Daily Report

Project: 4 Contract No: GR1429249

Contractor: TECHNICO CONSTRUCTION SERVICES, INC. Date: 10.23.2018

Working Hours:

Foreman/
Subcontractor Name Supervisor Section 3

PACIFIC ELECTRIC
E. ELECTRICAL 1
VITAL PLUMBING
HAYWARD BAKER, INC
MDF
TAMEER INS
ROMA SCAFFOLDING 1

Subcontractors TO

Foreman/
Technico Construction Services, Inc. / TRADES Supervisor Section 3

LABORERS
PCC
BRICKLAYERS
IRON WORKER
PAINTER
PROJECT MANAGER
SUPERVISORS 1
Technico CSI TO

Activities By Trade
Housekeeping at Bldg. # 3. ( TCS )
Installation of conduit nipples and riser box of Bldg. # 3. ( E ELECTRICAL )
Installation of conduit pipe on the load side enclosure at Bldg. # 3. ( E ELECTRICAL )
Cutting and welding on the gas pipe at Bldg. # 3. ( VITAL PLUMBING )
Executing punch list items on the dunnage at bldg. # 3. ( TCS )
Trenching for the gas line at Bldg. # 3. ( TCS )
House keeping at Bldg. # 4. ( TCS )
Piping out nipples from the transition box for the MI cable at Bldg. # 4. ( E ELECTRICAL )
Checking load for temp service at Bldg. # 4. ( E ELECTRICAL )
Cutting existing NYCHA gate to create opening for the upcoming crane lift at Bldg. # 4. ( TCS )
Installing new gate at Bldg. # 4. ( TCS )
Executing punch list items on the dunnage at bldg. # 4. ( TCS )
Installation of system scaffolding at the back of Bldg. # 4. ( ROMA SCAFFOLDING )
Cutting and welding on the gas pipe at Bldg. # 4. ( VITAL PLUMBING )
Change Order Work Inspections &

Visitors Deliveries of Material


EXIGER ( 3 REP )
NYCHA SAFETY ( 1 REP )

Supervisor Name: ANIL GANNESS


aily Report
Weather: 62 Sunny

Hours: 8

7:00am to 3:30 pm

Manpower SUB TOTAL

0
9 10
3 3
0
0
0
9 10
0
0
0
Subcontractors TOTAL : 23

Manpower SUB TOTAL

1 1
0
0
1 1
0
0
1
Technico CSI TOTAL : 3

tivities By Trade

CTRICAL )
( E ELECTRICAL )
BING )

. # 4. ( E ELECTRICAL )

crane lift at Bldg. # 4. ( TCS )

A SCAFFOLDING )
BING )
Inspections & Tests

Deliveries of Material & Equipment

Potrebbero piacerti anche