

do

do

do
Practically measurement has
been taken from site.

do

Field measurement has been


taken from site.

do

do

Work has not done. d

Physically measurement has


been taken from site.

do

Physically measurement has


been taken from site.

do
do

Physically measurement has


been taken from site.

do
do

Field measurement has been


taken from site.
do

Physically measurement has


been taken from site.

do

do

Field measurement has been


taken as per work done.

do
do

Practically measurement has


been taken from site.

Field measurement has been


taken as per work done.

As per site requirement with


respect to Drawing & Design.

do
do
do
do
do

do

do

do

do

As per Drawing & Design.

As per Drawing & Design.

As per Drawing & Design.

As per Drawing & Design.

do
do

As per Field measurement.

As per site requirement with


respect to Drawing & Design.

do

As per Drawing & Design.

do

do

do

do

As per estimate & agreement.

ELECT. CIVIL
As per Drawing & Design. - -

- CIVIL+PH

- Checked
Less qnty has been provided in
estimate, but as physically
reqd. work has done and
recorded

do
do
do

Field measurement has been


taken.
Less qnty has been provided in
estimate, but as physically
reqd. work has done and
recorded

Field measurement has been


taken.

do
do
do
do
do
Field measurement has been
taken

do
do
do
do

As per site requirement

Less qnty has been provided in


estimate, but as physically
reqd. work has done and
recorded

Field measurement has been


taken.
do
do

Field measurement has been


taken.

do

do

do
do
As per site measurement.

As per site measurement.

As per site requirement

As per Estimate & Agreement

As per Estimate & Agreement

PH
-
Accepting Authority

228..666
0
Special note/Check list towards sanction of Deviation pertaining to Bui
work as per OPWD code volume -1, Para-3.5.31 and 6.

1 Name of the work.- OFFICE-CUM-RESIDENCE OF SDP


JAGATSINGHPUR.

CA. No.- POL. 2014 - 0221 ,


Scheme - STATE PLAN 201
2 Name of the Agency/Contractor.- Sri Sunakar Behera, At.- Chahapada, P
Cuttack.

3 (a) A/A. No. & Date ( Attested Xerox copy of


Administrative Approval order to be attached )
Yes.
(b) Details of original A/A. Amount.-
Civil cost.- Rs. 0.00
EI. (Internal)- Rs. 0.00
PH. (Internal)- Rs. 0.00
EI. (External)- LS. Rs. 0.00
PH. (External)- Rs. 0.00
MIS. CC. Road Rs. 0.00
Probate / Departmental charges.- Rs. 0.00
TOTAL Rs. 6,170,000.00
Rounded up to Rs. 6,170,000.00
4 Till to date position of allotment received, expenditure incurred and balance amount of allotment
Division. (Furnish the information financial year wish)

Sl.
Financial Year Allotment Received Expenditure Incurred
No.
1 2 3 4 5 6

2
3

5 (a) Amount of actual payment made to the concerned agency / contractor through different runn
this work. Till to date position of payment made to the contractor ( i.e up to submission of th
to be furnished in the ....

Total Amount Cumulative Measurements record


Sl. Voucher No. Reference of
of the running Amount of
No. & date Running bill
bill running bill MB. No.
1 2 3 4 5 6

1 R/A. 1 1,289,806.00 1,289,806.00 1182/CTC

2 R/A. 2 745,528.00 2,035,334.00 1182/CTC

3 R/A. 3 996,162.00 3,031,496.00 1377/CTC

4 R/A. 4 572,097.00 3,603,593.00 1377/CTC

(b) Whether any amount is kept pending towards approval of deviation statement by the higher

6 Agreement No. 707, Date. 27. 01. 2016

7 Supplementary Agreement No. -


(Copy of the same may be attached) No.
8 Actual amount of work put to tender.- Rs. 4,849,060.00

9 Actual agreement value of the work.- Rs. 4,250,201.00


10 Value of the work done under original Agreement.- Rs. 0.00

11 Value of the work done under Supplementary.- No.

12 Total value of the work done.(both original &


supplementary Agreement) -
Rs. 0.00
13 Amount of Net deviation of the work. (Furnish deviation
statement in two sets along with original work.-
Rs. 0.00
14 Percentage of excess / less deviation.- #DIV/0! % Less

15 Date of commencement of the work.- Dt. 26. 11. 2015

16 Stipulated date of complettion of the work.- Dt. 26. 09. 2016


17 (a) Whether the work is completed in all respect if so,
completion certificate may be attached.- Yes.
(b) Whether the building is handed over to concerned
department for their functioning if so, furnish the
copy.-
Yes.

18 If not, state the present position of the work.- Handed Over.

19 Whether the deviation amount exceeds 10% then the


original agreement value.- No.
20 If it exceeds more than 10% detailed reasoning along
with technical report may be attached.-
No.
21 Permission from competent authority to go ahead with
the works to be furnished.- No.
22 Is the deviation is due to change of site / design, if so,
copy of the approval order for such changes may be.- No.
23 Whether EOT. Has been granted up to the required
extent, if so, a copy of the same may be furnished.- NA
24 Whether the deviation is due to extra quantities of work
done.- Yes.
25 (a) Whether the deviation is due to extra items of work
done.- No.
(b) If deviation is due to extra items of work, whether
the.- No.
26 Authority approved the tender.-
(Furnish the copy of the Letter No. & date of the same.)

27 Authority accepted the tender.-


(Furnish the copy of the Letter No. & date of the
same.)

(a) Tender accepted amount.- Rs. 4,250,201.00

(b) Amount put to tender.- Rs. 4,849,060.00

(c) Percentage of Excess / Less in comparison to the


estimate cost.- 94.19 % Less

(d) Corresponding Schedule of rates adopted while


commanding the tender.- Yes.
28 Whether R.A.A is required.- No.

29 (a) If so, what is the present position of R.E ? No.

(b) Whether R.A.A is obtained ? if so, furnish the xerox


copy of R.A.A order of the work.- No.
30 Nos. of contractor participated in the original tender.-

31 (a) Whether the relative position of the tenderer is


changed due to such deviation.-

(b) Relative position of the tenderer basing upon the


deviated quantities.- (Furnish the copy of the
relative position of tender)

Sl. Total Amount (As per present


Name of the Participant Tenders
No deviation Qnty.)
1 2 3

3
32
Reason of Deviation. - Furnish details along with all
technical report and other supporting documents to prove
the reasons for Deviation.-
Yes.
33
Whether the case is Recommended by the Executive
Engineer concerned.-

34 Whether the case is Recommended by the Superintending


Engineer concerned.-

All the columns are to be filled in properly. No column is remained blank. The same may be filled up "NO
Approved vide letter No. B I W/D 20/2003-31800, Dt. 23.07.2003 of Chief Engineers, Buildings, Odisha,
pertaining to Building/Road portion of
ara-3.5.31 and 6.3.17

M-RESIDENCE OF SDPO. AT
HPUR.

POL. 2014 - 0221 ,


STATE PLAN 2014 - 15
ehera, At.- Chahapada, Po.- Mahanga, Dist.-

nce amount of allotments available with the

Balance Amount
Remarks
Available
7 8 9
r through different running towards executing of
e up to submission of this Deviation statement )

Measurements recorded vide Remarks

Date of
Page No.
Measurement
7 8 9

92 05. 03. 2017

167 22. 03. 2017

36 15. 08. 2017

115 22. 12. 2017

tatement by the higher authorites.

01. 2016
( Handed over dt. 05.02.2018 )
nt (As per present
Position of Tenderer
tion Qnty.)
3 4
ame may be filled up "NOT APPLICABLE" or N.A.
neers, Buildings, Odisha, Bhubaneswar.
THE ODISHA STATE POLICE HOUSING & WELFA
BHUBANESWAR-22
FORM NO-11
1.Name of work - Const.of Internal electrification work of 30 men barrack for home guard Jagatsinghpur
FORM OF DEVIATION STATEM
2.Agreement No - 653,DT-26.
3.Contractors name Sri Smrutidhara Behera

Quantity as
Sl No. Item of Work per Rate Amount
Agreement

Electrical Work

1 Angle Holder Point 20.00 840.00 16800.00

2 Tube Light Point 17.00 840.00 14280.00

3 Concealed wiring to Bulkhead point 2.00 840.00 1680.00

4 Concealed wiring to batten holder point 4.00 840.00 3360.00

5 Concealed wiring to ceiling fan Point 15.00 1050.00 15750.00

6 Concealed wiring to security light point 4.00 900.00 3600.00


Concealed wiring to Exhaust fan point
7 3.00 840.00 2520.00

Concealed wiring to 6 AMP Modular Socket Point.


8 8.00 440.00 3520.00

Concealed wiring tosub main with 1.5 sq mm cupper


9 conductor 180.00 90.00 16200.00

10 Concealed wiring tosub main with 6.00 sq mm cupper 25.00 195.00 4875.00
conductor
Supply and fixing of 4 core 16 sqmm armoud cable
11 50.00 290.00 14500.00

Supply and fixing of 12 way BDB


12 2.00 5600.00 11200.00

Supply and fixing of32 AMP ,4P MCB main switch


13 with32 AMP .cut out including all accessories and 1.00 12000.00 12000.00
connection.
14 Supply and fixing 1*28 watt decorative type light 24.00 200.00 4800.00
fitting
Supply and fixing of 4'X28 watt T-5 fitting with lamp.
15 17.00 1400.00 23800.00

16 Supply and fixing of 1*36 watt pll streetlight 4.00 2000.00 8000.00

17 Supply and fixing of 1200 mm sweep ac celling fan 14.00 2200.00 30800.00
18 Supply and fixing of bulk head fitting 2.00 1000.00 2000.00
Supply and fixing of exhaust fan
19 3.00 1700.00 5100.00

Supply and fixing of earthing.


20 2.00 3000.00 6000.00

21 Supply and fixing of sub earthing with No- 8 bare 100.00 40.00 4000.00
copper wire.

204785.00

c. Net amount of variation i.e excess/less - Less ( 1606650.00-1070715 ) = Rs.535935.00(Excess)


d.Percentage of deviation/variation in comparison to original contract price-(1282640.70/10604451.85) x 100 =12.10%(Less)
OLICE HOUSING & WELFARE CORPORATION LTD.

FORM NO-11
Jagatsinghpur
RM OF DEVIATION STATEMENT
greement No - 653,DT-26.11.2015.

Revised Qty Rate Amount Less Excess

20.00 840.00 16800.00 0.00

17.00 840.00 14280.00 0.00

2.00 840.00 1680.00 0.00

4.00 840.00 3360.00

15.00 1050.00 15750.00 0.00

4.00 900.00 3600.00 0.00

3.00 840.00 2520.00

8.00 440.00 3520.00 0.00

160.00 90.00 14400.00 1800.00

20.00 195.00 3900.00 975.00

37.00 290.00 10730.00 3770.00

2.00 5600.00 11200.00

1.00 12000.00 12000.00

24.00 200.00 4800.00

17.00 1400.00 23800.00

4.00 2000.00 8000.00

14.00 2200.00 30800.00


2.00 1000.00 2000.00

3.00 1700.00 5100.00

2.00 3000.00 6000.00 0.00

80.00 40.00 3200.00 800.00

197440.00 0.00
7345.00

ss)
451.85) x 100 =12.10%(Less)