Sei sulla pagina 1di 141

EXPERIENCE LIST FOR THIRD PARTY INSPECTION OF TANKS &

VESSELS
Nos. of Date of
Sr. # Job Description Client Location Status
Equipment Award
Inspection of static equipment at GPF-IV (Vessel, Tank,
1 76 PPL Gambat Mar, 2018 Ongoing
Column etc.)
Integrity Assesment of Tanks at Pasni Depot , Turbat Pakistan State
2 3 Pakistan Jan, 2018 Ongoing
Aviation Station and Peshawar Aviation Station Oil
English Biscuit
3 Inspection of Air Vessel Pressure Testing 5 Karachi Dec, 2017 Completed
Manufacturers
LalPir Power
4 Inspection of condensate storage Tank 1 LalPir Nov, 2017 Completed
Ltd
LalPir Power
5 Third Party Inspection of Diesel Oil Tank testing services 1 LalPir Nov, 2017 Completed
Ltd
LalPir Power
6 Third Party Inspection of Diesel Oil Tank testing services 1 Lalpir Oct, 2017 Completed
Ltd
LalPir Power
7 Inspection Services for Acid and Caustic tanks, 2 Lalpir Oct, 2017 Completed
Ltd
LalPir Power
8 Inspection of condensate storage tank. 1 Lalpir Oct, 2017 Completed
Ltd
Al-Rahim
9 Thickness Monitroing of Shell at ATC Facility. 27 Trading Karachi Sep, 2017 Completed
Company
Al-Tariq
Third Party Inspection of In-service Inspection of Tank at
10 1 Constructors Parco-MKM Jul, 2017 Completed
Mehmoodkot General Tyre &
(Pvt) Limited
Rubber
11 Third Party inspection & NDT Testing Of Plant Deaerator 1 Company of Karachi Jun, 2017 Completed
Pakistan
Limited
Non-Intrusive Inspection Services of 11 Vessels at Adhi
12 11 PPL Adhi, Punjab May, 2017 Completed
LPG/NGL Plant 1&2 and EPF
Integrity assessment of Storage Tanks no 900-T-02, 003A Pakistan State
13 3 Lalpir Mar, 2017 In Progress
and 003B at Lalpir Depot Oil
Mechanical Integrity Assessment of Columns, vessels, ENAR
14 9 Karachi Mar, 2017 Completed
plant piping and furnace tubes at EPRF-II Petroleum
Third party thickness monitoring / in-service inspection of Engro Vopak Port Qasim
15 1 General Feb, 2017 Completed
the sphere V-101B TerminalTyre
Ltd& Plant
Rubber
16 Third Party inspection & NDT Testing Of Plant Deaerator 1 Company of Karachi Feb, 2017 Completed
Pakistan
Non-Intrusive Inspection Services for 40 Nos. Pressure Limited Sui,
17 40 PPL Feb, 2017 Completed
Vessels at SFGCS Baluchistan
Third Party inspection of Tanks at HASCOL terminal, Port
18 20 IIW Karachi Feb, 2017 Completed
Qasim Karachi
Non-Intrusive Inspection Services for 57 Nos. Pressure
19 57 PPL Adhi, Punjab Feb, 2017 Completed
Vessels at Adhi Field
BYCO Hub,
20 MFL & UT of Tank 1 Jan, 2017 Completed
Petroleum Balochistan
Integrity testing of vertical tank no: 2005 at shikarpur Pakistan State
21 1 Shikarpur Dec, 2016 Completed
terminal. Oil
Mechanical Integrity Assessment of columns, pipe, ENAR
22 5 Karachi Dec, 2016 Completed
furnace and Tanks Petroleum
Engineering Consultancy & Inspection Services for Up- Reliance
23 Gradation of Molasses Export Terminal to Petroleum 20 Commodities Karachi Nov, 2016 Completed
Product Storage & Handling (Pvt.) Ltd.,
Providing Services for UT Gauging of Bottom & Shell of Pakistan State
24 1 Daulatpur Oct, 2016 Completed
Tank # 2102 at Daulatpur Depot Oil
Third Party Inspection of Oil Storage Facility of M/s Hascol
25 Petroleum (PVT) Limited SIituated at Mehmoodkot 1 OGRA MehmoodKot Sep, 2016 Completed
Muzaffargrh
Integrity Assessment of above ground Storage Tank No. Pakistan State
26 1 Habibabad Sep, 2016 Completed
5302 at Habibabad Oil
Integrity Assessment of above Ground Vertical Steel Fire Pakistan State
27 1 Daulatpur Jul, 2016 Completed
Water Tank at Daulatpur Depot. Oil

Third Party Inspection of Oil Storage Facility of M/s Hascol


28 1 OGRA Daulatpur Apr, 2016 Completed
Petroleum (PVT) Limited SIituated at Daulatpur

29 Inspection Of Day Tanks & Water Storage Tanks 4 Asia Petroleum Karachi Apr, 2016 Completed

Oman Oil
Asset Integrity Management Systems (AIMS) for Block 60" Company
30 169 Oman Mar, 2016 Completed
for OOCEP Exploration &
Production LLC

Agro Trade
31 Third party inspection of off stream tanks as per API-653. 8 Karachi Mar, 2016 Completed
Terminal
THIRD PARTY INSPECTION FOR REG,ISTRATION OF
32 LUBE OIL RECLAMATION PLANT OF M/S FAREED OGRA Multan Feb, 2016 Completed
LUBRICANTS, MULTAN
Dubai Electricity
Integrity Inspection of Natural Gas System Piping for D, E,
33 63 and Water Dubai Jan, 2016 Completed
G, K & H Stations Authority
Pakistan
Inspection for Surveillance Activities in Construction of 40
34 1 Refinery Lahore Jan, 2016 Completed
Ton Boiler at Descon LMW Site, Lahore
Limited
Third Party Inspection of Oil Storage Facility of M/s Hascol
35 1 OGRA Shikarpur Nov, 2015 Completed
Petroleum (PVT) Limited SIituated at Shikarpur

Fatima
Inspection of Heat Exchangers to Asses Health of Tubes
36 1 Fertilizer Pakistan Nov, 2015 Completed
&To Determine their Thickness
Company
Inspection Engineer against Call Out Agreement No.
Sui,
37 4600000990 - Repairing / Coating of Shell of Heat 1 PPL Oct, 2015 Completed
Baluchistan
Exchanger at Sui PP

38 Third Party Inspection for Test Separator Vessel 1 PSS Asia Pakistan Oct, 2015 Completed

Fauji Kabirwala
39 Third Party Inspection of Underground Storage Tank 1 Pakistan Oct, 2015 Completed
Power
Inspection Engineer against Call Out Agreement No.
Sui,
40 4600000990 - Retubing of Shell & Tube type Heat 1 PPL Oct, 2015 Completed
Baluchistan
Exchanger at Sui Purification Plant
Inspection of Tubes of Heat Exchangers to Asses Health Fatima
41 of Tubes & Determine their Thickness & Compare Results 1 Fertilizer Pakistan Oct, 2015 Completed
with DUET Company
Non Intrusive Inspection of 06 Nos. Pressure Vessels at Sui,
42 6 PPL Oct, 2015 Completed
Gas Purification Plant, Sui Baluchistan
Non-intrusive inspection (NII) of pressure vessels at PPL
43 - PPL All PPL Field Sep, 2015 Completed
facilities on call-out basis for three years
Third Party External Inspection of HSD Storage Tanks T- Korangi-
44 3 PARCO Sep, 2015 Completed
406, T408A & T-408B at TS-3, Faisalabad. Karachi
Third Party External Inspection of Crude Oil Storage
Korangi-
45 Tanks A-002, A-021 and HSD Storage Tank A-001 at PS- 3 PARCO Sep, 2015 Completed
Karachi
1, Korangi.
Third Party Inspection of Oil Storage Facility of M/s
46 1 OGRA Sahiwal Jul, 2015 Completed
Pakistan State Oil (PSO) Situated at Sahiwal
Long range ultrasonic thickness LRUT insgection of
Korangi-
47 underground In let / outlet line of Tank A-003 at PS- I, 1 PARCO Jul, 2015 Completed
Karachi
Korangi
Third Party 15 Yearly Planned In-Service / External
Engro Vopak Bin Qasim,
48 Inspection of Sphere V-101A and V-101B as per API-510 2 Jun, 2015 Completed
Terminal Ltd Karachi
Guidelines.
Re-Inspection of Newly Constructed Storage Facility of
49 M/s Exceed Petroleum (PVT.) Limited Situated at Tehsil 1 OGRA Sheikhupura Jun, 2015 Completed
Ferozewala, District Sheikhupura
Inspection & Liquid Penetrant Testing of Boiler as per API National Foods Karachi &
50 1 Jun, 2015 Completed
510 Ltd. Gujrat
Third party thickness monitoring / in-service inspection of Engro Vopak Port Qasim
51 2 Feb, 2017 Completed
the sphere V-101B & V-101A Terminal Ltd Plant
Qadirpur,
52 MIA at plant vessels at Qadirpur as per API-510 5 OGDCL May, 2015 Completed
Sindh
Qadirpur,
53 MIA at storage tank at Qadirpur plant as per API-653 8 OGDCL May, 2016 Completed
Sindh
Inspection & Liquid Penetrant Testing of Boiler as per API National Foods Karachi &
54 1 Apr, 2015 Completed
510 Ltd. Gujrat
LalPir Power
55 Pre-Assessment of HFO Tank # 03 as per API 653 1 Pakistan Apr, 2015 Completed
Ltd
Third Party Inspection of Newly Constructed Storage Ferozewala,
56 Facility of M/s Exceed Petroleum (PVT.) Limited Situated 1 OGRA District Mar, 2015 Completed
at Tehsil Ferozewala, District Sheikhupura Sheikhupura

Mechanical Integrity Assessment, NDT Evaluation of Dakhni,


57 4 OGDCL Mar, 2015 Completed
Storage tanks and piping at Dakhani (ATA) Oil & Gas Field Panjab

Mechanical Integrity Assessment, NDT Evaluation of


Kunnar Oil &
58 Dehydration units as per API 510 and piping as per API- 2 OGDCL Feb, 2015 Completed
Gas Field
570 at Kunnar Oil & Gas Field
LalPir Power
59 Third Party Inspection Of HFO Tank No.2 As Per API 653 1 Pakistan Feb, 2015 Completed
Ltd
Exceed
60 Assessment of Underground Storage Tank as per API-653 1 Petroleum Pakistan Jan, 2015 Completed
(Pvt) Ltd
Inspection and NDT services of LPG Road Bowser as per Sadiq Gas
61 2 Lahore Jan, 2015 Completed
API 510 Company
Descon
62 Third Party Inspection of LPG Bullets as per API 510 2 Lahore Dec, 2014 Completed
Engineering
Third Party External Inspection of Crude Oil Tank & Slop
63 1 PARCO Karachi Dec, 2014 Completed
Tank at TS-1, KAEMARI as per API 653
Engro Vopak
64 Third Party Inspection of Heat Exchanger 1 Karachi Nov, 2014 Completed
Terminal Ltd
Engro Polymer
65 Third Party Inspection Services for Vessel V1491B Tank 1 China Nov, 2014 Completed
& Chemical
Third Party Integrity Assessment of Tank # 5302 as per Pakistan State
66 1 Pakistan Sep, 2014 Completed
API 653 Oil
Third Party Inspection of Pressure Vessel, Tank & Heat Engro Vopak
67 Numerious Karachi Aug, 2014 Completed
Exchanger ETC. Terminal Ltd
External / Internal Inspection of Zamzama Condensate
68 1 PARCO Pakistan Aug, 2014 Completed
Tank ZO3-T-02 at Bubak, PS-2 as per API-653
Inspection of Base Oil Storage Tank# 401 As per API-653 Pakistan State
69 1 Karachi Aug, 2014 Completed
Standard at Keamari Terminal 'A' Oil
Inspection Services for Vessel as per API-510 & Pipeline
70 2 SINOHYDRO Pakistan Aug, 2014 Completed
as per API-570
Pakistan State
71 Integrity assessment of boilers at LLP as per API-510 4 Pakistan Jul, 2014 Completed
Oil
Mechanical Integrity Assessment of Knock-out Vessel at Dakhni,
72 1 OGDCL Jul, 2014 Completed
Dakhni Gas Plant as per API-510 Panjab
Wartsila
Third Party inspection services for above ground storage
73 1 Pakistan (Pvt) Karachi Jun, 2014 Completed
Tank-01 as per API-653
Ltd.

Third Party Inspection of Newly Constructred Storage


74 1 OGRA Karachi Jun, 2014 Completed
Tanks of M/S Shell Pakistan Limited Situated at Kemari

Integrity assessment of above ground storage tank # 0805 Pakistan State


75 1 Pakistan Jun, 2014 Completed
at Mahmood kot terminal as per API-653 Oil
Design Verification of Crude Oil storage Tank as per API
76 1 POL Pakistan May, 2014 Completed
650
Third Party Inspection of the Oil Terminal / Storage Facility
77 1 OGRA Sheikhupura May, 2014 Completed
of M/s.Hascol Petroleum Limited at Machike

78 Positive Material Identification of Tanks 2 POL Pakistan May, 2014 Completed

79 LPG Storage Tanks Inspection at Pindori 22 POL Pakistan Apr, 2014 Completed

Charges for API-510 inspector for visual inspection of UCH


80 1 OGDCL Apr, 2014 Completed
damage vessels at UCH as per API-510 Baluchistan

Witness and Measured the Dents / Bulges at Tank Shell of


CHANDA
81 Constructed 20000 BBLS Crude Oil Storage Tank # 07 as 7 OGDCL Apr, 2014 Completed
KPK Region
per API 650

82 LPG Storage Tanks Inspection at Meyal 12 POL Pakistan Apr, 2014 Completed

Gul Ahmed
83 Third Party Inspection Services for Tank 1 Karachi Apr, 2014 Completed
Energy
Third Party inspection & Testing of vertical storage tank at Pearl
84 1 Karachi Mar, 2014 Completed
BOT as per API-653 Engineering

NDT and visual inspection services during construction of Pakistan State


85 2 Karachi Mar, 2014 Completed
fire water tank at BOT as per API-653 Oil

Witness Of Inspection Activities Of Under Construction


NASHPA
86 20,000 BBLS Crude Oil Storage Tanks As Per Quality 2 OGDCL Mar, 2014 Completed
KPK Region
Inspection Plan and API 650

Witness Of Inspection Activities Of Under Construction


CHANDA
87 20,000 BBLS Crude Oil Storage Tanks As Per Quality 1 OGDCL Mar, 2014 Completed
KPK Region
Inspection Plan and API 650

Gul Ahmed
88 Services to detect tank leakage 1 Pakistan Jan, 2014 Completed
Energy

Integrity testing of above ground storage Tank as per API- Pakistan State
89 1 Pakistan Oct, 2013 Completed
653 & Calibration of Tank as per optistap method Oil

Third Party inspection of Vessel V-1481 during fabrication Engro Polymer


90 1 China Sep, 2013 Completed
(FRP + PVC) & Chemical
Pakistan State
91 inspection & NDT services of tank at ZOT as per API-653 1 Karachi Aug, 2013 Completed
Oil
Visual inspection as per AI-653 & UT gauging of Tank 302 Pakistan State
92 1 Karachi Aug, 2013 Completed
at KTB Oil
NDT & Inspection services of crude oil tanks as per API- Qatar
93 7 UAE Aug, 2013 Completed
653 Petroleum

Third Party Integrity assessment of ground storage Tank # Pakistan State


94 2 Pakistan Jun, 2013 Completed
804 & 805 at Mehmood Kot installation as per API-653 Oil
Internal inspection of HSD storage Tank at WOTS-2,
95 2 PARCO Shikarpur Jun, 2013 Completed
Shikarpur
Pakistan State
96 NDT & inspection of tank # 01 at BOT as per API-653 1 Karachi Jun, 2013 Completed
Oil
Inspection Of PMG Vertical Tank # 4602 At Taru Jabba Pakistan State
97 1 Pakistan May, 2013 Completed
Depot as per API-653 Oil
Engro Polymer
98 Third Party inspection of Vessel during fabrication 1 China Apr, 2013 Completed
& Chemical
NDT & Visual inspection of storage tank at Faisalabad Pakistan State
99 1 Pakistan Feb, 2013 Completed
Depot. As per API-653 Oil

100 MIA and FFS of above ground storage tank at TOC field 1 OGDCL TOC Feb, 2013 Completed

Inspection, Testing and Certification of Pressure Vessels


101 7 ENI BHIT Pakistan Apr, 2011 Completed
during annual shut Down at BHIT site, as per API-510

Inspection, Testing and Certification of Tank during annual


102 1 ENI BHIT Pakistan Apr, 2011 Completed
shut Down at BHIT site, as per API-653
EXPERIENCE LIST FOR THIRD PARTY PRE-SHIPMENT / VENDOR
INSPECTION OF MATERIAL
Date of
Sr. # Job Description Client Location Status
Award

1 Third Party Inspection of CRA Linepipe at Indonesia PPL Indonesia Apr, 2018 In-Progress

Third Party Pre-shipment Inspection of 19 No. Loading Arms to be imported


2 PSO Italy Apr, 2018 In-Progress
from Italy

3 Third party inspection Services for 30 KVA DG set at China. PSO China Mar, 2018 In-Progress

Petro Allied
4 Third Party Pre-Shipment Inspection of PSV at Italy Solutions (pvt.) Italy Feb, 2018 Completed
Limited

5 Pre-Qualification of Third Party Pre-Shipment Inspection Firm.(03 years) SSGC All Over World Feb, 2018 In-Progress

6 Third Party Pre-Shipment Inspection for Anode Magnesium SSGC China Jan, 2018 Completed

USA &
7 Third Party Pre-Shipment Inspection for Pipe Wrap Tape & Primer SSGC Jan, 2018 Completed
Belgium

8 Third Party Inspection of Pressure / Vacuum (PV) Valves PSO Turkey Jan, 2018 Completed

100% Inspection of Welded Socket Welded Elbow of ¾” at OSAKA Engineering


9 SNGPL Lahore Nov, 2017 Completed
Lahore

10 Inspection of Steel Linepipe size 6inch dia X 0.188 inch WT, PSL-1 SNGPL Lahore Nov, 2017 Completed

11 Third Party Inspection of 3/4 inch. Aluminium Meter Coupling SNGPL Lahore Oct, 2017 Completed
12 Third Party Inspection of 3/4 inch.Gas Service Valves SNGPL Lahore Oct, 2017 Completed

13 Third Party Inspection of 3/4 inch.Domistic Gas Ragulators SNGPL Lahore Oct, 2017 Completed

Petro Allied
14 Third Party Pre-Shipment Inspection of Loading Arms Solutions (pvt.) India Oct, 2017 Completed
Limited

15 Third Party Inspection of 3/4 inch. Gas Service Tees SNGPL Lahore Sep, 2017 Completed

16 Third Party Inspection of Polyethelene Fittings at Mechfit SNGPL Lahore Sep, 2017 Completed

17 Third Party Inspection of Polyethelene Fittings at Moughal Engeering SNGPL Lahore Sep, 2017 Completed

18 Third Party Inspection of Polyethelene Fittings at Volta Dies SNGPL Lahore Sep, 2017 Completed

19 Third Party Inspection of Socket Welding Elbow 3/4 inch. SNGPL Lahore Sep, 2017 Completed

United
20 Third Party Inspection of Plug Valve 6" dia SSGC Aug, 2017 Completed
Kingdom

21 Third Party Inspection of Plug Valve 2" dia SSGC China Aug, 2017 Completed

Pakistan United
22 Third Party Inspection For Tube Bundle 201-C1 at U.K Jul, 2017 Completed
Refinery Limited Kingdom

Pakistan
23 Third Party Inspection of Return Bends Refinery Limited
Germany Jul, 2017 Completed
24 Pre-Shipment Inspection of Anodes SSGC USA Jul, 2017 Completed

25 FAT of shut down valve for Sofiya Phase-1 project OMV Pakistan UK Jul, 2017 Completed

Integrated
26 Third Party Pre-Shipment Inspection of Valves Engineering China Jun, 2017 Completed
Services

27 FAT of Valves OMV Pakistan UAE Jun, 2017 Completed

28 Inspection of Rocurement of 2000 M. Ton of API non-treated Bentonite OGDCL UAE Jun, 2017 Completed

29 Valve inspection at China for 8001-Sofiya-Phase-1 Project OMV Pakistan China Jun, 2017 Completed

Integrated
30 Third Party Pre-Shipment Inspection of Valves Engineering China Jun, 2017 Completed
Services

31 Inspection of 12" Sales Gas Meterking Skid OGDCL Italy Jun, 2017 Completed

32 Third Party Inspection of Polyethelene Fittings at Mechfit SNGPL Lahore Sep, 2017 Completed

33 Third Party Inspection of Polyethelene Fittings at Moughal Engeering SNGPL Lahore Sep, 2017 Completed

34 Third Party Inspection of Polyethelene Fittings at Volta Dies SNGPL Lahore Sep, 2017 Completed

35 Inspection of Flare Gas Package (HC & Acid Gas) OGDCL India Jun, 2017 Completed
Petro Allied
36 Third Party Pre-Shipment Inspection of Mechanical Seals Solutions (pvt.) Russia May, 2017 Completed
Limited

37 Third Party Inspection of 9-5/8 inch OD Casing pipes and cross overs OGDCL Japan May, 2017 Completed

38 Inspection / QC of 9-5/8" Casing OMV Pakistan Oman May,2017 Completed

39 Third Party Inspection of Rotor for Ruhrpumpen Pumps OGDCL Germany May, 2017 Completed

Inspection of 02 No. Twin Pump Cementer (Trailer Mounted) With Data


40 OGDCL China May, 2017 Completed
Acquisition System

41 inspection of 05 NoS Cat D-3512 Engines USA OGDCL USA May, 2017 Completed

42 Fat of Valves OMV Pakistan Netherland May, 2017 Completed

Mari Petroleum
43 TPI of Piping, Fittings and Valves for Aqeeq-1 UAE May, 2017 Completed
Company
TPI Services for Inspection of High Pressure Fittings for Hook-up Job of LP Mari Petroleum
44 UAE May, 2017 Completed
Separator and Gauge Tank Company

45 Inspection of DSS pipes OMV Pakistan Italy May, 2017 Completed

46 Third Party Inspection of 13-3/8 & 14 inch OD Casing pipes and cross overs OGDCL Mexico May, 2017 Completed

47 Inspection of Control valves OMV Pakistan Canada May, 2017 Completed

48 Inspection of bends OMV Pakistan China Apr, 2017 Completed


Mari Petroleum
49 TPI Services for Inspection of High Pressure Fittings UAE Apr, 2017 Completed
Company
TPI Services for Line Pipe, Fittings & Valves for Sujawal FEC Project (Mari Mari Petroleum
50 UAE Apr, 2017 Completed
Petroleum) Company
TPI Services for Line Pipe, Fittings & Valves for Sujawal FEC Project(PO# Mari Petroleum
51 UAE Apr, 2017 Completed
7100035239)-1 Company

52 Choke Valve Inspection OMV Pakistan USA Apr, 2017 Completed

Egypt, UK,
53 Pre-Shipment Inspection of Oil Base Mud Chemicals Package OGDCL Apr, 2017 Completed
USA

54 Metering skids for Sofiya Pjase-1 Project OMV Pakistan Singapore Apr, 2017 Completed

Third Party Inspection Services for Pre·Shipmcnt Inspection of Miscellaneous Mari Petroleum
55 Pakistan Apr, 2017 Completed
Valves, Fittings and Piping for Daharki Field. Company
Inspection Services for Fabrication of PVC/FRP Tank, V-1491A Sodium Engro Polymer
56 China Mar, 2017 Completed
Hypochlorite Storage Tank & Chemical

57 Third Party Inspection of line pipe 14 Inch dia. SCH STD PAPCO China Mar, 2017 Completed

58 Third Party OCTG Inspection at China Polish Oil & Gas China Mar, 2017 Completed

59 inspection of flow line for Sifiya Phase-1 project OMV Pakistan China Mar, 2017 Completed

60 Third Party Inspection of gravel pack completion equipment OGDCL UAE Mar, 2017 Completed

Petro Allied
61 Third party pre-shipment inspection Of bowzers seals Solutions (pvt.) China Feb, 2017 Completed
Limited

62 Inspection of 20 Inch OD Seamless Steel Casing Pipes 106.5 PPF OGDCL Italy Feb, 2017 Completed
63 Inspection of 300 M.Ton of polyanionic cellulose - Low Viscosity (PAC-LV) OGDCL China Feb, 2017 Completed

64 Inspection of Gas services Tee 3/4 inch SNGPL Lahore Feb, 2017 Completed

65 Third Party Inspection of 300 M.Tons of Poly Anionic Cellulose Low Viscosity OGDCL China Feb, 2017 Completed

66 Third Party Inspection of Rock Bits with Nozzles OGDCL USA Feb, 2017 Completed

Petro Allied
67 Third party pre-shipment inspection Of bowzers seals Solutions (pvt.) China Jan, 2017 Completed
Limited

Pakistan
68 Third Party Inspection of Heat Exchanger 107-CA Refinery Limited
UK Jan, 2017 Completed

69 Inspection of porta cabins. OMV Pakistan Pakistan Jan, 2017 Completed

Pakistan
70 Third Party Inspection of Pumps USA Jan, 2017 Completed
Refinery Limited

71 Inspection of Rock Bits & Nozzles OGDCL USA Jan, 2017 Completed
Orient Energy
72 Third Party Pre-Shipment Inspection of Forklifter Systems (Pvt) China Jan, 2017 Completed
Ltd.
73 Pre-Shipment Inspection of X-Mass Tree and Tubing Head Spool Assembly OGDCL Pakistan Jan, 2017 Completed
Mari Petroleum
74 Third party pre-shipment inspection for kalabagh-1A material UAE Jan, 2017 Completed
Company
75 Third Party Inspection of Reconnectable type Breakaway Couplings PSO USA Jan, 2017 Completed

76 100% Inspection of Gas Service Valve of ¾” at Universal Engineering Lahore SNGPL Lahore Jan, 2017 Completed
77 100% Inspection of Gas Service Tees of ¾” at Rashid Engineering Lahore SNGPL Lahore Jan, 2017 Completed
100% Inspection of Welded Socket Welded Elbow of ¾” at OSAKA Engineering
78 SNGPL Lahore Jan, 2017 Completed
Lahore
79 100% Inspection of Steel Line Pipe of 10” Diameter at Bashir Pipe Lahore SNGPL Lahore Dec, 2016 Completed

80 100% Inspection of Steel Line Pipe of 6” Diameter at IIL Karachi SNGPL Lahore Dec, 2016 Completed

Third party pre-shipment inspection against purchase order no. PROC-


81 FB/CB/PROD-1671/768528/2016 for procurement of X-mass tree assembly and OGDCL Islamabad Dec, 2016 Completed
tubing head spool
Pre-Shipment Inspection of Mudguard Media and Meshes against Purchase
82 OGDCL Belgium Dec, 2016 Completed
Order PROC-FA/PROP/P&P/CHEM-1703/768526/2016
83 Third Party Inspection of Joint Coating Material in USA SSGC USA Dec, 2016 Completed

84 Third Party Inspection of Joint Coating Material SSGC Maxico Dec, 2016 Completed
Siprion
85 Third Party Inspection of Coating Material in Belgium Petrotools Pvt. Belgium Dec, 2016 Completed
OrientLtd
Energy
86 Third Party Inspection of Material & Machinery Systems (Pvt) Japan Dec, 2016 Completed
OrientLtd.
Energy
87 Third Party Inspection of Material & Machinery Systems (Pvt) Italy Dec, 2016 Completed
Ltd.
Turkey &
88 Third Party Inspection of Plug Valves etc at Turkey & England SSGC Nov, 2016 Completed
England
Petro Allied
89 Third party pre-shipment inspection Of browzers seals Solutions (pvt.) China Nov, 2016 Completed
Limited

90 Inspection of 2-7/8 Inch seamless production Tubing, Pup Joints & X-Overs. OGDCL Indonesia Nov, 2016 Completed
Urban Sector
Third party Pre-Shipment Inspection Services for Chandeliers and Wall lights in
91 Planning & Italy Nov, 2016 Completed
Italy Management

Pakistan
92 Third Party Inspection for Heat Exchanger 303-C at Malaysia Malaysia Oct, 2016 Completed
Refinery Limited

Third Party Pre-Shipment Inspection of 800 Drums Water Soluble Corrosion


93 Inhibitor, CRW - 9110 against purchase order no. PROC-FA/CB/PROD- OGDCL USA Oct, 2016 Completed
1708/768450/2016

94 Inspection of 9-7/8 inch OD seamless steel casing pipes 66.4 PPF & crossovers OGDCL Japan Oct, 2016 Completed

Pakistan
95 Third Party Inspection for Heat Exchanger 201-C at Malaysia Refinery Limited
Malaysia Oct, 2016 Completed

Germany/
Third party pre-shipment inspection of procurement of pipe fittings against
96 OGDCL Brasil/France/ Sep, 2016 Completed
purchase order no. PROC-FB/CB/PROD-1654/768460/2015
Indonesia
Netherlands -
97 TPI of different material from Netherlands & Canada SSGC Sep, 2016 Completed
Canada
Third party pre shipment inspection of 400 drums of demulsified DMO 86000
98 (for heavy /waxy crude oils) against purchase order no. PROC FA/CB/PROD- OGDCL UK Sep, 2016 Completed
1707/768476/2016.

99 Factory Acceptance Test (FAT) at Canada SSGC Canada Sep, 2016 Completed
Third Party Pre-Shipment Inspection of Telecom & SCADA Network for LNG
100 SSGC USA Aug, 2016 Completed
Injection
101 Third Party Pre-Shipment Inspection of Gas Meter SSGC Netherlands Jul, 2016 Completed

102 Third Party Pre-Shipment Inspection of Gas Meter SSGC Canada Jul, 2016 Completed
103 Third Party Pre-Shipment Inspection of Cathodic Protection Equipment SSGC USA Jul, 2016 Completed

104 Third Party Inspection of 7 inch Casing Pipes OGDCL China Jul, 2016 Completed

105 Third Party Inspection of 9-5/8 inch casing pipe grade N-80, 47 PPF OGDCL China Jul, 2016 Completed

106 Third Party Inspection of 9-5/8 inch casing pipe grade N-80Q, 53.5 PPF OGDCL China Jul, 2016 Completed

107 Third party inspection of Valves OGDCL China Jul, 2016 Completed

108 Third Party Inspection of Mining Equipment /18 Excavators SECMC Japan Jul, 2016 Completed

109 Third Party Inspection of Single Rotor Turbine Gas Meters SSGC USA Jul, 2016 Completed
Third Party Pre-Shipment Inspection of component for Remus G.1.6 Meters
110 SSGC South Korea Jun, 2016 Completed
Diaphragm.

Sales & Services


111 Third Party Pre-Shipment Inspection of pipe fitting China Jun, 2016 Completed
International

112 Third Party Pre-Shipment Inspection of Terrian Crane, Lifting Capacity 40 Ton. SSGC Germany Jun, 2016 Completed

113 Third Party Pre-Shipment Inspection of Tape & Primer SSGC USA Jun, 2016 Completed
Third Party Pre-Shipment Inspection of CRA Lined Pipes at Manufacturer
114 PPL Indonesia May, 2016 Completed
Facility in Indonesia (Batam)
Third Party Pre-Shipment Inspection of Up gradation of 408XL to 428XL with
115 OGDCL USA & France May, 2016 Completed
7000 Channels
Third Party Pre-Shipment Inspection of Air Compressor, D/Engine Driven,
116 SSGC Czech Republic May, 2016 Completed
600CFM
Germany, Italy &
117 Third Party Pre-Shipment Inspection of Casing Accessories OGDCL Mar, 2016 Completed
Neatherlands
Third Party Pre-Shipment Inspection of 08 Nos. Motor Air Compressor Model
118 OGDCL Germany Mar, 2016 Completed
C105-14 200 PSI
Third Party Pre-Shipment Inspection of Welding Works for Mechanized &
119 SSGC China Mar, 2016 Completed
Automatic pipeline
120 Third Party Pre-Shipment Inspection for 6" seamless pipeline OGDCL China Mar, 2016 Completed
Third Party Pre-Shipment Inspection for workshop tools, pipe bending machine
121 SSGC USA Feb, 2016 Completed
38" to 48" dia.
Third Party Pre-Shipment Inspection for rough terrain crane, lifting capacity 35
122 SSGC Switzerland Feb, 2016 Completed
tons to 40 tons
123 Third Party Pre-Shipment Inspection for Full Bore Ball Valves SSGC Turkey Feb, 2016 Completed

124 Third Party Pre-Shipment Inspection for Full Bore Ball Valves SSGC Italy Feb, 2016 Completed

125 Third Party Pre-Shipment Inspection for Plug Valves Gear Operated SSGC China Feb, 2016 Completed
Third Party Pre-Shipment Inspection for Drilling consumable (20" to 10,000 PSI
126 OGDCL China Feb, 2016 Completed
well head assembly)
127 Third Party Pre-Shipment Inspection for Stabilizers in Japan PSO Japan Feb, 2016 Completed

128 Third Party Pre-Shipment Inspection for Multi-Geophone Strings and Spares OGDCL China Feb, 2016 Completed

129 Third Party Pre-Shipment Inspection for Perforating Hardware and accessories OGDCL Germany Feb, 2016 Completed

Mari Petroleum
130 Third Party inspection for Fittings & valves Dubai, UAE Jan, 2016 Completed
Company
Mari Petroleum
131 Wellhead Control Panel Leak Test -- Dubai Proserv facility Dubai Jan, 2016 Completed
Company
Mari Petroleum
132 Third Party inspection for Fittings & valves Dubai, UAE Jan, 2016 Completed
Company
Mari Petroleum
133 Third Party inspection for Check valves Karachi Jan, 2016 Completed
Company

134 Third Party inspection weld pipe fitting reducing Tees SSGC China Dec, 2015 Completed

135 Third Party Inspection of LPG Odorizing Units (Qty. 4) & Spares OGDCL UAE Dec, 2015 Completed

136 Third Party Inspection of Welding Electrodes SSGC UAE Dec, 2015 Completed

Third Party Inspection of Diesel AC-generating set 200KW with sound proof
137 SSGC Italy Dec, 2015 Completed
canopy

138 Third Party inspection of weld pipe fitting monolithic insulating joints SSGC Italy Dec, 2015 Completed

139 Third Party Inspection of weld pipe fitting anchor flanges SSGC Canada Dec, 2015 Completed

140 Third Party Inspection of Crawler dozer heavy Hydraulic SSGC Poland Dec, 2015 Completed

141 Third Party Inspection of Crawler dozer heavy Hydraulic SSGC Japan Dec, 2015 Completed

142 Third Party Inspection of pipeline cleaning & spare, brushes for 42" dia. SSGC Canada Dec, 2015 Completed

143 Third Party inspection of pipeline ultrasonic meter system, skid mounted 20" SSGC Canada Dec, 2015 Completed

Third Party Inspection of pipe line seamless ERW / SAW, API 5L, Grade X-70,
144 SSGC China Dec, 2015 Completed
Bare,

145 Post shipment Inspection of material Velosi Italy Kunnar, Sindh Dec, 2015 Completed

146 Third Party Inspection of High & Low bed trailer SSGC UAE Nov, 2015 Completed

147 Third Party Pre-Shipment of 3-1/2 inch PH-6 Tubing OGDCL Indonesia Nov, 2015 Completed
Third Party Pre-Shipment Inspection of Internal Lineup Clamp, Self Propelled
148 SSGC China Nov, 2015 Completed
Pneumatic
Petro Allied
149 Third Party Inspection of Burners for Nitrogen Pumpers Solutions (pvt.) USA Nov, 2015 Completed
Limited
Third Party Pre-Shipment Inspection of Flange, Fittings and Valves at Universal Mari Petroleum
150 Pakistan Nov, 2015 Completed
Corporation, Karachi Company

151 FAT of Valves at Italy OMV Pakistan Italy Nov, 2015 Completed

152 Pre-Shipment Inspection for Test Separator Vessel PSS Asia USA Oct, 2015 Completed
Presson
Descon
153 Pre-Shipment Inspection for Progress Monitoring/Expediting of Hot Oil Package International USA Nov, 2015 Completed
(Pvt) Limited
Third Party Pre-Shipment Inspection for 4 Habib Rahi Infill Wells, Daharki (For Mari Petroleum
154 Pakistan Oct, 2015 Completed
Universal Corporation and Saeed & Sons) Company

155 Third Party Pre-Shipment Inspection Services-2015 (FAT of Valves at UK) OMV Pakistan UK Oct, 2015 Completed

156 Third Party Inspection of Stand Pipe Valves OGDCL USA Oct, 2015 Completed

157 Third Party Inspection of Rotary Positive Displacement Gas Meters SSGC USA Sep, 2015 Completed

United
158 Third Party Inspection of 500 Drums of Odorant Oil SSGC Sep, 2015 Completed
Kingdom

159 Third Party Inspection of Welding Plant AC & DC generating set SSGC UAE Sep, 2015 Completed

160 Third Party Inspection of Self Operated Ragulator 4" SSGC Italy Sep, 2015 Completed

161 Third Party Pre-shipment Inspection of 6 inchs seamless pipeline, SCH 40 OGDCL China Sep, 2015 Completed
162 Third Party Inspection of single motor turbine gas meters SSGC USA Sep, 2015 Completed

Third Party Inspection of electronic volume corrector with dual pressure


163 SSGC USA Sep, 2015 Completed
transducer

164 Third Party Inspection of Odorent oil for Arema 420RUE SSGC France Sep, 2015 Completed

165 Third Party Pre-shipment Inspection of 6 inchs seamless pipeline, SCH 80 OGDCL China Sep, 2015 Completed

Third Party Inspection of generator gas engine driven 40KW with sound proof
166 SSGC USA Sep, 2015 Completed
canopy

167 Third Party Inspection of 20" dia bare linepipe with WT 0.438" SSGC Canada Aug, 2015 Completed

168 Third Party Inspection of Spares DR900 Turbine Compressor SSGC Italy Aug, 2015 Completed

169 Third Party Inspection of full bore valve Gear operated 24" dia SSGC China Aug, 2015 Completed

170 Third Party Inspection of Motor Grader Heavy duty hydraulically operated SSGC Switzerland Aug, 2015 Completed

171 Third Party Inspection of Gas Meters (Sensus) SSGC USA Aug, 2015 Completed

Third Party Pre- Shipment Inspection of Spares of Ground Electronics for 408XL
172 OGDCL China Aug, 2015 Completed
& 428XL Seismic Data Acquisition
Third Pre-Shipment Inspection of 20-3/4" X 13-5/8" X 11" X 7-1116" - 5000 PSI
173 OGDCL China Jul, 2015 Completed
Well Head Assembly
Third Party Inspection diapharam Metflex/Effbe, component for remus G.1.6
174 OGDCL England Jul, 2015 Completed
Gas Meter

175 Third Party Pre-Shipment Inspection of 7 inch OD Casing Pipes 35 PPF OGDCL China Jul, 2015 Completed

176 Third Party Pre-Shipment Inspection of Furnace Oil Pump PSO Australia Jul, 2015 Completed
Third Party Pre-Shipment Inspection of valve at boom realm International United
177 OMV Pakistan Jul, 2015 Completed
Limited Kingdom
Mari Petroleum All Over
178 Third Party Pre-Shipment Inspection Contract Jul, 2015 In-Progress
Company World

179 Third Party Pre-Shipment Inspection of servo Hydrealic Seismic vibrator OGDCL France Jul, 2015 Completed

Czech
180 Third party pre shipment inspection of Factory Bends SNGPL Jul, 2015 Completed
Republic

181 Third party pre shipment inspection of Welding Plants SNGPL USA Jul, 2015 Completed

182 Third party pre shipment inspection of Truck crane SNGPL China Jul, 2015 Completed

183 Third party pre shipment inspection of Steel Grit SNGPL South Africa Jul, 2015 Completed

184 Third party pre shipment inspection of Hot Tapping machine with accessories SNGPL Spain Jul, 2015 Completed

185 Third party pre shipment inspection of copolymer adhesive SNGPL Belgium Jul, 2015 Completed

186 Third party pre shipment inspection of Pipe layers SNGPL Poland Jul, 2015 Completed

187 Third party pre shipment inspection of High density teflone tape SNGPL Malaysia Jul, 2015 Completed

188 Third party pre shipment inspection of Multicyclone Gas separators SNGPL Italy Jul, 2015 Completed

189 Third party pre shipment inspection ofHorizental Gas filter separators SNGPL China Jul, 2015 Completed

190 Third party pre shipment inspection of High density Polyethylene SNGPL UAE Jul, 2015 Completed

191 Third Party Pre-Shipment Inspection of 9-5/8 INCH PPF Seamless Casing OGDCL China Jul, 2015 Completed
192 Third Party Pre-Shipment Inspection of Skid Mounted LPG Plant SSGC USA Jun, 2015 Completed

193 Third Party Pre-Shipment Inspection of chromatograph SSGC Singapore Jun, 2015 Completed

194 Third Party Pre-Shipment Inspection of PDC Bits & Nozzles OGDCL England Jun, 2015 Completed

195 FAT Witness of three phase separator OMV Pakistan USA Jun, 2015 Completed

196 TPI for Compressor Unit at AG Equipment, USA OMV Pakistan USA Jun, 2015 Completed

197 Third Party Pre-Shipment Inspection of PDC Bits & Nozzles OGDCL USA Jun, 2015 Completed

198 Third Party Pre-Shipment Inspection of PDC Bits & Nozzles OGDCL USA Jun, 2015 Completed

199 Third party pre shipment inspection of Needle valves SNGPL China Jun, 2015 Completed

200 Third party pre shipment inspection of Check valves SNGPL USA Jun, 2015 Completed

201 Third party pre shipment inspection of Microwave Radio link 8GHz SNGPL France Jun, 2015 Completed

202 Third party pre shipment inspection of Caterpillar D & R Dozer SNGPL Thailand Jun, 2015 Completed

203 Third party pre shipment inspection of Welding Plants SNGPL UAE Jun, 2015 Completed

204 Third party pre shipment inspection of Spares for Doosan excavator SNGPL KOREA Jun, 2015 Completed

205 Third party pre shipment inspection of Hatz Diesel Engine SNGPL Singapore Jun, 2015 Completed

206 Third party pre shipment inspection of Odourizer SNGPL USA Jun, 2015 Completed
Third party pre shipment inspection of water cooled shell & Tube heat
207 SNGPL China Jun, 2015 Completed
exchanger capacity 300 MMSCFD

208 Third party pre shipment inspection of Orifice Flanges SNGPL China Jun, 2015 Completed

209 Third party pre shipment inspection of Flow Computer SNGPL USA Jun, 2015 Completed

Third Party Pre-Shipment Inspection of Wire line set packets for 7 inch, 32, 35
210 OGDCL USA Jun, 2015 Completed
PPF Casing

211 Inspection of 8 inch seamless pipeline API 5L, GR X-52, PSL-2, WT 8.8 MM OGDCL China Jun, 2015 Completed

212 Third Party Pre-Shipment Inspection of Drilling Equipment MD Totco Unit OGDCL USA Jun, 2015 Completed

213 Third Party Inspection of 6 inch seamless pipeline GR: X-52, PSL-2, API 5L OGDCL China May, 2015 Completed

214 Third party pre shipment inspection of Plug Valves SNGPL Italy May, 2015 Completed

215 Third party pre shipment inspection of Welding Fittings SNGPL China May, 2015 Completed

216 Third party pre shipment inspection of Diesel Generator 250-275 KVA SNGPL China May, 2015 Completed

217 Third party pre shipment inspection of Needle Valves SNGPL Italy May, 2015 Completed

United
218 Third party pre shipment inspection of Plug Valves SNGPL May, 2015 Completed
Kingdom

219 Third party pre shipment inspection of Plug Valves SNGPL Italy May, 2015 Completed

United
220 Third party pre shipment inspection of Dew Point Analyzer SNGPL May, 2015 Completed
Kingdom
United
221 Third party pre shipment inspection of Cylindrical air intake filter elements SNGPL May, 2015 Completed
Kingdom
222 Third party pre shipment inspection of Fisher spares for level trolls at scrbbers SNGPL Singapore May, 2015 Completed

Third Party Pre-Shipment Inspection of 3-1/8" -5000 PSI X-Mass Tree Assembly
223 OGDCL China May, 2015 Completed
& Tubing Head

224 Third Party Inspection of component for remous G.1.6 Gas meter diaphram SSGC France May, 2015 Completed

225 Third Party Inspection of 13-3 8 Inch OD Casing Pipes 72 PPF OGDCL China May, 2015 Completed

226 Third Party Inspection of Explosion proof conduit clamps SSGC China May, 2015 Completed

Intech Process UAE &


227 Pre-Shipment Inspection of material in china, UAE & Singapore May, 2015 Completed
Automation Singapore

228 Third Party Pre-Shipment Inspection Of Trailer Mounted Work Over RIG 750 HP OGDCL China Apr, 2015 Completed

229 Third Party Inspection of 13-3 8 Inch OD Casing Pipes 68 PPF OGDCL China Apr, 2015 Completed

230 Third party inspection of Loading Arms PSO Spain Apr, 2015 Completed

231 Third party inspection of prime mover with low bed trailer SSGC Dubai Apr, 2015 Completed

232 Third party inspection of assorted Valve SSGC USA Apr, 2015 Completed

233 Third party pre-shipment inspection of Stud Bolts with (2nuts & 2washers) SNGPL China Apr, 2015 Completed

United
234 Third party pre-shipment inspection of Plug Valves SNGPL Apr, 2015 Completed
Kingdom

235 Third party pre-shipment inspection of Valves at Netherland OMV Pakistan Netherland Apr, 2015 Completed

236 Third party pre-shipment inspection of Orifice Plate SNGPL Italy Apr, 2015 Completed
237 Third party pre shipment inspection of Ball Valves SNGPL Italy Apr, 2015 Completed

238 Third party pre shipment inspection of Filter Separator SNGPL Italy Apr, 2015 Completed

239 Third party pre shipment inspection of Mechanized Welding system SNGPL UAE Apr, 2015 Completed

240 Third party pre shipment inspection of Digital pressuer & Temprature Calibrators SNGPL USA Apr, 2015 Completed

United
241 Third party pre shipment inspection of Turbine meters with accessories SNGPL Apr, 2015 Completed
Kingdom

242 Third party pre shipment inspection of Mechanized Welding system SNGPL USA Apr, 2015 Completed

243 Third party pre shipment inspection of Orifice Plates SNGPL KOREA Apr, 2015 Completed

244 Third party pre shipment inspection of Hyundai wheel Loader SNGPL Poland Apr, 2015 Completed

Czech
245 Third party pre shipment inspection of Pipe Layer SNGPL Apr, 2015 Completed
Republic

246 Third party pre shipment inspection of Factory Bends SNGPL USA Apr, 2015 Completed

247 Third party inspection of assorted Valve SSGC Italy Apr, 2015 Completed

Czech
248 Third party inspection of full bore valve gear operated SSGC Apr, 2015 Completed
Republic

249 Third party inspection of Wireline set Packers TRSCSSV's OGDCL Singapore Apr, 2015 Completed

250 Third Party Pre-Shipment Inspection of Lubricated Taper Steel Plug Valve 8” Dia SSGC Italy Mar, 2015 Completed

251 Third Party Pre-Shipment Inspection of Blind Flanges SSGC China Mar, 2015 Completed
252 Third Party Pre-Shipment Inspection of Lubricated Taper Steel Plug Valve 2” Dia SSGC Italy Mar, 2015 Completed

253 Third party pre shipment inspection of Weld Neck/Blind Flanges SNGPL Italy Mar, 2015 Completed

254 Third party pre shipment inspection of steel linepipe size 1" to 2",6" & 12" SNGPL China Mar, 2015 Completed

255 Third party pre shipment inspection of stud Bolts SNGPL China Mar, 2015 Completed

256 Third party pre shipment inspection of Domestic Gas Meters, SNGPL China Mar, 2015 Completed

Third party pre shipment inspection of Mueller Drilling /Stoppling Machines with
257 SNGPL USA Mar, 2015 Completed
Accessories

258 Third party pre shipment inspection of Twist tite seals SNGPL China Mar, 2015 Completed

259 Third party pre shipment inspection of Welding inverter/Welder SNGPL USA Mar, 2015 Completed

260 Third party pre shipment inspection of Welding inverter/Welder SNGPL UAE Mar, 2015 Completed

261 Third party pre shipment inspection of Vertical gas filter SNGPL Italy Mar, 2015 Completed

262 Third party pre shipment inspection of air compressors SNGPL China Mar, 2015 Completed

263 Third party pre shipment inspection of Gas meters diaphragm CL-400 SNGPL Slovakia Mar, 2015 Completed

264 Third party pre shipment inspection of air compressors SNGPL USA Mar, 2015 Completed

265 Third party pre shipment inspection of Tadano Truck Crane SNGPL China Mar, 2015 Completed

266 Third party pre shipment inspection of spares of laser leak detection equipment SNGPL Italy Mar, 2015 Completed
267 Third party pre shipment inspection of orifice meters with complete accessories SNGPL USA Mar, 2015 Completed

268 Third party pre shipment inspection of pressure control Valves SNGPL Malaysia Mar, 2015 Completed

269 Third party pre shipment inspection of Fisher make pressure control SNGPL Singapore Mar, 2015 Completed

270 Third party pre shipment inspection of spares for sensus turbine meters SNGPL USA Mar, 2015 Completed

United
271 Third party pre shipment inspection of Plug Valves SNGPL Mar, 2015 Completed
Kingdom

272 Third party pre shipment inspection of Plug Valves SNGPL Italy Mar, 2015 Completed

273 Third party pre shipment inspection of welding work station SNGPL Taiwan Mar, 2015 Completed

274 Third party pre shipment inspection of screwed Fittings class 3000 SNGPL China Mar, 2015 Completed

Third party pre shipment inspection of online Moisture Analyzer with complete
275 SNGPL USA Mar, 2015 Completed
acessories

276 Third Party Pre-Shipment Inspection of Meter Prover with Laptop Computer SSGC France Mar, 2015 Completed

277 Third Party Pre-Shipment Inspection of Full Bore Valves 12” with Actuators SSGC Germany Mar, 2015 Completed

278 Third Party Pre-Shipment Inspection of different material, pressure control valve SSGC Malaysia Mar, 2015 Completed

279 Third party pre shipment inspection of welding Fittings SNGPL China Feb, 2015 Completed

United
280 Third party pre shipment inspection of Serck Audco Sealant Size H, E & B SNGPL Feb, 2015 Completed
Kingdom

281 Third party pre shipment inspection of Meter Run 6" Dia Cl-300 RF SNGPL USA Feb, 2015 Completed
Third party pre shipment inspection of water Cooled heat exchanger Capacity
282 SNGPL China Feb, 2015 Completed
300 MMSCFD
Third party pre shipment inspection of Spares of Laser Leak Detection
283 SNGPL France Feb, 2015 Completed
Equipment

284 Third party pre shipment inspection of bends at APCO OMV Pakistan China Feb, 2015 Completed

285 Third party pre shipment inspection of Corrosion Protection Tape SNGPL Belgium Feb, 2015 Completed

286 Third party pre shipment inspection of Stud Bolts with 2Nuts & Washers SNGPL China Feb, 2015 Completed

287 Third party pre shipment inspection of Spares for Daewoo/Doosan Excavators SNGPL KOREA Feb, 2015 Completed

288 Third party pre shipment inspection of Factory Bends SNGPL Belgium Feb, 2015 Completed

289 Third party pre shipment inspection of Hydraulic Excavators SNGPL KOREA Feb, 2015 Completed

290 Third party pre shipment inspection of Welding Fittings SNGPL Italy Feb, 2015 Completed

291 Third party pre shipment inspection of Valves at Netherland OMV Pakistan Netherland Feb, 2015 Completed

292 Third party pre shipment inspection of Vessel inspection prior to PWHT-UAE OMV Pakistan UAE Feb, 2015 Completed

293 Third party pre shipment inspection of Pipe Bending Machine SNGPL Germany Feb, 2015 Completed

United
294 Third party pre shipment inspection of Door Closure SNGPL Feb, 2015 Completed
Kingdom

295 Third party pre shipment inspection of Weld Neck/Blind Flanges SNGPL China Feb, 2015 Completed

296 Third party pre shipment inspection of Domestic Gas Meters SNGPL China Feb, 2015 Completed
297 Third party pre shipment inspection of Weld Neck/Blind Flanges SNGPL China Feb, 2015 Completed

Mari Petroleum
298 FAT for three Phase Separator Spain Feb, 2015 Completed
Company

299 Third party pre shipment inspection of Choker Slings SNGPL USA Feb, 2015 Completed

300 Third party pre shipment inspection of Stud Bolt with Nuts and washers SNGPL China Feb, 2015 Completed

301 Third party pre shipment inspection of Actuater for 42" Ball valves SNGPL Germany Feb, 2015 Completed

United
302 Third party pre shipment inspection of Door Closure SNGPL Feb, 2015 Completed
Kingdom

303 Third party pre shipment inspection of Transfer prover Machine SNGPL Spain Feb, 2015 Completed

Third Party Pre-Shipment Inspection of 4 & 8 Inch Seamless Pipeline, 11.13MM


304 W.T (SCH--120) API 5L X-52 PSL-2, BE, SMLS DOUBLE RANDOM OGDCL China Feb, 2015 Completed
LENGTHPIPE ANSI B16.25 DIM ASME B36.10.

305 Third Party Pre-Shiment Inspection of Joint Coating Material at Canada SSGC Canada Feb, 2015 Completed

306 100% pre-shipment inspection of 42" Dia Steel Linepipe SNGPL China Jan, 2015 Completed

307 Third party pre shipment inspection of Spares for DAEOO/Doosan Excavator SNGPL KOREA Jan, 2015 Completed

Third party pre shipment inspection of Cleaning Pigs,Neoprene Cupsand foam


308 SNGPL USA Jan, 2015 Completed
Pigs

309 Third party pre shipment inspection of Welding Fittings SNGPL Italy Jan, 2015 Completed

310 Third party pre shipment inspection of Factory Bends SNGPL KOREA Jan, 2015 Completed
311 Third party pre shipment inspection of Pipe Layers SNGPL Poland Jan, 2015 Completed

312 Third party pre shipment inspection of S.I Oval Rings SNGPL China Jan, 2015 Completed

United
313 Third party pre shipment inspection of PIG Signals 42" SNGPL Jan, 2015 Completed
Kingdom

314 Third party pre shipment inspection of Hyundai Wheel Loader SNGPL KOREA Jan, 2015 Completed

315 Third party pre shipment inspection of Welding Fittings SNGPL Italy Jan, 2015 Completed

Third Party Pre-Shipment Inspection of Tubing (OCTG), Size 2-7/8" OD, Hydril Sales & Services
316 China Jan, 2015 Completed
CS 100% Equivalent SD-5T, R-2, 6.5 PPF, Grade L-80 International

317 Third Party Inspection of Ball Valves SSGC USA Jan, 2015 Completed

318 Third Party Inspection of Meter Prover SSGC France Jan, 2015 Completed

319 Third Party Inspection of Full Bore Ball Valves SSGC Dubai Jan, 2015 Completed
Presson
Descon
320 Third Party Inspection for progress monitoring of oil stabilization unit in USA International USA Jan, 2015 Completed
(Pvt) Limited

321 Third Party Inspection of Full Bore Ball Valves SSGC Germany Jan, 2015 Completed

Czech
322 Third Party Inspection of Full Bore Ball Valves SSGC Jan, 2015 Completed
Republic

323 Third Party Inspection of Horizontal Filter Separator SSGC China Jan, 2015 Completed

324 Third Party Inspection of Horizontal Filter Separator SSGC Italy Jan, 2015 Completed
Presson
Descon
325 Third Party FAT witness of LPG and sales gas metering packages in Singapore International Singapore Jan, 2015 Completed
(Pvt) Limited
326 Third Party Inspection of Revamp of Telecommunication & Expansion SSGC USA Jan, 2015 Completed

327 Third Party Inspection of Rock Bits with Nozzles OGDCL USA Jan, 2015 Completed

328 Third party pre shipment inspection of Welding Plants SNGPL UAE Dec, 2014 Completed

329 Third party pre shipment inspection of Hot Tapping Machine W/O Air Motor SNGPL Spain Dec, 2014 Completed

330 Third party pre shipment inspection of Hot Tapping Machine with accessories SNGPL Belgium Dec, 2014 Completed

331 Third party pre shipment inspection of anchor flanges SNGPL Maxico Dec, 2014 Completed

332 Third party inspection of Steel Line Pipe 42" dia, API 5L, 44th Edition SNGPL China Dec, 2014 Completed

333 Third party pre shipment inspection of Check Valves SNGPL Maxico Dec, 2014 Completed

Third party pre shipment inspection of Heat Shrink sleeves & primer / closure
334 SNGPL Belgium Dec, 2014 Completed
patches

335 Third party pre shipment inspection of Copolymer adhesives SNGPL USA Dec, 2014 Completed

336 Third party pre shipment inspection of Lowering In Belts SNGPL Italy Dec, 2014 Completed

337 Third party pre shipment inspection of Weld Neck Flanges SNGPL Greece Dec, 2014 Completed

338 Third party pre shipment inspection of Ball Valves SNGPL USA Dec, 2014 Completed
339 Third party pre shipment inspection of High density polyethylene SNGPL UAE Dec, 2014 Completed

340 Steel Line Pipe 42" dia X 0.562" WT, API 5L GR X70, PSL-2 SNGPL China Dec, 2014 Completed

341 Steel Line Pipe 42" dia X 0.625" WT, API SL GR. X70. PSL-2 SNGPL China Dec, 2014 Completed

342 Third Party Inspection for Procurement of Down Hole Tools OGDCL USA Dec, 2014 Completed

343 Third Party Inspection of Gas Meters Spares SSGC USA Nov, 2014 Completed

344 IThird Party Pre-Shipment Inspection of Stopple Fittings SSGC USA Nov, 2014 Completed

345 Third Party Pre-Shipment Inspection of Ball Valves SSGC Germany Nov, 2014 Completed

346 Third Party Pre-Shipment Inspection of Air Compressor SSGC Europe Nov, 2014 Completed

347 Third Party Pre-Shipment Inspection of Dump Truck SSGC Sweden Nov, 2014 Completed

348 Third Party Pre-Shipment Inspection of Split Tees SSGC Belgium Nov, 2014 Completed

349 Third Party Pre-Shipment Inspection of Pressurizing Pump SSGC Italy Nov, 2014 Completed

350 Third Party Pre-Shipment Inspection of Filter Separators & Vertical Scrubbers SSGC Italy Nov, 2014 Completed

Third party pre shipment inspection of Spares for DAEOO/Doosan Excavator


351 SNGPL KOREA Nov, 2014 Completed
300LC-V

352 Third party pre shipment inspection of Anchor Flanges SNGPL China Nov, 2014 Completed

Third party pre shipment inspection of Pre-Fabricated Insulating Joints Class-


353 SNGPL Italy Nov, 2014 Completed
600
Third party pre shipment inspection of Electronic Pressure/Temprature
354 SNGPL Germany Nov, 2014 Completed
Calibrators

355 Third party pre shipment inspection of Welding Plants (Single Holder) SNGPL USA Nov, 2014 Completed

United
356 Third party pre shipment inspection of Pig Signallers SNGPL Nov, 2014 Completed
Kingdom

357 Third party pre shipment inspection of Imported Gas Meters SNGPL China Nov, 2014 Completed

Third party pre shipment inspection of Spares for Norriseal make Pressure
358 SNGPL USA Nov, 2014 Completed
Control Valves

359 Third party pre shipment inspection of linePipe Dia 1",2",3" & 12" SNGPL China Nov, 2014 Completed

360 Third party pre shipment inspection of High Density Teflon Tape SNGPL Italy Nov, 2014 Completed

361 Third party pre shipment inspection of Air Compressors SNGPL USA Nov, 2014 Completed

362 Third Party Pre-Shipment Inspection of On Line Moisture Analyzer SSGC USA Nov, 2014 Completed

363 Third Party Pre-Shipment Inspection of Telecom Equipment SSGC USA Nov, 2014 Completed

364 Third Party Pre-Shipment Inspection of Air Compressors SSGC Dubai Nov, 2014 Completed

365 Third Party Pre-Shipment Inspection of Weld Pipe Fitting SSGC China Nov, 2014 Completed

366 Third Party Pre-Shipment Inspection of Welding Electrodes SSGC Dubai Nov, 2014 Completed

367 Third Party Pre-Shipment Inspection of Lubricated Plug Vaves SSGC USA Nov, 2014 Completed

368 Third Party Pre-Shipment Inspectionn of Lubricated Taper Plug Valves SSGC Italy Nov, 2014 Completed
369 Third Party Pre-Shipment Inspection for Inspection of Stabilizers OGDCL China Nov, 2014 Completed

Engro Polymer
370 Third Party Inspection Services for Vessel V1491B Tank China Nov, 2014 Completed
& Chemical
Third Party Inspection for Procurement of 30,000 Nos Multi Geophone Strings &
371 OGDCL China Nov, 2014 Completed
Spares
All Over
372 Third Party Pre-Shipment Inspection Services SSGC Oct, 2014 Completed
World

373 Third party pre shipment inspection of hot tapping/stoppling Fittings SNGPL Belgium Oct, 2014 Completed

Third party pre shipment inspection of high flow gas samplers for flow rate
374 SNGPL USA Oct, 2014 Completed
measurement

375 Third party pre shipment inspection of P.E Fittings SNGPL USA Oct, 2014 Completed

376 Third party pre shipment inspection of Hydraulic excavators SNGPL KOREA Oct, 2014 Completed

Third party pre shipment inspection of Hydraulic breaker for Hydraulic


377 SNGPL KOREA Oct, 2014 Completed
excavators

378 Third party pre shipment inspection of Check Valves SNGPL Maxico Oct, 2014 Completed

379 Third party pre shipment inspection of Rubber casing end Seals SNGPL Germany Oct, 2014 Completed

380 Third party pre shipment inspection of P.E Fittings SNGPL Singapore Oct, 2014 Completed

Atlas
381 Inspection of Wayne Dispensing Units in Brazil Brazil Oct, 2014 Completed
Engineering

382 Inspection of 'Spares for Jet Pumps' OGDCL USA Oct, 2014 Completed

Czech
383 Third Party Witness of FAT for Ball Valves OMV Pakistan Sep, 2014 Completed
Republic
Polish Oil &
384 Third Party Pre-Shipment Inspection of Valves at China China Sep, 2014 Completed
Gas

385 FAT / TPI of Ball Valves at IPS OMV Pakistan Netherland Sep, 2014 Completed

386 FAT / Third Party Pre-Shipment Inspection of Ball Valves at Meverick OMV Pakistan Netherland Sep, 2014 Completed

387 Third Party Pre-Shipment Inspection for Valves at Emerson OMV Pakistan Malaysia Sep, 2014 Completed

388 Third party pre shipment inspection of Twist tite seals with barcodes & RFID SNGPL China Sep, 2014 Completed

389 Third party pre shipment inspection of Welding Plants SNGPL USA Sep, 2014 Completed

390 Third party pre shipment inspection of Welding Fittings SNGPL China Sep, 2014 Completed

Third party pre shipment inspection of Spares for Sensus RW-275 & RW-415
391 SNGPL USA Sep, 2014 Completed
gas meters
Czech
392 FAT of Ball Valves OMV Pakistan Sep, 2014 Completed
Republic
Polish Oil &
393 Third party pre shipment inspection of Valves at China China Sep, 2014 Completed
Gas

394 FAT / Third party pre shipment inspection of Ball Valves at IPS, Netherland OMV Pakistan Netherland Sep, 2014 Completed

395 FAT / Third party pre shipment inspection of Ball Valves at Meverick, Netherland OMV Pakistan Netherland Sep, 2014 Completed

396 Third party pre shipment inspection for Valves at Emerson, Malaysia OMV Pakistan Malaysia Sep, 2014 Completed

397 Third party pre shipment inspection for Bends Inspection at APCO, China OMV Pakistan China Sep, 2014 Completed

398 Third party FAT of Valves at Valeronics, UAE OMV Pakistan UAE Sep, 2014 Completed
399 Third party pre shipment inspection of air compressors SNGPL Germany Sep, 2014 Completed

400 Third party pre shipment inspection of air compressors SNGPL USA Sep, 2014 Completed

401 Third party pre shipment inspection of G.I Fittings SNGPL China Sep, 2014 Completed

402 Third party pre shipment inspection of Calibration gas mixtures filled Cylinder SNGPL USA Sep, 2014 Completed

403 Third party pre shipment inspection of Cutter for hot Tapping Machines SNGPL Belgium Sep, 2014 Completed

404 Third Party Pre-Shipment Inspection for Valves at Emerson OMV Pakistan Malaysia Sep, 2014 Completed

405 Third Party Pre-Shipment Inspection for Bends Inspection at APCO OMV Pakistan China Sep, 2014 Completed

406 FAT of Valves at Valeronics OMV Pakistan UAE Sep, 2014 Completed

United
407 Third party pre shipment inspection of Pressure Transducers SNGPL Aug, 2014 Completed
Kingdom

408 Third party pre shipment inspection of Polyethylene Tool kits SNGPL USA Aug, 2014 Completed

Mari Petroleum All Over


409 PSI of Metering Skid, Pipe Lines & Separator at Shujal 1 Aug, 2014 Completed
Company World

410 Third party pre shipment inspection of Polyethylene Tool kits SNGPL Italy Aug, 2014 Completed

411 Third party pre shipment inspection of Plug Valves SNGPL Italy Aug, 2014 Completed

412 Third Party Pre-Shipment Inspection of Wayne Brand Dispensing Units. PSO Japan Aug, 2014 Completed

413 Third Party Inspection of ‘Coalescer & Particle Filter Elements’ OGDCL Singapore Aug, 2014 Completed
414 Third Party Pre-Shipment Inspection of Jet Pump Surface Power Units OGDCL USA Aug, 2014 Completed

415 Third Party Pre-Shipment Inspection of 13-3/8" OD HC Casing Pipes 72 PPF OGDCL China Jul, 2014 Completed

Third party pre shipment inspection of Spares for Emerson Make flow
416 SNGPL USA Jul, 2014 Completed
Computers
Third party pre shipment inspection of Spares for Petro Firontni Orifice Meters
417 SNGPL Italy Jul, 2014 Completed
(Orifice Plate)

418 Third party pre shipment inspection of Spares for Rockwell Turbine Meters SNGPL USA Jul, 2014 Completed

419 Third party pre shipment inspection of Gas Turbine Meters 4" & 6" SNGPL USA Jul, 2014 Completed

420 Third party pre shipment inspection of Pressure Control Valves SNGPL Argentina Jul, 2014 Completed

421 Third party pre shipment inspection of G.I Fittings SNGPL China Jul, 2014 Completed

Sales &
422 Third Party Pre-Shipment Inspection Job in Qingdao for Pipe Fittings Services China Jul, 2014 Completed
International

423 Third party pre shipment inspection of Domestic Gas Meters SNGPL China Jun, 2014 Completed

424 Third party pre shipment inspection of Spares for Leak Detection Equipment SNGPL France Jun, 2014 Completed

Third party pre shipment inspection of Spares for Fisher Make Pressure Control
425 SNGPL Singapore Jun, 2014 Completed
Valves

426 Third party pre shipment inspection of Pressure Control Valves SNGPL Malaysia Jun, 2014 Completed

Czech
427 Third party pre shipment inspection of Factory Bends SNGPL Jun, 2014 Completed
Republic
428 Third party pre shipment inspection of P.E Coating Raw Material SNGPL UAE Jun, 2014 Completed

429 Third party pre shipment inspection of Pressure Control Valves SNGPL Singapore Jun, 2014 Completed

430 Third party pre shipment inspection of Blowdown/Relief valves SNGPL Germany Jun, 2014 Completed

431 Third party pre shipment inspection of Pressure Control Valves SNGPL USA Jun, 2014 Completed

432 Third party pre shipment inspection of Polyethylene Tool kit with accessories SNGPL USA Jun, 2014 Completed

433 Third party pre shipment inspection of Spares for Daniel Gas Chromatograph SNGPL USA Jun, 2014 Completed

Plastipack
434 Third Party inspection of Laser Coding Machine Machines (Pvt) Spain Jun, 2014 Completed
Ltd.
Third Party Pre-Shipment Inspection of 2 Nos Furnace Oil Pumps Imported from
435 PSO USA Jun, 2014 Completed
USA

436 Third Party Pre-Shipment Inspection of CAT 3512 Engine spares against PO OGDCL USA Jun, 2014 Completed

437 Third Party Inspection of 9-5/8” OD Casing pipes P-110 OGDCL China Jun, 2014 Completed

Sales & Services


438 Third Party Pre-shipment inspection of Oilwell Tubing & Accessories China Jun, 2014 Completed
International

Procyon Supply
439 PSI of Corrosion coupion Kit in USA USA June, 2014 Completed
USA
Integrated
Pre-Shipment Third Party Inspection of temperature and pressure Gauges,
440 Engineering Thailand May, 2014 Completed
Thailand
Services
Integrated
441 Third Party Inspection of Orifice plates Engineering Germany May, 2014 Completed
Services
China, USA,
442 Third Party inspection of packing machine PSO May, 2014 Completed
Spain

443 Third Party inspection 6000 additional ground electronics OGDCL France May, 2014 Completed

444 Third Party inspection 3000 geophone strings OGDCL China May, 2014 Completed

445 Pre-shipment inspection of three phase separator OGDCL China May, 2014 Completed

DUPLEX LINE PIPE, BARE, 8” NPS SUITABLE FOR CO2:24-25 MOLE%, N2:
Sales &
24-25 MOLE%, TEMP: 290F, SHUT-IN PRESSURE: 4500PSI, WATER
446 Services China May, 2014 Completed
CHLORIDES: 16000MG/L, MATERRAIL: ASTM A790 UNS S31803, WALL
International
THICKNESS 0.5”

447 Third party pre shipment inspection of Misc. Regulators. SNGPL Singapore May, 2014 Completed

448 Third party pre shipment inspection of Misc. Regulators. SNGPL USA May, 2014 Completed

449 Third party pre shipment inspection of Spares for Orifice meters SNGPL Canada May, 2014 Completed

450 Third party pre shipment inspection of High density teflon Tape SNGPL Australia May, 2014 Completed

451 Third party pre shipment inspection of Orifice Meters SNGPL Canada May, 2014 Completed

DUPLEX LINE PIPE, BARE, 10” NPS SUITABLE FOR CO2:24-25 MOLE%, N2:
Sales &
24-25 MOLE%, TEMP: 290F, SHUT-IN PRESSURE: 4500PSI, WATER
452 Services China May, 2014 Completed
CHLORIDES: 16000MG/L, MATERRAIL: ASTM A790 UNS S31803, WALL
International
THICKNESS 0.5”
Procyon Supply United
453 Pre-Shipment Inspection of Pressure Switches in May, 2014 Completed
USA Kingdom
Procyon Supply
454 Pre-Shipment Inspection of Double O-Ring Seal Isolation Joints Italy May, 2014 Completed
USA

455 Third party pre-shipment inspection in Italy of 29NOs. Loading arms. PSO Italy Apr, 2014 Completed

456 Pre-Shipment Inspection of Valves in USA OMV Pakistan USA Apr, 2014 Completed

457 Compressors unit run test in USA OMV Pakistan USA Apr, 2014 Completed

Third party pre-shipment inspection in USA of positive displacement rotary


458 PSO USA Apr, 2014 Completed
pump.

459 Third party pre shipment inspection of Welding Fittings SNGPL China Apr, 2014 Completed

460 Third party pre shipment inspection of Flanges SNGPL China Apr, 2014 Completed

United
461 Third party pre shipment inspection of Sizing Beem / Ring Rail SNGPL Apr, 2014 Completed
Kingdom

462 Third party pre shipment inspection of G.I Fittings SNGPL China Apr, 2014 Completed

463 Third party pre shipment inspection of Vehicle mounted gas leak detector SNGPL France Apr, 2014 Completed

464 Third party pre shipment inspection of Rotary gas meters SNGPL Canada Apr, 2014 Completed

465 Third party pre shipment inspection of Turbine gas meters SNGPL USA Apr, 2014 Completed

Slovak
466 Third party pre shipment inspection of Diaphragm Type Gas Meters SNGPL Apr, 2014 Completed
Republic

467 Third party pre shipment inspection of Fiberglass filter separators elements SNGPL USA Apr, 2014 Completed
468 Third party pre shipment inspection of Needle valves SNGPL Singapore Apr, 2014 Completed

469 Third party pre shipment inspection of Welding Fittings SNGPL Italy Apr, 2014 Completed

470 Third party pre shipment inspection of Misc. Regulators. SNGPL USA Apr, 2014 Completed

471 Third Party inspection of drilling strings group-B OGDCL China Apr, 2014 Completed

472 Third party pre shipment inspection of Flow Computers SNGPL USA Mar, 2014 Completed

473 Third party pre shipment inspection of Welding Fittings SNGPL China Mar, 2014 Completed

474 Third party pre shipment inspection of Odorant Oil SNGPL USA Mar, 2014 Completed

475 Third party pre shipment inspection of Polyethylene Tool kit with accessories SNGPL USA Mar, 2014 Completed

476 Third Party inspection 3-1/8 inch X-mass tree assembly OGDCL China Mar, 2014 Completed

Sales & Services


477 Third Party inspection of valves, flanges and spares China Mar, 2014 Completed
International

478 Third Party inspection of UPS and spares Net-Line Singapore Mar, 2014 Completed

479 Third Party inspection of off gas compressor OGDCL China Feb, 2014 Completed

480 Third party pre shipment inspection of Weld Neck Flanges SNGPL Italy Feb, 2014 Completed

481 Third party pre shipment inspection of Thermo Electric Generator SNGPL Russia Feb, 2014 Completed
Third party pre shipment inspection of Mueller Drilling /Stopping Machines with
482 SNGPL USA Feb, 2014 Completed
Accessories

483 Third party pre shipment inspection of 1" Gas regulators (800-1000SCFH) SNGPL USA Feb, 2014 Completed

484 Third Party inspection of drilling strings group-A OGDCL China Feb, 2014 Completed

International
485 Pre-shipment inspection of Aerial Bundled Cable (ABC) Cables Resources China Feb, 2014 Completed
Group

486 Third party pre shipment inspection of material VELOSI Qatar USA Jan, 2014 Completed

Solution
487 Third party inspection of Material USA Jan, 2014 Completed
Engineering
DESCON
488 Third party inspection of Methanol Skids USA Jan, 2014 Completed
Engineering

489 Third party pre shipment inspection of Neoprene pig Cups SNGPL USA Jan, 2014 Completed

United
490 Third party pre shipment inspection of Plug Valves SNGPL Jan, 2014 Completed
Kingdom

491 Third party pre shipment inspection of Filters / Strainers SNGPL China Jan, 2014 Completed

492 Third party pre shipment inspection of Check Valves SNGPL Maxico Jan, 2014 Completed

493 Third party pre shipment inspection of spares for NOV pumps OGDCL USA Jan, 2014 Completed

494 Third party pre shipment inspection of 8 inch seamless line pipe OGDCL China Jan, 2014 Completed

495 Third Party Inspection of Plastic Pallets To Be Imported From South Korea PSO South Korea Jan, 2014 Completed
496 Third Party Inspection of 6 inch seamless pipeline OGDCL China Jan, 2014 Completed

Czech
497 Third party pre shipment inspection of Relief Valves SNGPL Dec, 2013 Completed
Republic

498 Third party pre shipment inspetion of Diaphragm / Rotary / Turbine Gas Meters, SNGPL Germany Dec, 2013 Completed

499 Third party pre shipment inspection of Welding Fittings SNGPL China Dec, 2013 Completed

Third party pre shipment inspection of Genuine Spares for Daewoo / Doosan
500 SNGPL Italy Dec, 2013 Completed
Excavators

501 Third party pre shipment inspection of Anchor Flanges SNGPL KOREA Dec, 2013 Completed

502 Third party pre shipment inspetion of Coaltar Enamel / Primer SNGPL China Dec, 2013 Completed

503 Third party pre shipment inspection of Plug Valves SNGPL China Dec, 2013 Completed

504 Third party pre shipment inspection of Plug Valves SNGPL Italy Dec, 2013 Completed

505 Pre-shipment inspection of spares of ground electronics OGDCL China Dec, 2013 Completed

Pre-shipment inspection of 30 Tons Hydraulic Cranes along with tool /


506 OGDCL China Dec, 2013 Completed
accessories

507 Inspection of Nitrogen Generation Package against purchase order OGDCL Netherlands Dec, 2013 Completed

508 Third party pre shipment inspection of Plug Valves SNGPL USA Nov, 2013 Completed

United
509 Third party pre shipment inspection of Ball Valves SNGPL Nov, 2013 Completed
Kingdom

510 Third party pre shipment inspection of Repair Sticks SNGPL Italy Nov, 2013 Completed
Third party pre shipment inspection of 3-layer heat Shrink sleeves & Epoxy
511 SNGPL Germany Nov, 2013 Completed
Primer

512 Third party pre shipment inspection of Stud Bolts with Nuts & Washers SNGPL USA Nov, 2013 Completed

513 Third party pre shipment inspection of Steel line Pipe SNGPL Singapore Nov, 2013 Completed

514 Third party pre shipment inspection of Gas Turbine Meters SNGPL KOREA Nov, 2013 Completed

515 Third party pre shipment inspection of Welding Plants , USA SNGPL USA Nov, 2013 Completed

516 Third party pre shipment inspection of Heat Shrinkable sleeves & Epoxy primer SNGPL Maxico Nov, 2013 Completed

517 Third party pre shipment inspection of Orifice meter Run and Orifice Fittings , SNGPL Canada Nov, 2013 Completed

518 Third party pre shipment inspection of Weld Neck / Blind Flanges SNGPL Canada Nov, 2013 Completed

519 Third party pre shipment inspection of Pre-Filter Wraps (SOCKS) Cylinderical, SNGPL Italy Nov, 2013 Completed

third party pre shipment inspection of Genuine Spares for Daewoo/Doosan


520 SNGPL India Nov, 2013 Completed
Excavators
Third party pre shipment inspetion of EVC's & GPRS Based Measuring and
521 SNGPL KOREA Nov, 2013 Completed
Monitoring System

522 Third party pre shipment inspection of Pre- Fabricated insulating Joints SNGPL Italy Oct, 2013 Completed

523 Third party pre shipment inspection of Needle Valves SNGPL China Oct, 2013 Completed

524 Third party pre shipment inspection of Steel Line Pipe SNGPL Italy Oct, 2013 Completed

525 Third party pre shipment inspection of Plug Valves SNGPL Italy Oct, 2013 Completed
United
526 Third party pre shipment inspection of Temprature Bath for Calibration, SNGPL Oct, 2013 Completed
Kingdom

527 Third party pre shipment inspection of Ball Valves SNGPL Taiwan Oct, 2013 Completed

528 Third party pre shipment inspection of Misc.Regulators SNGPL Italy Oct, 2013 Completed

529 Third party pre shipment inspection of Spares for PE Extruder SNGPL Singapore Oct, 2013 Completed

Third party pre shipment inspection of Spares for Ingersoll Rand Air
530 SNGPL Netherland Oct, 2013 Completed
compressor Airend LP

531 Third party pre shipment inspection of Steel Pigs with Rubber Cups & Brushes SNGPL Germany Oct, 2013 Completed

532 Third party pre shipment inspection of Imported Gas Meters SNGPL USA Oct, 2013 Completed

533 Third party pre shipment inspection of Imported Gas Meters SNGPL China Oct, 2013 Completed

534 Third party pre shipment inspection of High Density Teflon Tap, SNGPL China Oct, 2013 Completed

535 Third party pre shipment inspection of P.E Fittings SNGPL Australia Oct, 2013 Completed

536 Third party pre shipment inspection of Foam pigs/Neoprene Pigs SNGPL USA Oct, 2013 Completed

537 Third Party Inspection and witness of fire lorries at sharjah Meraj Lorries Sharjah, UAE Sep, 2013 Completed

United
538 Third Party Inspection of field instruments (flame detectors) at UK AVANCEON Sep, 2013 Completed
Kingdom

539 Inspection of water soluble corrosion inhibitor (crew 9110) against PO OGDCL USA Sep, 2013 Completed

Engro Polymer
540 Third party inspection services for TT-206 at M/s ACE workshop Austria. Austria Sep, 2013 Completed
& Chemical
Third party pre shipment inspection of Mueller Drilling /Stopping Machines with
541 SNGPL USA Sep, 2013 Completed
Accessories

542 Third party pre shipment inspection of G.I Fittings SNGPL China Sep, 2013 Completed

543 Third party pre shipment inspection of Polyethylene Tool Kits with Accessories SNGPL Italy Sep, 2013 Completed

Third party pre shipment inspection of Spares required for Caterpiller Gas United
544 SNGPL Sep, 2013 Completed
Engine Kingdom

545 Third party pre shipment inspection of Stud Bolts with Nuts & Washers SNGPL Singapore Sep, 2013 Completed

546 Third party pre shipment inspection of Stud Bolts with Nuts & Washers SNGPL UAE Sep, 2013 Completed

547 Third party pre shipment inspection of Pre-fabricatd insulatings Joints SNGPL Italy Sep, 2013 Completed

548 Third party pre shipment inspection of Stud Bolts with 2 Nuts & Washers SNGPL Singapore Sep, 2013 Completed

Czech
549 Third party pre shipment inspection of Factory Bends SNGPL Sep, 2013 Completed
Republic
Czech
550 Third party pre shipment inspection of Factory Bends SNGPL Sep, 2013 Completed
Republic

551 Third party pre shipment inspection of Steel line Pipe SNGPL China Sep, 2013 Completed

552 Third party pre shipment inspection of Ball Valves SNGPL Germany Sep, 2013 Completed

Third party pre shipment inspection of Electronic Differential pressure / Static


553 SNGPL USA Sep, 2013 Completed
pressure temprature recorder alongwith Accessories

554 Third party pre shipment inspection of Weldolets SNGPL Taiwan Sep, 2013 Completed

Czech
555 Third party pre shipment inspection of Factory Bends SNGPL Sep, 2013 Completed
Republic
Czech
556 Third party pre shipment inspection of Factory Bends SNGPL Sep, 2013 Completed
Republic

557 Third Party inspection of Pig launcher & receiver package. OGDCL China Sep, 2013 Completed

Engro Polymer
558 Third Party inspection of Vessel during fabrication China Sep, 2013 Completed
& Chemical

559 Pre-Shipment Inspection of Valves in Dubai M.K Int’l Dubai Sep, 2013 Completed

560 Third party inspection of High Lift Pumps & spares OGDCL UAE Aug, 2013 Completed

561 Pre-Shipment Inspection of Pipes in China KSB Pumps China Aug, 2013 Completed

562 Third party inspection of FAT in USA OMV Pakistan USA Aug, 2013 Completed

563 Third party pre shipment inspection of Door closures SNGPL China Aug, 2013 Completed

564 Third party pre shipment inspection of Stud Bolts with 2 Nuts Washers SNGPL UAE Aug, 2013 Completed

United
565 Third party pre shipment inspection of spares for total sulphur Daniel SNGPL Aug, 2013 Completed
Kingdom

566 Third party pre shipment inspection of Anchor Flanges SNGPL China Aug, 2013 Completed

567 Third party pre shipment inspection of Weld Neck / Blind Flanges SNGPL Italy Aug, 2013 Completed

568 Third party pre shipment inspection of S.I Oval Rings SNGPL China Aug, 2013 Completed

569 Third party pre shipment inspection of Weld Neck / Blind Flanges SNGPL China Aug, 2013 Completed

570 Third party pre shipment inspection of Welding Fittings SNGPL China Aug, 2013 Completed
571 Third party pre shipment inspection of Spare Parts for Compare Compressor SNGPL Germany Aug, 2013 Completed

572 Third party pre shipment inspection of Welding Fittings SNGPL Italy Aug, 2013 Completed

573 Third party pre shipment inspection of Lowring in Belts SNGPL USA Aug, 2013 Completed

574 Third party pre shipment inspection of Spares of Hydraulic Hammer, SNGPL KOREA Aug, 2013 Completed

575 Third party inspection for Pipe Manufacturing at TPCO in China OMV Pakistan China Aug, 2013 Completed

576 Third party inspection of inspection of jet pumping units and spares OGDCL USA Jul, 2013 Completed

577 Third party pre shipment inspection of Laser Based Leak Detector SNGPL Italy Jul, 2013 Completed

578 Third party pre shipment inspection of Orifice Meter Run SNGPL Italy Jul, 2013 Completed

579 Third party pre shipment inspection of Orifice Meter Run SNGPL USA Jul, 2013 Completed

580 Third party pre shipment inspection of Chromate SNGPL Canada Jul, 2013 Completed

United
581 Third party pre shipment inspection of Foam Pigs SNGPL Jul, 2013 Completed
Kingdom

582 Third party pre shipment inspection of Pressure Transmitters SNGPL Germany Jul, 2013 Completed

583 Third party pre shipment inspection of Needle Valves SNGPL KOREA Jul, 2013 Completed

584 Third party pre shipment inspection of Soft Iron Oval Ring SNGPL Singapore Jul, 2013 Completed

585 Third party pre shipment inspection of weldolets SNGPL UAE Jul, 2013 Completed
United
586 Third party pre shipment inspection of Stud Bolts with 2 Nuts Washers SNGPL Jul, 2013 Completed
Kingdom

587 Third party pre shipment inspection of spares for total sulphur Daniel SNGPL France Jul, 2013 Completed

UAE, UK &
588 Third party inspection for field instrumentation for fire and gas safety system OGDCL Jul, 2013 Completed
Singapore
United
589 Third party inspection of equipment BIZ LINK Jun, 2013 Completed
Kingdom

590 Inspection & witness of fire lorries gauges in united Meraj Lorries UAE Jun, 2013 Completed

Engro Polymer
591 Third Party Inspection of HRSG MP Economizer Tubes. (RFQ# 6912) China Jun, 2013 Completed
& Chemical

592 Third party inspection of cat 3512 engines for Rig N-1 OGDCL USA Jun, 2013 Completed

Third Party Pre-Shipment Inspection Of Electronic Air Gauges in United United


593 PSO Jun, 2013 Completed
Kingdom Kingdom

594 Third party pre shipment inspection of Spares for Rockwell Turbine Meters SNGPL USA Jun, 2013 Completed

595 Third party pre shipment inspection of pressure Control Valves SNGPL USA Jun, 2013 Completed

596 Third party pre shipment inspection of corrosion Protection Tape SNGPL USA Jun, 2013 Completed

597 Third party pre shipment inspection of corrosion Protection Tape SNGPL USA Jun, 2013 Completed

Netherland &
598 Third party pre shipment inspection of P.E Fittings SNGPL Jun, 2013 Completed
USA

599 Third party pre shipment inspection of Orifice Meter SNGPL USA Jun, 2013 Completed
600 Third party pre shipment inspection of Spares Parts for caterpillar Pipe Layer SNGPL USA Jun, 2013 Completed

United
601 Third party pre shipment inspection of spare parts for Tadano Truck Crane SNGPL Jun, 2013 Completed
Kingdom

602 Third party pre shipment inspection of Pig Signallers SNGPL UAE Jun, 2013 Completed

United
603 Third party pre shipment inspection of Weld Neck Flanges SNGPL Jun, 2013 Completed
Kingdom

604 Inspector At Hamriya Workshop Sharjah for Valve OMV Pakistan Sharjah Jun, 2013 Completed

All Over
605 Two Year contract for Worldwide Pre-Shipment Inspection OMV Pakistan Jun, 2013 Completed
World

606 Third party pre shipment inspection of Cylindrical Air intake Filter Elements SNGPL USA May, 2013 Completed

607 Third party pre shipment inspection of Diaphragm Type Gas Meters SNGPL Belgium May, 2013 Completed

608 Third Party Pre-Shipment Inspection Of Multistage Centrifugal Pump In England PSO England May, 2013 Completed

609 Third Party Inspection of Manufacturing of 16-inch line pipes API - 5L PSL-2 OMV Pakistan China May, 2013 Completed

Inspection Engineer to SJV workshop for monitoring of mechanical valves


610 OMV Pakistan China May, 2013 Completed
manufacturing
Inspection Engineer for monitoring & witness metering skid manufacturing
611 OMV Pakistan Singapore May, 2013 Completed
activities
Witness of hydrostatic testing of piping & Liquid Penetrant testing of the fillet
612 OMV Pakistan Italy May, 2013 Completed
weld of flare stack system

613 Third party pre shipment inspection of spares for Volvo Prime Mover SNGPL UAE Apr, 2013 Completed

614 Third party pre shipment inspection of Miscellaneous Regulators SNGPL USA Apr, 2013 Completed
Third party pre shipment inspection of spares for GE Jenbacher Gas Engine
615 SNGPL UAE Apr, 2013 Completed
Model JGS320,

616 Third party pre shipment inspection of Industrial /TBS Gas Regulators SNGPL Itlay Apr, 2013 Completed

617 Third party pre shipment inspection of Remote Termonal Unit SNGPL USA Apr, 2013 Completed

United
618 Third party pre shipment inspection of spares for Flow Computers SNGPL Apr, 2013 Completed
Kingdom
Third party pre shipment inspection of Spares for Pressure Flow / Digital
619 SNGPL USA Apr, 2013 Completed
Calibrators

620 Third party pre shipment inspection of Mechanized Welding System SNGPL Itlay Apr, 2013 Completed

621 Third party pre shipment inspection of Twist Tite Seals with Bar Code & RFID SNGPL UAE Apr, 2013 Completed

Sales & Services


622 Third Party inspection of Valves & Pipe fittings China Apr, 2013 Completed
International

623 Third Party Inspection of 02 Nos. of Drilling Rigs 2000 HP in China OGDCL China Apr, 2013 Completed

624 Third Party Inspection of 6 & 8 inch ERW line pipe in China PSL 1, GR X-52 OGDCL China Apr, 2013 Completed

625 Third Party Inspection of Valves OMV Pakistan China Apr, 2013 Completed

Sales & Services


626 Third Party inspection of Casing and Accessories China Mar, 2013 Completed
International

United
627 Third Party inspection of 1250 KVA diesel Genset along with tool kit OGDCL Mar, 2013 Completed
Kingdom

628 Third party pre shipment inspection of Welding Fittings SNGPL Thailand Mar, 2013 Completed
629 Third party pre shipment inspection of Welding Work Station SNGPL CHINA Mar, 2013 Completed

Third party pre shipment inspection of Spares for Lincoln welding plants
630 SNGPL UAE Mar, 2013 Completed
Vantage 500 (DUETZ)
Third party pre shipment inspection of Spares for Lincoln Shield Diesel Engine United
631 SNGPL Mar, 2013 Completed
ARC 500(PERKINS) Kingdom
Salaria &
632 Third Party Pre-shipment inspection of Molybdenum Plates China Mar, 2013 Completed
Sheikh

633 Third Party Inspection of 6 inch ERW line pipe in China PSL 1, GR X-52 OGDCL China Feb, 2013 Completed

Third Party Pre-Shipment Inspection Of 20" Dia 400 Meters Pipe in Heibei,
634 PSO China Feb, 2013 Completed
China

635 Third Party inspection of Well head control Panels OGDCL China Feb, 2013 Completed

636 Third party inspection of Loading Arms PSO Netherlands Feb, 2013 Completed

United
637 Third party pre shipment inspetion of P.E coating Repair Material SNGPL Feb, 2013 Completed
Kingdom

638 Third party pre shipment inspetion of Pressure control valves SNGPL Malaysia Feb, 2013 Completed

Third party pre shipment inspetion of Large Capacity Flow Prover and Portable
639 SNGPL Spain Feb, 2013 Completed
Transfer Prover

640 Third party pre shipment inspection of Coaltar Coating System SNGPL China Feb, 2013 Completed

641 Third party inspection of 4” ERW line pipe at China OGDCL China Feb, 2013 Completed

642 Witness of run test 02 Nos. of compressors OMV Pakistan USA Jan, 2013 Completed

United
643 Third party pre shipment inspection of Plug Valves SNGPL Jan, 2013 Completed
Kingdom
Third party pre shipment inspection of Spares for 300KW Gas
644 SNGPL Belgium Jan, 2013 Completed
Genset(CAT3412)

645 Third party pre shipment inspetion of Plug Valves SNGPL Itlay Jan, 2013 Completed

646 Third party pre shipment inspection of Corrosion Protection Tape SNGPL Netherlands Jan, 2013 Completed

United
647 Factory Acceptance Test for Solar System OMV Pakistan Jan, 2013 Completed
Kingdom

648 Third party inspection of 3-1/2" seamless production tubing against PO OGDCL Indonesia Dec, 2012 Completed

649 Third party pre shipment inspetion of Polyethylene Tool Kit, SNGPL Itlay Dec, 2012 Completed

650 Third party pre shipment inspection of Fiber Glass SNGPL CHINA Dec, 2012 Completed

651 Thirdparty pre shipment inspetion of Weld Neck / Blind Flange SNGPL Itlay Dec, 2012 Completed

652 Third party inspection of 26" dia. SAWL pipeline in China OGDCL China Dec, 2012 Completed

653 Third Party Inspection of Manufacturing of 16-inch line pipes API - 5L PSL-2 OMV Pakistan China Dec, 2012 Completed

654 Third Party Inspection of 02 No. of Russian Engine in Russia OGDCL Russia Dec, 2012 Completed

655 Third party pre shipment inspection of Gas Turbine Meters SNGPL USA Nov, 2012 Completed

Third party pre shipment inspetion of Digital Pressure and Temprature


656 SNGPL Italy Nov, 2012 Completed
Caliberators,

657 Third party pre shipment inspection of Spares for Caterpillar Gas Engine SNGPL Belgium Nov, 2012 Completed

658 Third party pre shipment inspection of Diaphragm type Gas meters SNGPL USA Nov, 2012 Completed
659 Third party pre shipment inspection of Turbine Gas Meters SNGPL USA Nov, 2012 Completed

660 Third party pre shipment inspection of Turbine Rotary Type Gas Meter SNGPL Canada Nov, 2012 Completed

661 Third party pre shipment inspection of Diaphragm type Gas meters SNGPL Germany Nov, 2012 Completed

662 Third party pre shipment inspection of P.E Fittings SNGPL USA Nov, 2012 Completed

663 Third party pre shipment inspection of Fusion Bonded Epoxy, SNGPL KOREA Nov, 2012 Completed

664 Third party pre shipment inspection of DAEWOO EXCAVATORS SNGPL CHINA Nov, 2012 Completed

Czech
665 Third party pre shipment inspetion of Factory Bends, SNGPL Nov, 2012 Completed
Republic
United
666 Third party pre shipment inspection of Pig Signals, SNGPL Nov, 2012 Completed
Kingdom
Third party inspection/root cause analysis of gas generator and power turbine
667 OGDCL Germany Nov, 2012 Completed
against contract

668 Third party pre shipment inspection of 3-Layer Heat Shrink Sleeves, SNGPL USA Nov, 2012 Completed

669 Third Party Inspection of Electromagnetic Induction Brake in Russia OGDCL Russia Nov, 2012 Completed

670 Third Party inspection of Swivel 500 ton model A-500 and spares as per PO OGDCL USA Nov, 2012 Completed

Czech
671 Third party pre shipment inspetion of Factory Bends SNGPL Oct, 2012 Completed
Republic
Czech
672 Third party pre shipment inspetion of Factory Bends SNGPL Oct, 2012 Completed
Republic

673 Third party pre shipment inspetion of Factory Bends, SNGPL Belgium Oct, 2012 Completed
674 Third party pre shipment inspection of Door Closures SNGPL USA Oct, 2012 Completed

675 Third party pre shipment inspection of Stud Bolts C/w Washers SNGPL Singapore Oct, 2012 Completed

Third party pre shipment inspection of Ingersoll Rand Air Compressor Model #
676 SNGPL Belgium Oct, 2012 Completed
SM 110 AC

677 Third party pre shipment inspection of SCADA Host System Hardware, SNGPL Canada Oct, 2012 Completed

678 Third party pre shipment inspection of Flow Computers SNGPL USA Oct, 2012 Completed

679 Inspector required for FAT of chemical injection package OMV Pakistan Italy Oct, 2012 Completed

680 Inspection of Valves at Emerson FZE Jabil Ali U.A.E OMV Pakistan UAE Oct, 2012 Completed

681 Inspector required at SPEC workshop sharjah. UAE OMV Pakistan Sharjah, UAE Oct, 2012 Completed

Mc-Master
682 TPI of 8” Dia 2500 Class Control Valve in Australia Australia Sep, 2012 Completed
Lahore.

683 Third party pre shipment inspection of Laser Based Gas Leak Detectors SNGPL France Sep, 2012 Completed

684 Third party pre shipment inspection of Spares for Orifice Meter SNGPL Netherlands Sep, 2012 Completed

685 Third party pre shipment inspection of Air Compressors SNGPL CHINA Sep, 2012 Completed

686 Pre shipment inspection of Spares for Spares for Daniel Turbine meter SNGPL USA Sep, 2012 Completed

687 Third party pre shipment inspection of Spares for Pressure Control Valves SNGPL Singapore Sep, 2012 Completed

United
688 Third party pre shipment inspection of Plug Valves SNGPL Sep, 2012 Completed
Kingdom
689 Third party pre shipment inspection of Needle Valves SNGPL CHINA Sep, 2012 Completed

690 Third party pre shipment inspection of Neoprene Pig Cups SNGPL CHINA Sep, 2012 Completed

691 Third party pre shipment inspection of Foam Pigs SNGPL KOREA Sep, 2012 Completed

692 Third party pre shipment inspection of cleaning Pigs/Pig Cups SNGPL USA Sep, 2012 Completed

693 Third party pre shipment inspection of Welding Fittings SNGPL Thailand Sep, 2012 Completed

694 Third party pre shipment inspection of Ball Valves SNGPL Germany Sep, 2012 Completed

Czech
695 Third party pre shipment inspetion of Factory Bends SNGPL Sep, 2012 Completed
Republic

696 Third party pre shipment inspection of copolymer adhesive SNGPL Switzerland Sep, 2012 Completed

Third party pre shipment inspection of Spares for Meters RW- 415 and RW-
697 SNGPL USA Sep, 2012 Completed
275)
United
698 Third party pre - shipment inspetion of Chromate SNGPL Sep, 2012 Completed
Kingdom

699 Third party pre shipment inspection of External Auto Release Tong Clamp, SNGPL USA Sep, 2012 Completed

700 Third Party Inspection of Manufacturing of 16-inch line pipes API - 5L PSL-2 OMV Pakistan China Sep, 2012 Completed

701 Provision of inspector to inspect spares in Workshop OMV Pakistan Sharjah, UAE Aug, 2012 Completed

702 Third party pre shipment inspetion of Air Compressors SNGPL USA Aug, 2012 Completed

703 Third Party Inspection of Manufacturing of 16-inch line pipes API - 5L PSL-2 OMV Pakistan China Aug, 2012 Completed
704 Third Party inspection of Instrument Cables OGDCL Belgium Aug, 2012 Completed

705 Inspection of Nomad-65 Vibratos along with Spare OGDCL France Aug, 2012 Completed

United
706 Third party pre shipment inspetion of Door closures SNGPL Jul, 2012 Completed
Kingdom
USA &
707 Third party pre shipment Inspection of 3-Layer Heat Shrink Sleeves SNGPL Jul, 2012 Completed
MAXICO

708 Third party pre shipment inspetion of Filter Cartridge SNGPL Netherlands Jul, 2012 Completed

709 Third party pre shipment inspetion of S.I Oval rings SNGPL Saudi Arabia Jul, 2012 Completed

710 Third party pre shipment inspection of Welding Fittings SNGPL Thailand Jul, 2012 Completed

711 Third party pre shipment inspetion of Stud Bolts c/w Washers SNGPL Singapore Jul, 2012 Completed

712 Third party pre shipment inspetion of Twist Tite seals with Barcode SNGPL TURKEY Jul, 2012 Completed

Czech
713 Third party pre shipment inspetion of Spares for elgas evs’s GPRS enabled SNGPL Jul, 2012 Completed
Republic

714 Third party pre shipment inspetion of Pressure Caliberator/ Dead Weight SNGPL Italy Jul, 2012 Completed

715 Third party pre shipment inspetion of Welding Plants SNGPL USA Jul, 2012 Completed

716 Third party pre- shipment inspection of Weld Neck Flanges, SNGPL Itlay Jul, 2012 Completed

717 Third party pre shipment inspection of Teflon Tape SNGPL Australia Jul, 2012 Completed

718 Third party pre shipment inspection of Orifice Meter Runs 8" Dia SNGPL Canada Jul, 2012 Completed
United
719 Third party pre - shipment inspetion of PIG Signaller SNGPL Jul, 2012 Completed
Kingdom

720 Third party pre shipment inspetion of Weldolets / Threaddolets SNGPL France Jul, 2012 Completed

Third Party Pre-Shipment Inspection of Material, Machinery, Equipment’s and All Over
721 SNGPL Call Off Basis Completed
Steel Lines Pipe Etc. World

Petroflo Trading
722 Inspection of Seamless pipes in China China Jul, 2012 Completed
Company

Singapore,
723 Inspection of flame detectors, shutdown valves, and spares against PO. OGDCL UAE, Ireland, Jul, 2012 Completed
Italy
Pre-shipment inspection of 2400 channels ground electronics for 408 XL system
724 OGDCL France Jul, 2012 Completed
against PO

725 Inspection Of Separator and Pressure vessel Packages OGDCL China Jun, 2012 Completed

726 Third Party Inspection Of Fire water Pump PSO USA Jun, 2012 Completed

727 Inspection Of new Seismic Data Processing System OGDCL Egypt, UAE Jun, 2012 Completed

728 Witness of hydro testing of pumps in UAE OMV Pakistan UAE Apr, 2012 Completed

729 Inspection for spares of Rig-307 OGDCL Russia Apr, 2012 Completed

730 Inspection for Feed Gas & Sale Gas Compressor Packages OGDCL China Apr, 2012 Completed

Petroflo Trading
731 Inspection for Seamless Pipe China Apr, 2012 Completed
Company
732 Inspection for Sale Gas Metering Skid OGDCL Italy Mar, 2012 Completed

733 Witness of Hydro testing Of Pumps In Germany OMV Pakistan Germany Mar, 2012 Completed

734 Witness of Hydro testing Of Pumps In Germany OMV Pakistan Germany Mar, 2012 Completed

735 Pre-Shipment 3rd Party Inspection Ground Electronics & Spares Of System OGDCL U.S.A Mar, 2012 Completed

China, U.A.E &


736 Inspection for Valves, Flanges, Studs/ Nuts, Pressure, Pipes OGDCL Mar, 2012 Completed
Italy
Lahore
737 Pre-shipment inspection of Imported CNG Buses (250 Nos.) Transport China Feb, 2012 Completed
Company
Lahore
738 Pre-shipment inspection of imported CNG Buses (100 Nos.) Transport China Jan, 2012 Completed
Company

739 Third Party Inspection of Spares in Germany OMV Pakistan Germany Jan, 2012 Completed

Pre-Shipment Third party Inspection of SPARES for Refrigeration (Evaporation


740 OGDCL Australia May, 2011 Completed
Condenser) as per inspection test plan.
Third party Inspection of Dispending Unit (DU) as per PSO scope of work, in
741 PSO Brazil May, 2011 Completed
BRAZIL
TPI Services to Inspect Line Pipes in Austria as per API 5L Standards for OMV
742 OMV Pakistan Austria Jan, 2011 Completed
Pakistan
Engro Polymer
743 Expediting and Inspection of Vessel in USA for ENGRO Polymer USA Jan, 2011 Completed
& Chemical

744 TPI for Twin Electronic Dispensing Unit to be carried out in TOKYO PSO Japan Jan, 2011 Completed
745 TPI of Gas Generator (Low Pressure Turbine) in Florence OMV Pakistan Italy Dec, 2010 Completed

746 Third Party Inspection of Stabilizers PSO Japan May, 2010 Completed

TPI services for Natural Gas Engine Driven Reciprocating Gas Compression
747 OGDCL USA Aug, 2010 Completed
Package for OGDCL

748 TPI of Aluminum Composite Material in China for PSO PSO China Jun, 2010 Completed

Third Party Pre-Shipment Inspection of Censtar Brand Mechanical Dispensing


749 PSO China Jun, 2010 Completed
Units in China for PSO

750 Third Party Inspection of Plate type Heat Exchanger OMV Pakistan Korea Mar, 2010 Completed

751 Pre-Shipment inspection of Cast Iron Plug Valves in Italy SSGC Italy Jan, 2010 Completed

752 Pre-Shipment inspection of Cast Iron Plug Valves in Italy SSGC Italy Sep, 2009 Completed
EXPERIENCE LIST FOR THIRD PARTY INSPECTION OF PIPING /
PIPELINES
Date of
Sr. # Job Description Client Location Status
Award

Inspection of 167 dead legs outside fenced area to confirm its Sui field,
1 PPL Apr, 2018 In Progress
integrity will be perfomred against the approval of GMSA Baluchistan
Base line survey for feederline of Sui-95(P), Sui-100(U) and Sui- Sui field,
2 PPL Apr, 2018 In Progress
101(U) will be perfomred against the approval of GMSA Baluchistan
3 Integrity Testing of 06 Inch Dia pipeline at PSO KTA PSO Karachi Apr, 2018 In Progress
4 Third Party Inspection of CRA linepipe at Indinesia PPL Indonesia Apr, 2018 In Progress

5 Inspection of piping and dead legs at GPF-I PPL Gambat Apr, 2018 Completed

3 Layer PE Coating of Steel Linepipe size 6inch dia X 0.188 inch


6 SSGC Karachi Mar, 2018 Completed
WT.
3 Layer PE Coating of Steel Linepipe size 6inch dia X 0.188 inch
7 SSGC Karachi Mar, 2018 Completed
WT, PSL-1

8 Inspection of piping and dead legs at GPF-IV PPL Gambat Mar, 2018 Completed

9 Third Party inspection of GPF-I plant Piping PPL Gambat Feb, 2018 Completed

3 Layer PE Coating of 8" NB x 0.219" dia WT. MS Line pipe


10 SSGC Karachi Feb, 2018 Completed
(30,000 Mtr)
Inspection of Steel Linepipe size 6inch dia X 0.188 inch WT, PSL-
11 SNGPL Lahore Nov, 2017 Completed
1
Welding Inspection Services required 12” X 26.5 KMS Supply
12 SSGC Sindh Oct, 2017 Completed
main from SMS Palijani to Tando Allah Yar
Pakistan
Health assessment of critical piping loop pertaining to Boiler Sui field,
13 Petroleum Jun, 2017 Completed
Feed Water Baluchistan
Limited
Welding Inspection & Radiography Services for 3/4" dia to
Multan,
14 2" dia and above assorted operational phases in Multon SNGPL Apr, 2017 Completed
Pakistan
Distribution Reaian
Welding Inspection & Radiography Services for 3/4" dia to
Lahore,
15 2" dia and above assorted operational phases in Lahore East & SNGPL Apr, 2017 Completed
Pakistan
West Distribution Regions

Pakistan
Sui field,
16 Third Party Inspection of Dead Leg at Sui Field Petroleum Jan, 2017 Completed
Baluchistan
Limited
17 Piping design from PARCO depot to Askar Oil Depot Machikey ASKAR Oil Pakistan Nov, 2016 Completed
Pakistan
Sui field,
18 Third Party Inspection of Dead Leg at Sui Field Petroleum Nov, 2016 Completed
Baluchistan
Limited
Glaxo
19 Inspection and Testing of natural gas line for leak detection SmithKline Karachi Oct, 2016 Completed
Pakistan Ltd
Engro Vopak
20 5 Yearly In-Service Inspection of Phos & MEG Pipeline Pakistan Sep, 2016 Completed
Terminal Ltd
Pakistan
Third Party Inspection of CRA Lined Pipes at Manufacturer Facility in
21 Petroleum Indonesia May, 2016 Completed
Indonesia (Batam)
Limited
Welding Inspection & Radiography Services contract for 24"Ø
22 SSGC Karachi Apr, 2016 Completed
and 21 KM Interlink pipeline
Third Party QA/QC inspection required for 42" dia. 342 KM SMS
23 SSGC Pakistan Mar, 2016 Completed
Pakland to Nara. RLNG pipeline Project
Third Party Linepipe inspection of 6 inch dia. Sch 80, API 5L, Grade
24 OGDCL China Mar, 2016 Completed
X52, NS, PSL-2.
Third Party Linepipe inspection of 8 inch dia. Sch 80, API 5L, Grade
25 OGDCL China Feb, 2016 Completed
X52, NS, PSL-2.
Mari Petroleum
26 Third Party inspection of line pipe 2 inch dia. Sch 80, Karachi Jan, 2016 Completed
Company Limited
Welding Inspection & Radiography Services for 3/4" to 2"Ø and
ISB/RWP/Abb
27 above assorted operational Phases in Islamabad / SNGPL Jun, 2016 Completed
otabad Region
Rawalpindi/Abbottabad Distribution Regions
Pakistan
28 Third Party inspection of piping/pipelines Petroleum Karachi May, 2016 Completed
Limited
Welding Inspection & Radiography Services contract for 36"Ø
29 SNGPL RYK Mar, 2016 Completed
and 112 KM A3-AV20 Transmission Lines

Welding Inspection & Radiography Services contract for 24"Ø Sahiwal


30 SNGPL Mar, 2016 Completed
and 145 KM AV29-Sahiwal Transmission Lines Region
Dubai Electricity
Integrity Inspection of Natural Gas System Piping for D, E, G, K & H
31 and Water Dubai Jan, 2016 Completed
Stations Authority
Mari Petroleum
32 Third Party inspection of line pipe 3 inch dia. Sch 80,
Company Limited
Karachi Jan, 2016 Completed

Welding inspection & Radiography Services contract for 36 inch


33 SNGPL Pakistan Jan, 2016 Completed
dia. x 112KMs A3-AV20 Transmission Line
Welding Inspection & Radiography Services Contract for 24”inch
34 SNGPL Pakistan Jan, 2016 Completed
dia. X 145 KMs AV29-Sahiwal Transmission Line
Mari Petroleum
35 Third Party inspection of line pipe 8 inch dia. Sch 80,
Company Limited
Karachi Jan, 2016 Completed

Mari Petroleum
36 Third Party inspection of line pipe 4 inch dia. Sch 80, Karachi Jan, 2016 Completed
Company Limited
Mari Petroleum
37 Third Party inspection of line pipe 4 inch dia. Sch 80, Karachi Jan, 2016 Completed
Company Limited

Mari Petroleum
38 Third Party inspection of line pipe 2 inch dia. Sch 80,
Company Limited
Karachi Jan, 2016 Completed
Pakistan
Radiography for 10" line welding at Sui Purification Plant against Sui field,
39 Petroleum Oct, 2015 Completed
Call-Out Agreement No. 4600000990 Baluchistan
Limited
API-570 Inspector for assessment of 04 Nos. Piping loop Pakistan
Sui field,
40 inspection scope at Sui Purification Plant as per Call Out Petroleum Oct, 2015 Completed
Baluchistan
Agreement No. 4600001037 Limited
Pakistan
Services for 04 Nos. Piping Loop Inspection at Sui Purification Sui field,
41 Petroleum Oct, 2015 Completed
Plant as per Call Out Agreement No. 4600001037 Baluchistan
Limited
Pakistan
Inspection of Piping / Pipelines of Inside / Outside Fence area of Sui field,
42 Petroleum Jul, 2015 Completed
Sui Gas Field. Baluchistan
Limited
Long range ultrasonic thickness LRUT inspection of underground
43 PARCO Karachi Jul, 2015 Completed
In let / outlet line of Tank A-003 at PS- I Korangi

Attok Refinery
44 Third Party Inspection of HSD pipe Line Pakistan Jun, 2015 Completed
Limited

Pakistan
Contract for Third Party Inspection of Piping / Pipelines at all PPL
45 Petroleum All PPL Fields Jun, 2015 Completed
Operated Fields / Locations for 3 years
Limited
PETRONAS
46 Baseline Survey of plant piping CARIGALI Iraq Iraq Mar, 2015 Completed
Holding B. V.

Mechanical Integrity Assessment, NDT Evaluation of Dehydration Kunnar


47 OGDCL Mar, 2015 Completed
units and piping at Kunnar Oil & Gas Field Sindh

Third Party Inspection of Steel Line Pipe 42" dia X 0.562" WT,
48 SNGPL China Dec, 2014 Completed
API 5L GR X70, PSL-2
Third Paty Inspection of Steel Line Pipe 42" dia X 0.625" WT, API
49 SNGPL China Dec, 2014 Completed
SL GR. X70. PSL-2

Mechanical Integrity Assessment, NDT Evaluation of TEG unit Sinjhoro,


50 OGDCL Dec, 2014 Completed
and piping at Sinjhoro Oil & Gas Field Sindh
Pakistan
Base Line Survey of Fire Fighting Line as per Piping Inspection
51 Petroleum Adhi Gas Field Apr, 2014 Completed
Code (API 570)
Limited
Pakistan
Sui field,
52 Supervision of NDT / NDE works HRL Pipeline at Sui Fields Petroleum Apr, 2013 Completed
Baluchistan
Limited
Bobi Oil
Integrity assessment of Well Head Piping including NDT (UT
53 OGDCL Complex, 2013 Completed
Guaging, MT, PT, UFD, TOFD, Metallography)
Sindh
Pakistan
Sui field,
54 Supervision of NDT / NDE works HRL Pipeline at Sui Fields Petroleum Apr, 2012 Completed
Baluchistan
Limited

55 Third Party Price Audit for Line Pipe Supply ISGS Worldwide Dec, 2012 Completed

NWFP -
56 Integrity Inspection (Technical Audit) of Pipelines SNGPL 2007 & 2008 Completed
PAKISTAN
Man Power Details

American Society for Non-destructive Testing (ASNT) Level NDT III

No of Year
Sr. # Name Certification Details Designation
Experience

1 Naveed Iqbal ASNT NDT Level III in UT,MT,PT,RT 20+ Sr. Manager Technical
ASNT NDT Level III in UT,MT,PT( Saudi Aramco qualified in
2 Ali Umair Anwar 10+ Manager Advamce NDT
PAUT,ToFD,AUT)
3 Laxmiknat Vishnu ASNT NDT Level III in UT,MT,PT,RT,IR,AE,VT,LT,MFL 20+ NDT expert & Trainer

4 Asghar Ali ASNT NDT Level III in MT,PT,RT 10+ NDT expert & Trainer

American Petroleum Institute (API) certified Inspecrors

No of Year
Sr. # Name Certification Details Designation
Experience
1 M Azhar Gul API 510,570 and NACE Certified 25+ Principal Integrity & Corrosion Engineer
2 M Atif Naeem API 510,570,653 15+ Sr. Inspection Engineer
3 Wisal Ur Rehman API 510,570,580 10+ Asst Manager Inspection
4 Fawad Bin Fazil API 510,570,653 5+ Asst Manager Inspection
5 Shahid Iqbal API 510,570,653 7+ Sr. Inspection Engineer
6 Waqas Ahmed API 510,653 5 Inspection Engineer

NDT Level II (ASNT-TC-1A)

No of Year
Sr. # Name Certification Details Designation
Experience
1 Amir Shahzad NDT Level II in UT,MT,PT,PAUT,ToFD,UT Crawler 8+ NDT Inspector
NDT Level II in VA,UT,MT,PT,RT,ET,VT,PAUT and NDT Level I Infrared
2 Shahbaz Akram 3+ Mechanical Inspections engineer
thermography
3 Sifat Ali NDT Level II in UT,ET 10 NDT Inspector
4 Zeeshan Illyas NDT Level II in UT,MT,PT,RT 10+ NDT Inspector/Radiographer
5 Kashif Shah NDT Level II in UT,MT,PT,PAUT,ToFD,UT Crawler 10+ NDT Inspector
6 Syed Wajaht Ali NDT Level II in UT,MT,PT 5+ NDT Inspector
7 Syed Saad Ahmed NDT Level II in UT,MT,PT 3 NDT Inspector
8 Rashid Ali NDT Level II in RT 5 Radiographer
9 Nauman Hussain NDT Level II in MT,PT 5 NDT Inspector/Helper
10 M Tanveer NDT Level II in UT,MT,PT 15+ NDT Inspector
11 M Salman Ahmad NDT Level II in UT,MT,PT 5 NDT Inspector
12 Muhammad Khan NDT Level I in RT 3 NDT Inspector/Helper
13 Muhammad Ishtiaq NDT Level II in UT,MT,PT 4 NDT Inspector
14 Muhammad Mubashir NDT Level II in UT,MT,PT 5 NDT Inspector
15 Mohsin Ali NDT Level II in UT,MT,PT 7+ NDT Inspector
16 Harris Khawar NDT Level II in UT 3 NDT UT Inspector
17 Hafiz Nabeel NDT Level II in UT,MT 5 NDT Inspector
18 Bilal Rao NDT Level I in RT 3 Radiographer
19 Ali Nawaz NDT Level II in UT 5+
EXPERIENCE LIST FOR ISO 9001:2008 / ISO 14001:2004 / OHSAS 18001:2007
Date of
Sr. # Job Description Client Location Status
Award

Delta Control
1 Consultancy Services of Lab Certification 17025 Karachi Apr, 2018 In Progress
Automation Co.
GlaxoSmithKline
2 Gap Analysis (IMS) Karachi Dec, 2017 Completed
Pakistan Ltd.
GlaxoSmithKline
3 Gap Analysis (QMS) Karachi Dec, 2017 Completed
Pakistan Ltd.
Delta Control
4 Integrity Management Consultancy Services Karachi Jul, 2017 Completed
Automation Co.

Delta Control
5 Consultancy for HSE (IMS & QMS) Certification of Company Karachi Dec, 2016 Completed
Automation Co.

Ministry of
Planning,
6 ISO Certification for the Ministry ISO-9001-2008 Development & Pakistan March, 2016 In Progress
Reform
(PROTOCOL
SECTION)

ISO 9001:2015 Certification of Gaseous Fuels Department (LPG, CNG and LNG) Head Pakistan State
7 Pakistan Jan, 2016 Completed
Office, LPG Plants, Korangi, Lahore, Dhurnal and Akora Khattak Oil

8 Initial Integrated Management System Certification PROMAG Pakistan Sep, 2015 Completed

Sui Southern Gas


9 Renewal of ISO 9001:2008 Certification of Meter manufacturing Plant Pakistan Aug, 2015 Completed
Company
Security
10 ISO 9001:2008 Certification Organizing Pakistan May, 2015 Completed
System Pakistan

11 Consultancy Services of OHSAS-18001 -KCDF POL Pakistan Dec, 2014 Completed

12 Consultancy Services of OHSAS-18001 -POL SCR RIG POL Pakistan Dec, 2014 Completed

Pakistan State PSO House,


13 ISO 9001:2015 QMS Recertification of PSO HSE Dept Nov, 2014 Completed
Oil Karachi
Integrited Management System certification (ISO 14001:2004 & OHSAS 18001:2007) at Pakistan State
14 Karachi Airport Nov, 2013 Completed
Aviation into plan facility Karachi Airport. Oil
Pakistan State PSO House,
15 ISO Certification of PSO Supply Department at Head Office Aug, 2013 Completed
Oil Karachi
Establishment of a certifiable Environment, Health & Safety (EHS) Management system,
16 KPT Pakistan Jun, 2013 Completed
(ISO 14001: 2004 & OHSAS 18001:2007) at Port Karachi
Pakistan State
17 Certification ISO 9001:2008 Pakistan Oct, 2012 Completed
Oil
Sui Northern Gas
18 ISO 9001:2008 –QMS recertification audit Pakistan Jun, 2012 Completed
Pipeline
Pakistan State
19 ISO 9001:2008 –QMS recertification audit of PSO HSE Dept Karachi May, 2012 Completed
Oil

20 IMS Certification of QMS 9001, EMS 14001, OSHAS 18001 PROMAG Karachi Apr, 2012 Completed

Pakistan State
21 ISO 9001:2008 by third party certification audit of PSO’s export department, Karachi Apr, 2012 Completed
Oil

22 Gap Analysis for Lab accreditation ISO 17025:2005 KESC Karachi Nov, 2011 Completed
23 Surveillance Audit Meter manufacturing plant for ISO 9001:2008 SSGC Karachi Nov, 2011 Completed

GASTECH
24 ISO 9001:2008 certification Audit Karachi Oct, 2011 Completed
International
Dynamics
25 ISO 9001:2008 certification Audit Karachi Oct, 2011 Completed
Engineering

26 ISO 9001:2008 Audit for Meter Manufacturing Plant SSGC Karachi Nov, 2010 Completed
EXPERIENCE LIST FOR ENGINEERING CONSULTANCY SERVICES

Date of
Sr. # Job Description Client Location Status
Award

Architects & Civil Projects Consultants for all over PPL-


1 PPL All Over Pakistan Feb, 2016 In Progress
Pakistan.

2 Consultancy services for Oil Transfer and heating system Gresham's Karachi Jan, 2018 In Progress

Mechanical Design Review of New Female Hostle at State Bank of


3 Karachi Dec, 2017 In Progress
Karachi Pakistan
Consultancy Services for evaluation of Bids received
Sui Southern Gas
4 against EPCC Tender for ECC approved LPG Air Mix Balochistan Dec, 2017 In Progress
Company
Plants.
Electrical Design Review of New Office Building at State Bank of
5 D.I Khan Oct, 2017 In Progress
D.I.Khan Pakistan
Plumbing Design Review of New Office Building at State Bank of
6 D.I Khan Oct, 2017 In Progress
D.I.Khan Pakistan
Mechanical Design Review of New Office Building at D.I. State Bank of
7 D.I Khan Oct, 2017 In Progress
Khan Pakistan
Structural Design Review of New Office Building at State Bank of
8 Gujranwala Oct, 2017 In Progress
Gujranwala Pakistan
Electrical Design Review of New Office Building at State Bank of
9 Gujranwala Oct, 2017 In Progress
Gujranwala Pakistan
Plumbing Design Review of New Office Building at State Bank of
10 Peshawar Oct, 2017 In Progress
Gujranwala Pakistan
Structural Design Review of LRC & allied facilities at Rafiq State Bank of
11 Peshawar Oct, 2017 In Progress
Lane Peshawar Pakistan
Electrical Design Review of LRC & allied facilities at Rafiq State Bank of
12 Peshawar Oct, 2017 In Progress
Lane Peshawar Pakistan
Plumbing Design Review of LRC & allied facilities at Rafiq State Bank of
13 Peshawar Oct, 2017 In Progress
Lane Peshawar Pakistan
Mechanical Design Review of LRC & allied facilities at State Bank of
14 Peshawar Oct, 2017 In Progress
Rafiq Lane Peshawar Pakistan
State Bank of
15 Electrical Design Review of New Office Building at Sialkot Sialkot Oct, 2017 In Progress
Pakistan
State Bank of
16 Plumbing Design Review of New Office Building at Sialkot Sialkot Oct, 2017 In Progress
Pakistan
Mechanical Design Review of New Office Building at State Bank of
17 Gawadar Oct, 2017 In Progress
Sialkot Pakistan
State Bank of
18 Electrical Design Review of New Office Building at Gwadar Gawadar Oct, 2017 In Progress
Pakistan

Electrical Design Review of New Office Building at G-5/2, State Bank of


19 Islamabad Oct, 2017 In Progress
Islamabad Pakistan

Plumbing Design Review of Female Hostel at Lalazar, State Bank of


20 Karachi Oct, 2017 In Progress
Queens Road, Karachi Pakistan
Mechanical Design Review of New Office Building at State Bank of
21 Gawadar Oct, 2017 In Progress
Gwadar Pakistan
Mechanical Design Review of New Office Building at G- State Bank of
22 Islamabad Oct, 2017 In Progress
5/2, Islamabad Pakistan
Structural Design Review of New Office Building at State Bank of
23 Gawadar Oct, 2017 In Progress
Gwadar Pakistan
Structural Design Review of New Office Building at G-5/2, State Bank of
24 Islamabad Oct, 2017 In Progress
Islamabad Pakistan
Plumbing Design Review of New Office Building at State Bank of
25 Gawadar Oct, 2017 In Progress
Gwadar Pakistan

Plumbing Design Review of New Office Building at G-5/2, State Bank of


26 Islamabad Oct, 2017 In Progress
Islamabad Pakistan
Consultancy for planning, designing & top supervision of
State Bank of
27 emergency exit stairs for main building & BSC house at I.I Karachi Aug, 2017 In Progress
Pakistan
Chundrigar road.
Delta Control
28 Integrity Management Consultancy Services Karachi Jul, 20147 In Progress
Automation Co.
Consultancy services for disposal of HVAC plant at NBP, National Bank
29 Peshawar Jul, 20147 In Progress
Hayatabad building, Peshawar Pakistan
Consultancy Fire Fighting/2017 (Approval of Contract for
providing consulting services for up Gradation of fire State Bank of
30 Hyderabad Jun, 2017 In Progress
Fighting system at State Bank of Pakistan BSC Pakistan
Hyderabad.)

Consultancy Services for Designing, Tendering, Technical


Sui Southern Gas
31 Commercial Evaluation, Installation & Commissioning of Sindh-Pakistan Apr, 2017 In Progress
Company
One New turbo Compressor at HQ-Shikarpur.

Consultancy Services for survey and analysis of electrical Sui Northern Gas
32 Lahore Mar, 2017 Completed
system at head office building Pipelines
Construction / Extension and Preparation of Sustainable
33 Master Plan for DHQ Hospital Gilgit·& Shaheed Saif-ur- Gilgit PWD Gilgit Jan, 2017 Completed
Rehman Hospital Gilgit
Detail Engineering Design according to
Allied Petroleum
34 Agreed Facility Layout of Oil Terminal for Machikey, Pakistan Jan, 2017 Completed
Pvt. Limited
Tarujabba, Sahiwal & Habibabad
Pakistan Security
Pre-qualification for the services of Consultant for HAVC
35 Printing Karachi Jan, 2017 Completed
projects
Corporation
Consultancy for Resident Construction Supervision for
36 The Urban Sector Punjab Dec, 2016 Completed
establishment offices / nodes in 9 cities of Punjab

Delta Control
37 Consultancy for HSE Certification of Company Karachi Dec, 2016 Completed
Automation Co.
Prequalification of Consultants for designing/planning of Karachi
38 "KCB TOWER IV" at Old Dumping Ground Adjacent Cantonment Karachi Dec, 2016 Completed
Shahrah-e-Quaideen Bridge Board
Pakistan Security
Pre-Qualification of Consultants for Civil project at PSPC
39 Printing Karachi Nov, 2016 Completed
Karachi
Corporation
Detailed Engineering Design of Segregation and
40 Composting Facility Including Resident Construction The Urban Sector Punjab Oct, 2016 Completed
Supervision at Sahiwal
Third Party Validation for Conservation & Restoration of The Urban Unit
41 Punjab Oct, 2016 Completed
Govt. House Muree Lahore
Ministry of Textile
Master Planning, Designing and Detailed Supervision of
Industry
42 Construction of the Building of Cotton Ginning Research & Multan Oct, 2016 Completed
Government of
Training Institute.
Pakistan
Consultancy Services of Design of Civil, Electrical,
43 Electronic, Public Health & HVAC system for Galito's at Galito's Lahore Oct, 2016 Completed
Khursheed Kasuri Road.
Development of RFP for Surveys, Site Development, Pakistan Institute
44 Design and Construction of PIDE Complex at H-11" of Development Punjab Oct, 2016 Completed
Economics
Prequalification of Consultants for designing/planning of Karachi
45 "KCB TOWER IV" at Old Dumping Ground Adjacent Cantonment Sindh-Pakistan Sep, 2016 Completed
Shahrah-e-Quaideen Bridge Board
Engineering Consultancy Services for Improvement of
46 Pakistan State Oil Punjab-Pakistan Sep, 2016 Completed
Power Factor at Lalpir Depot

Consultancy Services for Modification in Tank # 2102


47 Pakistan State Oil Sindh-Pakistan Sep, 2016 Completed
(PMG) at Daulatpur Depot
Development of RFP for Surveys, Site Development,
48 PIDE Islamabad Aug, 2016 Completed
Design and Construction of PIDE Complex at H-1
consultants for survey design & supervision for up
State Life
49 gradation of fire fighting system in state life buildings all All Over Pakistan Aug, 2016 Completed
Pakistan
over Pakistan

Engineering Consultancy Services for construction of Ministry of Textile


50 Multan Jun, 2016 Completed
cotton, ginning research & training institute Multan & Industry

Gap Analysis for the Capabilities of Japanese Integrated


51 JITS Islamabad Jun, 2016 Completed
Turbine Services Workshops

Consultancy Services for Planning, Designing, and Detail


State Bank of
52 Supervision for Building and Sports Area, Day Care, Union Lahore May, 2016 Completed
Pakistan
Office and Bachelor Rooms At 2nd Floor Annex building.

Detailed Engineering Design of Segregation and composting


53 The Urban Unit Sahiwal Apr, 2016 Completed
facility including resident construction supervision at Sahiwal

Consultancy Services for Pressure Vessels Design Pakistan


54 Study/Review & Designing of Pipe Support & Structure at Petroleum Pakistan Feb, 2016 Completed
Purification Plant, Sui Gas Field Limited
MEC Engineering
55 Review and approval of Procedure Pakistan Jan, 2016 Completed
Company
State Life
Pre-Qualification of Consultants for Survey, Design &
56 Insurance Pakistan Dec, 2015 Completed
Supervision for Upgradation of Fire Fighting Systems
Pakistan
Consultancy Services for Stress & Hydraulic Analysis and Pakistan
57 Design Review of Existing Southern and Northern Header Petroleum Pakistan Oct, 2015 Completed
Anchors at Sui Gas Field Limited
HSE Monitoring Consultant for Exploration, Drilling, Plant
Installation and Pipeline Laying Project Activities in PPL Pakistan
58 Pakistan Sep, 2015 Completed
Exploration Blocks / Mining Leases on Call-Out basis for Three Petroleum Ltd.
Years
Review of Liquid Transmission System from SFGCS to Flash
Pakistan
59 Vessel, Open Pit, Condensate Settling Tanks And Effluent Pakistan Jul, 2015 Completed
Petroleum Ltd.
Disposal Well
Consultancy Services for Selection, Evaluation, Facility Design
Sui Southern Gas
60 & Installation Supervision of Gas Turbo-Compressors Package Pakistan Jun, 2015 Completed
Company
for Gas Companies in Pakistan.
Consulting Firm to provide consulting services for Up
State Bank of
61 gradation of Fire Fighting systems at State Bank of Pakistan Peshawar May, 2015 Completed
Pakistan
BSC (Ba nk), Peshawar
Consultancy Services for Vetting of Boilers Fuel Optimization Pakistan
62 Report and Evaluation of Existing Burners Efficiency at Sui Petroleum Pakistan May, 2015 Completed
Purification Plant Limited
Pakistan
Consultancy Services for Health Assessment of Boiler no. 14 &
63 Petroleum Pakistan Apr, 2015 Completed
15 at Sui Purification Plant, Sui Gas field
Limited
64 Consultancy Services of OHSAS-18001 -KCDF POL Pakistan Dec, 2014 Completed

65 Consultancy Services of OHSAS-18001 -POL SCR RIG POL Pakistan Dec, 2014 Completed
Consultancy services of Establishment of a certifiable
66 Environment, Health & Safety (EHS) Management system, (ISO KPT Pakistan Jun, 2013 In Progress
14001: 2004 & OHSAS 18001:2007) at port Karachi
Pakistan
Consultancy of provision of Manhole in Dehydration unit # 03 &
67 Petroleum Kandh Kot Dec, 2012 Completed
04
Limited
EXPERIENCE LIST FOR CALIBRATION OF EQUIPMENT
Nos. of Date of
Sr. # Job Description Equipment
Client Location Method
Award
Pakistan State
Karachi -
1 Services for Calibration of PV vents at KTC 7 Oil Company Apr, 2018 -
Pakistan
Limited
Pakistan State
Calibration of Pressure/Vacuum Vent Valve and PRVs at
2 22 Oil Company Shikarpur Feb, 2018 -
Shikarpur Terminal
Limited
Karachi -
3 Calibration Services of Equipment 9 PGNiG Feb, 2018 -
Pakistan
Pakistan
4 Third Party Calibration Services of IMTEs for Sui Field Store 50 Petroleum Sui Gas Field Feb, 2018 -
Limited
Associated Karachi -
5 Calibration of dead weight tester 2 Feb, 2018 -
Group Pakistan
Pakistan State
6 Calibration of Pressure Gauges, PRVs at Sihala Installation. 59 Oil Company Sihala Dept. Feb, 2018 -
Limited
Pakistan
7 Third Party Calibration Services of IMTEs for Kandhkot 56 Petroleum Kandhkot Jan, 2018 -
Limited
Pakistan State
Karachi -
8 Calibration of Pressure/Vacuum Vent at KTA. 20 Oil Company Nov, 2017 -
Pakistan
Limited
Inter Equipment Karachi -
9 Testing of check valves as per API-598 3 Oct, 2017 -
Co. Ltd Pakistan
MAN Diesel &
Karachi -
10 Calibration of Instruments tools 25 Turbo Pakistan Sep, 2017 -
Pakistan
(Private) Limited
Karachi -
11 Calibration of Instrumentation 8 Exterran Aug, 2017 -
Pakistan
Pakistan State
Calibration required for 6'' & 10'' Dia Breather Valves of dw Karachi -
12 3 Oil Company Aug, 2017 -
Crude/PMG Oil Tanks at ZOT Complex Pakistan
Limited
Hub Power Karachi -
13 Calibration of Instruments tools 12 Aug, 2017 -
Services Ltd Pakistan

Port Qasim,
14 Calibration and Certifcation of Boiler Safety valves 76 SEPCO-III Jul, 2017 -
Karachi
Karachi -
15 Calibration of Vertical & Horizontal Tanks as per API-2550 10 IIW Jun, 2017 Strapping
Pakistan
Pakistan State
Calibration of Volumetric prover tanks with capacity of 5000
16 1 Oil Company Lahore Jun, 2017 -
Ltrs at Lahore Airport
Limited

17 Calibration of 02 Nos. HSD Storage Tanks 2 PPL Sui Gas Field Jun, 2017 Strapping

Pakistan State
Providing Services for Calibration of Storage Tanks # 900- Optical
18 3 Oil Company Lalpir Apr, 2017
T-02, 003A and 003B at Lalpir depot” reference line
Limited
Karachi -
19 Calibration of two galley sampler devices 2 Fateh Chemical Apr, 2017
Pakistan
China State
Construction
Optical
20 Calibration of 150 TON Weight Bridge 3 Engineering Islamabad Apr, 2017
reference line
Corporation Ltd
(CSCEC)
21 Calibration Services 2 OGRA Islamabad Apr, 2017 -

22 Calibration of Pressure Gauges 1 Cougar Rawalpindi Feb, 2017 -

Cougar Drilling
23 Calibration of Torque Wrenches & Load Cell 2 Rawalpindi Feb, 2017 -
Solutions
United
24 Commercial Quotation for Calibration of Pressure Gauges 6 Rawalpindi Feb, 2017 -
Construction
25 Calibration/Recertification of Equipment 6 PGNiG Dadu Feb, 2017

Public Health
26 Calibration of Pressure Gauge 10 Engineering Rawalpindi Jan, 2017 -
Division
Unilever Karachi -
27 Calibration of Equipment for the year 2017 15 Jan, 2017 -
Pakistan Pakistan
Qadenwari
28 Calibration of Torque Wrenches 21 OMV Pakistan Dec, 2016 -
field
Unilever Karachi -
29 Calibration of Equipment for the year 2017 314 Nov, 2016 -
Pakistan Pakistan
30 Calibration of the Torque Wrench 1 POL Khaur Sep, 2016

Noise & Emission Testing of Aviation Equipment Based at Pakistan State


Islamabad -
31 Islamabad and Peshawar Airport as per NEQ's 13 Oil Company Sep, 2016 -
Peshawar
Requirements Limited
Yangtze Three
Gorges
32 Calibration of Concrete Mixing Plant 1 Technology and Rawalpindi July, 2016 -
Economy
Development

33 Inspection/ Calibration of Instruments 53 POL Islamabad May, 2016 -

GlaxoSmithKline Karachi -
34 Calibration of Shut off valve at SITE 1 April, 2016 -
Pakistan Ltd. Pakistan

Yangtze Three
Gorges
Technology and
35 Calibration of Concrete Mixing Plant 1 Economy
Rawalpindi March, 2016 -
Development Co
Ltd

Calibration Of 08 Nos Mela Crude Storage Tanks (Capacity 8000 OGDCL-Chanda Optical
36 8 Pakistan Dec, 2015
Bbls Each) Site reference line
Calibration of Pressure Gauge of Air Vessels, Master Pressure
Dadex Eternit Karachi -
37 Gauge of (Analog + Digital) & Calibration of Compressed Air 2 Oct, 2015 -
Limited Pakistan
Vessels PSV, KF
SINOHYDRO GROU
38 Calibration of Weighbridge and Concrete Mixing Station 1 P TARBELA 4th Pakistan Oct, 2015 -
EXTENTION HPP

Dadex Eternit Karachi -


39 Calibration of Digital Weigh Scale 2 Ton 1 Oct, 2015 -
Limited Pakistan
Dhodak &
40 Services for Calibration of Tanks at Dhodak & Dhurnal Plant 7 PARCO Jun, 2015 Strapping
Dhurnal Plant

41 Calibration of Pressure and temperature Gauges - Elite Engineering Pakistan Jun, 2015 -

42 Calibration of Electrical instruments - GE Saif Power Pakistan Jun, 2015 -

GE-Saif Power
43 Calibration of Weather Station - Pakistan May, 2015 -
Plant
Khalid &
44 Tank Calibration - Pakistan May, 2015 -
Company
Calibration & Repair Works of Lel Meter, Vibration Meter & Sound
45 5 PSO Machike Apr, 2015 -
Level Meter at Machike Installation

Re-Calibration of Product Tanks at Sahiwal Depot as API MPMS Optical


46 3 PSO Sahiwal Apr, 2015
chapter 2.2B (Revise API standard 2550). reference line

Calibration of Horizontal buried tank # 0004, 0005 & 0006 as per Liquid
47 3 PSO Sahiwal Apr, 2015
API 2555 Calibration
48 Scale Calibration of Batch Plant & Weight Bridge 2 SINOHYDRO Pakistan Aug, 2014 -

49 Ambient Air & Drinking Water Quality Tests 2 Sinohydro Group Pakistan Apr, 2014 -

50 Flow Rate and Gas Analysis - Saif Textile Mills Pakistan Mar, 2015 -
GE-Saif power
51 Emission Testing of DLN Tunning - Pakistan Mar, 2015 -
Plant
52 Calibration of Batching Plant 2 Sinohydro Group Pakistan Feb, 2014 -

Optistrap
53 Calibration of above ground storage Tank 1 PSO Pakistan Oct, 2013
Method

Karachi - Optical
54 Calibration of vertical Storage Tank at KT-A, Karachi 1 PSO Jun, 2010
Pakistan Reference Line

Karachi - Optical
55 Calibration of vertical Storage Tank at KT-A, Karachi 1 PSO May, 2010
Pakistan Reference Line
EXPERIENCE LIST FOR THIRD PARTY INSPECTION / PHYSICAL
VERIFICATION / SURVEY OF MATERIAL
Date of
Sr. # Job Description Client Location Status
Award
Hiring of 3rd party consultant to review decommissioning
1 PPL Karachi Feb, 2018 On Going
estimation mechanism

2 Third Party inspection of GPF-I plant Piping PPL Gambat Feb, 2018 On Going

Gandhara
3 Third party inspection for Oil tanker 48KL as per OGRA Standard Karachi Jan, 2018 On Going
Industries
Tank Lorries on Patrom Standard with Hydrotest of both, Location Port
4 FMOTC Karachi Jan, 2018 Completed
Qasim
Services required for third party inspection of Fin Fan Cooler, E-110,
Pakistan
5 fabrication job by API-510 inspector as per Quality inspection plan, at Lahore Nov, 2017 Completed
Petroleum Limited
contractor’s workshop
Third Party Surveillance activities in construction of 3 ton Boiler at DDFC Pakistan Refinery
6 Lahore Nov, 2017 Completed
site, Lahore Limited
Shahzad
7 Inspection for PSO oil tanker Karachi Oct, 2017 Completed
Enterprises
Pump Inspection, Vibration, Noise test & Performance Testing (ISO KSB, Hassan
8 Petronas Jul, 2017 Completed
9906) Abdal
Third Party Inspection services during Fabrication of 40 Ton Boiler at Pakistan Refinery
9 Lahore Jul, 2017 Completed
Descon Lahore Manufacturing Works Limited

Pakistan
10 Services of API 510/570 Inspector for PSV Testing Lahore Jul, 2017 Completed
Petroleum Limited

Third Party Inspection services during Fabrication of Inlet Separator /


11 OMV Pakistan Pakistan Jul, 2017 Completed
Slug Catcher (V-2001) at Descon Lahore Manufacturing Works
Glaxo SmithKline
12 Calculation Of Safety Valves Installed On Boiler Korangi Jun, 2017 Completed
Pakistan Limited

13 Third Party Inspection of Transition Pieces SNGPL Lahore Jun, 2017 Completed

Third Party Inspection of P.E End Caps, External Coupling, Tapping


14 SNGPL Lahore Jun, 2017 Completed
Tees

15 Third Party Inspection of P.E Elbow 3/4" & Tapping Tees SNGPL Lahore Jun, 2017 Completed

GlaxoSmithKline
16 Development of As built drawings Karachi Jun, 2017 Completed
Pakistan Ltd.

Providing Supervision Services of Constuction at Well Nausherwani Pakistan


17 Pakistan May, 2017 Completed
Balochistan Petroleum Limited

18 Hiring of Contractor for Third Party Inspection Services for Kalabagh-1A MPCL Pakistan Apr, 2017 Completed

19 Third Party Vehicles Fitness Inspection Weatherford Pakistan Apr, 2017 Completed

Third Party Inspection Services for Sujawal Front-end Compression


20 MPCL Pakistan Apr, 2017 Completed
Project.

21 Third Party Inspection of Cherry picker Exalo Drilling SA Pakistan Mar, 2017 Completed

22 Third Party Inspection of Lifting Equipment POL Pakistan Mar, 2017 Completed

GlaxoSmithKline West Warf


23 As Build Drawings development for Piping Network Across the Site. Feb, 2017 Completed
Pakistan Ltd. Karachi
Supervision of febrication and instalation of 2 overhead cranes Welders
24 Karachi Jan, 2017 Completed
at K-electric plant International

25 Inspection of X-Mass Tree Assembly and Tubing Head Spool OGDCL Pakistan Jan, 2017 Completed

BGP (Pakistan)
26 Third Party Inspection Services Pakistan Jan, 2017 Completed
International

KCA Deutag
27 Third Party Services for Drop’s Inspection for Rig T-72 Drilling GmbH
Pakistan Jan, 2017 Completed

28 Third Party Inspection of Lifting Belts, Sling Wires & Shackles Power Engineering Pakistan Jan, 2017 Completed

Engro Fertilizers
29 Third Party Inspection of Repair of Nozzle Limited
PAKISTAN Jan, 2017 Completed

Engineering Design according to agreed Facility Layout of Oil


30 Allied Petroleum Pakistan Jan, 2017 Completed
Terminal

Third party inspection services at Karachi for inspection of


31 MPCL Karachi Jan, 2017 Completed
procured material for integration of ZS3 well with ZGPF

Supervision Services During Construction of Access Road at Well Pakistan


32 Kalat Jan, 2017 Completed
Kalat-X-1 Petroleum Limited

Cougar Drilling
33 Tubular Inspection Services Islamabad Dec, 2016 Completed
Solutions

34 Third Party Inspection Services BGP Dhok Sultan Nov, 2016 Completed

Cougar Drilling
35 Mechanical Testing of Stator Material Islamabad Nov, 2016 Completed
Solutions
Glaxo SmithKline
36 Inspection and Testing of natural gas line for leak detection Karachi Oct, 2016 Completed
Pakistan Ltd
Third Party Pre-Shipment Inspection of Plug Valves etc at Turkey Sui Southern Gas
37 Karachi Oct, 2016 Completed
& England Company Limited
Pakistan
38 Third Party Inspection of Piping Pipelines Karachi Oct, 2016 Completed
Petroleum Limited

TPI of Sizing Beam Lifting Crane Capacity = 3000 Kgs (Crane 1 Yunus Textile Mill
39 Karachi Oct, 2016 Completed
& 2) Operational Limited
Inspector for Surveillance Activities in Construction of 40 Ton Pakistan Refinery
40 Lahore Sep, 2016 Completed
Boiler at Descon LMW Site, Lahore Limited
Integrity Assessment of above ground Storage Tank No. 5302 at
41 PSO Habibabad Sep, 2016 Completed
Habibabad
NDT Inspection of Welds at Site - Third Party Inspection
42 ANDRITZ GmbH Chiral Aug, 2016 Completed
Company

43 MPI & UFD Inspection at Balkasar Oilfield, POL POL Balkasar Aug, 2016 Completed

44 RT Inspection at Golen Gol HPP, Chitral ANDRITZ GmbH Chiral Aug, 2016 Completed

45 MPI & RT Services ZESCO Islambad Aug, 2016 completed

46 Energy Audit in Industrial Units and Building Enercon Pakistan Aug, 2016 Completed

Integrity Assessment of above Ground Vertical Steel Fire Water Tank at


47 PSO Daulatpur July, 2016 Completed
Daulatpur Depot.

48 Vehicle Fitness Test SENSHE Pakistan Mianwali July, 2016 Completed

Welding Inspection & Radiography Services for 3/4" to 2"Ø and ISB/RWP/Abb
49 above assorted operational Phases in SNGPL otabad June, 2016 Completed
Islamabad/Rawalpindi/Abbottabad Distribution Regions Region

50 Borescopy Services at DPL Plant-Taunsa Dewan Petroleum Taunsa June, 2016 Completed

Third Party Inspection of CRA Lined Pipes at Manufacturer Facility in


51 PPL Indonesia May, 2016 Completed
Indonesia (Batam)
52 Inspection of DAY Tank & water storage tank Asia Petroleum Karachi Apr, 2016 Completed
DANA
53 Vehicle Fitness Test GEOPHYSICS Chakwal Apr, 2016 Completed
PAKISTAN
Provision of API 510/570 for witness of testing of PSV at Adhi Field,
54 PPL ADHI field ISB Apr, 2016 Completed
Islamabad
Glaxo SmithKline
55 Third Party Inspection of compressed air vessel Karachi Mar, 2016 Completed
Pakistan Ltd.
Inspection & supervision services of manufacturing loading / unloading
56 SSGC Baluchistan Feb, 2016 Completed
fire fighting system at Bela.

57 Third Party Inspection of Gear Pump FOTCO Karachi Feb, 2016 Completed

Inspection & supervision services of manufacturing loading / unloading


58 SSGC Baluchistan Feb, 2016 Completed
fire fighting system at Awaran.
Inspector for Surveillance Activities in Construction of 40 Ton Boiler at Pakistan Refinery
59 Karachi Jan, 2016 Completed
Descon LMW Site, Lahore Limited

Inspection of Lube Oil Reclamation Plant of M/S Fareed


60 OGRA Multan Jan, 2016 Completed
Lubricants, Multan

Hyundai
61 Third party Verification of Phased Array works Engineering Rawalpindi Jan, 2016 Completed
Pakistan Ltd.

62 Third Party Quality Control Services PETROSIN Pakistan Jan, 2016 Completed

Outreach (Pvt)
63 Third Party Material Verification Pakistan Nov, 2015 Completed
Ltd
Third Party Inspection of Heat Exchangers to Asses Health of Tubes &
64 Fatima Fertilizer Pakistan Nov, 2015 Completed
To Determine their Thickness
Haji Gul
65 Third Party Inspection of Tank Lorries Pakistan Nov, 2015 Completed
Enterprises
TPI of Additional Oil Storage Constructed by M/S Hascol Petroleum
66 OGRA Pakistan Nov, 2015 Completed
(PVT.) Limited SIituated at SHIKARPUR

As Build Drawings for the Compressed Air System Piping Network GlaxoSmithKline
67 Karachi Nov, 2015 Completed
Across the Site. Pakistan Ltd.

Pre-Qualification of Third Party Contractors for Providing / Manpower Sui Southern Gas Sindh &
68 Nov, 2015 Completed
(Project & Construction) Department Company Ltd. Baluchistan
Third Party Inspection of C-104 Ant-Surge NRV at Manufacturer's Fatima Fertilizer
69 Pakistan Oct, 2015 Completed
Workshop Company Limited

Hiring Services for 04 Nos. Piping Loop Inspection at Sui Purification Pakistan Sui,
70 Oct, 2015 Completed
Plant as per Call Out Agreement No. 4600001037 Petroleum Ltd. Baluchistan

71 TPI for QA/QC Supervision for FML FML Pakistan Oct, 2015 Completed

Consultancy Services for Pressure Vessels Design Study/Review &


Pakistan Sui,
72 Designing of Pipe Support & Structure at Purification Plant, Sui Gas Oct, 2015 Completed
Petroleum Ltd. Baluchistan
Field.
Hiring of API-570 Inspector for assessment of 04 Nos. Piping loop
Pakistan Sui,
73 inspection scope at Sui Purification Plant as per Call Out Agreement No. Oct, 2015 Completed
Petroleum Ltd. Baluchistan
4600001037
Inspection of Tubes of Heat Exchangers to Asses Health of Tubes & Fatima Fertilizer
74 Pakistan Oct, 2015 Completed
Determine their Thickness & Compare Results with DUET Company

Quotation of 90 Nos. Flange Scanning as per Call Out Agreement06 Pakistan Sui,
75 Oct, 2015 Completed
Nos. Pressure Vessels as per Call Out Agreement No. 4600001037 Petroleum Ltd. Baluchistan

Hiring Services of Inspection Engineer against Call Out Agreement No. Pakistan Sui,
76 Oct, 2015 Completed
4600000990 - Repairing / Coating of Shell of Heat Exchanger at Sui PP Petroleum Ltd. Baluchistan

Balloki Power
77 Pressure Recording Services for Water Line for Fire Fighting System Pakistan Oct, 2015 Completed
Palnt
Quotation of Non Intrusive Inspection of 06 Nos. Pressure Vessels as Pakistan Sui,
78 Oct, 2015 Completed
per Call Out Agreement No. 4600001037 Petroleum Ltd. Baluchistan
Hiring Services of Inspection Engineer against Call Out Agreement No.
Pakistan Sui,
79 4600000990 - Retubing of Shell & Tube type Heat Exchanger at Sui Oct, 2015 Completed
Petroleum Ltd. Baluchistan
Purification Plant
Quotation of Radiography for 10" line welding at Sui Purification Plant Pakistan Sui,
80 Oct, 2015 Completed
against Call-Out Agreement No. 4600000990 Petroleum Ltd. Baluchistan

Hiring Services of Inspection Engineer against Call Out Agreement No. Pakistan Sui,
81 Oct, 2015 Completed
4600000990 - Fabrication of U-type tube bundle Petroleum Ltd. Baluchistan

82 Integrity Testing of Equipments Unilever Pakistan Karachi Oct, 2015 Completed

International
83 Verification of the Mill Test Certificates of HR Coils Karachi Oct, 2015 Completed
Industries Limited

As Build Drawings for the Compressed Air System Piping Network GlaxoSmithKline
84 Karachi Sep, 2015 Completed
Across the Site Pakistan Ltd.

HSE Monitoring Consultant for Exploration, Drilling, Plant Installation


Pakistan
85 and Pipeline Laying Project Activities in PPL Exploration Blocks / Mining Pakistan Sep, 2015 Completed
Petroleum Ltd.
Leases on Call-Out basis for Three Years
Non-intrusive inspection (NII) of pressure vessels at PPL facilities on Pakistan
86 Pakistan Sep, 2015 Completed
call-out basis for three years Petroleum Ltd.

87 Third Party Inspection of Diesel Generator Sets Pakistan State Oil Pakistan Jul, 2015 Completed

Review of Liquid Transmission System from SFGCS to Flash Vessel, Pakistan


88 Pakistan Jul, 2015 Completed
Open Pit, Condensate Settling Tanks And Effluent Disposal Well Petroleum Ltd.

Long range ultrasonic thickness LRUT insgection of underground In let /


89 PARCO Karachi Jul, 2015 Completed
outlet line of Tank A-003 at PS- I Korangi
Hydrostatic Witness of Threaded connection for Flow meter at Safe Way
90 MPCL Rawalpindi Jul, 2015 Completed
CNG.
GE-Balloki Power
91 DGA Test for Transformer Oil Pakistan Jul, 2015 Completed
Plant

92 Third Party Inspection of Tank Lorries- Machike Marwat Group Pakistan Jul, 2015 Completed

Third Party Inspection & Physical Verification of Electrical & Mechanical KSB Pumps
93 Pakistan Jun, 2015 Completed
Items Company Ltd
94 Third Party Inspection of Tank Lorries- Machike Rasch (Machike) Pakistan Jun, 2015 Completed
GE- Bhikki Power
95 Transformer oil Testing Pakistan Jun, 2015 Completed
Plant

96 Third Party Inspection of Tank Lorries- Machike Marwat Group Pakistan Jun, 2015 Completed

97 Third Party Inspection of 100 KVA Generators JKS Pakistan Jun, 2015 Completed

98 Third Party Inspection of HSD Pipelines ARL Pakistan May, 2015 Completed

Alstom Grid
99 Third Party Inspection of Torque Spanners & Testing Equipment Pakistan May, 2015 Completed
Pakistan (Pvt) Ltd

Mechanical Integrity Assessment, NDT Evaluation of Storage tanks and Dakhni,


100 OGDCL May, 2015 Completed
piping at Dakhani (ATA) Oil & Gas Field Panjab

Mechanical Integrity Assessment, NDT Evaluation of TEG unit and Sinjoro


101 OGDCL May, 2015 Completed
piping at Sinjhoro Oil & Gas Field Sindh
Sinjoro
102 Visual Inspection and PT of Demister Pad in High Pressure Vessel OGDCL May, 2015 Completed
Sindh
Mechanical Integrity Assessment, NDT Evaluation of Hot Oil coil at Sinjoro
103 OGDCL May, 2015 Completed
Sinjhoro Oil & Gas Field Sindh
Mechanical Integrity Assessment, NDT Evaluation of Dehydration units Kunnar
104 OGDCL May, 2015 Completed
and piping at Kunnar Oil & Gas Field Sindh
MELA
105 Cost of Data Entry and Analysis of Package No 5 & 6 OGDCL Apr, 2015 Completed
KPK
DAKHNI
106 LP & HP DRUMS OGDCL Apr, 2015 Completed
FIELD
Sambu SARCO
107 Third Party Inspection of Winch Machine Pakistan Apr, 2015 Completed
JV
Qadirpur,
108 MIA at plant vessels at Qadirpur OGDCL Apr, 2015 Completed
Sindh

109 Inspection of Tank Lorries Total PARCO Pakistan April, 2015 Completed

Qadirpur,
110 MIA at storage tank at Qadirpur plant OGDCL Apr, 2015 Completed
Sindh
Orient Energy
111 Third Party Witness Testing of Diesel Generator Set Systems (Private) Pakistan Apr, 2015 Completed
Ltd

112 Third Party Inspection of Cooling Plant SINOHYDRO Pakistan Apr, 2015 Completed

113 Inspection for assessment of economizer tubes misalignment Nishat Mills Ltd Pakistan March, 2015 Completed

Bellelli
114 Third Party Inspection of material at OGDCL Kunnar Gas Field Pakistan Feb, 2015 Completed
Engineering
115 Third Party Inspection of Injection Skid at Descon, Lahore OMV Pakistan Lahore Feb, 2015 Completed

116 Third Party Survey of Natural Gas Storage Skid Feroze 1888 Mills Pakistan Feb, 2015 Completed
CHANDA
117 Cost of Data Entry and Analysis of Package No 5 & 6 OGDCL Jan, 2015 Completed
KPK
MELA
118 Cost of Data Entry and Analysis of Package No1 & 2 OGDCL Jan, 2015 Completed
KPK
Stage inspection of under construction NGL storage tank at DAKHANI Dakhni,
119 OGDCL Jan, 2015 Completed
Gas Field Panjab

120 Third Party Rig Audit Services for MGCL Rig-3 MGCL Pakistan Jan, 2015 Completed

Sambu
121 Third Party Inspection of Steel Girder Fabrication Pakistan Dec, 2014 Completed
Engineering

122 Third Party Inspection of Fire Fighting Vehicles ETC Lahore Pakistan Dec, 2014 Completed
CHANDA
123 RBI Data Collection Chanda Oil Field OGDCL Dec, 2014 Completed
KPK
NASHPA
124 RBI DATA COLLECTION AT NASHPA OIL FIELD OGDCL Dec, 2014 Completed
KPK
CHANDA
125 Cost of Data Entry and Analysis of Package No1 & 2 OGDCL Dec, 2014 Completed
KPK
Bellelli
126 Third Party Inspection of material at OGDCL – KSB store Pakistan Dec, 2014 Completed
Engineering

127 Third Party LPG Cylinders Inspection CYL PAK Pakistan Nov, 2014 Completed
Bellelli
128 Inspection of Gas Treatment Plant at OGDCL Qadir pur gas field Pakistan Nov, 2014 Completed
Engineering
Engro Vopak
129 Third Party Inspection of Heat Exchanger Pakistan Nov, 2014 Completed
Terminal Ltd.
Engro Polymer &
130 Third Party Inspection Services for Vessel V1491B Tank China Nov, 2014 Completed
Chemical
Qadirpur,
131 TPI & UT guaging of heater tubes at QP field OGDCL Oct, 2014 Completed
Sindh
Mari Gas
132 Third Party Rig Audit Services, Rig-1 Pakistan Oct, 2014 Completed
Company Ltd.
Bellelli
133 Third Party inspection services against Material Pakistan Sep, 2014 Completed
Engineering
134 Fit For Services (FFS) Engro Fertilizer Pakistan Sep, 2014 Completed

135 RBI Data collection at Nashpa OGDCL Pakistan Sep, 2014 Completed

136 RBI Data collection at Chanda OGDCL Pakistan Sep, 2014 Completed

137 RBI Data collection at Mela OGDCL Pakistan Sep, 2014 Completed

138 ATA at Dakhani OGDCL Pakistan Sep, 2014 Completed

139 Third Party Services of API 510 / 570 Inspector for PSV Testing PPL Pakistan Sep, 2014 Completed

140 Third Party Integrity Assessment of Tank # 5302 PSO Pakistan Sep, 2014 Completed
Engro Vopak
141 Third Party Inspection of Pressure Vessel, Tank & Heat Exchanger ETC. Pakistan Aug, 2014 Completed
Terminal Ltd
TPI of Work Facility in Faisalabad & Islamabad for Refurbishment /
142 PPL Pakistan Aug, 2014 Completed
Repair of HP Gas Turbine Rotor for Frame 1 & 3
Al-Rahim Tanks
143 Witnessing of Hydrotesting of Jetty Line Pakistan Aug, 2014 Completed
Kemari
External/Internal Inspection of Zamzama Condensate Tank ZO3-T-02 at
144 PARCO Pakistan Aug, 2014 Completed
Bubak, PS-2

145 Provision of Drill Rig Inspection Services KUFPEC Pakistan Aug, 2014 Completed

146 Pre- Qualification for Third Party inspection services MOL Pakistan Aug, 2014 Completed

Data Collection for RBI of Qadirpur field, data entry and and analysis Qadirpur,
147 OGDCL Jul, 2014 Completed
(package-1) Sindh Region
Data Collection for RBI of Qadirpur field, data entry and and analysis Qadirpur,
148 OGDCL Jul, 2014 Completed
(package-2) Sindh Region

Review of basic design data, Operating parameters, Material


Qadirpur,
149 specification, entry of data into software and analysis of all equipment of OGDCL Jul, 2014 Completed
Sindh Region
all plants / processing unit (package-3)

Identifying, preparation and design of corrosion loops of all pipelines Qadirpur,


150 OGDCL Jul, 2014 Completed
circuits and equipment of all plants. (package-4) Sindh Region

Data entry into software and analysis of previous inspection history


Qadirpur,
151 including failure & replacement of all pipelines, equipment of all plants. OGDCL Jul, 2014 Completed
Sindh Region
(package-5)
Risk-Based Analysis of all pipeline circuits, equipments and plants
Qadirpur,
152 covering PoF (Probability of Failure) and CoF (Consequences of OGDCL Jul, 2014 Completed
Sindh Region
Failure), prioritization of inspection requirements etc (package-6)

153 Third Party Integrity assessment of boilers at LLP PSO Pakistan Jul, 2014 Completed

Annual safety inspection of CNG stations as per Pakistan CNG rules


154 OGRA Pakistan May, 2014 Call out Basis
1992 for OGRA

155 Certifying the MTCs against SNGPL specifications Data Steels Pakistan May, 2014 Completed

Providing supervision services for construction of access road and well


156 PPL Pakistan May, 2014 Completed
site location for 5th and 6th exploratory wells in Gambat South Block.

Providing Supervision Services during construction of well sites and


157 PPL Pakistan May, 2014 Completed
miscellaneous construction works at well Sui-94(P), Sui Gas Field.

158 Providing Supervision Services at 3rd Exploratory Well Hala PPL Pakistan May, 2014 Completed
159 Providing Supervision Services at Well Kandhkot-32 PPL Pakistan May, 2014 Completed

Providing Supervision Services at 2nd Exploratory Well Naushero


160 PPL Pakistan May, 2014 Completed
Feroze
Nuricon Union
161 Witness of Electrical Safety of Mud logging Unit Pakistan May, 2014 Completed
Pte. Ltd

162 Rig Audit Services MOL Pakistan May, 2014 Completed

Procyon Supply
163 PSI of Pup joints in USA Pakistan May, 2014 Completed
USA

164 Third Party Inspection of LPG Cylinders CYLPAK Pakistan May, 2014 Completed

Nuricon Union
165 Witness of Electrical Safety of Mud logging Unit Pakistan May, 2014 Completed
Pte. Ltd

166 Cylinders Inspection CYLPAK Pakistan Mar, 2014 Completed

Polish Oil & Gas


167 Third Party Inspection Services Pakistan Mar, 2014 Completed
Company
Dakhni,
168 RBI Data Collection at Dakhani OGDCL Mar, 2014 Completed
Panjab
CHANDA
169 RBI Data Collection at Chanda OGDCL Mar, 2014 Completed
KPK Region

170 Wellhead Inspection at DAKHNI OGDCL Pakistan Feb, 2014 Completed

Third Party Inspection & Verification Witness of Thickness Testing /


171 Hydro test of 15 kg LPG Cylinders According to Code BS5430 at POL POL Pakistan Jan, 2014 Completed
Facility
NASHPA
172 Painting inspection of the crude oil storage tank # 05 & 06 OGDCL Jan, 2014 Completed
KPK Region
Sambu
173 Third Party Inspection Inspection of Winch Machines Pakistan Jan, 2014 Completed
Construction

174 Third party inspection of 1 & 10" dia line pipe at Bashir pipe factory PPL Lahore Jan, 2014 Completed

175 Third Party Inspection of Panel at S.I.T.E Schneider Electric Karachi Jan, 2014 Completed

Third Party Inspection for 3 layer Polyethylene Coating of Pipes at


176 OMV Group Karachi Jan, 2014 Completed
Crescent Steel, Karachi

177 RCA of Valves Failure at Sawan Gas Field OMV OMV Group Pakistan Jan, 2014 Completed

178 Re-rating of Low Pressure Separator POL Pakistan Dec, 2013 Completed

179 Supervision of Bends Fabrication at K.I Engg., Lahore OMV Pakistan Pakistan Nov, 2013 Completed

180 Inspection Services – NandPur ATA OGDCL Pakistan Oct, 2013 Completed

181 Integrity testing of above ground storage Tank & Calibration of Tank PSO Pakistan Oct, 2013 Completed

182 TPI for PQR & WQT at Pak Arab Engg., Dharki OMV Group Dhariki Oct, 2013 Completed

183 TPI for Line Pipe Inspection at M/s Crescent steel Nooriabad OMV Group Karachi Oct, 2013 Completed
Engro polymer &
184 Supervision of fabrication works of heat exchanger at ABS workshop Pakistan Oct, 2013 Completed
Chemical

185 Provision of draft man for Sui field PPL Pakistan Oct, 2013 Completed

Supervision of fabrication works of waste water stripper & heat Engro polymer &
186 Pakistan Oct, 2013 Completed
exchanger Chemical

187 Inspection of 6", 8" & 10" line pipe at Sui field PPL Pakistan Sep, 2013 Completed

188 Third Party Inspection Services at Vendor's Location for Barite Supply Velosi UAE Pakistan Sep, 2013 Completed
Provision of API 510/570 for witness of testing of PSV at Adhi Field,
189 PPL Pakistan Sep, 2013 Completed
Islamabad

190 Third Party Visual inspection & UT gauging of Tank 302 at KTB PSO Pakistan Aug, 2013 Completed

Third Party Inspection of 6" X 0.321” WT Carbon Steel Line Pipe of API
191 PPL Pakistan Aug,2013 Completed
5L Grade B (PSL-1) at Manufacturer's Facility in Lahore
192 NDT & Inspection services of crude oil tanks Qatar Petroleum UAE Aug, 2013 Completed

193 TPI for Pipe Manufacturing at TPCO in China OMV Pakistan China Aug, 2013 Completed
Monitoring and inspection of pipe bending process at K.I. Engineering
194 OMV Pakistan Pakistan Jul, 2013 Completed
Lahore
195 Third party inspection of equipment BIZ LINK Pakistan Jun, 2013 Completed

196 Inspector required for supervision of RT works OMV Pakistan Pakistan Jun, 2013 Completed
Integrity assessment of ground storage Tank # 804 &805 at Mehmood
197 PSO Mehmood Kot Jun, 2013 Completed
Kot installation
Qadirpur,
198 Data Collection for RBI of Qadirpur Field OGDCL Jun, 2013 Completed
Sindh Region
199 Internal inspection of HSD storage Tank at WOTS-2,Shikarpur PARCO Shikarpur Jun, 2013 Completed

200 Provision of piping designer OMV Pakistan Pakistan Jun, 2013 Completed

201 Third Party Vehicle Inspection MOL Pakistan Pakistan Jun, 2013 Completed

202 NDT inspection tank # 01 at BOT PSO Pakistan Jun, 2013 Completed

203 Third Party Rig Audit Mari Petroleum Pakistan Jun, 2013 Completed

204 Inspection Of PMG Vertical Tank # 4602 At Taru Jabba Depot PSO Pakistan May,2013 Completed

Qadirpur,
205 Gap Analysis at Qadirpur piping construction for the suervision OGDCL May,2013 Completed
Sindh
206 Supervision of NDT/NDE works at Sui Fields PPL Pakistan Apr, 2013 Completed

Khanewal,
207 PQR at SNGPL Kacha Kho camp Khanewal OMV Pakistan Feb, 2013 Completed
Pakistan
Engro Polymer &
208 General Services Contract of inspection and NDT services Pakistan Mar, 2013 Completed
Chemical

209 RBI & NDT inspection contract for all OGDCL operated Fields OGDCL Pakistan Feb, 2013 In Progress

210 NDT & Visual inspection of storage tank at Faisalabad Depot. PSO Pakistan Feb, 2013 Completed

Pakistan Oilfields
211 Metal Inspection Pakistan Feb, 2013 Completed
Ltd.

212 Third party inspection of Turbine Repair Facility in Islamabad PPL Pakistan Jan, 2013 Completed
Excel
213 Third Party Inspection of Breathing Apparatus Technologies Pakistan Jan, 2013 Completed
Limited
Excel
214 Third Party Inspection of Fire Lorries at M/s Haseen Habib- Lahore Technologies Pakistan Jan, 2013 Completed
Services
215 Third Party Inspection contract for PPL Operated Fields And Project Site PPL Pakistan Dec, 2012 Completed

Third Party Inspection of Methanol Injection packages at Descon


216 OGDCL Lahore Dec, 2012 Completed
Workshop Lahore
Third party inspection during fabrication of Slug Catcher at Descon
217 OMV Pakistan Lahore Dec, 2012 Completed
workshop Lahore

218 CNG Cylinder UT Thickness Gauging Testing Inspection. Petrosin Energy Pakistan Dec, 2012 Completed

219 Inspector required for wellhead gas cooler (natural draft) job OMV Pakistan Pakistan Oct, 2012 Completed

Lahore,
220 Stage Inspection of Tube Bundles at Descon workshop Lahore PPL Oct, 2012 Completed
Rawalpindi
Inspector required to review WQT steel structure at sunder estate
221 OMV Pakistan Pakistan Oct, 2012 Completed
Lahore
Deewan
222 X-Mas Tree & Well Head Thick. Inspection Pakistan Oct, 2012 Completed
Petroleum
Pakistan Oilfields
223 Re-rating of High Pressure Separator Pakistan Sep, 2012 Completed
Ltd.
Inspection of 4” Seamless line pipe at Huffaz Factory Karachi, API 5L,
224 OGDCL Pakistan Aug, 2012 Completed
PSL-1, GR-X-52
Third Party Inspection & Verification Witness of Thickness Testing/Hydro Pakistan Oilfields
225 Pakistan Feb, 2012 Completed
test of 15 Kg LPG Cylinders Limited

226 Inspection of Tube Support Assembly Velosi Qatar Lahore Jul, 2012 Completed

227 Supervision of RT works in Chachar Field PPL Pakistan Jul, 2012 Completed

228 Third party Audit of CP System Karachi PARCO Pakistan Jun, 2012 Completed

229 API Audit Inspection Of Pipe Factory in Lahore SSGC Lahore May, 2012 Completed

230 Inspection of Fire Lorries along with accessories OGDCL Karachi May, 2012 Completed

231 Inspection of Fire Water Pumps OGDCL Karachi May, 2012 Completed
Trading
232 Physical Verification / inspection of Sugar Stocks at Pipri site. Corporation Karachi Jan, 2012 Completed
Pakistan
233 Third Party Price Audit for Line Pipe Supply ISGS Worldwide Dec, 2012 Completed

234 Witness of activities for storage Tank construction PSO LALPEER Oct, 2011 Completed

235 Inspection of Tube Bundle Fabrication for Heat Exchangers PSO Lahore Sep, 2011 Completed

Third party Inspection to witness the maintenance job of 750 KVA Diesel
236 PSO Karachi May. 2011 Completed
generator
Third party Inspection to witness the maintenance job of 300 KVA Diesel
237 PSO Karachi May. 2011 Completed
generator
Inspection, Testing and Certification of Pressure Vessels (8 Vessels)
238 during annual shut Down at BHIT site, using DPT, MPI, UT gauging and ENI BHIT Pakistan Apr, 2011 Completed
UT Flaw detection
Karachi
239 Third party Inspection of 500 KVA Diesel generator at Keamari Terminal PSO Mar, 2011 Completed
Pakistan

240 Providing the services of NDT specialist (Level – III) PNAC Pakistan Feb, 2011 Completed

Annual safety inspection of CNG stations as per Pakistan CNG rules


241 OGRA Pakistan On call basis Completed
1992 for OGRA for 3 years

242 Third Party Inspection of 300 KVA DG set PSO Pakistan Apr, 2010 Completed

Karachi
243 Hydro Static Test of Pressure Vessel for Unilever Pakistan UNILEVER Sep, 2010 Completed
Pakistan
EXPERIENCE LIST FOR THIRD PARTY MILL INSPECTION OF LINEPIPE

Qty. Date of
Sr. # Job Description Client Location Status
(Meters) Award

1 3 Layer PE Coating of 8" NB x 0.219" dia WT. MS Line pipe. 30,000 SSGC Karachi Apr, 2018 In Progress

Third Party Inspection of CRA Lined Pipes Dia. 10", Grade X-80, WT: 0.365,
2 PSL-2 at Manufacturer Facility in Indonesia (Batam) as per API 5L, 5LC and 500 PPL Indonesia Apr, 2018 In Progress
5LD, Coating Specs: 3-Layer PP

3 3 Layer PE Coating of 6" NB x 0.188" dia WT. MS Line pipe. 35,000 SSGC Karachi Feb, 2018 In Progress

4 3 Layer PE Coating of 6" NB x 0.188" dia WT. MS Line pipe. 15,000 SSGC Karachi Feb, 2018 In Progress

5 3 Layer PE Coating of 8" NB x 0.219" dia WT. MS Line pipe. 30,000 SSGC Karachi Feb, 2018 In Progress

All over
6 Mill Inspection and Loading Supervision Services for the period of 3 years Various SSGC
Pakistan
Jan, 2018 Completed

7 Inspection of Steel Linepipe size 6inch dia X 0.188 inch WT, PSL-1 200,000 SNGPL Lahore Nov, 2017 Completed

Mari Petroleum
Mill inspection reports, API Spec 5L, PSL-2, X-46, Sch-40, 3 Layer HDPE as
8 5,500 Company Karachi Jun, 2017 Completed
per DIN 30670, Double random Limited

9 Mill Pre-shipment inspection of 14" dia. Std. W.T, 356 PAPCO China Mar, 2017 Completed

Third Party Local Pre Shipment Inspection Services at BBJ Pipes Lahore for
10 35,000 SNGPL Lahore Mar, 2017 Completed
¾”, 1-1/4” & 2” P.E Pipeline
Third Party Inspection of CRA Lined Pipes Dia. 10", Grade X-80, WT: 0.365,
11 PSL-2 at Manufacturer Facility in Indonesia (Batam) as per API 5L, 5LC and 1,000 PPL Indonesia May, 2016 Completed
5LD, Coating Specs: 3-Layer PP

Third Party Linepipe inspection of 6 inch dia. Sch 80, API 5L, Grade X52, NS,
12 40,000 OGDCL China Mar, 2016 Completed
PSL-2, BE, NACE MR 0175. Double Radom Length, Coating 3 layer.

Third Party Linepipe inspection of 8 inch dia. Sch 80, API 5L, Grade X52, NS,
13 45,000 OGDCL China Feb, 2016 Completed
PSL-2, BE, NACE MR 0175. Double Radom Length, Coating 3 layer.

Mari Petroleum
14 Third Party inspection of line pipe 2 inch dia. Sch 80, 51,200 Company Karachi Jan, 2016 Completed
Limited

Mari Petroleum
15 Third Party inspection of line pipe 3 inch dia. Sch 80, 103,310 Company Karachi Jan, 2016 Completed
Limited

Mari Petroleum
16 Third Party inspection of line pipe 8 inch dia. Sch 80, 200,680 Company Karachi Jan, 2016 Completed
Limited

Mari Petroleum
17 Third Party inspection of line pipe 4 inch dia. Sch 80, 150 Company Karachi Jan, 2016 Completed
Limited

Mari Petroleum
18 Third Party inspection of line pipe 4 inch dia. Sch 80, 50 Company Karachi Jan, 2016 Completed
Limited
Mari Petroleum
19 Third Party inspection of line pipe 2 inch dia. Sch 80, 52,110 Company Karachi Jan, 2016 Completed
Limited

Third Party Inspection of line pipe 16" OD dia. x 0.375" WT, Grade X60N
20 180 SSGC China Dec, 2015 Completed
(PSL-2) HFW Bevel End Bare Pipes

Third Party Inspection of line pipe 48" OD dia. x 0.562" WT, Grade X70 (PSL-
21 400 SSGC China Dec, 2015 Completed
2) SAWH Bevel End Bare Pipes

Mill inspection of 6 inchs dia seamless pipeline, WT 7.11 MM, SCH 40, API
22 15,000 OGDCL China Sep, 2015 Completed
5L, GR X-52, PSL-2, Coated with 3 layer polyethylene

Mill inspection of 6 inchs dia seamless pipeline, SCH 80, API 5L, GR X-52,
23 55,000 OGDCL China Sep, 2015 Completed
PSL-2, Coated with 3 layer polyethylene

Mill Inspection of Bare Line pipe dia 20" with WT 0.438", PSL2, API 5L, Grade Sui Southern
24 1,400 China Aug, 2015 Completed
X-60 Gas Company
Mill Inspection Loading & Unloading Supervision Services for Manufacturing
Sui Southern Crescent,
25 of Ms Line Pipe 42" dia x 0.688" WT, API 5L, Grade 70, PSL-2, and coating 24,000 Jun, 2015 Completed
Gas Company Karachi
inspection as per DIN 30670

Third Party inspection of 8 inch Dia seamless pipeline API 5L, GR X-52, PSL-
26 30,000 OGDCL China Jun, 2015 Completed
2, WT 8.8 MM

27 Inspection of 6 inch seamless pipeline GR: X-52, PSL-2, API 5L 40,000 OGDCL China May, 2015 Completed

Third Party Inspection of 4 & 8 Inch Seamless Pipeline, 11.13MM W.T (SCH--
28 1,000 OGDCL China Feb, 2015 Completed
120) API 5L X-52 PSL-2.

29 Steel Line Pipe 42" dia X 0.562" WT, API 5L GR X70, PSL-2 112,314 SNGPL China Dec, 2014 Completed

30 Steel Line Pipe 42" dia X 0.625" WT, API SL GR. X70. PSL-2 11,996 SNGPL China Dec, 2014 Completed
DUPLEX LINE PIPE, BARE, 8” NPS SUITABLE FOR CO2:24-25 MOLE%,
Sales &
N2: 24-25 MOLE%, TEMP: 290F, SHUT-IN PRESSURE: 4500PSI, WATER
31 800 Services China May, 2014 Completed
CHLORIDES: 16000MG/L, MATERRAIL: ASTM A790 UNS S31803, WALL
International
THICKNESS 0.5”
DUPLEX LINE PIPE, BARE, 10” NPS SUITABLE FOR CO2:24-25 MOLE%,
Sales &
N2: 24-25 MOLE%, TEMP: 290F, SHUT-IN PRESSURE: 4500PSI, WATER
32 400 Services China May, 2014 Completed
CHLORIDES: 16000MG/L, MATERRAIL: ASTM A790 UNS S31803, WALL
International
THICKNESS 0.5”

33 Third party inspection of *' & 10" dia line pipe at Bashir pipe factory 1,000 PPL Pakistan Jan, 2014 Completed

Third party inspection of 8 inch seamless line pipe, Grade X-52, Sch 40, PSL-
34 15,000 OGDCL China Jan, 2014 Completed
2, API 5L Lastest Edition and 3 layer polyethylene coating

Third party inspection of 6 inch seamless pipeline, Double Random, Grade X-


35 10,000 OGDCL China Jan, 2014 Completed
52, Sch 40, PSL-2, API 5L Lastest Edition and 3 layer polyethylene coating

Third party inspection for 3 layer Polyethylene Coating of Pipes at Crescent


36 10,000 OMV Group Pakistan Jan, 2014 Completed
Steel as per DIN 30670
Third party inspection for Line Pipe Inspection at M/s Crescent steel
37 10,000 OMV Group Karachi Oct, 2013 Completed
Nooriabad

38 Inspection of 6", 8" & 10" line pipe at Sui field 1,000 PPL Pakistan Sep, 2013 Completed

39 Line Pipe inspection for Mehar condensate Project 2,000 OMV Pakistan Sep, 2013 Completed

Third Party Inspection of 6" X 0.321” WT Carbon Steel Line Pipe of API 5L
40 2,500 PPL Pakistan Aug, 2013 Completed
Grade B (PSL-1) at Manufacturer's Facility in Lahore

41 Third Party Inspection of Pipes in China 5,000 KSB Pumps China Aug, 2013 Completed

Third Party Inspection for 6" Seamless steel line pipe, Grade:X42, 168.3mm
42 60,000 OMV Pakistan China Aug, 2013 Completed
OD×5.60mm W.T, API 5L PSL2 ( 44th Edition ) at TPCO
Third Party Inspection of Manufacturing of 16-inch Seamless steel line pipe,
43 48,500 OMV Pak China May, 2013 Completed
Grade:X52 ,406.4MM OD×18.6MM W.T API 5L 44th Edition(SPL-2)

Third Party Inspection of 6 & 8 inch ERW line pipe in China PSL 1, GR X-52,
44 SCH-40, API 5L (44th Edition ) SPL1 and Din 30670 with 3layer PE 15,000 OGDCL China Apr, 2013 Completed
Coating & Platic Protector.
Third Party Inspection of 6 inch ERW line pipe Sch-40, double random,
45 length,apl 5l GR.x-52 (PSL-1) NACE MR 0175 coated With three layer 10,000 OGDCL China Feb, 2013 Completed
polyethylene coating
Third Party Pre-Shipment Inspection Of 20" Dia pipeline API 5L GR.B / ASTM
46 400 PSO China Feb, 2013 Completed
A 53 GR.B
Mari
47 Third Party Inspection of Line Pipes at M/s Crescent steel Nooriabad 10,000 Petroleum Pakistan Feb, 2013 Completed
Company

Third party inspection of 4” ERW line pipe SCH-40,double random length,API


48 30,000 OGDCL China Feb, 2013 Completed
5L, GR. X-52 (PSL-1) coated with three layer polyethylene coating

Third party inspection of 26" dia. SAWL pipeline 660 mm X 9.53 mm API 5L
49 15,000 OGDCL China Dec, 2012 Completed
PSL-1 Grade X65,Carbon Steel , with three layer polyethylene coating

Third Party Inspection of Manufacturing of 16-inch Seamless steel line pipe,


50 40,000 OMV Pakistan China Dec, 2012 Completed
Bare as per API 5L Grade X42

Third Party Inspection of Manufacturing of 16-inch line pipes Bare API 5L


51 20,000 OMV Pakistan China Sep, 2012 Completed
Grade X42, PSL 2 (44th Edition ) , Annex E, NACE MR0175,

Third Party Inspection of Manufacturing of 06-inch line pipes Bare API 5L


52 10,000 OMV Pakistan China Aug, 2012 Completed
Grade X42, PSL 2 (44th Edition ) , Annex E, NACE MR0175,
Inspection of 4” Seamless line pipe, Double Random at Huffaz Factory
53 40,000 OGDCL Pakistan Aug, 2012 Completed
Karachi, API 5L, PSL-1, GR-X-52, with three layer polyethylene coating
Petroflo
54 Inspection of 20 inch Seamless Pipe, ASTM A333 Gr.6, ANSI B36.10, NACE, 2,000 Trading China Jul, 2012 Completed
Company

55 Mill inspection & load supervision of 16 inch dia, & PE 100 Polyethylene 3,800 SSGC Pakistan Jul, 2012 Completed

Petroflo
56 Inspection of 20 inch Seamless Pipe, ASTM A333 Gr.6, ANSI B36.10, NACE, 1,500 Trading China Apr, 2012 Completed
Company
EXPERIENCE LIST FOR THIRD PARTY INSPECTION OF LIFTING
EQUIPMENT / RACKS
Date of
Sr. # Job Description Client Location Status
Award
Yunus Textile
1 Third Party Inspection & Load Testing of Hoist 3 Ton Karachi Apr, 2018 Completed
Mills Limited

Associate
2 Third Party Inspection of Indus Hospital site Equipment’s Karachi Apr, 2018 Completed
Construction Ltd.

Welders
3 Inspection/Load test of 5 ton crane Karachi Apr, 2018 Completed
International
Hub-Pak Salt Hub,
4 Lifting Equipment Inspection and Building Stability Testing Apr, 2018 Completed
Refinery Balochistan
Glaxo
Korangi-
5 Third Party Inspection of Racks at Korangi SmithKlien Apr, 2018 Completed
Karachi
Pakistan
Glaxo
6 Third Party Rack inspection at Korangi SmithKlien Karachi Mar, 2018 Completed
Pakistan
Welder
7 Inspection of Crane at Baldia Karachi Karachi Feb, 2018 Complete
International
Engro Vopak
8 Annual inspection of lifting equipment’s for the year 2018 Karachi Feb, 2018 Complete
Teminal Limited
Yunus Textile
9 Third Party inspection Cargo lift Karachi Feb, 2018 Completed
Mills Limited
Total
10 Third Party Inspection for Tower Cranes / Transit Mixers Construction and Karachi Feb, 2018 Completed
Haris & Co. (JV).
Descon Power
11 Third Party Inspection of Full Body Harness Ghamber Feb, 2018 Completed
Solution
Third Party Inspection of Concrete Transit Mixture, Wheel Loader, Associate
12 Karachi Feb, 2018 Completed
Stationary Concert Pump & Tower Crane Construction
GlaxoSmithKlien
13 Load testing of Lactam Oral Manufacturing Equipment Karachi Feb, 2018 Completed
Limited
Associate
14 Inspection of Loading Equipment Karachi Jan, 2018 Completed
Construction
Yunus Textile
15 Third Party Inspection & Load Testing of Overhead Crane 3.2 Ton. Karachi Dec, 2017 Completed
Mills Limited
Pipelink
16 Third Party Inspection of lifting tolls / assosaries Construction Karachi Nov, 2017 Completed
(Private) Limited

Welder
17 Inspection of Crane at Baldia Karachi Karachi Nov, 2017 Complete
International
Glaxo
18 Third Party Rack inspection at Korangi SmithKline Karachi Oct, 2017 Completed
Pakistan Limited
Glaxo
19 Third party inspection of store racks and sling wire pulley SmithKline Karachi Oct, 2017 Completed
Pakistan Limited
Pipelink
20 TPI of 5 ton Crane Construction Karachi Oct, 2017 Completed
(Private) Limited
Glaxo
21 Load Testing for Winch SmithKline Karachi Oct, 2017 Completed
Pakistan Limited

22 Inspection of Cradle Machines at PSO House PSO Karachi Oct, 2017 Completed
Tri-Pack Films
23 Third Party Inspection of Lifting Test and Inspection Karachi Oct, 2017 Completed
Ltd.
Glaxo
24 Third Party Inspection of lifting equipment SmithKline SITE, Karachi Sep, 2017 Completed
Pakistan Limited
MAN Diesel &
25 Third Party Inspection contract for lifting equipment Turbo Pakistan Karachi Sep, 2017 Completed
(Private) Limited
Glaxo
26 Load Testing of Equipment required SmithKline Karachi Aug, 2017 Completed
Pakistan Limited
Artistic Fabric &
27 Inspection of Crane, Fork Lifters & Passenger Lift Garment Karachi Aug, 2017 Completed
Industries
General Tyres &
28 Inspection and calibration of two lifts of new and old Rubber Karachi Aug, 2017 Completed
Company
Glaxo
Korangi,
29 Racking Inspection at different locations SmithKline Aug, 2017 Completed
Karachi
Pakistan Ltd

30 Inspection of Lifting Gadgets MPCL Sujawal, Sindh Jul, 2017 Completed

Glaxo
31 Third Party Inspection of lifting equipment SmithKline SITE, Karachi Jul, 2017 Completed
Pakistan Limited
English Biscuit
Korangi,
32 Third Party Inspection of Cargo Lifts Manufacturer Jul, 2017 Completed
Karachi
(Pvt) Ltd
Artistic Fabric &
Korangi,
33 Inspection of Cargo Lift & Chain Hoist Garment Jul, 2017 Completed
Karachi
Industries

National Korangi,
34 Inspection/Certification of Lifting Equipment Jul, 2017 Completed
Refinery Limited Karachi
Yunus Textile
35 Third Party Inspection of Overhead Crane Karachi Jul, 2017 Completed
Mills Limited
Power
36 LEEA Inspection of Scissor Lift Islamabad Jul, 2017 Completed
Engineering
Wali Enterprises
37 Inspection & Load Testing of Concrete Lifting Trolley. (GE Grid Lahore Jul, 2017 Completed
Solutions)
Glaxo
38 Third Party Inspection of lifting equipment SmithKline SITE, Karachi Jul, 2017 Completed
Pakistan Limited
Redco Construct
39 LEEA Inspection of Tower Crane Pakistan (Pvt.) Islamabad May, 2017 Completed
Ltd.
Glaxo
40 Inspection of Pallet Racks at GSK Site SmithKline Karachi May, 2017 Completed
Pakistan Limited
Glaxo
41 Inspection of Pallet Racks in New Ambient store Non-Lactam SmithKline Karachi Apr, 2017 Completed
Pakistan Limited
Associated
42 Third Party Inspection for Tower Crane Constructors Karachi Apr, 2017 Completed
Limited

43 LEEA Inspection & Certification of Lifting Equipment Cougar Islamabad Mar, 2017 Completed
English Biscuit
Korangi,
44 Third Party Inspection of Cargo Lifts Manufacturer Jul, 2017 Completed
Karachi
(Pvt) Ltd

45 Third Party Inspection of Lifting Equipment POL Islamabad Mar, 2017 Completed

Glaxo
Third Party Inspection for pallet racks in new ambient store non
46 SmithKline Karachi Mar, 2017 Completed
lactam
Pakistan Ltd

GlaxoSmithKline West Warf


47 As Build Drawings development for Piping Network Across the Site. Feb, 2017 Completed
Pakistan Ltd. Karachi
Associated
48 Third Party Inspection for Tower Crane Constructors Karachi Feb, 2017 Completed
Limited
Inspection and load testing of 8 ton Tadano crane at PS-3 & 11 ton Kato Karachi &
49 PARCO Feb. 2017 Completed
crane at PS-1 Shikarpur
Associated
50 Third Party Inspection for Tower Crane Constructors Karachi Jan, 2017 Completed
Limited
Third Party annual inspection & Certification of lifting gears, gears &
51 OMV Pakistan All Fields Dec, 2016 Completed
Torque wrenches
Power
52 LEEA Inspection of Scissor Lift Islamabad Dec, 2016 Completed
Engineering
Associated
Third Party Inspection for Transit Mixer, Mobile Concrete Pump &
53 Constructors Karachi Dec, 2016 Completed
Wheel Loader.
Limited
Glaxo
54 Racking Inspection at different locations SmithKline Karachi Dec, 2016 Completed
Pakistan Ltd
Engro Vopak
55 Re Certification harnesses & lifting accessories lifting contract 2016 Karachi Dec, 2016 Completed
Terminal Ltd

Glaxo
56 Third Party Inspection of Store Racks SmithKline Karachi Nov, 2016 Completed
Pakistan Ltd
China National
Electric
57 Third Party Inspection of Gantry Crane Muzaffarabad Nov, 2016 Completed
Engineering and
Co., Ltd
Glaxo
58 Third Party Inspecction of Pallet Racks SmithKline Karachi Nov, 2016 Completed
Pakistan Ltd
Glaxo
Third Party Inspection & Load Testing of Passenger Lifts & Cargo
59 SmithKline Karachi Oct, 2016 Completed
Lifts
Pakistan Ltd
Glaxo
60 Racking Inspection at different locations SmithKline Karachi Oct, 2016 Completed
Pakistan Ltd
Pakistan
61 Annual inspection & Certification of Hoisting Equipment Karachi Oct, 2016 Completed
Refinery Limited
Yunus Textile
62 Third Party Inspection of Cargo Lifts Karachi Oct, 2016 Completed
Mill Limited
Pakistan
63 Certification of Hoisting Equipment Karachi Oct, 2016 Completed
Refinery Limited

64 Third Party Inspection of LEEA Inspection of Equipment Kuoung Dong Muzaffarabad Oct, 2016 Completed

Yunus Textile
65 Third Party Inspection of Cargo Lifts Karachi Oct, 2016 Completed
Mills Limited
Glaxo
66 Third Party Load Testing of Pharma Lifting Equipments SmithKline Karachi Sep, 2016 Completed
Pakistan Ltd
Third Party Bi-Annual Inspection Contract of Cargo Lift of Spinning Yunus Textile
67 Karachi Sep, 2016 Completed
Unit-1,3 & 4 Mills Limited
Yunus Textile
68 Third Party Bi-Annual Inspection Contract of Cargo Lift of YTM-3 Karachi Sep, 2016 Completed
Mills Limited
Yunus Textile
69 Third Party Bi-Annual Inspection Contract of Cargo Lift of YTM-2 Karachi Sep, 2016 Completed
Mills Limited
Yunus Textile
70 Third Party Bi-Annual Inspection Contract of Cargo Lift of YTM-7 Karachi Sep, 2016 Completed
Mills Limited
Third Party Bi-Annual Inspection Contract of Cargo Lift of Yunus Textile
71 Karachi Sep, 2016 Completed
Processing Area Mills Limited

72 Third Party Inspection of LEEA Inspection of Equipment PEPSICO Hattar Sep, 2016 Completed

Third Party Bi-Annual Inspection Contract of Cargo Lift of Stitching Yunus Textile
73 Karachi Sep, 2016 Completed
Unit-1 Mills Limited

74 Third Party Certification of Lifting Equipments K-Electric Karachi Aug, 2016 Completed
CNEEC
75 Third Party Inspection of Bridge Crane (Pakistan Muzaffarabad June, 2016 Completed
Patrind
CNEECHPP)
76 LEEA Inspection and Certification of Gantry Crane (Pakistan Muzaffarabad May, 2016 Completed
Patrind HPP)
GlaxoSmithKline
77 Inspection & Load Testing of Various lifting equipment Karachi May, 2016 Completed
Pakistan Ltd.
Dawlance
78 Inspection & Load Testing of Fork Lift Karachi Apr, 2016 Completed
Pakistan
Engro Vopak
79 Lifting Equipments Inspection contract for the Year 2016 Karachi Mar, 2016 Completed
Terminal Ltd.
Third Party Annual Inspection / Certification of Overhead Cranes & Lifting
80 Exterran Jamshoro Feb, 2016 Completed
Gears
CNEEC
81 LEEA Inspection-Gantry Crane (Pakistan Muzaffarabad Feb, 2016 Completed
Patrind HPP)

82 LEEA Inspection SNGPL Islamabad Feb, 2016 Completed

GlaxoSmithKline
83 Inspection of Pallet Rackes Karachi Feb, 2016 Completed
Pakistan Ltd.
Inspection and load testing of 8 ton Tadano crane at PS-3 & 11 ton Kato Karachi &
84 PARCO Jan. 2016 Completed
crane at PS-1 Shikarpur
Dawlance
85 Third Party Inspection of Fork Lifter Karachi Jan, 2016 Completed
Pakistan

86 Third Party Inspection of Cargo Lifts CHT (PVT) LTD Pakistan Jan, 2016 Completed

Royal
87 LEEA Inspection of Tower Crane Pakistan Dec, 2015 Completed
Incorporation.
CNEEC (Pakistan
88 LEEA Inspection-Gantry Crane Patrind)
Pakistan Dec, 2015 Completed

89 Third Party Inspection of Cargo Lifts Hira Terry Mills Pakistan Dec, 2015 Completed

90 Third Party Inspection of Lifting Equipment ITC Logistoics Pakistan Nov, 2015 Completed

Nordex Pakistan
91 Third Party Inspection of Lifting Tools Pakistan Nov, 2015 Completed
(PVT) Ltd.

92 Third Party Inspection of Cargo Lifts Hira Terry Mills Pakistan Nov, 2015 Completed

93 Third Party inspection & Certification of 5 Ton Overhead Crane Aeroroyce Karachi Nov, 2015 Completed

94 Lifting equipment inspection during ATA 2015 OGDCL Punjab Nov, 2015 Completed
GlaxoSmithKline
95 Inspection Required for Load Bearing Capacity of Engineering Store Racks Karachi Nov, 2015 Completed
Pakistan Ltd.

96 Third Party LEEA inspection of Equipment at CHANDA KPK Region OGDCL KPK Nov, 2015 Completed

Fauji Oil
97 Third Party Verification Services of Load Hook for Ship Karachi Nov, 2015 Completed
Terminal
Nordex Pakistan
98 Inspection of Lifting Tools Pakistan Oct, 2015 Completed
(PVT) Ltd.
Dadex Eternit
99 Inspection and Load Test of Chain Block & Hoist Crane Lahore Oct, 2015 Completed
Limited
Dadex Eternit
100 Inspection and Load Test of Cranes & PVC Plant Karachi Oct, 2015 Completed
Limited
Associated
101 Tower Crane Inspection 2.5 Ton tip Load Constructors Karachi Sep, 2015 Completed
Limited
102 Third Party Inspection of Fork Lifter Exterran Limited Karachi Aug, 2015 Completed

OGDCL Rig
103 Third Party Inspection of Crane Hilong Group Aug, 2015 Completed
site, Soghri
OGDCL Rig
104 Third Party Inspection of Wheel Loader Hilong Group Aug, 2015 Completed
site, Soghri

105 Inspection of Racks as per SEEMA Guidelines Wyeth Pakistan Karachi Aug, 2015 Completed

106 LEEA EQUIPMENT INSPECTION NASHPA OIL & GAS FIELD OGDCL Punjab Aug, 2015 Completed

107 Inspection of Lifting Equipments of Plant and Warehouses Wyeth Pakistan Karachi Aug, 2015 Completed

108 Third Party Inspection of Store Racks as per SEEMA Guidelines Pfizer Karachi Aug, 2015 Completed
109 Re- Certification of Fork Lifter and Stacker Pfizer Karachi Aug, 2015 Completed

GlaxoSmithKline
110 Third Party Inspection of Store Racks as per SEEMA Guidelines Karachi Jul, 2015 Completed
Pakistan Ltd.

111 Re-inspection of Lifting Equipment at Qadir pur OGDCL Sindh Jul, 2015 Completed

GlaxoSmithKline
112 Third Party Inspection of Racks as per SEEMA Guidelines Karachi Jun, 2015 Completed
Pakistan Ltd.

113 Third Party Inspection of Lifting accessories of 40 Feet Vehicle ITC Logistics Pakistan Jun, 2015 Completed

114 Lifting Inspection of Chain Hoist Elite Engineering Pakistan May, 2015 Completed

Dawlance
115 Third Party Inspection of Cargo Lifts at DPL-II Karachi May, 2015 Completed
Pakistan

116 Third Party Man Basket Certification Exterran Limited Jamshoro May, 2015 Completed

117 TPI of Fork Lifters and Cargo Lifts Azgard-9 Pakistan May, 2015 Completed

Associated
118 Fitness Inspection of Concrete Transit Mixture & Tower Crane Karachi May, 2015 Completed
Constructors Ltd
Dawlance
119 Third Party inspection of Cargo Lifts Karachi May, 2015 Completed
Pakistan
GlaxoSmithKline
120 Third party inspection of racks at GSK’s West Wharf Karachi Apr, 2015 Completed
Pakistan Ltd.

121 Third Party Inspection of Overhead Cranes and Crane Truck SNGPL Pakistan Apr, 2015 Completed
Engro Vopak
122 Lifting Equipments Inspection contract for the Year 2015 Karachi Mar, 2015 Completed
Terminal Ltd.

123 TPI Of Overhead Cranes And Truck Cranes SNGPL Pakistan Mar, 2015 Completed

GlaxoSmithKline
124 Third Party Rack Inspection at Korangi Site Karachi Feb, 2015 Completed
Pakistan Ltd.
Third Party Load Testing and Physical Inspection of Overhead Cranes and
125 SNGPL Pakistan Feb, 2015 Completed
Truck Cranes
ICD Engineering
126 Third Party Certification of Reach Stackers Pakistan Feb, 2015 Completed
Pakistan
Qadirpur,
127 Lifting Equipment Inspection OGDCL Jan, 2015 Completed
Sindh Region
Third Party Inspection and certification of lifting gears and earth moving
128 OMV Pakistan Sawan Jan, 2015 Completed
Equipment

Nandipur
129 Lifting equipment inspection at Dakhni field OGDCL Nov, 2014 Completed
Panjab

Nandipur
130 Lifting equipment inspection at Nandipur field OGDCL Nov, 2014 Completed
Panjab

131 Inspection and Testing of Overhead Crane PEL Pakistan Oct, 2014 Completed

132 LEEA Inspection and Certification of Equipment POL Pakistan Oct, 2014 Completed

Pakistan Patrind
133 LEEA Inspection and Certification of Equipment Hydropower Pakistan Sep, 2014 Completed
Project, MZD.
Exterran
134 Third Party inspection & Certification of Lifting Gears Jamshoro Sep, 2014 Completed
Services (UK)

135 Third Party inspection of 08 no. of Lifts OGDCL Islamabad Aug, 2014 Completed

UCH
136 lifting equipment inspections at UCH field OGDCL Aug, 2014 Completed
Baluchistan

137 LEEA inspection & Certification of Equipment PEPSICO Pakistan Aug, 2014 Completed

GlaxoSmithKline
138 Mobile Racks Inspection at GSK West Warf Site Karachi Jul, 2014 Completed
Pakistan Ltd.
TOC
139 Lifting Equipment Inspection OGDCL Jul, 2014 Completed
Sindh

140 Re- Certification of Fork Lifter Pfizer Karachi Jul, 2014 Completed

GlaxoSmithKline
141 Third Party Inspection of Racks at West wharf site Karachi Jun, 2014 Completed
Pakistan Ltd.
GlaxoSmithKline
142 Third Party Inspection of Racks at West wharf site Karachi Jun, 2014 Completed
Pakistan Ltd.

143 Inspection Of Racks Wyeth Pakistan Karachi Apr, 2014 Completed

144 Inspection Of Lifting Equipment’s Wyeth Pakistan Karachi Apr, 2014 Completed

145 Inspection of Racks / Shelves Pfizer Karachi Apr, 2014 Completed

146 Inspection of Crane Inspection Sinohydro Group Pakistan Feb, 2014 Completed
Qadirpur,
147 Lifting Equipment Inspection OGDCL Jan, 2014 Completed
Sindh Region
Sambu
148 Inspection of Gantry Cranes Pakistan Jan, 2014 Completed
Construction
Third Party inspection of 30 Tons Hydraulic Cranes along with tool /
149 OGDCL China Dec, 2013 Completed
accessories

150 Inspection / testing of lifting equipment Dalda Foods Karachi Oct, 2013 Completed

Pakistan
151 Inspection of Mobile Crane & Hoist Pakistan Sept, 2013 Completed
Oilfields
Sambu
152 Tower Crane Inspection Pakistan Aug, 2013 Completed
Construction
Pakistan
153 Chain Block Inspection Pakistan Aug, 2013 Completed
Oilfields

154 Mobile Crane Inspection Wazir Crane Pakistan Jul, 2013 Completed

155 Mobile Crane Inspection Arabia House Pakistan Jul, 2013 Completed

156 Lifting Equipments Inspection PEPSICO Pakistan Jul, 2013 Completed

157 Lifting Equipment Inspection & Operator Training At Bobi Oil Complex OGDCL Pakistan May, 2013 Completed

158 Inspection of cranes / lifting equipment SSGC Pakistan Feb, 2013 Completed

Pakistan
159 Overhead Crane Inspection Pakistan Feb, 2013 Completed
Oilfields Ltd.
160 Third Party Inspection and Load Testing of 33 Cranes SNGPL Pakistan Jan, 2013 Completed

Dadex Eternit
161 Inspection and certification of Overhead crane at KF Karachi Oct, 2012 Completed
Limited
Dadex Eternit
162 Inspection and certification of Overhead crane at Sunder Estate Lahore Lahore Sep, 2012 Completed
Limited
Dadex Eternit
163 Inspection and certification of Overhead crane at HF and LF Pakistan Jun, 2012 Completed
Limited
Dadex Eternit Hyderabad &
164 Inspection Of Overhead Cranes At Hyderabad & Lahore May, 2012 Completed
Limited Lahore
DADEX Eternit
165 Inspection & Load Test Of Cranes Pm2 Repair & Maintenance Of Machines Karachi Mar, 12 Completed
Limited

166 Inspection, Testing & Certification of lifting equipment KESC Korangi Creek Dec, 2012 Completed

MEC Khairpur -
167 Inspection of Lifting equipments Oct, 2011 Completed
Engineering SINDH
Shikarpur –
168 Inspection of Lifting equipments SSGC Oct, 2011 Completed
SINDH

169 Inspection of Lifting equipments SSGC Karachi Oct, 2011 Completed

Inspection and Testing of seven Over head Cranes having different


170 DADEX Karachi Sep, 2011 Completed
capacities, at MANGHOPIR site Karachi
Inspection and Testing of Over head Cranes having capacities, 1 ton and 2 Lahore &
171 DADEX May, 2011 Completed
ton capacity Hyderabad

172 Inspection, testing and certification of Lifting Gears ENI Pakistan BHIT Sindh Jun, 2010 Completed
173 Inspection, Load testing and Certification of Hydraulic Mobile Crane ENI Pakistan BHIT Sindh Sep, 2010 Completed
EXPERIENCE LIST FOR QHSE / ISO / HSSE / NDT / LEEA TRAININGS &
RISK ASSESSMENT
Date of
Sr. # Job Description Client Location Status
Award

1 ASNT Level-I UT Training & Certification PPL Karachi Mar, 2018 In Progress

Delta Control
2 HSE & ISO Trainings Automation Co. Karachi Nov, 2017 In Progress
(Pvt) Ltd.

3 NDT MPI & DPT Level-II Training MOL Islamabad Apr, 2017 Completed

4 Training for Fork Lifter Operator SNGPL Islamabad Sep, 2016 Completed

Pakistan
Training (In-House) on Awareness & Internal Auditing to Quality
5 Meterological Karachi Sep, 2016 Completed
Management System ISO 9001:2015
Department

6 UT, MT & PT Training and Certification Daewoo E&C Pakistan Nov, 2015 Completed

7 UT, MT & PT Training and Certification Misc. Pakistan Nov, 2015 Completed

8 HSE Training at Drilling Rig TCPDC Pakistan Oct, 2015 Completed

Plastech
9 Training for ISO 22000 (FSMS) & ISO 140041 (EMS) Pakistan Oct, 2015 Completed
Autosafe
Hilong Oil
10 HSE Trainings for First Aid, Fire Fighting & H2S for HL 05 & HL 21 Pakistan Sep, 2015 Completed
Service & Eng
Mari Petroleum Sujawal Gas &
11 Services of Fork Lift Training & Certification Condensate Aug, 2015 Completed
Company Limited Field

Guangdong
12 Magnatic Partical Inspection Training Yuantian Pakistan Jun, 2015 Completed
Engineering
Tianjin China
HSSE Trainings at TCPDC Drilling location DFXK-650 and at DFXK- Sindh,
13 Petroleum May, 2015 Completed
1000 Pakistan
Drilling Co. ,Ltd

14 Training for heavy machinery operators SNGPL Pakistan May, 2015 Completed

Guangdong
15 Panetant Testing Training Yuantian Pakistan Apr, 2015 Completed
Engineering
Mehran
University of Sindh,
16 Ultrasonic Testing Training Apr, 2015 Completed
Engineering and Pakistan
Technology

Guangdong
17 Magnatic Partical Inspection Training Yuantian Pakistan Apr, 2015 Completed
Engineering
EFU General Sindh,
18 Risk Review Assessment at Various Locations Mar, 2015 Completed
Insurance Pakistan
Hilong Oil Sindh,
19 Fire risk Assessment of Rig HL5 Mar, 2015 Completed
Service & Eng Pakistan
20 Training For Fork Lifter And Scaffolding Operators SNGPL Pakistan Mar, 2015 Completed
GE Bhikhi Power
21 Training For Scaffolding Operators Pakistan Mar, 2015 Completed
Plant
GE Bhikhi Power
22 Training of Fork Lifter Operator Pakistan Mar, 2015 Completed
Plant
Hilong Oil Sindh,
23 Various QHSE Trainigs for year 2015 Feb, 2015 Completed
Service & Eng Pakistan
Third Party Assessment for Fire Fighting and Control System At Punjab,
24 MOL Pakistan Jan, 2015 Completed
MOL Production Facilities Pakistan
Punjab,
25 NDT Training for UT, PT, MT ARL Jan, 2015 Completed
Pakistan
Punjab,
26 NDT Training for UT, PT, MT Sambu JV Dec, 2014 Completed
Pakistan
27 H2S Training POL Pakistan Oct, 2014 Completed

Plastech
28 QMS Training for ISO 9001:2008 Autosafe (Pvt) Pakistan Oct, 2014 Completed
Ltd
SYNTRON
29 Training of Fire Fighting Pakistan Sep, 2014 Completed
Limited
30 Training on Fork Lift Operation SNGPL Pakistan Apr, 2014 Completed

31 Fire Fighting, First Aid & Rescue Training PEPSICO Pakistan Feb, 2014 Completed

32 ISO 9001 Awareness Training Royal Consultant Pakistan Feb, 2014 Completed

33 ASNT Radiographic Testing Training Engro Fertilizer Pakistan Feb, 2014 Completed

34 ASNT Ultrasonic Testing Training MOL Pakistan Pakistan Jan, 2014 Completed

Mehran
35 ASNT NDT Training Pakistan Dec, 2013 Completed
University
36 Radiographic Testing Training MOL Pakistan Pakistan Dec, 2013 Completed
37 NDT Awareness Training Weatherford Pakistan Nov, 2013 Completed

38 Phased Array Training Western Group Pakistan Oct, 2013 Completed


Mehran
39 NDT Training in Mehran University Pakistan Sep, 2013 Completed
University
40 Development of Safety Professional Training NRTC Pakistan Jul, 2013 Completed

41 Fire Fighting, First Aid & Rescue Training NRTC Pakistan Jul, 2013 Completed

42 ASNT UT + RT Training Engro Fertilizer Pakistan Jul, 2013 Completed

43 ASNT PT & MT Training VISP Islamabad Pakistan Jun, 2013 Completed

44 Training & Evaluation / Assessment of Crane Operators OGDCL Pakistan May,2013 Completed

45 ASNT UT Training VISP Islamabad Pakistan Apr, 2013 Completed

46 Rig Safety Officers Training ENI Pakistan Pakistan Apr, 2013 Completed

47 First Aid, Fire Safety & Rescue Training PEPSICO Pakistan Jan, 2013 Completed

48 API-570, 510. 653 AND API 580- RBI AWARENESS Trainings PSO Pakistan Jan, 2013 Completed

49 Development of safety Professionals Training VISP Islamabad Pakistan Jan, 2013 Completed

50 ASNT Level-II Certification/ Training for UT OMV Pakistan Pakistan Oct, 2012 Completed
Rahim yar
51 NDT Training for RT Fatima Fertilizers Oct, 2012 Completed
Khan
Internal Auditor Training programme (Quality management System) Karachi
52 Karachi Jan, 2012 Completed
for ISO 9001:2008 Standard university
One day “awareness training” of ISO 14001 standard. Conducted in
53 PSO Karachi Sep, 2011 Completed
Velosi Karachi office

Conducted Radiographic Interpretation Course Level – II, at SNGTI


54 SNGTI Lahore May, 2011 Completed
Lahore

ISO Awareness Training 9001:2008 Standards is to be carried out at


55 SSGC Pakistan Jan, 2011 Completed
SSGC
EXPERIENCE LIST FOR HAZOP & SIL STUDY
Date of
Sr. # Job Description Client Location Status
Award
Safety Integrity level assessment for our Ammonia and LPG Unilever Pakistan
1 Karachi Apr, 2018 In Progress
circuits. Limited
Glaxo SmithKline
2 Root cause failure analysis study of transportation vessel Karachi Nov, 2017 Completed
Pakistan Limited
Glaxo SmithKline
3 SIL Study Re-Evaluation for Boilers (3 Nos.) Karachi Nov, 2017 Completed
Pakistan Ltd.

Consultancy Services for Hazard and Operability Study (HAZOP) for Pakistan
4 All Fields Mar, 2017 Completed
PPL’s existing and new Process Plants for a period of three Years Petroleum Ltd

Glaxo SmithKline
5 SIL Study for Boilers Karachi Jan, 2017 Completed
Pakistan Ltd.

Hazop study at PPL Head Office for Kandhkot Production Pakistan Sindh,
6 Dec, 2016 Completed
Enhancement Project Petroleum Ltd Pakistan

HAZOP Study for Kandhkot Production Enhancement Project thru Pakistan Sindh,
7 Sep, 2016 Completed
HRL Equipment Relocation Petroleum Ltd Pakistan

Enlistment for HAZOP for all PPL existing and newly constructed Pakistan
8 Pakistan Aug, 2016 Completed
fields. Petroleum Ltd

Pakistan Sindh,
9 HAZOP Study at PPL Gambat Field May, 2016 Completed
Petroleum Ltd Pakistan
Review of Liquid Transmission System from SFGCS to Flash
Pakistan Sindh,
10 Vessel, Open Pit, Condensate Settling Tanks And Effluent Disposal Jul, 2015 Completed
Petroleum Ltd Pakistan
Well
Hazop Study of ESD Valves at Discharge Headers at SFGCS and Pakistan Sindh,
11 May, 2015 Completed
Inlet Headers of SPP, Sui Field, Baluchistan. Petroleum Ltd Pakistan

Hazop Study for Front End Compressor Packages & Associated Dewan Petroleum
12 Pakistan Apr. 2012 Completed
Piping Scope of work (Pvt) Ltd.

13 Reliability Centered Maintenance (RCM) Study at BHIT Field ENI Pakistan BHIT Sindh Jun, 2010 Completed
EXPERIENCE LIST FOR QHSE / TECHNICAL AUDITS
Date of
Sr. # Job Description Client Location Status
Award
Call-out Agreement for Health, Safety & Environment
1 (HSE) Monitoring Consultant for Exploration for the PPL Karachi Feb, 2018 In Progress
period of 3 years
Delta Control
2 HSE Certification of Company Karachi Dec, 2016 In Progress
Automation Co
Third Party HSEQ and House Keeping Audit at PARCO
3 PARCO Pakistan Sep, 2016 Completed
and PAPCO stations and terminals.
Audit / survey design & supervision for up gradation
State Life All Over
4 of fire fighting system in state life buildings all over Aug, 2016 Completed
Pakistan Pakistan
Pakistan

5 Third party Audit of CP System Karachi to Mehmood kot PARCO Pakistan Jun, 2016 Completed

HSE Monitoring Consultant for Exploration, Drilling, Plant


Installation and Pipeline Laying Project Activities in PPL All Over
6 PPL Sep, 2015 On-Going
Exploration Blocks I Mining Leases on Call-Out basis for Pakistan
Three Years
Third Party HSEQ & Housekeeping Audit at 09 PARCO &
7 PARCO Pakistan Aug, 2015 Completed
PAPCO Stations & Terminals

Third Party HSEQ & Housekeeping Audit at 09 PARCO &


8 PARCO Pakistan Feb, 2015 Completed
PAPCO Stations & Terminals
Mari Gas
9 Third Party Rig Audit Services for MGCL Rig-3 Pakistan Jan, 2015 Completed
Company Ltd.

10 Audit on behalf of National Accreditation Council (PNAC) Inspectest Pakistan Apr, 2015 Completed
Third Party Assessment for Fire Fighting and Control
11 MOL Pakistan Jan, 2015 Completed
System At MOl Production Facilities
Mari Gas
12 Third Party Rig Audit Services, Rig-1 Pakistan Oct, 2014 Completed
Company Ltd.
TPI of Work Facility in Faisalabad & Islamabad for
13 Refurbishment / Repair of HP Gas Turbine Rotor for Frame PPL Pakistan Aug, 2014 Completed
1&3

14 Provision of Drill Rig Audit / Inspection Services KUFPEC Pakistan Aug, 2014 Completed

15 Rig Audit Services MOL Pakistan May, 2014 Completed

Nuricon Union
16 Electrical Safety Audit of Mud logging Unit Pakistan May, 2014 Completed
Pte. Ltd

17 Third Party Rig Audit Mari Petroleum Pakistan Jun, 2013 Completed

Third Party Inspection of 02 Nos. of Drilling Rigs 2000 HP in


18 OGDCL China Apr, 2013 Completed
China

Third party inspection / Audit of Turbine Repair Facility in


19 PPL Pakistan Jan, 2013 Completed
Islamabad

20 Third party Audit of CP System Karachi to Mehmood kot PARCO Pakistan Jun, 2012 Completed

21 API Audit Inspection Of Pipe Factory in Lahore SSGC Lahore May, 2012 Completed

22 Third Party Price Audit for Line Pipe Supply ISGS Worldwide Dec, 2012 Completed
EXPERIENCE LIST FOR MAN-POWER SUPPLY (SKILLED & UN-SKILLED)

Nos. of Contract Date of


Sr. # Job Description Client Location Status
Persons Duration Award

1 Provision of HSE Monitors at PPL various Fields Numerious PPL 1,000 Days Various Mar, 2018 In-Progress

Sui,
2 Provision of Non-API inspector at Sui Field 1 PPL 15 Days Mar, 2018 Completed
Balochistan
Services required for third party inspection of Fin Fan Cooler, E-
3 110, fabrication job by API-510 inspector as per Quality inspection 2 PPL 30 Days Lahore Nov, 2017 Completed
plan, at contractor’s workshop

4 Provision NDT Personnel for annual turn around 136 FFBL 1 Year Karachi Nov, 2017 Completed

Third Party Surveillance activities in construction of 3 ton Boiler at


5 1 PRL 120 Days Lahore Nov, 2017 Completed
DDFC site, Lahore
Mechanical Integrity Assessment of Rehmat Gas Plant
6 3 PPL 60 Days Rehmat Fields Oct, 2017 Completed
(RGP) static equipment & piping (Phase-1)

7 Provision of API 510/570 Inspector for PSV Testing 1 PPL 14 Days Lahore Jul, 2017 Completed
Provision of API 510 pressure vessel inspector at Mazarani Gas
8 1 PPL 03 Days Gambat Field Mar, 2017 Completed
Field
9 Recruitment / Hiring of MD or CEO Positions 1 SSGC LPG 3 Years Karachi Mar, 2017 Completed
Recruitment / Hiring of HR manpower of different Grade and
10 12 SSGC LPG 3 Years Karachi Mar, 2017 Completed
Positions through Pre-Qualified Recruitment firms
Recruitment / Hiring of HR manpower of different Grade and
11 12 SSGC LPG 3 Years Karachi Sep, 2016 Completed
Positions through Pre-Qualified Recruitment firms
12 Provision API-510 Inspector for NII 2 PPL 2 Months Adhi Field Feb, 2017 Completed
13 Provision NDT Personnel for annual turn around 12 FFBL 1 Year Karachi Dec, 2016 Completed

Recruitment / Hiring of HR manpower of different Grade and


14 4 SSGC LPG 3 Years Karachi Sep, 2016 Completed
Positions through Pre-Qualified Recruitment firms

Provision of Draft man/AutoCAD operation for development of 49


15 4 PPL - Karachi Mar, 2016 Completed
Nos. of Engineering Drawings

Recruitment / Hiring of HR manpower of different Grade and


16 8 SSGC LPG 3 Years Karachi Jan, 2016 Completed
Positions through Pre-Qualified Recruitment firms
Provision of QA/QC Inspector for Supervision of Surveillance
17 Activities in Construction of 40 Ton Boiler at Descon LMW Site, 1 PRL 90 Days Lahore Jan, 2016 Completed
Lahore
Provision of QA/QC Inspector for Third Party Quality Control
18 1 PETROSIN 10 Days Pakistan Jan, 2016 Completed
Services

19 Pre-Qualification I Enlistment as Firm for Recruitment agencies on Call Basis SSGC LPG 3 Years Karachi Dec, 2016 Pre-Qualified

Pre-qualification of Third Party Contractors for Providin2 Sui Southeren


Sindh &
20 Manpower For Project & Construction Department (Skilled & Un- 800-1,800 Gas Company 3 Years Nov, 2015 Pre-Qualified
Balochistan
Skilled) Ltd
Provision of Inspection Engineer against Call Out Agreement No.
21 4600000990 - Repairing / Coating of Shell of Heat Exchanger at 1 PPL 30 Days Balochistan Oct, 2015 Completed
Sui PP
Hiring of API-570 Inspector for assessment of 04 Nos. Piping loop
22 inspection scope at Sui Purification Plant as per Call Out 1 PPL 10 Days Balochistan Oct, 2015 Completed
Agreement No. 4600001037
Provision of Man Power for Data Entry and Analysis of Package
23 3 OGDCL 30 Days KPK Apr, 2015 Completed
No 5 & 6
Provision of Man Power for Data Entry and Analysis of Package
24 3 OGDCL 22 Days KPK Jan, 2015 Completed
No 5 & 6
Provision of Man Power for Data Entry and Analysis of Package
25 3 OGDCL 15 Days KPK Dec, 2014 Completed
No 5 & 6

26 Provision of API 510 / 570 Certified Inspector for PSV Testing 2 PPL 6 Days Adhi Field Sep, 2014 Completed

Data Collection for RBI of Qadirpur field, data entry and and
27 2 OGDCL 10 Days Sindh Jul, 2014 Completed
analysis (package-1)

Data Collection for RBI of Qadirpur field, data entry and and
28 2 OGDCL 10 Days Sindh Jul, 2014 Completed
analysis (package-2)

Review of basic design data, Operating parameters, Material


29 specification, entry of data into software and analysis of all 6 OGDCL 15 Days Sindh Jul, 2014 Completed
equipment of all plants / processing unit (package-3)

Identifying, preparation and design of corrosion loops of all


30 4 OGDCL 15 Days Sindh Jul, 2014 Completed
pipelines circuits and equipment of all plants. (package-4)
Data entry into software and analysis of previous inspection
31 history including failure & replacement of all pipelines, equipment 4 OGDCL 15 Days Sindh Jul, 2014 Completed
of all plants. (package-5)
Polish Oil &
32 Provision of inspector for Third Party Inspection Services Call out Basis 1 Year All over World Mar, 2014 Completed
Gas Company
Provision of API 510/570 for witness of testing of PSV at Adhi
33 2 PPL 6 Days Adhi Field Sep, 2013 Completed
Field, Islamabad
Third Party Inspection contract for PPL Operated Fields And
34 Call out Basis PPL 3 Years Pakistan Dec, 2012 Completed
Project Site
Provision of inspector of Methanol Injection packages at Descon
35 2 OGDCL 30 Days Lahore Dec, 2012 Completed
Workshop Lahore
Provision of inspector during fabrication of Slug Catcher at Descon
36 2 OMV Pakistan 60 Days Lahore Dec, 2012 Completed
workshop Lahore

Provision of Inspector required for wellhead gas cooler (natural


37 2 OMV Pakistan 30 Days Pakistan Oct, 2012 Completed
draft) job
Provision of Inspector Stage Inspection of Tube Bundles at Lahore,
38 2 PPL 30 Days Oct, 2012 Completed
Descon workshop Lahore Rawalpindi
Provision of Inspector required to review WQT steel structure at
39 2 OMV Pakistan 30 Days Pakistan Oct, 2012 Completed
sunder estate Lahore

40 Providing the services of NDT specialist (Level – III) PNAC 10 Days Pakistan Feb, 2011 Completed

Mari
41 Third Party Pre-Shipment Inspection Contract Call Out Basis Petroleum 1 Year All Over World Jul, 2015 Completed
Company
Provision of Third Party Inspectors for Pre-Shipment Inspection of
42 Call Out Basis SSGC 3 years All Over World Oct, 2014 Completed
Material
Mari
Provision of man-power for inspection of Metering Skid, Pipe Lines
43 Call Out Basis Petroleum 1 Year All Over World Aug, 2014 Completed
& Separator at Shujal 1
Company
Mehar Gas
44 Provision of Piping Designer Services 3 OMV Pakistan - May, 2013 Completed
Field
Provision of Man-Power (Inspector) for Worldwide Pre-Shipment
45 Call Out Basis OMV Pakistan 2 Years All Over World Jun, 2013 Completed
Inspection

Provision of Third Party Inspectors for Pre-Shipment Inspection of


46 Call Out Basis SNGPL 5 Years All Over World Jul, 2012 Completed
Material, Machinery, Equipment’s and Steel Lines Pipe Etc.
EXPERIENCE LIST FOR RISK BASED INSPECTION
Date of
Sr. # Job Description Client Location Status
Award

1 Risk Based Inspection at West Wharf Plant-Karachi GSK Pakistan 2016 Completed

2 Risk Based Inspection at Sui Gas Field PPL Pakistan 2016 Completed

3 Risk Based Inspection at Mela Oil Field OGDCL Pakistan 2015 Completed

4 Risk Based Inspection at Neshpa Oil Field OGDCL Pakistan 2015 Completed

5 Risk Based Inspection at Qadirpur Gas Field OGDCL Pakistan 2014 Completed

6 Risk Based Inspection at Chanda Oil Field OGDCL Pakistan 2013 Completed
EXPERIENCE WITH PHARMACEUTICAL
Date of
Sr. # Job Description Client Location Status
Award
Services of Non Destructive Testing on Glaxo SmithKline
1 SITE Karachi Apr, 2018 In Progress
blenders Pakistan Limited

GlaxoSmithKline
2 Third Party Inspection of Racks at Korangi Korangi-Karachi Apr, 2018 Completed
Pakistan Ltd.
GlaxoSmithKline
3 Gap Analysis (QMS-9001) Karachi Dec, 2017 In Progress
Pakistan Ltd.
GlaxoSmithKline
4 SIL Study Re-Evaluation for Boilers (3 Nos.) Karachi Nov, 2017 In-Progress
Pakistan Ltd.

Root cause failure analysis study of Glaxo SmithKline


5 Karachi Nov, 2017 Completed
transportation vessel Pakistan Limited

Third party inspection of store racks and GlaxoSmithKline


6 Karachi Oct, 2017 Completed
sling wire pulley Pakistan Ltd.

GlaxoSmithKline
7 Load Testing for Winch Karachi Oct, 2017 Completed
Pakistan Ltd.

GlaxoSmithKline
8 Third Party Inspection of lifting equipment SITE, Karachi Sep, 2017 Completed
Pakistan Ltd.

GlaxoSmithKline
9 Load Testing of Equipment required Karachi Aug, 2017 Completed
Pakistan Ltd.
GlaxoSmithKline
10 Racking Inspection at different locations Korangi, Karachi Aug, 2017 Completed
Pakistan Ltd.
GlaxoSmithKline
11 Third Party Inspection of lifting equipment SITE, Karachi Jul, 2017 Completed
Pakistan Ltd.

PMI and UT gauging for the pipe-work at GlaxoSmithKline


12 Westwarf, Karachi Jul, 2017 Completed
site. Pakistan Ltd.

GlaxoSmithKline
13 Calculation Of Safety Valves Installed On Boiler Korangi Jun, 2017 Completed
Pakistan Ltd.

GlaxoSmithKline
14 Inspection of Pallet Racks at GSK Site Karachi May, 2017 Completed
Pakistan Ltd.

Inspection of Pallet Racks in New Ambient GlaxoSmithKline


15 Karachi Apr, 2017 Completed
store Non-Lactam Pakistan Ltd.

Third Party Inspection for pallet racks in GlaxoSmithKline


16 Karachi Mar, 2017 Completed
new ambient store non lactam Pakistan Ltd.

As Build Drawings development for Piping GlaxoSmithKline


17 West Warf Karachi Feb, 2017 Completed
Network Across the Site. Pakistan Ltd.

GlaxoSmithKline
18 Safety Integrity Level (SIL) Study for Boilers Karachi Jan, 2017 Completed
Pakistan Ltd.

Risk Based Inspection at West Wharf Plant- GlaxoSmithKline


19 Karachi Dec, 2016 Completed
Karachi Pakistan Ltd.

GlaxoSmithKline
20 Racking Inspection at different locations Karachi Dec, 2016 Completed
Pakistan Ltd.

GlaxoSmithKline
21 Third Party Inspection of Store Racks Karachi Nov, 2016 Completed
Pakistan Ltd.
GlaxoSmithKline
22 Third Party Inspecction of Pallet Racks Karachi Nov, 2016 Completed
Pakistan Ltd.
Third Party Inspection & Load Testing of GlaxoSmithKline
23 Karachi Oct, 2016 Completed
Passenger Lifts & Cargo Lifts Pakistan Ltd.

Inspection and Testing of natural gas line GlaxoSmithKline


24 Karachi Oct, 2016 Completed
for leak detection Pakistan Ltd.
GlaxoSmithKline
25 Racking Inspection at different locations Karachi Oct, 2016 Completed
Pakistan Ltd.

Inspection & Load Testing of Various lifting GlaxoSmithKline


26 Karachi May, 2016 Completed
equipment Pakistan Ltd.
GlaxoSmithKline
27 Calibration of Shut off valve at SITE Karachi - Pakistan April, 2016 Completed
Pakistan Ltd.
GlaxoSmithKline
28 Third Party Inspection of compressed air vessel Karachi Mar, 2016 Completed
Pakistan Ltd.
NDT Testing Services for Robey Loos Boiler at GlaxoSmithKline
29 Karachi March, 2016 Completed
WW Pakistan Ltd.
GlaxoSmithKline
30 Inspection of Pallet Rackes Karachi Feb, 2016 Completed
Pakistan Ltd.
31 Ultrasonic Flaw Detection Services ICI Khewra Pakistan Jan, 2016 Completed
Inspection Required for Load Bearing Capacity of GlaxoSmithKline
32 Karachi Nov, 2015 Completed
Engineering Store Racks Pakistan Ltd.
As Build Drawings for the Compressed Air GlaxoSmithKline
33 Karachi Nov, 2015 Completed
System Piping Network Across the Site. Pakistan Ltd.
As Build Drawings for the Compressed Air GlaxoSmithKline
34 Karachi Sep, 2015 Completed
System Piping Network Across the Site Pakistan Ltd.

35 Inspection of Racks as per SEEMA Guidelines Wyeth Pakistan Karachi Aug, 2015 Completed

Inspection of Lifting Equipments of Plant and


36 Wyeth Pakistan Karachi Aug, 2015 Completed
Warehouses
Third Party Inspection of Store Racks as per
37 Pfizer Karachi Aug, 2015 Completed
SEEMA Guidelines
38 Re- Certification of Fork Lifter and Stacker Pfizer Karachi Aug, 2015 Completed
Third Party Inspection of Store Racks as per GlaxoSmithKline
39 Karachi Jul, 2015 Completed
SEEMA Guidelines Pakistan Ltd.
Third Party Inspection of Racks as per SEEMA GlaxoSmithKline
40 Karachi Jun, 2015 Completed
Guidelines Pakistan Ltd.
Third party inspection of racks at GSK’s West GlaxoSmithKline
41 Karachi Apr, 2015 Completed
Wharf Pakistan Ltd.
GlaxoSmithKline
42 Third Party Rack Inspection at Korangi Site Karachi Feb, 2015 Completed
Pakistan Ltd.

43 Positive Material Identification of Boiler Tubes ICI Pakistan Lahore Dec, 2014 Completed

GlaxoSmithKline
44 Mobile Racks Inspection at GSK West Warf Site Karachi Jul, 2014 Completed
Pakistan Ltd.
45 Re- Certification of Fork Lifter Pfizer Karachi Jul, 2014 Completed
Third Party Inspection of Racks at West wharf GlaxoSmithKline
46 Karachi Jun, 2014 Completed
site Pakistan Ltd.
Third Party Inspection of Racks at West wharf GlaxoSmithKline
47 Karachi Jun, 2014 Completed
site Pakistan Ltd.

48 Inspection Of Racks Wyeth Pakistan Karachi Apr, 2014 Completed

49 Inspection Of Lifting Equipment’s Wyeth Pakistan Karachi Apr, 2014 Completed

50 Inspection of Racks / Shelves Pfizer Karachi Apr, 2014 Completed


51 Borescopic Services ICI Pakistan Pakistan Mar, 2014 Completed

Potrebbero piacerti anche