Table of Contents
1 Scope..............................................................2
2 Purpose...........................................................2
3 References......................................................2
4 Abbreviations..………………………………… 2
5 Definitions...................................................... 3
6 General …………………………………………4
7 Instruction ..................................................... 4
8 Roles and Responsibilities..............................7
Previous Issue: 19 August, 2009 Next Planned Update: 10 April 2017
Page 1 of 12
Primary Contact: Khalid S. Al‐Ghamdi on +966 13 880‐1775
Copyright Saudi Aramco 2014. All rights reserved.
Document Responsibility: Project Quality Standards Committee 00‐SAIP‐13
Issue Date: 10 April 2014 Projects Quality Assessments
Next Planned Update: 10 April 2017
1 Scope
This procedure defines the minimum requirements for planning, performing, and reporting
of quality assessments by Inspection Department for all projects managed by Project
Management.
Note: Unscheduled projects quality assessment shall be requested in writing from the
Inspection Department Manager at least one (1) month before the assessment required date.
2 Purpose
3 References
SCHEDULE Q Quality Systems for Major LSTK Projects
SAEP-1150 Inspection Coverage on Projects
SAEP-1154 Guidelines for Contractor's Quality Plan
ISO 10005 Quality management systems- Guidelines for quality plans
GI-0400.001 General Instruction Manual, Quality System Roles & Responsibilities
ISO 9001 Quality Management System Requirements
ISO 29001 Petroleum, petrochemical and natural gas industries -- Sector-
specific quality management systems -- Requirements for product
and service supply organizations
4 Abbreviations
ACU Assessment and Contracts Unit
CAR Corrective Action Request
ID Inspection Department
ISSD Inspection Support Services Division
NCR Non Conformance Report
PQM Project Quality Manager
QAG Quality Assessment Group
SAPMT Saudi Aramco Project Management Team
Page 2 of 12
Document Responsibility: Project Quality Standards Committee 00‐SAIP‐13
Issue Date: 10 April 2014 Projects Quality Assessments
Next Planned Update: 10 April 2017
5 Definitions
Assessed Party: A contractor for the project, which is assessed.
Assessment Team: A group of individuals selected to perform a project assessment
referred as assessors. The group consists of team leader who assesses the Quality
Management System and leads the team members who are technical experts in various
disciplines such as: mechanical, electrical, instrumentation, civil, and/or as required
Corrective Action: An action taken to eliminate the causes of any existing nonconformity
or other undesirable situation in order to prevent recurrence
Lead Assessor: A person who has the qualification to perform and manage quality
assessments in Inspection Department.
Quality Plan: The document setting out specific project organizations, interactions, Quality
Management System practices, resources and sequence of activities relevant to the contract.
It shall explicitly define the direct control function and procedures which inspect, measure,
test, record and regulate procurement, fabrication, construction, installation, pre-
commissioning and/or mechanical completion activities through established methods,
specifications and standards for all disciplines involved
Yearly Projects Assessment Schedule: A schedule of projects that will be assessed during
the year. The projects will be selected form Master Scheduling System Report and based on
specific criteria. The schedule contains the names and numbers of projects, contractor
names, date of assessment, and the status of the assessment result.
Page 3 of 12
Document Responsibility: Project Quality Standards Committee 00‐SAIP‐13
Issue Date: 10 April 2014 Projects Quality Assessments
Next Planned Update: 10 April 2017
6 General
7 Instruction
7.1 Competent Lead Assessor is assigned to conduct the assessment for the project and
shall have successfully completed 5-days ISO Quality Management System Lead
Auditor course from an accredited training service provider and passed the
examination.
Page 4 of 12
Document Responsibility: Project Quality Standards Committee 00‐SAIP‐13
Issue Date: 10 April 2014 Projects Quality Assessments
Next Planned Update: 10 April 2017
7.2 The following six assessment phases shall be followed as applicable: initiating the
assessment, conducting documents review, preparing for the on-site assessment,
conducting on-site assessment, reporting assessment results, and conducting
follow-up activities.
7.3 Planning, Preparation, and Scheduling Assessment:
7.3.1 QAG establishes and maintains a schedule of selected projects for
assessments.
7.3.2 PQM is notified on the assessment date by QAG prior to the scheduled
assessment at least one month and the contractor is notified on the
assessment date by PQM at least three weeks to ensure readiness. In
situation where assessments are needed immediately advance notification is
not required.
7.3.3 PQM is informed on the assessment plan by QAG at least one week prior to
the scheduled assessment and the contractor is notified on the assessment
plan by PQM at least three working days to ensure readiness.
7.3.4 The necessary documentations are reviewed in order to become thoroughly
familiar with the project prior to the assessment.
Page 5 of 12
Document Responsibility: Project Quality Standards Committee 00‐SAIP‐13
Issue Date: 10 April 2014 Projects Quality Assessments
Next Planned Update: 10 April 2017
Establish the official communication links between the assessment team
and the Assessed Party.
Discuss the availability of the necessary resources.
Discuss the time and date for the closing meeting with the Assessed
Party.
Record the attendees during the opening.
7.4.3 Objective evidence is collected through interviews, examination of
documents, and observations of activities in the area of concern. Areas
suggesting non-conformities should be further investigated.
7.4.4 Prior to the closing meeting with the Assessed Party, the assessment team
reviews their findings and agree on the non-conformities to be discussed to
the Assessed Party management. The assessment team ensures that the
audit findings are clear, concise, and supported by objective evidence.
7.4.5 Nonconformities are identified in terms of the specific requirements of the
standard or other related documents against which the assessment was
conducted.
7.4.6 Upon completion of the assessment, the Lead Assessor conducts a closing
meeting. The purpose of the closing meeting is to:
Present the assessment findings to ensure that assessment findings are
clearly understood.
Any disagreements shall be highlighted and discussed with Assessed
Party
The time frame of submitting corrective actions implementation shall not
exceed 90 days from releasing SAP notification or follows section 6.7.
Record the attendees during the closing meeting
Page 6 of 12
Document Responsibility: Project Quality Standards Committee 00‐SAIP‐13
Issue Date: 10 April 2014 Projects Quality Assessments
Next Planned Update: 10 April 2017
7.5 Reporting Project Assessment
7.5.1 The assessment findings are reported in SAP through F6 Notification within
fourteen (14) working days from the date of the assessment completed, and
handed over for review and approval.
7.5.2 As a minimum, the assessment report in the SAP through F6 Notification
includes the following information: Executive Summary, Assessment Dates,
Purpose, Scope, Assessment Team, Details of Assessment Findings, and
Corrective Actions (Appendix I).
7.5.3 As a minimum, ID Manager, ISSD Division Head, ACU Supervisor, QAG
Leader, PID Sr. Supervisor, PQM, SAPMT, Lead Auditor, and contractor
shall be included in the notifier list.
7.5.4 The Assessed Party completes all required corrective actions with objective
evidence for closure of the non-conformity within the agreed time frame.
Page 7 of 12
Document Responsibility: Project Quality Standards Committee 00‐SAIP‐13
Issue Date: 10 April 2014 Projects Quality Assessments
Next Planned Update: 10 April 2017
8.2 PQM or his representative is responsible for the following:
8.2.1 Attend opening and closing meeting.
8.2.2 Notify the contractor of the scheduled assessment date at least three weeks
prior to the scheduled assessment.
8.2.3 Notify the contractor of the assessment plan at least three working days
prior to the assessment.
8.2.4 Report the CARs of the assessment to the assessed party.
8.2.5 Receive and verify completed corrective actions from assessed party.
8.2.6 Upload the completed corrective actions with evidences in SAP.
Page 8 of 12
Document Responsibility: Project Quality Standards Committee 00‐SAIP‐13
Issue Date: 10 April 2014 Projects Quality Assessments
Next Planned Update: 10 April 2017
8.4.6 Make final decisions regarding the conduct of the assessment
8.4.7 Report critical nonconformities to the Assessed Party immediately
8.4.8 Report assessment findings in SAP through F6 Notification.
8.4.9 Review all corrective actions and complete F6 notification in SAP
accordingly.
8.5 Assessment team is responsible for the following:
8.5.1 Prepare for the assessments by reviewing the contractor's Quality Plan,
Schedule Q, B , and H of the Contract Document, applicable quality system
standards (ISO-9001or equivalent Industry Standards), and Mandatory
Saudi Aramco Engineering Requirements as applicable.
8.5.2 Prepare a list of findings for his area of responsibility and forward them to
the Lead Assessor to prepare a list of findings for his area of responsibility.
Revision Summary
April 10, 2014 Major Revision
Page 9 of 12
Document Responsibility: Project Quality Standards Committee 00‐SAIP‐13
Issue Date: 10 April 2014 Projects Quality Assessments
Next Planned Update: 10 April 2017
Requirement:
PROPOSED ACTIONS
Correction:
Root Cause:
……………………………………………………………………………………………
Verified by: Date: Signature:
Page 10 of 12
Document Responsibility: Project Quality Standards Committee 00‐SAIP‐13
Issue Date: 10 April 2014 Projects Quality Assessments
Next Planned Update: 10 April 2017
Appendix II –Projects Quality Assessment Flow Chart
Schedule Project Assessments by
Assessment Group Leader
Communicate assessment date to PQM
and request assessment documentations
by Lead Assessor
Send technical
documentation
Receive projects documentations by Lead to Technical
Assessors Assessor
Review QMS project documentations by
Lead Assessor Review project
technical
documentation
Conduct assessment by Assessment Team
by Technical
Assessor
Evaluation
NO
Satisfactory
Record Assessment
report and create SAP Yes
F6 notification with
Corrective Actions
Request Complete SAP notification
Send note
Assessment completed
Page 11 of 12
Document Responsibility: Project Quality Standards Committee 00‐SAIP‐13
Issue Date: 10 April 2014 Projects Quality Assessments
Next Planned Update: 10 April 2017
Appendix III –CAR Closure Flow Chart
Uploaded CARs in the SAP through F6
notification by PQM
Receive / Review CARs
by Lead Assessor
Follow up
assessment YES
Create another task
required?
in the SAP for
Corrective Actions
Request
NO Conduct follows up
assessment by Lead
Assessor
NO CARs
Satisfactory?
YES
Complete SAP notification and send note
CARs completed and closed