Sei sulla pagina 1di 28

AL BAYT STADIUM - AL KHOR CITY

PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code

Correct the last statement which states 'The role


of the first aider will be to provide an accident.'
The emergency response procedure shall follow Q11017-0100D-LPS-STA-PK2-ELE-MST-
1 KEO-HSE-SS/LO Section 4, Emergency the procedures as detailed in the Project A
00010 Rev. C2
approved HSE Management Plan.
16.01.2017
Noted as addressed.

The HSE Manager was not included, having to


consider his key role and responsibility in the Q11017-0100D-LPS-STA-PK2-ELE-MST-
2 KEO-HSE-SS/LO Page 12, Responsibilities safe execution of the scope of work. A
16.01.2017 00010 Rev. C2
Noted as addressed.
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code

MEWP, e.g. scissor lift, was mentioned in the


risk assessment during installation works yet not Q11017-0100D-LPS-STA-PK2-ELE-MST-
3 KEO-HSE-SS/LO Page 14, Tools & Equipment indicated in this section. A
00010 Rev. C2
16.01.2017
Noted as addressed.

There was no evaluation of hazards and risks for


falling objects, such as tools and materials Q11017-0100D-LPS-STA-PK2-ELE-MST-
4 KEO-HSE-SS/LO Risk Assessment during overhead installation works. A
00010 Rev. C2
16.01.2017
Noted as addressed.
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code

There was no evaluation of hazards and risks


associated with the use of pipe threading and Q11017-0100D-LPS-STA-PK2-ELE-MST-
5 KEO-HSE-SS/LO Risk Assessment bending machines. A
00010 Rev. C2
16.01.2017
Noted as addressed.

Residual risk rating of 'Work under unfavorable


weather conditions' is still unacceptable as
clearly defined in the table of degree of
consequences, i.e. at 8 value and at medium Q11017-0100D-LPS-STA-PK2-ELE-MST-
6 KEO-HSE-SS/LO Risk Assessment A
risk; more recovery measures to be 00010 Rev. C2
implemented.
16.01.2017
Noted as addressed.
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code

QCS 2014 referenced sections attached in the


Appendix have QDVC watermarks which has no Q11017-0100D-LPS-STA-PK2-ELE-MST-
7 KEO-HSE-SS/LO Appendix involvement in this Project. A
00010 Rev. C2
16.01.2017
Noted as addressed.

Contractor shall consider and add the following:


● Material delivered on site must be new & bear
complete identification as per specification.
● All materials shall be as per approved material
submittal & samples.
KEO-EL- Page 9 of 38 16/01/2017 Q11017-0100D-LPS-STA-PK2-ELE-MST-
8 Addressed A
HW/AMA Material Delivery 00010 Rev. C2
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code

Contractor shall consider and add the following:


● Timber supports of suitable size shall be
placed at equal distance below the conduits.
● Conduits shall be stacked on a flat surface free
from any sharp objects and shall be given
adequate supports at all times.
● End caps shall be in place until taken out for
installation.
● Delivery of materials will be checked /
inspected by Contractor QC Engineer to ensure
all items on the delivery note are correct prior
to signing. Any shortage or damaged items
should be recorded on the delivery note and
KEO-EL- Page 10 of 38 reported to the Engineer. Q11017-0100D-LPS-STA-PK2-ELE-MST-
9 A
HW/AMA Handling/Storage 16/01/2017 00010 Rev. C2
Addressed
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code

Contractor shall consider and add the following:


● Ensure that all materials received are
inspected (By Engineer); found acceptable as
per approved material submittal and are
available to carry out the work.
● Ensure that proper materials are selected and
used in accordance with approved shop
drawings.
● Ensure that all relevant documentations i.e.
Approved ITP, installation method statement,
shop drawings & MEP coordinated drawings etc.
are available and approved.
KEO-EL- Section 7 ● Check that proper tools and equipment are Q11017-0100D-LPS-STA-PK2-ELE-MST-
10 A
HW/AMA Pre Site Work available to carry out the work and are 00010 Rev. C2
incompliance with contract specifications.
16/01/2017
Addressed
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code

Furnished installation procedures shall be


revised to include the following:
● Route conduit parallel and perpendicular to
walls.
● All horizontal runs shall be supported at no
more than 900 mm. Vertical runs shall be
supported at no more than 1200 mm. Where
directional changes occur support shall be
provided at no more than 150 mm either side of
the bend.
● Avoid moisture traps; provide junction box
with drain fitting at low points in conduit
system.
● Use conduit hubs or sealing locknuts to fasten
conduit to boxes and fittings.
● Use suitable caps to protect installed conduit
against entrance of dirt and moisture.
Furnished installation procedures shall be
revised to include the following:
● Route conduit parallel and perpendicular to
walls.
AL BAYT STADIUM - AL KHOR CITY
● All horizontal runs shall be supported at no
more than 900 mm. Vertical runs shall be
supportedPAKAGE 2 (Stadium,
at no more than Auxiliary Building and Bridges) & Package 4 (Energy Ce
1200 mm. Where
directional changes occur support shall be
provided at no more than 150 mm either side of
the bend.
COMMENTS SHEET (CS)
● Avoid moisture traps; provide junction box
with drain fitting at low points in conduit
CS Ref. No.: system.
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
● Use conduit hubs or sealing locknuts to fasten
Transmittal/Document Ref. No.: conduit to boxes and fittings. CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
● Use suitable caps to protect installed conduit
Engineer in Charge: against
ASPIRE entrance of dirt and moisture. CS Date :
● Inaccessible junction boxes will not be
Document title: allowed.
Installation of GI and Flexible Conduit with Accessories
KEO-EL- Section 8 ● No single conduit serving phase socket outlets Q11017-0100D-LPS-STA-PK2-ELE-MST-
11 B
HW/AMA Rigid GI Conduits Installation lighting points and switches shall contain more 00010 Rev. C2
than one phase. A = No objection B = No Objection Subject to Incorporation of all comments as noted
Assessment Code: B ● Where the conduit system terminates at any
equipment requiring a non-rigid connection a
flexible conduit shall be installed of PVC
sheathed metallic type ASPIRE/KEO
fully watertight with
purpose made connection adapters.
● Surface Mounted Conduit (including conduit
Reviewer Ref. Identification of comment's installed above false ceiling) shall be fixed with Returned
S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) distance spacing saddles to allow conduits to be Code
taken directly into accessories without bends or
sets.
● All boxes installed in exterior locations, plant
rooms, ducts, etc., shall be fitted with approved
type gaskets to provide a waterproof seal
between box and cover or other items fitted to
the box.
16/01/2017
Item "D" @ Page 16: Change "Saddle Clamp
Bases" by "distance spacing saddles"
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code

Color coding for conduits shall be provided as


per QCS 2014 section 21 Part 1 clause 1.1.19.4.
Color coding with different color codes shall be
provided to distinguish between GI conduits for
various systems. Methodology and
KEO-EL- Section 8 Q11017-0100D-LPS-STA-PK2-ELE-MST-
12 Rigid GI Conduits Installation implementation of the same shall be furnished. B
HW/AMA 00010 Rev. C2
16/01/2017
Contractor response is noted - however
comment will remain open till this methodology
and implementation of aforementioned color
coding requirements is furnished.
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code

Methodology of Conduits installation when


passing thru waterproof membrane shall be
coordinated with the approved waterproofing
details.
16/01/2017
Furnished item "V" in page 16 does not address
the aforementioned comment i.e. item "V" is for
conduits running on the waterproof membrane
while comment is related to conduits passing
thru waterproof membrane. Contractor shall
confirm the same by adding a note to this MST
KEO-EL- Section 8 Q11017-0100D-LPS-STA-PK2-ELE-MST-
13 Rigid GI Conduits Installation stating that "Conduits passing thru waterproof B
HW/AMA 00010 Rev. C2
membrane shall be coordinated with the
approved waterproofing details"
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code

Methodology of Conduits installation when


passing thru floor slabs or fire walls shall be
coordinated with the approved fire protection
and sealant details, method statement and DRI
requirements.
KEO-EL- Section 8 16/01/2017 Q11017-0100D-LPS-STA-PK2-ELE-MST-
14 B
HW/AMA Rigid GI Conduits Installation Contractor response is noted - However a note 00010 Rev. C2
can be added into this MST stating that
"Conduits passing thru floor slabs or fire walls
shall be coordinated with the approved fire
protection and sealant details, method
statement and DRI requirements"
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code

Furnished installation procedures shall be


revised to include the following:
● Metallic flexible conduits shall not be used as
the sole means of providing earth continuity
and a separate earth continuity conductor of
appropriate size shall be provided.
Section 8 ● Flexible conduits shall only be run exposed
KEO-EL- Q11017-0100D-LPS-STA-PK2-ELE-MST-
15 Installation of Flexible and shall be so positioned that they are not A
HW/AMA 00010 Rev. C2
Conduit susceptible to mechanical damage. Where
necessary flexible conduits shall be adequately
supported.
● The maximum length of a flexible conduit run
shall be 2.50 meters.
16/01/2017
Addressed
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code

Enclosed checklist shall be part of the relevant


ITP document. Further comments will be given
KEO-EL- Section 9: on ITP document submittal. Q11017-0100D-LPS-STA-PK2-ELE-MST-
16 16/01/2017 A
HW/AMA Checklist 00010 Rev. C2
Closed

Layout and detail shop drawings shall be


submitted for Engineer review and approval.
Methodology of the installation shall be subject
KEO-EL- Q11017-0100D-LPS-STA-PK2-ELE-MST-
17 General to additional comments upon Engineer’s review A
HW/AMA 00010 Rev. C2
& approval on the same.
16/01/2017
Noted

Corrections or comments made relative to submittals during this review does not relieve the contractor from compliance with the requirements of his Contract, drawings and
general conformance with the design intent of the project and general compliance with the information given in the Contract documents. The contractor remains responsible
such parts of the project he has design responsibility for (if design forms part of the Contract), for confirming and correlating all quantities and dimensions, selecting fabricatio
coordinating his work with that of other trades, and performing his work in a safe and satisfactory manner, all in accordance with the Contract.
AL BAYT STADIUM - AL KHOR CITY
PAKAGE 2 (Stadium, Auxiliary Building and Bridges) & Package 4 (Energy Ce

COMMENTS SHEET (CS)


CS Ref. No.: Q11017-0100D-LPS-STA-PK2-ELE-MST-00010-CS
Transmittal/Document Ref. No.: CS Rev. :
Q11017-0100D-LPS-STA-PK2-ELE-MST-00010
Engineer in Charge: ASPIRE CS Date :
Document title: Installation of GI and Flexible Conduit with Accessories

A = No objection B = No Objection Subject to Incorporation of all comments as noted


Assessment Code: B
ASPIRE/KEO

Reviewer Ref. Identification of comment's Returned


S/N Comments Reference Number of Doc. or Dwg.
Indicator source: (title /page /clause) Code
Corrections or comments made relative to submittals during this review does not relieve the contractor from compliance with the requirements of his Contract, drawings and
general conformance with the design intent of the project and general compliance with the information given in the Contract documents. The contractor remains responsible
such parts of the project he has design responsibility for (if design forms part of the Contract), for confirming and correlating all quantities and dimensions, selecting fabricatio
coordinating his work with that of other trades, and performing his work in a safe and satisfactory manner, all in accordance with the Contract.
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)

Complied in section 4, Emergency Closed Closed

Complied in Page 11 Section 5, Closed Closed


Responsibilities
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)

Complied in Page 14 section 7 Tools and Closed Closed


Equipment.

Complied in Point # 6 of RA. Additional Closed Closed


control measures included.
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)

Complied in point# 10 of RA Closed Closed

Complied in Point#17 in RA. Additional


control measures included and residual Closed Closed
risk reduced to acceptable level of 5
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)

Complied. Watermark removed. Closed Closed

Kindly Refer section 5, Page 9 Material


delivery. Closed Closed
Both Items have been complied.
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)

Kindly Refer to Page # 10 Handling and


Storage All Below listed Items have been
complied:
● Refer Page # 10 Item"k" Complied
● Refer Page # 10 Item"I" Complied
● Refer Page # 10 Item"e" Complied
● Refer Page # 10 Item"m" Complied

Closed Closed
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)

Kindly Refer to Section # 7 Presite work


All Below listed Items have been
complied:
● Refer Section 7 Item"c" Complied
● Refer Section 7 Item"k" Complied
●Refer Section 7 Item"l" Complied
● Refer Section 7 Item"m" Complied

Closed Closed
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)

Kindly Refer to Section # 8 All Below


listed Items have been complied: The
installation procedures ( Section 8 page
15/38) had revised including the
following:
● Refer Section # 8 Item"d" Complied
● Refer Section # 8 Item"e" Complied
● Refer Section # 8 Item"h" Complied
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS) Kindly Refer to Section # 8 All Below


listed Items have been complied: The
installation procedures ( Section 8 page
15/38) had revised including the
following:
C2 Project Stage: Construction
● Refer Section # 8 Item"d" Complied

16Refer Section
January # 8 Item"e" Complied
2017 Discipline: Electrical
● Refer Section # 8 Item"h" Complied
cessories ● Refer Section # 8 Item"i" Complied
● Refer Section # 8 Item"l" Complied
● Refer Section # 8 Item"k" Complied Closed Open
● Refer Section # 8 Item"s" Complied
= No Objection Subject to Incorporation of all comments as noted
● Refer C= Rejected,
Section # 8 Item"t" Compliedto be resubmitted
● Refer Section # 8 Page 16 Item"d"
Complied
● Refer Section # 8 CONTRACTOR’s
Page 16 Item"u"Input ASPIRE/KEO
Complied Reply
for Rev C2. dated 16/01/17 :
refer sec 8 page 16 Sign-Off
item" d " , Comments
complied. (if any) (Open/Closed) (Open/Closed)
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)

"Noted"
The colour coding methodology will be
submitted seperately for all electrical
services
Reply FOR Rev C2 dated 16/01/17 : Closed Open
Color code for conduits: A
new title has been added.
Refer sec 8 page 17 for new title.
comments complied
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)

● Refer to Page 16 Item "v" .


Reply FOR Rev C2
dated 16/01/17 : refer Closed Open
sec 8 page 16 item "W" , complied
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)

" Noted"
Fire stop application method statement
will be submitted seperately for all MEP
penetration passing through fire walls. Closed Open
Reply FOR
Rev C2 dated 16/01/17 : refer sec 8
page 16 item " X " complied.
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)

Kindly Refer to Section # 8,


Page # 17 Below listed Items have been
complied.
● Refer Section 8, Page 17 Item"e"
Complied Closed Closed
● Refer Section 8, Page 17 Item"f"
Complied
● Refer Section 8, Page 17 Item"g"
Complied
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)

Noted Closed Closed

Noted Closed Closed

m compliance with the requirements of his Contract, drawings and specifications. This review is only in respect of
en in the Contract documents. The contractor remains responsible, among other things, for the design of the project or
ng and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction,
all in accordance with the Contract.
STADIUM - AL KHOR CITY
Building and Bridges) & Package 4 (Energy Center)

MENTS SHEET (CS)


C2 Project Stage: Construction

16 January 2017 Discipline: Electrical


cessories

= No Objection Subject to Incorporation of all comments as noted C= Rejected, to be resubmitted

CONTRACTOR’s Input ASPIRE/KEO

Sign-Off
Comments (if any) (Open/Closed) (Open/Closed)
m compliance with the requirements of his Contract, drawings and specifications. This review is only in respect of
en in the Contract documents. The contractor remains responsible, among other things, for the design of the project or
ng and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction,
all in accordance with the Contract.