Introduction:
This report includes the check of the existing concrete slab and beams subjected to additional SDL of
10kPa which comprises of 300mm thick plinth, 12mm thk steel plate, 50mm screeding as well as the
4 nos of point loads from the steel frame supporting cross. This is a load replacement method where
the liveload is not present and being replaced by the superimposed deadload from these 4 elements.
The usual 0.5kPa of maintenance liveload is still applicable.
Design Code:
Design Assumption:
Fck= 25 (slab)
Fck = 30 (beam)
Fy of rebar = 500N/mm2
Table of Content
2) RHB20 Check 31 - 37
4) RVB17 Check 42 - 50
5) RVB20 Check 51 - 59
Load Cases
Sketch of slab
Eurocode 2 - 2004
Y
Lx=7.20
13.50 kN -7.83 kN
Ly=4.30
5.00 kN
5.40 kN
Total UDL =
Output
LOAD CASE 1
Position Wood-Armer Moments (kNm/m) Reinforcement (mm²/m)
Top Bottom Top Bottom
X (m) Y(m) X Y X Y X Y X Y
Wood-Armer Moments:
Eurocode 2 - 2004
Top:LC 1 (kNm/m)
4.00
00 2.00
4.
8.00
10.00
12.00
14.00
16.00
10.00
8.00
12.00
14.00
16.00
2.00
4.00 0
4.0
4.00 4.00
2.0
0 6.00 6.00
Wood-Armer Moments:
Eurocode 2 - 2004
Top:LC 1 (kNm/m)
15
10 10
5
5 5
20 20
25 25
5
30 30
Wood-Armer Moments:
Eurocode 2 - 2004
Bot:LC 1 (kNm/m)
1.00 2.00
432.0.000 4.
3.00
00
.0
6.005.00 0 00
5.00
6.
4.
5.000
6 0 00
8.0 7.00 .00 5. .00
0 6
6.00 5.00
5. .00
0 0
6.00
00
6
7.
6.00
7.00
0
6.0
7.0
2.00
5. 0
1.00
7.0
0
00
6.
6.0
0
0
1.00
Wood-Armer Moments:
Eurocode 2 - 2004
Bot:LC 1 (kNm/m)
2. 2.00
4. 00
00 4.00
6.00 6.00
8.00 8.00
10.00
2.0
12.00 10.00
0
14.00
10.00
0
00
8 .0
16.00
8.00
0
10.
6 .0
00
2.
0
6 .0 6 .0
0 4 .0 0
4 .0 0
Reinforcement:
Eurocode 2 - 2004
Top:LC 1 (mm²/m)
50
50
150
200
250
150
200
250
50 50
50
100 100
Reinforcement:
Eurocode 2 - 2004
Top:LC 1 (mm²/m)
150
200 250
200
150 150
100 100 100
50
50
50
50
50
100 100
300 30
350 35 0
400 4000
100
450 4
50
500 500 5 0
Reinforcement:
Eurocode 2 - 2004
Bot:LC 1 (mm²/m)
2 40
4 0
600 60
80
100 80 100
80
1
14 120 00 80 100
0
100
80 0
10
0
12
100
0
120
10
40
12
20
0
10
0
10
80
Reinforcement:
Eurocode 2 - 2004
Bot:LC 1 (mm²/m)
20 20
4 40
80 60 0 60 80
1000
12 100
14 120
16
18 000 140
160
40
2220
00
20
180
240
100 20
180
260
140
160
160
140
1
280
180
120
220
20
0
40
22
100 10
0
8060 60 80
40
Wood-Armer Moments:
Eurocode 2 - 2004
Envelope : Max. Top (kNm/m)
4.00
00 2.00
4.
8.00
10.00
12.00
14.00
16.00
10.00
8.00
12.00
14.00
16.00
2.00
4.00 0
4.0
4.00 4.00
2.0
0 6.00 6.00
Wood-Armer Moments:
Eurocode 2 - 2004
Envelope : Max. Top (kNm/m)
15
10 10
5
5 5
20 20
25 25
5
30 30
Wood-Armer Moments:
Eurocode 2 - 2004
Envelope : Max. Bot (kNm/m)
1.00 2.00
432.0.000 4.
3.00
00
.0
6.005.00 0 00
5.00
6.
4.
5.000
6 0 00
8.0 7.00 .00 5. .00
0 6
6.00 5.00
5. .00
0 0
6.00
00
6
7.
6.00
7.00
0
6.0
7.0
2.00
5. 0
1.00
7.0
0
00
6.
6.0
0
0
1.00
Wood-Armer Moments:
Eurocode 2 - 2004
Envelope : Max. Bot (kNm/m)
2. 2.00
4. 00
00 4.00
6.00 6.00
8.00 8.00
10.00
2.0
12.00 10.00
0
14.00
10.00
0
00
8 .0
16.00
8.00
0
10.
6 .0
00
2.
0
6 .0 6 .0
0 4 .0 0
4 .0 0
Reinforcement:
Eurocode 2 - 2004
Envelope : Max. Top (mm²/m)
50
50
150
200
250
150
200
250
50 50
50
100 100
Reinforcement:
Eurocode 2 - 2004
Envelope : Max. Top (mm²/m)
150
200 250
200
150 150
100 100 100
50
50
50
50
50
100 100
300 30
350 35 0
400 4000
100
450 4
50
500 500 5 0
Reinforcement:
Eurocode 2 - 2004
Envelope : Max. Bot (mm²/m)
2 40
4 0
600 60
80
100 80 100
80
1
14 120 00 80 100
0
100
80 0
10
0
12
100
0
120
10
40
12
20
0
10
0
10
80
Reinforcement:
Eurocode 2 - 2004
Envelope : Max. Bot (mm²/m)
20 20
4 40
80 60 0 60 80
1000
12 100
14 120
16
18 000 140
160
40
2220
00
20
180
240
100 20
180
260
140
160
160
140
1
280
180
120
220
20
0
40
22
100 10
0
8060 60 80
40
Wood-Armer Moments:
Eurocode 2 - 2004
Envelope : Min. Top (kNm/m)
4.00
00 2.00
4.
8.00
10.00
12.00
14.00
16.00
10.00
8.00
12.00
14.00
16.00
2.00
4.00 0
4.0
4.00 4.00
2.0
0 6.00 6.00
Wood-Armer Moments:
Eurocode 2 - 2004
Envelope : Min. Top (kNm/m)
15
10 10
5
5 5
20 20
25 25
5
30 30
Wood-Armer Moments:
Eurocode 2 - 2004
Envelope : Min. Bot (kNm/m)
1.00 2.00
432.0.000 4.
3.00
00
.0
6.005.00 0 00
5.00
6.
4.
5.000
6 0 00
8.0 7.00 .00 5. .00
0 6
6.00 5.00
5. .00
0 0
6.00
00
6
7.
6.00
7.00
0
6.0
7.0
2.00
5. 0
1.00
7.0
0
00
6.
6.0
0
0
1.00
Wood-Armer Moments:
Eurocode 2 - 2004
Envelope : Min. Bot (kNm/m)
2. 2.00
4. 00
00 4.00
6.00 6.00
8.00 8.00
10.00
2.0
12.00 10.00
0
14.00
10.00
0
00
8 .0
16.00
8.00
0
10.
6 .0
00
2.
0
6 .0 6 .0
0 4 .0 0
4 .0 0
Reinforcement:
Eurocode 2 - 2004
Envelope : Min. Top (mm²/m)
50
50
150
200
250
150
200
250
50 50
50
100 100
Reinforcement:
Eurocode 2 - 2004
Envelope : Min. Top (mm²/m)
150
200 250
200
150 150
100 100 100
50
50
50
50
50
100 100
300 30
350 35 0
400 4000
100
450 4
50
500 500 5 0
Reinforcement:
Eurocode 2 - 2004
Envelope : Min. Bot (mm²/m)
2 40
4 0
600 60
80
100 80 100
80
1
14 120 00 80 100
0
100
80 0
10
0
12
100
0
120
10
40
12
20
0
10
0
10
80
Reinforcement:
Eurocode 2 - 2004
Envelope : Min. Bot (mm²/m)
20 20
4 40
80 60 0 60 80
1000
12 100
14 120
16
18 000 140
160
40
2220
00
20
180
240
100 20
180
260
140
160
160
140
1
280
180
120
220
20
0
40
22
100 10
0
8060 60 80
40
4.50M SETBACK
3710
4.50
M SE
4.50M SETBACK
2885
TBA
CK
C4 RHB1 RHB2 (200x500) C10 RHB3 C12
RVB13
(200x500) RHB3a
C8
(200x400)
2115
PROPERTY BOUNDARY LINE
(200x500)
S2 C14 RHB5
(250x500)
(250x500)
C19
(250x500)
(200x500)
2543
S1 S1 S1
(200x500)
RVB2
RVB5
RVB9
S2 S6
(300x650)
RHB7 (200x600) C27
RVB7
RVB12
200mm thk
1649
RHB24
RVB16
C3 RHB8 (250x500) RHB9 (250x500) RHB10 (250x500) RHB11 S3
(250x600)
(250x500)
C9 S6
(200x500)
C7 C11 (250x500) C13
RVB22
RVB19
2051
(200x500)
1
RVB2a
S3 S1
200mm thk
RHB12 (200x400) C18 C26
(250x500)
(250x500)
(200x500)
(250x500)
300 2900
H10@100c/c B/W
RHB13a RHB13 (300x650) C23 RHB14 (250x600) H10@300c/c BOTHWAY
S1 S1
(200x400)
RVB22
300
S2 (250x600)
800)
EXISTING
(250x600)
(250x600)
RVB6
S2
175
RVB4
LIFT TO
(200x
RVB11
4107
80
ROOF SLAB
REMAIN
RVB8
S2
S1 SECTION A THE TRUSTEE OF THE METHODIST CHURCH
RVB21
RVB1a
RVB15
S1 Scale 1:15
RVB18
RHB15 (200x400)
IN SINGAPORE
(200x500)
S3
RHB16 RHB16a RHB17a RHB17 (300x800) RHB18 (300x800)
H10@300 c/c B/W
H10@100 c/c B/W
C2 (200x500) C6 (200x500) EC EB EC EB EC EB (300x800) C17 C22 C25
TBACK 300 ROUGHENING
CEMENT SAND PLASTER
800)
(200x500)
300mm THK
EXT'G SCREED & TILES PLINTH
(200x
EB EB EB 2938 EXT'G FOAM
80mm EMBEDMENT
WITH HILTI RE-500
(300x800)
EXT'G WATER PROOFING
6176
S1 MEMBRANE
0
00
RVB2
14
175
EB
EB
7.50M SETBACK
RVB3
RVB14
2495
2900
contextarchitects pte ltd
RVB10
14
S4 S1
RVB17
00
MAKE GOOD BY OTHERS
EB EB EB 45° CHAMFER
2554 DETAIL 1
S1 C21 3 C24 Scale 1:5
RHB2 0)0
(300x8
C1 EXISTING BUILDING TO REMAIN 2
RHB200)
2574
(300x8
C5 RHB
C16
(200 21 EB EB EB RHB22a
x50
0)
(300x80
0)
S E R V E LINE KJ Consultants
EC EC EC ROAD RE
R Y L INE
BOU NDA
R T Y
ROAD RESERVE LINE PR OPE
ROOF SLAB :-
ARY LINE
P R O P E R T Y B O U N D 5600 S1 - 175mm THK WITH H10-100mm C/C BOTHWAYS TOP AND BOTTOM
5585 5600 6700 7850 4405
S2 and S3 - 150mm THK WITH H10-125mm C/C BOTHWAYS TOP AND BOTTOM
S4 - 150mm THK WITH H10-100mm C/C(Short Span) + H10-150 c/c (Long Span) TOP AND BOTTOM
3.1 4.1 5.1 8 9.1 10.1 S6 - 200mm THK WITH H10-100mm C/C(Short Span) + H10-100 c/c (Long Span) TOP AND BOTTOM
915 3185 5150 5050 5050 2200 2850 5050 5050
10 5050
11 5050
12 5150
13 3900
14
2690
3710
(200x400)
2115
(200x500)
S2 C14 RHB5
28 DEC 2017
(250x500)
(250x500)
(200x500)
2543
(250x500)
S1 S1 S1
(200x500)
RVB2
RVB5
RVB9
S2 S6
(300x650)
RHB7 (200x600) C27
RVB7
RVB12
200mm thk
1649
RHB24
RVB16
C3 RHB8 (250x500) RHB9 (250x500) RHB10 (250x500) RHB11 S3
(250x600)
(250x500)
S6
(200x500)
RVB22
C7 C9 C11 (250x500) C13
RVB19
2051
(200x500)
RVB2a
S3 S1
200mm thk
RHB12 (200x400) C18 C26
(250x500)
(250x500)
(200x500)
(250x500)
EXISTING S2 (250x600)
(300x600)
(250x600)
800)
RVB6
S2
RVB4
LIFT TO
RVB11
4107
(200x
REMAIN
RVB8
S2
S1
RVB15
S1
RVB18
RVB21
RHB15 (200x400)
RVB1a
(200x500)
S3
RHB16 RHB16a RHB17a RHB17 (300x800) RHB18 (300x800)
800)
(200x500)
(200x
EB EB EB
(300x800)
6176
S1
0
RVB2
EB
EB
RVB3
RVB14
S4
RVB17
EB EB EB
S1 C24
3
RHB2
S1 C21 00)
C1 (300x8
2
EXISTING BUILDING TO REMAIN RHB2
2574
C5 RHB
C16 (300x8
00)
21 EB EB EB RHB22a
(200
x50
0)
EC EC EC
(300x800
)
KJ Consultants
ROOF SLAB :-
S1 - 175mm THK WITH H10-100mm C/C BOTHWAYS TOP AND BOTTOM
S2 and S3 - 150mm THK WITH H10-125mm C/C BOTHWAYS TOP AND BOTTOM
5600
5585 5600 6700 7850 4405
S4 - 150mm THK WITH H10-100mm C/C(Short Span) + H10-150 c/c (Long Span) TOP AND BOTTOM
3.1 4.1 5.1 8 9.1 10.1 S6 - 200mm THK WITH H10-100mm C/C(Short Span) + H10-100 c/c (Long Span) TOP AND BOTTOM
1
H10-200
21
46
17
20
5B4
5B3 - 1 5B3 - 2
RVB3
RVB2a RVB2
APPROVED / CONSTRUCTION
DRAWING
5B8
RVB10
KJ Consultants
1
21
46
17
20
5B5 - 1 5B5 - 2
RVB4 RVB5
RVB6 RVB7
RVB8 RVB9
5B9 - 1 5B9 - 2
RVB11 RVB12
H10-300 H10-300
H10-150
5B24
RVB13
5B33 - 1 5B33 - 2
RVB20 RVB21
KJ Consultants
5B20
5B21 RHB6
RHB7
APPROVED / CONSTRUCTION
DRAWING
1
21
46
5B14 - 1 5B14 - 2 5B14 - 3 5B14 - 4
17
RHB8 RHB9 RHB10 RHB11
20
5B22 - 1 5B22 - 2 5B22 - 3
5B31
RHB21 KJ Consultants
5B45 - 1 5B45 - 2 5B45 - 3 5B45 - 4
RHB12 RHB15
46
17
20
APPROVED / CONSTRUCTION
DRAWING
5B17 - 1 5B17 - 2
RHB16 RHB16a
5B19 - 1 5B19 - 2
RHB4 RHB5
5B25 - 1 5B25 - 2
RHB19 RHB20