Sei sulla pagina 1di 17

Engineering Projects

2017 -2018

19/09/2018 XPRTHUB Projects 1


HSD System
2017

XPRTHUB Project: HSD System 2


Project:
BORKUM WEST II PHASE 2

Clients:
• TRIANEL WINDPARK BORKUM
• SEAWAY HEAVY LIFTING

Scope of Work:
Design a Hydro Sound Damping
(HSD) System for the installation of
the windmill’s monopile

XPRTHUB Project: HSD System 3


HSD System Design included:

• Donut-like Basket structure


to contain the HSD net
• Deployment system for the
Basket and HSD net around
the Monopile
• Sea-fastening structure for
the basket underneath the
Outrigger
• HSD net (not developed by XPRTHUB)

XPRTHUB Project: HSD System 4


HSD System 3D Model:

XPRTHUB Project: HSD System 5


Summary HSD System:
• Time span:
o Concept Phase → Shop
Drawings – 5 months
• Weight:
o Basket – 69 mT
o Deployment System – 15 mT
o Sea-fastening – 3 mT

XPRTHUB Project: HSD System 6


Project:
BORKUM WEST II PHASE 2

Clients:
TRIANEL WINDPARK BORKUM
&
SEAWAY HEAVY LIFTING

Scope of Work:
Design a basket support and
deployment system for the Hydro
Sound Damping Net used in the
installation of the Windmills
Monopiles

XPRTHUB Project: HSD System 7


Airtight Platform(AP) Lifting Frame
2017

XPRTHUB Project: AP Lifting Frame 8


Project:
BORKUM WEST II PHASE 2

Clients:
• TRIANEL WINDPARK BORKUM
• SEAWAY HEAVY LIFTING

Scope of Work:
Design a Lifting Frame for the
installation of the Airtight Platforms
on the windmill’s monopile

XPRTHUB Project: AP Lifting Frame 9


AP Lifting Frame Design
included:

• Lifting Frame for the Airtight


Platform
• Inflatable seal between
Monopile and Transition
Piece

XPRTHUB Project: AP Lifting Frame 10


AP Lifting Frame 3D Model:

XPRTHUB Project: AP Lifting Frame 11


Summary AP Lifting Frame:
• Time span:
o Concept Phase → Shop
Drawings – 3 months
• Weight:
o Lifting Frame – 69 mT

XPRTHUB Project: AP Lifting Frame 12


Onshore Carousel
2018

XPRTHUB Project: Onshore Carousel 13


Project:
Onshore Carousel

Clients:
• Van Oord
• Dutch Offshore Contractors
• SWAN HUNTER

Scope of Work:
Design a Land Base type Carousel
for a payload of 4750 mT of marine
cable

XPRTHUB Project: Onshore Carousel 14


Onshore Carousel Design
included:

• Carousel
• Rollers
• Drive-Units

XPRTHUB Project: Onshore Carousel 15


Onshore Carousel 3D Model:

XPRTHUB Project: Onshore Carousel 16


Summary Onshore Carousel:

• Time span:
o Concept Phase → Shop
Drawings → Execution – 4
months
• Weight:
o Carousel – 220 mT

XPRTHUB Project: Onshore Carousel 17