Sei sulla pagina 1di 1

Legend:

SYMBOLS
DESCRIPTION SYMBOLS DESCRIPTION

THERMAL EXPANSION VALVE PIPE REDUCER

SAFETY VALVE PIPE INSULATION


400V / 3ph / 50Hz 400V / 3ph / 50Hz
THREE WAY VALVE CCP CENTRAL CONTROL PANEL

STOP VALVE AT OPEN POSITION TE TEMPERATURE ELEMENT


COMPRESSOR COMPRESSOR
CCP CCP
STOP VALVE AT CLOSED POSITION PT PRESSURE TRANSMITTER
ISOLATION POWER STARTER PANEL ISOLATION POWER STARTER PANEL
FILTER PI PRESSURE INDICATOR
JUNCTION BOX JUNCTION BOX JUNCTION BOX JUNCTION BOX
INTERFACE POINT DIRECTION ARROW

TYPICAL FOR TYPICAL FOR


ALL 3 COMPRESSORS ALL 3 COMPRESSORS

ITEM DESCRIPTION ITEM DESCRIPTION

HS HS

TYPICAL FOR ALL 3 COMPRESSORS TYPICAL FOR ALL 3 COMPRESSORS

R R R R R R R R R R
TYPICAL FOR ALL 3 COMPRESSORS

TYPICAL FOR ALL 3 COMPRESSORS


PT PI PSL PT PI PSL
R

R
PSH PSH
R

R
R

R
400Vac ELECTRIC POWER SUPPLY

400Vac ELECTRIC POWER SUPPLY


R

R
R

R
R

R
R

R
TYPICAL FOR ALL 3 COMPRESSORS TYPICAL FOR ALL 3 COMPRESSORS

R
R

R
R

R
R R R R R R

R
R R R R R R R R R R

Reference Drawings
R

R
R

R
Drawing No. Description

WHP01-RCE1-ASEGY-02-190004 EG WELLHEAD PLATFORM - MEZZANINE DECK


R

R
R

R
WHP01-RCE1-ASEGY-02-190005 EG WELLHEAD PLATFORM - MAIN DECK
R

R
R R
WHP01-RCE1-ASEGY-02-190007 EG WELLHEAD PLATFORM - TOP DECK
R

R
R

R
R R WHP01-RCE1-ASEGA-07-190001 EG WELLHEAD PLATFORM - ELECTRICAL EQUIPMENT LAYOUT

WHP01-RCE1-ASEGA-08-190005 EG WELLHEAD PLATFORM - INSTRUMENT ROOM LAYOUT


R

R
R

R
WHP01-RCE1-ASEGA-11-030001 EG WELLHEAD PLATFORM - BASIC HEAT LOAD CALCULATION

WHP01-RCE1-ASYYY-11-26001 PLATFORM HVAC DESIGN BASIS


R

R
AIR COOLED CONDENSER UNIT-WORKING AIR COOLED CONDENSER UNIT-STANDBY WHP01-RCE1-ASEGA-11-460001 EG WELLHEAD PLATFORM - HVAC UTILITY DIAGRAM

Key Plan:
R

R
R

R
EG PLATFORM
R R R R R R R R R R R R

R R R R
BRIDGE TO EG

THIS DRAWING
TE

TE
T

T
X X X X X X X X X X X X X X X X X X
R

R
R

R
ED PLATFORM
R

R
3~ __ 3~ __
R

R
R R R R R R
TO OPEN DRAIN

TO OPEN DRAIN

00 05-APR-2018 IFR ISSUED FOR REVIEW MUNAF NIRAJ SHUKLA MIKE HOLLOWAY

AIR HANDLING UNIT- WORKING AIR HANDLING UNIT- STANDBY Rev. Rev. Date St. Description Issued by Reviewed by Approved by

Originator Doc Number :

NOTES Block 5 - AL SHAHEEN FIELD Development


NWHP01 PHASE 2 - FEED STUDIES
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ELEVATIONS IN METERS UNLESS OTHERWISE
NOTED. EG WELLHEAD PLATFORM
2. INSTRUMENTS SHOWN IN THE SKID ARE SUBJECT TO CHANGE BASED ON VENDOR DATA.
HVAC P&IDs
3. COMPRESSOR QUANTITY AND CONDENSER FAN QUANTITY ARE SUBJECT TO CHANGE
BASED ON VENDOR DATA.
4. THIS DRAWING IS SCHEMATIC TYPE. ACTUAL INSTRUMENT SHOWN ARE SUBJECT TO
CHANGE DURING DETAILED ENGINEERING STAGE AND BASED ON VENDOR DATA. Phase: FE Class: 2 Sub System: LSPS Doc. Type: PID
5. INTERCONNECTIONS SHOWN WITH CONTROL PANEL ARE SUBJECT TO CHANGE BASED ON
VENDOR DATA AND SITE CONDITION DURING DETAILED ENGINEERING STAGE. Rev: 00 Format: A1 Scale: NTS Folio: 01 of 01

Document Number : WHP01-RCE1-ASEGA-11-270001


The information contained in this document is the proprietary to North Oil Company. It must not be
reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.

Potrebbero piacerti anche