Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Following information is required for the under preparation "State of Industry Report" 2017-18
2019
2020
2021
2022
2023
6 Investment Plan for Public Sector Power Generation Projects as per approved PC-I
Expecetd Commissioning Estimated Cost
S. No. Name of Project Capacity (MW)
Year (Million Rupees)
1
2
3
4
5
…..
7 Transmission Lines and Grid Stations with NTDC
Transmission Lines as on 30th June, 2017-18
Planned Outage Max Forced Outage
duration of
No. of Max. duration of any single
Period of Report Total Duration (Min) ny single No. of Outage Total duration (Min)
Outage outage (Min.)
Outage
500KV
(Min) Transmisison Lines
2016-17
2017-18
220KV Transmisison Lines
2016-17
2017-18
7 Transmission Lines and Grid Stations with NTDC
2017
2018
(MW)
(MW)
es)
y single
)
Line with
tions with
2
Loading Position of Transmission Lines and Power Transformers (2016-17 and 2017-18)
2016-17
8 2017-18
2016-17
2017-18
Loading Position of Power Transformer at 500KV and 220KV Grid Station (2017-18)
Overloading of 500KV and 220KV Power Transformers at 500KV Grid Stations (2017-18)
Name
Grid Voltage Capaicty Capacity
Region Staiton Auto and Power T/F Level (KV) (MVA) (Ampere
9
Loading Position of Power Transformer at 500KV and 220KV Grid Station (2017-18)
Overloading of 500KV and 220KV Power Transformers at 500KV Grid Stations (2017-18)
Name Voltage Capaicty Capacity
Region Grid Auto and Power T/F Level (KV) (MVA) (Ampere
Staiton
F: Power Sector Investment Plan for NTDC Transmission Lines as per approved PC-I
Transmission Lines
Capacity
S. No. Name of Project Voltage Line Length MVA
Level (KV) (Km)
1
2
3 N.A N.A N.A N.A
4
5
Line Length
Voltage Level (KV) (KM)
Power Sector Investment Plan for NTDC TransmissioN Lines (as per approved PC-
Sr. NO. Name of Power Project Capacity of
12 Plant (MVA) COD
Line Length
Voltage Level (KV) (KM)
Information related to Board of Directors of NTDC
a) Name of Directors of BODs
b) Number of Meetings of Board of Directors held during the financial Year 2017-18
c) Attendance of envery Director on the Board Annual Meetings held during the financial year 20
13 d) Details of Decissions taken in the Board Meeting held during the Fiannacial year 2017-18
er Transformers (2016-17 and 2017-18)
& 2017-18)
500 KV 220KV
& 2017-18)
500 KV 220KV
Estimated
Expected COD Cost
(Million Rs.)
N.A N.A
N.A N.A
N.A N.A
ded Grid Stations
N.A N.A
nt Plan for NTDC TransmissioN Lines (as per approved PC-I)
DC
J: Energy Statistics
Total Energy Purchased by NTDC Unit 2016-17 2017-18
GENCO's GWh
IPPs Thermal GWh
WAPDA Hydel GWh
IPPs Hydel GWh
Nuclear GWh
Imports GWh 2110.68422 2506.077440
Others GWh
Total GWh 2110.68422 2506.0774400
Total Energy sold by NTDC GWh 2112.37318 2505.532000
Overall Transmission Losses GWh 1.68896 0.545440
Overall Transmission Losses % -0.08% 0.02176%
23821.530 2382.554444
121.982556 2382554444
4.8704633232 0.54544
0.021765
2506083200