Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Unit Code & Title : M/601/0472– Unit 24 - NETWORKING TECHNOLOGIES (NT) (No 1 of 1)
Assessment Title & No’s : A network solution for Winsoft (Pvt) Ltd - (NT – 16 – 001)
Date of Submission:
I hereby, declare that I know what plagiarism entails, namely to use another’s work and to
present it as my own without attributing the sources in the correct way. I further understand
what it means to copy another’s work.
Floor 1:
o Reception Area
o Marketing Department (10 employees)
o GM’s Room
o Accounts Department (08 employees)
o Customer Interview Area – with Wi-Fi facilities
Floor 2:
o Calling Center for USA clients - 150 computers
o Video conferencing room
o Training Center with 50 computers
Floor 3
o Calling Center for UK clients - 120 computers
o Auditorium – with Wi-Fi facilities
o The Server Room with the IT team
Floor 1:
o Reception Area
o Center Manager’s Room
o Calling Center for Australian clients - 100 computers
o Video conferencing room
Floor 2:
o Calling Center for Asian clients - 80 computers
o Training Center with 30 computers
o Auditorium – with Wi-Fi facilities
a) All departments’ computers of the HEAD OFFICE are to be integrated in to a centralized network.
Name – WINSOFT.com.
b) All computers in the KANDY branch are to be integrated in to a child entity of the main domain
which supposed to be designed under (a).
Name – KANDY.WINSOFT.com
c) Finance department should be kept independently in separate non-centralized environments.
d) The Auditorium of each branch and Customer Interview Area are to be equipped with Wi-Fi
connections which are limited only to their respective sites.
e) A dedicated connection between two branches (Head Office and Kandy) which would allow the
intra network connectivity between departments.
You are the Chief Network Engineer of Winsoft (Pvt) Ltd, and assigned with the task of plan, design and
implement a network solution for your own organization.
You are free to make assumptions, but all your assumption must be stated in the introduction.
Main Tasks
Task 01:
Discuss the benefits and constraints of different network systems types and topologies, and suggest
a suitable network topology for Winsoft (Pvt) Ltd networks and provide the reasons for your selection.
(LO1.1)
Task 02:
Prepare a report on network related technologies and standards that would be employed to when
implementing the network solution for Winsoft (Pvt) Ltd and discuss how they would impact on your
solution (individually and / or collectively). (LO 1.2)
Task 03:
Discuss the roles of different protocols that you would have to employ in this solution and how they
enable the effective utilization of your networking system. (LO 1.3)
Task 04:
Design a comprehensive network solution for the main and city center and explain how your design
meets the requirements of Winsoft (Pvt) Ltd. (LO 3.1) (M2.1) (D3.4)
Task 05:
Critically discuss the role of software and hardware components that you would employ in this
solution and how you would utilize them to create your new network infrastructure. (LO 2.1)
Task 07:
Discuss how workstation hardware inter-dependent with network components in the performance
of network. (LO 2.3)
Task 08:
You are required to obtain the feedback of the users of the network resources in different aspects in
order to stay updated of the performance and many other aspect of the network. Design a feedback
form to obtain the feedback of users. And analyze and summarize them. (LO 3.2)
Task 09:
Record your test results obtained in Activity 04 (with proper descriptions and screenshots) and
analyze with the expected outputs. Evaluate your analysis. (LO4.3)
Task 10:
State the enhancements that you would implement after a period of one year from the
implementation of the solution to improve the aspects including but not limited to bandwidth,
quality, security and scalability (LO 4.4)
Task 11:
Design a comprehensive maintenance schedule for the network which is to be designed for Winsoft
(Pvt) Ltd. (LO 4.5)
Practical Observation Sheet
Activity Activity Learning Date Signature
No Outcome (LO)
1 Install Windows Server 2008 Operating (LO 4.1)
System and set up correct IP Address (D2.3)
Settings
2 Configure the Primary Domain Controller (LO 4.1)
for WINSOFT.com (D2.3)
3 Add a client computer to the domain with (LO 4.1)
appropriate IP Address Settings to the (D2.3)
domain WINSOFT.com
4 Design the child domain for (LO 4.1)
KANDY.WINSOFT.com (D2.3)
5 Test whether the configurations work as (LO 4.2)
expected
4.3 document and analyse test results against expected results Task 09
M1.1 Effective judgments have been made To achieve M1, you must decide
correctly the servers required in this
solution and justify your selection of
the best server out of the products
available in the market (Task 06).
M2.1 relevant theories and techniques have been applied To achieve M2, you must provide a
comprehensive solution for the
scenario given here (Task 04) by
applying correct techniques and
theories
M3.3 A range of methods of presentation have been used and To achieve M3 your documentation
technical language has been accurately used must be well structured adhering to
the formatting guidelines with non-
overlapping facts.
Data provided are accurate, reliable
and consistent.
Appropriate technical terms must
have been used with correct screen
shots where appropriate.