Corrections or comments made relative to submittals during this review does not relieve the contractor from compliance with the requirements of his Contract, drawings and
general conformance with the design intent of the project and general compliance with the information given in the Contract documents. The contractor remains responsible
such parts of the project he has design responsibility for (if design forms part of the Contract), for confirming and correlating all quantities and dimensions, selecting fabricatio
coordinating his work with that of other trades, and performing his work in a safe and satisfactory manner, all in accordance with the Contract.
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
Closed Closed
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
Closed Closed
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
"Noted"
The colour coding methodology will be
submitted seperately for all electrical
services
Reply FOR Rev C2 dated 16/01/17 : Closed Open
Color code for conduits: A
new title has been added.
Refer sec 8 page 17 for new title.
comments complied
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
" Noted"
Fire stop application method statement
will be submitted seperately for all MEP
penetration passing through fire walls. Closed Open
Reply FOR
Rev C2 dated 16/01/17 : refer sec 8
page 16 item " X " complied.
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
m compliance with the requirements of his Contract, drawings and specifications. This review is only in respect of
en in the Contract documents. The contractor remains responsible, among other things, for the design of the project or
ng and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction,
all in accordance with the Contract.
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)
Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
m compliance with the requirements of his Contract, drawings and specifications. This review is only in respect of
en in the Contract documents. The contractor remains responsible, among other things, for the design of the project or
ng and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction,
all in accordance with the Contract.