SIMOPS for GC-32/ISC171A

Site survey
Excavation
Civil work
Structural Erection
Scaffolding
Working at height
Hot work
Flushing/Card blasting
Hydrotesting
Manul handling
Painting/Insulation
Crane movements and lifting
Vehicle movement
Cable laying/Cable termination
Installation of Electrical/Intrumnet equipment
Tie-in piping
Tie-inElectrical
Tie-in Instrument/Telecom
Operation on Adjacent facility ( Close system-i.e. maintenance, Chemical loading, etc.)
Operation on Adjacent facility ( Open system-i.e. e.g Draining, Venting, etc)
H2S/Toxic release
Severe weather conditions
Pre- Commissioning(leak.Loop checks,Energisation, Gas/Oil in)
Commissining
Emenrgency shut sown
Demolition
CONSTRUCTION ACTIVITIES

A8 Flushing/Card blastng
SIMULTANEOUS OPERATIONS

A4 Structural Erecton

A6 Working at height

A10 Manul handling


(SIMOPS)

A9 Hydrotestng
A5 Scafolding
A1 Site survey

A2 Excavaton

A3 Civil work

A7 Hot work
CONSTRUCTION ACTIVITIES
A1 Site survey
A2 Excavaton Y
A3 Civil work Y R
A4 Structural Erecton Y N N
A5 Scafolding R N Y Y
A6 Working at height Y R Y Y Y
A7 Hot work Y Y Y Y Y Y
A8 Flushing/Card blastng R R R R Y R Y
A9 Hydrotestng Y Y Y Y Y Y Y N
A10 Manul handling Y Y Y Y Y Y Y Y Y
A11 Paintng/Insulaton Y Y Y Y Y Y N Y Y Y
A12 Crane movements and lifting Y Y Y Y Y Y Y Y Y Y
A13 Vehicle movement Y Y Y Y Y NA Y Y Y Y
A14 Cable laying/Cable terminaton Y R R R Y R R R R Y
A15 Installaton of Electrical/Intrumnet equipment Y R Y R Y Y Y Y Y Y
A16 Tie-in piping Y R Y R Y Y Y Y N Y
A17 Tie-in Electrical Y R Y R Y Y Y Y N Y
A18 Tie-in Instrument/Telecom Y R Y R Y Y Y Y Y Y

A19 Operaton on Adjacent facility (Close system-i.e. maintenance, Y R R R Y Y R Y Y Y


Chemical loading, etc.)
A20 Operaton on Adjacent facility (Open system-i.e. e.g Draining, Y N Y Y Y N N N N Y
Ventng, etc)
A21 H2S/Toxic release N N N N N N N N N N
A22 Severe weather conditons N N N N N N N N N N

A23 Y Y Y Y Y R N N Y Y
Pre- Commissioning (leak.Loop checks,Energisaton, Gas/Oil in)
A24 Commissining Y R Y Y Y Y Y Y Y Y
A25 Emenrgency shut sown N N N N N N N N N N
A26 Demoliton Y Y Y Y Y Y R Y Y Y

LEGEND
Y simultaneous operation allowed with normal procedures including PTW/ JSA
R simultaneous operation allowed but specific procedures have to be followed. PTW compulsory.
N simultaneous operation not permitted
NA Not applicable
FS Further Study required treat as prohibited in the mean time
NR Not Relevant for SIMOPS
sory.
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y

N
N
N
A11 Paintng/Insulaton
Crane movements and lifting

Y
Y
Y
Y
Y
Y
Y
Y
R

N
N
N
N
N
A12

Y
Y
Y
Y
Y
Y
Y
Y
R

N
N
N
N
A13 Vehicle movement
Cable laying/Cable

Y
R
R
R
R
R
R
R
R

N
N
N
A14 terminaton

Installaton of
Electrical/Intrumnet

Y
Y
Y
Y
Y
Y
Y

N
N
N
A15 equipment
ACTIVITIES

Y
Y
Y
Y
Y
Y

N
N
N
N
A16 Tie-in piping

Y
Y
Y
Y
Y

N
N
N
N
A17 Tie-inElectrical
Tie-in Instrument/Telecom

Y
Y
Y
Y
Y

N
N
N
A18
Operaton on Adjacent facility
(Close system-i.e.
maintenance, Chemical

Y
Y
Y
Y

N
N
N
A19 loading, etc.)

Operaton on Adjacent facility


(Open system-i.e. e.g Draining,

Y
Y

R
N
N
N
A20 Ventng, etc)

N
N
N
N
N
A21 H2S/Toxic release
Severe weather conditons

N
N
N
N
A22
Pre- Commissioning (leak.
Loop checks,Energisaton,

R
N
A23 Gas/Oil in)

Y
N
A24 Commissining

N
A25 Emenrgency shut sown

A26 Demoliton