Process owner : MS E4

Controlled documents are


CP-122 HSE Manual Process Author:
IS O ref:
MS E47
8.1.2
online.
Printed hard copies only valid if
SP-1190-4 Red Zone Working Requirement (4.1.4.23b) Da te issued: 1/11/2017
Process #:
date of print is reflected.
E D5Q1 V 1.0

SP-1190-4 Red Zone Working


Requirement (4.1.4.23b)

Production Coordinator:
Limit number of personnel to 4
and apply buddy system PR-1081

Production Coordinator:
Ensure one observer remains
outside red zone

Production Coordinator:
Ensure persons using supplied air
are SCBA trained

Production Coordinator:
Ensure only one red zone
entered

Control Room Operator:


Review status of F&G system

Control Room Operator:


Monitor cameras in red zone

On-site Technicians
Check personal H2S detector

No
Touching
Equipment?

On-site Technicians
Stop outside the skid and remove
mask from its holder Yes

On-site Technicians
Hold mask in hand (from
supplied air set), proceed to
enter the area

On-site Technicians
Don Breathing Apparatus on
entry to the skid

On-site Technicians
Carry the cylinder escape set

End