Sei sulla pagina 1di 28

PROJECT TITLE: ______________________________________________________

NAME:_______________________________________________________________
CRS. YR. & SEC.: ______________________________________________________

UNIT
ITEM DESCRIPTION OF WORKS QTY UNIT TOTAL COST
COST
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila

COLLEGE OF ENGINEERING
Civil Engineering Department

PROJECT TITLE: PROPOSED FOUR - STOREY HIGHSCHOOL BUILDING


OWNER/S: LUZ GUTIERREZ
LOCATION: BRGY. APITONG, MUN. OF NAUJAN, ORIENTAL MINDORO

BILL OF MATERIALS
Materials & Estimated Quantities
Item to be Required
CALCULATIONS
Estimated
Prepared By: SANIDAD, JAY BENEDICT T. Approved:

ENGR. MARJUN B. MACASILHIG


INSTRUCTOR
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila

COLLEGE OF ENGINEERING
Civil Engineering Department

PROJECT TITLE: PROPOSED FOUR - STOREY HIGHSCHOOL BUILDING


OWNER/S: LUZ GUTIERREZ
LOCATION: BRGY. APITONG, MUN. OF NAUJAN, ORIENTAL MINDORO

ITEM DESCRIPTION OF WORKS QUANTITY UNIT


FOOTING
TOTAL VOLUME OF CONCRETE 47.23 CU.M.
# OF CEMENT 426.00 BAGS
VOLUME OF SAND 23.70 CU.M.
VOL. OF 3/4" GRAVEL 47.30 CU.M.

WALL FOOTING
TOTAL VOLUME OF CONCRETE 39.60 CU.M.
# OF CEMENT 357.00 BAGS
VOLUME OF SAND 19.90 CU.M.
VOL. OF 3/4" GRAVEL 39.70 CU.M.

FLOOR SLAB (BY AREA)


TOTAL VOLUME OF CONCRETE 551.10 CU.M.
# OF CEMENT 4,961.00 BAGS
VOLUME OF SAND 275.70 CU.M.
VOL. OF 3/4" GRAVEL 551.30 CU.M.
CONCRETING WORKS
CONCRETE COLUMNS (RECTANGULAR)
TOTAL VOLUME OF CONCRETE 211.23 CU.M.
# OF CEMENT 1,902.00 BAGS
VOLUME OF SAND 105.70 CU.M.
VOL. OF 3/4" GRAVEL 211.30 CU.M.

CONCRETE BEAMS
TOTAL VOLUME OF CONCRETE 216.94 CU.M.
# OF CEMENT 1,954.00 BAGS
VOLUME OF SAND 108.70 CU.M.
VOL. OF 3/4" GRAVEL 217.10 CU.M.

CONCRETE STAIRS
TOTAL VOLUME OF CONCRETE 0.97 CU.M.
# OF CEMENT 9.00 BAGS
VOLUME OF SAND 0.50 CU.M.
VOL. OF 3/4" GRAVEL 1.00 CU.M.

WALLS
MORTAR USING 4" CHB
TOTAL NUMBER OF CHB 196,298.00 PCS
# OF CEMENT 8,245.00 BAGS
VOLUME OF SCREENED SAND 687.90 CU.M.
MORTAR USING 6" CHB
TOTAL NUMBER OF CHB 196,298.00 PCS
# OF CEMENT 15,908.00 BAGS
MASONRY WORKS VOLUME OF SCREENED SAND 1,325.50 CU.M.

PLASTER
ONE FACE
# OF CEMENT 4,523.00 BAGS
VOLUME OF FINE SAND 251.30 CU.M.
TWO FACE
# OF CEMENT 9,046.00 BAGS
VOLUME OF FINE SAND 502.60 CU.M.

WALLS
VERTICAL BARS USED 5,575.00 PCS @ 6M
HORIZONTAL BARS USED 5,628.00 PCS @ 6M
#16 TIE WIRE USED 738.10 Kgs

FOOTING MATTING
NET. LENGTH ALONG L 1.16 M
NET. LENGTH ALONG W 1.16 M
# OF REIN. BARS USED 229.60 LHS
#16 TIE WIRE USED 30.40 Kgs

WALL FOOTING MATTING


OVERALL TOTAL # OF BARS USED 75.00 LHS
#16 TIE WIRE USED 4.00 Kgs

RECTANGULAR COLUMN REINFORCEMENT


TOTAL NUMBER OF VERTICAL BARS @ 6M 492.00 LHS
TOTAL NUMBER OF BARS USED FOR STIRRUPS @ 6M 1,886.00 LHS
#16 TIE WIRE USED 170.90 Kgs

BEAM REINFORCEMENT
ONE BAY
NUMBER OF 16 MM BARS USED AS MAIN BARS 24.00 PCS
STEEL REINFORCEMENT NUMBER OF 10 MM BARS USED AS WEB BARS 7.00 PCS
NUMBER OF 10 MM BARS USED AS WEB STIRRUPS 26.00 PCS
#16 TIE WIRE USED 3.70 Kgs

TWO BAY
NUMBER OF 12MM BARS REQUIRED AS MAIN BARS 12.00 PCS
NUMBER OF 10MM BARS REQUIRED AS MAIN BARS - PCS
NUMBER OF 10MM BARS REQUIRED AS MAIN BARS 2.00 PCS
#16 TIE WIRE USED 2.20 Kgs

ONE WAY SLAB


# OF STEEL BARS REQUIRED 35.00 PCS
# OF #16 TIE WIRE REQUIRED 3.00 Kgs

TWO WAY SLAB


# OF STEEL BARS REQUIRED 253.00 PCS
# OF #16 TIE WIRE REQUIRED 22.00 Kgs

CONCRETE STAIRS
NUMBER OF 12MM LATERAL BARS REQUIRED @ STEPS 7.00 PCS
NUMBER OF 12MM HORIZONTAL BARS REQUIRED @ STEPS 9.00 PCS
NUMBER OF 16MM LATERAL BARS REQUIRED @ STRINGER 5.00 PCS
NUMBER OF 12MM HORIZONTAL BARS REQUIRED @ STRINGER 3.00 PCS
# OF #16 TIE WIRE USED 2.00 Kgs

MAIN ROOF
TWO SHEETS
# OF THE 1ST ROOF SHEET USED @ 10 FT LONG 35.00 Sheets
# OF THE 2ND ROOF SHEET USED @ 10 FT LONG 35.00 Sheets
# OF UMBRELLA NAILS / TEKSCREW 13.00 Kgs

THREE SHEETS
# OF THE 1ST ROOF SHEET USED @ 10 FT LONG 35.00 Sheets
# OF THE 2ND ROOF SHEET USED @ 10 FT LONG 35.00 Sheets
# OF THE 3RD ROOF SHEET USED @ 10 FT LONG 35.00 Sheets
# OF UMBRELLA NAILS / TEKSCREW 20.00 Kgs

# OF ROOF ACCESSORIES 19.00 PCS


ROOFING WORKS
VALLEY ROOF
TWO SHEETS
# OF THE 1ST ROOF SHEET USED @ 10 FT LONG 12.00 Sheets
# OF THE 2ND ROOF SHEET USED @ 10 FT LONG 12.00 Sheets
# OF UMBRELLA NAILS / TEKSCREW 4.00 Kgs

THREE SHEETS
# OF THE 1ST ROOF SHEET USED @ 10 FT LONG 12.00 Sheets
# OF THE 2ND ROOF SHEET USED @ 10 FT LONG 12.00 Sheets
# OF THE 3RD ROOF SHEET USED @ 10 FT LONG 12.00 Sheets
# OF UMBRELLA NAILS / TEKSCREW 6.00 Kgs

# OF ROOF ACCESSORIES 5.00 PCS

TILE SIZE
8 X 8 INCHES (20 X 20 CM) 42,438.00 PCS
12 X 12 INCHES (30 X 30 CM) 18,859.00 PCS
16 X 16 INCHES (40 X 40 CM) 10,611.00 PCS
TILING WORKS
CEMENT MORTAR 141.00 BAGS
WHITE CEMENT 809.00 KGS
ADHESIVE 180.00 BAGS

PAINTING WORKS GALLONS 786.00 Gals

SCAFFOLDING FORMS
COLUMNS
TOTAL # OF BD. FT OF FRAME REQUIRED 3,649.41 Bd.ft
TOTAL # OF LUMBER 133.00 PCS
TOTAL # OF PLYWOOD REQUIRED 123.00 Sheet(s)
TOTAL # OF #2 1/2 CWNAILS 28.40 KGS
TOTAL NUMBER OF #1 FINISHING NAILS 11.70 Kgs
QUANTITY OF LUMBER FOR SCAFFOLDING 3,649.41
BEAMS & GIRDERS
TOTAL # OF BD. FT OF FRAME REQUIRED 11,340.00
TOTAL # OF LUMBER 1,335.00
TOTAL # OF PLYWOOD REQUIRED 405.00
TOTAL # OF #2 1/2 CWNAILS 93.20
TOTAL NUMBER OF #1 FINISHING NAILS 38.50

Prepared By: Approved:

ENGR. MARJUN B
INSTRU
L UNIVERSITY OF THE PHILIPPINES
ala Blvd., Ermita, Manila

LEGE OF ENGINEERING
il Engineering Department

UNIT COST TOTAL COST

-
₱215.00 91,590.00
₱550.00 13,035.00
₱1,000.00 47,300.00
-
-
-
₱215.00 76,755.00
₱550.00 10,945.00
₱1,000.00 39,700.00
-
-
-
₱215.00 1,066,615.00
₱550.00 151,635.00
₱1,000.00 551,300.00
-
-
-
₱215.00 408,930.00
₱550.00 58,135.00
₱1,000.00 211,300.00
-
-
-
₱215.00 420,110.00
₱550.00 59,785.00
₱1,000.00 217,100.00
-
-
-
₱215.00 1,935.00
₱550.00 275.00
₱1,000.00 1,000.00
-
-
-
₱7.50 61,837.50
₱215.00 147,898.50
₱770.00 529,683.00
-
₱12.00 2,355,576.00
₱215.00 3,420,220.00
₱770.00 1,020,635.00
-
-
-
₱215.00 972,445.00
₱65.00 16,334.50
-
₱215.00 1,944,890.00
₱65.00 32,669.00
-
-
₱261.00 1,455,075.00
₱148.00 832,944.00
₱43.00 31,738.30
-
-
₱261.00 302.76
₱261.00 302.76
₱261.00 59,925.60
₱43.00 1,307.20
-
-
₱148.00 11,100.00
₱43.00 172.00
-
-
₱261.00 128,412.00
₱148.00 279,128.00
₱43.00 7,348.70
-
-
-
₱261.00 6,264.00
₱110.00 770.00
₱110.00 2,860.00
₱43.00 159.10
-
-
₱148.00 1,776.00
₱110.00 -
₱110.00 220.00
₱43.00 94.60
-
-
₱110.00 3,850.00
₱43.00 129.00
-
-
₱110.00 27,830.00
₱43.00 946.00
-
-
₱148.00 1,036.00
₱148.00 1,332.00
₱261.00 1,305.00
₱148.00 444.00
₱43.00 86.00
-
-
-
₱245.00 8,575.00
₱254.00 8,890.00
₱55.00 715.00
-
-
₱245.00 8,575.00
₱245.00 8,575.00
₱245.00 8,575.00
₱55.00 1,100.00
-
-
-
-
-
₱245.00 2,940.00
₱245.00 2,940.00
₱55.00 220.00
-
-
₱245.00 2,940.00
₱245.00 2,940.00
₱245.00 2,940.00
₱55.00 330.00
-
-
-
-
₱13.30 564,425.40
₱28.35 534,652.65
₱60.15 638,251.65
-
₱38.25 5,393.25
₱20.00 16,180.00
₱9.94 1,789.20
-
₱530.00 416,580.00
-
-
-
-
-
-
-
#REF!
-
-
-

ENGR. MARJUN B. MACASILHIG


INSTRUCTOR
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila

COLLEGE OF ENGINEERING
Civil Engineering Department

PROJECT TITLE: PROPOSED FOUR - STOREY HIGHSCHOOL BUILDING


OWNER/S: LUZ GUTIERREZ
LOCATION: BRGY. APITONG, MUN. OF NAUJAN, ORIENTAL MINDORO

ITEM DESCRIPTION OF WORKS QUANTITY UNIT


CONCRETE WORKS
TOTAL VOLUME OF CONCRETE 47.23 CU.M.
# OF CEMENT 426.00 BAGS
VOLUME OF SAND 23.70 CU.M.
VOL. OF 3/4" GRAVEL 47.30 CU.M.

WALL FOOTING
TOTAL VOLUME OF CONCRETE 39.60 CU.M.
# OF CEMENT 357.00 BAGS
VOLUME OF SAND 19.90 CU.M.
VOL. OF 3/4" GRAVEL 39.70 CU.M.

FLOOR SLAB (BY AREA)


TOTAL VOLUME OF CONCRETE 742.25 CU.M.
# OF CEMENT 6,682.00 BAGS
VOLUME OF SAND 371.30 CU.M.
VOL. OF 3/4" GRAVEL 742.50 CU.M.
I
CONCRETE COLUMNS (RECTANGULAR)
TOTAL VOLUME OF CONCRETE 211.23 CU.M.
# OF CEMENT 1,902.00 BAGS
VOLUME OF SAND 105.70 CU.M.
VOL. OF 3/4" GRAVEL 211.30 CU.M.

CONCRETE BEAMS
TOTAL VOLUME OF CONCRETE 216.94 CU.M.
# OF CEMENT 1,954.00 BAGS
VOLUME OF SAND 108.70 CU.M.
VOL. OF 3/4" GRAVEL 217.10 CU.M.

CONCRETE STAIRS
TOTAL VOLUME OF CONCRETE 18.29 CU.M.
# OF CEMENT 170.00 BAGS
VOLUME OF SAND 9.40 CU.M.
VOL. OF 3/4" GRAVEL 18.80 CU.M.

WALLS
MORTAR USING 4" CHB
TOTAL NUMBER OF CHB 196,298.00 PCS
# OF CEMENT 8,245.00 BAGS
VOLUME OF SCREENED SAND 687.90 CU.M.
MORTAR USING 6" CHB
TOTAL NUMBER OF CHB 196,298.00 PCS
# OF CEMENT 15,908.00 BAGS
MASONRY WORKS VOLUME OF SCREENED SAND 1,325.50 CU.M.

PLASTER
ONE FACE
# OF CEMENT 4,523.00 BAGS
VOLUME OF FINE SAND 251.30 CU.M.
TWO FACE
# OF CEMENT 9,046.00 BAGS
VOLUME OF FINE SAND 502.60 CU.M.

WALLS
VERTICAL BARS USED 5,575.00 PCS @ 6M
HORIZONTAL BARS USED 5,628.00 PCS @ 6M
#16 TIE WIRE USED 738.10 Kgs

FOOTING MATTING
NET. LENGTH ALONG L 1.16 M
NET. LENGTH ALONG W 1.16 M
# OF REIN. BARS USED 229.60 LHS
#16 TIE WIRE USED 30.40 Kgs

WALL FOOTING MATTING


OVERALL TOTAL # OF BARS USED 75.00 LHS
#16 TIE WIRE USED 4.00 Kgs

RECTANGULAR COLUMN REINFORCEMENT


TOTAL NUMBER OF VERTICAL BARS @ 6M 492.00 LHS
TOTAL NUMBER OF BARS USED FOR STIRRUPS @ 6M 1,886.00 LHS
#16 TIE WIRE USED 170.90 Kgs

BEAM REINFORCEMENT
ONE BAY
NUMBER OF 16 MM BARS USED AS MAIN BARS 24.00 PCS
STEEL REINFORCEMENT NUMBER OF 10 MM BARS USED AS WEB BARS 7.00 PCS
NUMBER OF 10 MM BARS USED AS WEB STIRRUPS 26.00 PCS
#16 TIE WIRE USED 3.70 Kgs

TWO BAY
NUMBER OF 12MM BARS REQUIRED AS MAIN BARS 12.00 PCS
NUMBER OF 10MM BARS REQUIRED AS MAIN BARS - PCS
NUMBER OF 10MM BARS REQUIRED AS MAIN BARS 2.00 PCS
#16 TIE WIRE USED 2.20 Kgs

ONE WAY SLAB


# OF STEEL BARS REQUIRED 105.00 PCS
# OF #16 TIE WIRE REQUIRED 9.00 Kgs

TWO WAY SLAB


# OF STEEL BARS REQUIRED 759.00 PCS
# OF #16 TIE WIRE REQUIRED 66.00 Kgs

CONCRETE STAIRS
NUMBER OF 12MM LATERAL BARS REQUIRED @ STEPS 137.00 PCS
NUMBER OF 12MM HORIZONTAL BARS REQUIRED @ STEPS 167.00 PCS
NUMBER OF 16MM LATERAL BARS REQUIRED @ STRINGER 101.00 PCS
NUMBER OF 12MM HORIZONTAL BARS REQUIRED @ STRINGER 59.00 PCS
# OF #16 TIE WIRE USED 36.00 Kgs

MAIN ROOF
TWO SHEETS
# OF THE 1ST ROOF SHEET USED @ 10 FT LONG 35.00 Sheets
# OF THE 2ND ROOF SHEET USED @ 10 FT LONG 35.00 Sheets
# OF UMBRELLA NAILS / TEKSCREW 13.00 Kgs

THREE SHEETS
# OF THE 1ST ROOF SHEET USED @ 10 FT LONG 35.00 Sheets
# OF THE 2ND ROOF SHEET USED @ 10 FT LONG 35.00 Sheets
# OF THE 3RD ROOF SHEET USED @ 10 FT LONG 35.00 Sheets
# OF UMBRELLA NAILS / TEKSCREW 20.00 Kgs

# OF ROOF ACCESSORIES 19.00 PCS


ROOFING WORKS
VALLEY ROOF
TWO SHEETS
# OF THE 1ST ROOF SHEET USED @ 10 FT LONG 12.00 Sheets
# OF THE 2ND ROOF SHEET USED @ 10 FT LONG 12.00 Sheets
# OF UMBRELLA NAILS / TEKSCREW 4.00 Kgs

THREE SHEETS
# OF THE 1ST ROOF SHEET USED @ 10 FT LONG 12.00 Sheets
# OF THE 2ND ROOF SHEET USED @ 10 FT LONG 12.00 Sheets
# OF THE 3RD ROOF SHEET USED @ 10 FT LONG 12.00 Sheets
# OF UMBRELLA NAILS / TEKSCREW 6.00 Kgs

# OF ROOF ACCESSORIES 5.00 PCS

TILE SIZE
8 X 8 INCHES (20 X 20 CM) 6,978.00 PCS
12 X 12 INCHES (30 X 30 CM) 7,879.00 PCS
16 X 16 INCHES (40 X 40 CM) 9,321.00 PCS
TILING WORKS 24 X 24 INCHES (60 X 60 CM) 5,292.00 PCS

CEMENT MORTAR 361.00 BAGS


WHITE CEMENT 2,089.00 KGS
ADHESIVE 462.00 BAGS

PAINTING WORKS GALLONS 786.00 Gals

SCAFFOLDING FORMS
COLUMNS
TOTAL # OF BD. FT OF FRAME REQUIRED 3,649.41 Bd.ft
TOTAL # OF LUMBER 133.00 PCS
TOTAL # OF PLYWOOD REQUIRED 123.00 Sheet(s)
TOTAL # OF #2 1/2 CWNAILS 28.40 KGS
TOTAL NUMBER OF #1 FINISHING NAILS 11.70 Kgs
QUANTITY OF LUMBER FOR SCAFFOLDING 3,649.41
BEAMS & GIRDERS
TOTAL # OF BD. FT OF FRAME REQUIRED 11,340.00
TOTAL # OF LUMBER 1,335.00
TOTAL # OF PLYWOOD REQUIRED 405.00
TOTAL # OF #2 1/2 CWNAILS 93.20
TOTAL NUMBER OF #1 FINISHING NAILS 38.50

Prepared By: Approved:

ENGR. MARJUN B
INSTRU
L UNIVERSITY OF THE PHILIPPINES
ala Blvd., Ermita, Manila

LEGE OF ENGINEERING
il Engineering Department

UNIT COST TOTAL COST

-
₱215.00 91,590.00
₱550.00 13,035.00
₱1,000.00 47,300.00
-
-
-
₱215.00 76,755.00
₱550.00 10,945.00
₱1,000.00 39,700.00
-
-
-
₱215.00 1,436,630.00
₱550.00 204,215.00
₱1,000.00 742,500.00
-
-
-
₱215.00 408,930.00
₱550.00 58,135.00
₱1,000.00 211,300.00
-
-
-
₱215.00 420,110.00
₱550.00 59,785.00
₱1,000.00 217,100.00
-
-
-
₱215.00 36,550.00
₱550.00 5,170.00
₱1,000.00 18,800.00
-
-
-
₱7.50 61,837.50
₱215.00 147,898.50
₱770.00 529,683.00
-
₱12.00 2,355,576.00
₱215.00 3,420,220.00
₱770.00 1,020,635.00
-
-
-
₱215.00 972,445.00
₱65.00 16,334.50
-
₱215.00 1,944,890.00
₱65.00 32,669.00
-
-
₱261.00 1,455,075.00
₱148.00 832,944.00
₱43.00 31,738.30
-
-
₱261.00 302.76
₱261.00 302.76
₱261.00 59,925.60
₱43.00 1,307.20
-
-
₱148.00 11,100.00
₱43.00 172.00
-
-
₱261.00 128,412.00
₱148.00 279,128.00
₱43.00 7,348.70
-
-
-
₱261.00 6,264.00
₱110.00 770.00
₱110.00 2,860.00
₱43.00 159.10
-
-
₱148.00 1,776.00
₱110.00 -
₱110.00 220.00
₱43.00 94.60
-
-
₱110.00 11,550.00
₱43.00 387.00
-
-
₱110.00 83,490.00
₱43.00 2,838.00
-
-
₱148.00 20,276.00
₱148.00 24,716.00
₱261.00 26,361.00
₱148.00 8,732.00
₱43.00 1,548.00
-
-
-
₱245.00 8,575.00
₱254.00 8,890.00
₱55.00 715.00
-
-
₱245.00 8,575.00
₱245.00 8,575.00
₱245.00 8,575.00
₱55.00 1,100.00
-
-
-
-
-
₱245.00 2,940.00
₱245.00 2,940.00
₱55.00 220.00
-
-
₱245.00 2,940.00
₱245.00 2,940.00
₱245.00 2,940.00
₱55.00 330.00
-
-
-
-
₱13.30 92,807.40
₱28.35 223,369.65
₱60.15 560,658.15
-

₱38.25 13,808.25
₱20.00 41,780.00
₱9.94 4,592.28
-
₱530.00 416,580.00
-
-
-
-
-
-
-
#REF!
-
-
-

ENGR. MARJUN B. MACASILHIG


INSTRUCTOR
TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES
Ayala Blvd., Ermita, Manila

COLLEGE OF ENGINEERING
Civil Engineering Department

PROJECT TITLE: PROPOSED FOUR - STOREY HIGHSCHOOL BUILDING


OWNER/S: LUZ GUTIERREZ
LOCATION: BRGY. APITONG, MUN. OF NAUJAN, ORIENTAL MINDORO

ITEM DESCRIPTI QUANTITY UNIT UNIT COST


I CONCRETE WORKS
PORTLAND 8531 BAGS 215
SAND 474.2 CU. M. 550
GRAVEL 947.8 CU. M. 1000

II MASONRY WORKS
150 MM C 46671 PCS. 7.5
PORTLAND 4112 BAGS 215
FINE SAND 283.1 CU. M. 770

III REINFORCEMENT WORKS


16 MM DIA 2076.6 PCS. 261
12 MM DIA 3383 PCS. 148
10 MM DIA 286 PCS. 110
#16 TIE WI 415.2 KGS 43

IV ROOFING WORKS
THREE SHEETS
1ST ROOF 47 SHEETS 245
2ND ROOF 47 SHEETS 245
3RD ROOF 47 SHEETS 245
UMBRELLA 26 KGS 55

V TILING WORKS
8 X 8 INCH 72330 PCS. 13.3
12 X 12 IN 32144 PCS. 28.35
16 X 16 IN 18083 PCS. 60.15
CEMENT M 239 BAGS 38.25
WHITE CE 1379 KGS 20
ADHESIVE 304 BAGS 9.94

VI PAINTING WORKS
ACRYLIC G 187 GALS 530

VII ELECTRICAL WORKS


DEVICES A 1 LOT 307829

VIII PLUMBING WORKS


FIXTURES 1 LOT 663765.78
PIPES AND 1 LOT 183947.5

IX SCAFOLDING
2" X 4" X 166393.485
#4 CWNAIL 988
#2 1/2 CW 201.3
#1 CWNAIL 83.2
1/4" X

Prepared By: Approved:

ENGR. MARJUN B. MACASILHIG


INSTRUCTOR

TECHNOLOGICAL UNIVERSITY OF THE PHILIPPINES


Ayala Blvd., Ermita, Manila

COLLEGE OF ENGINEERING
Civil Engineering Department

PROJECT TITLE: PROPOSED FOUR - STOREY HIGHSCHOOL BUILDING


OWNER/S: SANIDAD, JAY BENEDICT T.
LOCATION: BRGY. APITONG, MUN. OF NAUJAN, ORIENTAL MINDORO

ITEM DESCRIPTION OF WORKS QUANTITY UNIT


I CONCRETE WORKS
PORTLAND CEMENT 9,609.00 BAGS
SAND 534.20 CU. M.
GRAVEL 1,067.70 CU. M.

II MASONRY WORKS
150 MM CONCRETE HOLLOW BLOCKS 196,298.00 PCS.
PORTLAND CEMENT 17,291.00 BAGS
FINE SAND 1,190.50 CU. M.

III REINFORCEMENT WORKS


16 MM DIA. X 6 M BAR 6,325.60 PCS.
12 MM DIA X 6 M BAR 7,632.00 PCS.
10 MM DIA X 6 M BAR 286.00 PCS.
#16 TIE WIRE 974.10 KGS

IV ROOFING WORKS
GA 26 LONG SPAN RIB TYPE 236.00 SHEETS
GA 24 HIP ROLL 56.00 SHEETS
GA 24 RIDGE ROLL 56.00 SHEETS
GA 24 ALUMINUM GUTTER 56.00 SHEETS
UMBRELLA NAILS / TEKSCREW 26.00 KGS

V TILING WORKS
8 X 8 INCHES (20 X 20 CM) 42,438.00 PCS.
12 X 12 INCHES (30 X 30 CM) 18,859.00 PCS.
16 X 16 INCHES (40 X 40 CM) 10,611.00 PCS.
CEMENT MORTAR 141.00 BAGS
WHITE CEMENT 809.00 KGS
ADHESIVE 180.00 BAGS

VI PAINTING WORKS
BRUSHES 50.00 PCS
ACRYLIC GLOSS LATEX 786.00 GALS

VII ELECTRICAL WORKS


INCANDESCENT LAMP
FLUORESCENT LAMP
PINLIGHT
ONE GANG SWITCH
TWO GANG SWITCH
THREE WAY SWITCH
PANELBOARD SET
OUTLET
AIRCONDITIONING
WIRING 1.00 LOT

VIII PLUMBING WORKS


FIXTURES 1.00 LOT
PIPES AND FITTING 1.00 LOT

IX SCAFOLDING
2" X 4" X 8 LUMBER 163,935.13 BD. FT.
#4 CWNAILS 964.00 KGS.
#2 1/2 CW NAILS 201.30 KGS.
#1 CWNAILS 83.20 KGS.
1/4" X 4" X 8" ORDINARY PLYWOOD 876.00 SHEETS

TOTAL COST:
Prepared By: Approved:

SANIDAD, JAY BENEDICT T. ENGR. MARJUN B. MAC


INSTRUCTOR
TOTAL COST

1834165
260810
947800

350032.5
884080
217987

541992.6
500684
31460
17853.6

11515
11515
11515
1430

961989
911282.4
1087692.45
9141.75
27580
3021.76

99110
0
0
307829

0
0

B. MACASILHIG

HILIPPINES

UNIT COST TOTAL COST

₱215.00 ₱2,065,935.00
₱550.00 ₱293,810.00
₱1,000.00 ₱1,067,700.00

₱7.50 ₱1,472,235.00
₱215.00 ₱3,717,565.00
₱770.00 ₱916,685.00

₱261.00 ₱1,650,981.60
₱148.00 ₱1,129,536.00
₱110.00 ₱31,460.00
₱43.00 ₱41,886.30

₱245.00 ₱57,820.00
₱281.50 ₱15,764.00
₱299.75 ₱16,786.00
₱350.00 ₱19,600.00
₱55.00 ₱1,430.00

₱13.30 ₱564,425.40
₱28.35 ₱534,652.65
₱60.15 ₱638,251.65
₱38.25 ₱5,393.25
₱20.00 ₱16,180.00
₱9.94 ₱1,789.20

₱133.00 ₱6,650.00
₱530.00 ₱416,580.00

₱307,829.00 ₱307,829.00

₱663,765.78 ₱663,765.78
₱183,947.50 ₱183,947.50

₱56.00 ₱9,180,367.00
₱40.00 ₱38,560.00
₱45.00 ₱9,058.50
₱47.00 ₱3,910.40
₱275.00 ₱240,900.00

₱25,311,454.23

ENGR. MARJUN B. MACASILHIG


INSTRUCTOR

Potrebbero piacerti anche