BURKHARDT ROAD

TIF DISTRICT PROJECTS


BURKHARDT ROAD
TIF DISTRICT LOC ATION
C APITAL IMPROVEMENT PLAN
RECOMMENDATIONS
CURRENT AND UPCOMING
TIF DISTRICT PROJECTS
BOONVILLE NEW HARMONY ROAD
PETERSBURG – GREEN RIVER

 The project will be designed by The Lochmueller Boonville New Harmony Rd. - Petersburg to SR 57 Cost
Group Design $425,000.00

Right of Way Engineering & Acquisition Services $663,000.00

 The project will consist of three lanes, and it will Right of Way Purchase $760,000.00

have a roundabout at Petersburg Road. Construction Inspection $840,000.00

Construction $6,378,000.00

TOTAL COST ESTIMATE: $9,066,000.00


 The project will also include an asphalt trail along
the south side of the road.
BOONVILLE NEW HARMONY ROAD
PETERSBURG – GREEN RIVER

• Project typical section will be three lanes


with an asphalt path along the south side
of the road.

• The path will be comparable to the one


that was recently completed as a part of
the Peck Road project as shown in this
photo.
GREEN RIVER ROAD TRAIL –
LENAPE TO MILLERSBURG
GREEN RIVER ROAD
TRAIL COSTS

Green River Trail - Lenape Dr. to Heckel Rd. Cost Green River Trail - Heckel Rd. to Millersburg Rd. Cost

Design $612,400.00 Design $252,400.00

Right of Way $296,000.00 Right of Way $296,000.00

Construction $6,000,000.00 Construction $2,500,000.00

Construction Inspection $600,000.00 Construction Inspection $250,000.00

TOTAL COST ESTIMATE: $7,508,400.00 TOTAL COST ESTIMATE: $3,298,400.00

• The trail project is being designed by VS Engineering.


• This trail will link all pedestrian and bicycle facilities that have been constructed
or will be constructed in upcoming TIF district projects.
• Grant funds will be pursued in order to assist in funding the construction of the
trail.
• The construction of this project will require the widening of five existing bridges
on Green River Road. The travel lanes on the existing bridges will not be
demolished or reconstructed in any manner.
KANSAS ROAD
PETERSBURG – SR 57

• This project is being designed by American


Kansas Road - Petersburg Rd. to Green River Rd. Cost
Structurepoint.
Design/RW/Constr. Insp. $1,515,645.00

• Kansas Road will be widened to have three Right of Way Purchase $600,000.00

11’ lanes with an 8’ sidewalk. Construction $7,010,630.71

TOTAL COST ESTIMATE: $9,126,275.71


• This design will be comparable to the
reconstruction of Millersburg Road
between Hedden Road and Green River
Road, and Heckel Road between Oak Hill
Road and Green River Road.
KANSAS ROAD
PETERSBURG – GREEN RIVER
OAK HILL ROAD
LYNCH - EASTWOOD

• The project will be designed by American Structurepoint. Oak Hill Road - Lynch Rd. to Eastwood Dr. Cost

Design $689,300.00

• The project will consist of a three lane road section, bike Right of Way Engineering & Acquisition Services $859,905.00
lanes, and a sidewalk along one side of the road. Right of Way Purchase $900,000.00

Construction Inspection $990,500.00

Construction $9,030,000.00

TOTAL COST ESTIMATE: $12,469,705.00

• This design will be a continuation of the design of


Oak Hill Road south of Lynch that was completed
by the City of Evansville several years ago.
OAK HILL ROAD
EASTWOOD - MILLERSBURG

• The project will be designed by United


Consulting.

• The project will be have three lanes, bike lanes,


and a sidewalk along one side of the road.

• The project will also include a trail connection


between the Oak Hill/Hedden/Millersburg
roundabout and Kansas Road.

• An application has been submitted to the


Evansville MPO to request federal funding for the
reconstruction of this section of Oak Hill Road.
OAK HILL ROAD
EASTWOOD - MILLERSBURG

Oak Hill Road - Eastwood Dr. - Hedden Road Cost

Design $849,300.00

Right of Way Engineering & Acquisition Services $572,690.00

Right of Way Purchase $750,033.00

Construction Inspection $943,000.00

Construction $6,921,200.00

TOTAL COST ESTIMATE: $10,036,223.00


What is the purpose of adding
these new trails, sidewalks, and
bike lanes?

THE COMPLETION OF THESE PROJECTS


PROVIDES CONNECTIVITY BETWEEN
ALL TIF DISTRICT PROJECTS
COMPLETED NORTH OF LYNCH ROAD.
T I F P ROJ E CT S
FROM
LY NCH TO H E CK EL
T I F PROJ E CT S
FROM
H E CK EL TO K ANSAS
T I F P RO J E C T S -
BOONVILLE NEW HARMONY
AND GREEN RIVER
COMPLETED TIF DISTRICT PROJECTS
BURKHARDT ROAD
LLOYD - VIRGINIA

• The project included turn lanes on the


Lloyd Expressway and the construction
of portions of Virginia Street. A concrete
box culvert was also installed in the
Crawford Brandeis legal drain as a part of
this project.

• Bid amount - $4,142,050.67


BURKHARDT ROAD
VIRGINIA - MAXWELL

• The project continued the four lane


cross section started in phase 1, and it
also included the installation of a box
culvert in the Crawford Brandeis Ditch.

• Bid amount - $4,870,286.04


BURKHARDT ROAD
MAXWELL – INTERCHANGE ROAD SOUTH

• The project continued the four lane


cross section and the installation of a box
culvert in the Crawford Brandeis Ditch.
The project also included the addition of
turn lanes on S.R. 62.

• Federal funds were used in the


construction of this project.

• Bid amount - $2,142,212.95


BURKHARDT ROAD
INTERCHANGE ROAD SOUTH – LYNCH

• This project provided a five lane section


between Interchange Road South and
Lynch Road. It also included the
construction of a right turn lane on
Lynch Road.

• Bid amount - $2,655,047.67


BURKHARDT ROAD – VIRGINIA STREET
INTERSECTION RECONSTRUCTION

• Turn lanes were added and/or


extended on all approaches to
this intersection.

• Bid Amount – $1,394,870.98


CROSS POINTE BOULEVARD
VIRGINIA TO MORGAN

• This project consisted of the construction of a new


road between Virginia Street and Oak Grove Road, and
the reconstruction of the existing section of Cross
Pointe between Oak Grove and S.R. 62.

• Bid Amount - $6,098,088.20


GREEN RIVER ROAD
MILLERSBURG TO KANSAS

• This project widened Green River


to five lanes between Millersburg
and Kansas. It also included bike
lanes and a sidewalk on the east
side of the road.

• Bid Amount - $5,305,000.00


HECKEL ROAD
OAK HILL – GREEN RIVER

• This project consisted of the


reconstruction of Heckel between
Oak Hill and Green River. It widened
the road to three lanes and added a
sidewalk on the north side of the
road.

• Bid Amount – $3,782,000


MILLERSBURG ROAD
HEDDEN – GREEN RIVER

• This project consisted of the reconstruction of


Millersburg between Hedden and Green River.
It widened the road to three lanes and added a
sidewalk on the south side of the road.

• Bid Amount - $2,521,808.43


CONSTRUCTION COSTS
FOR COMPLETED TIF PROJECT

COMPLETED TIF DISTRICT PROJECTS

PROJECT PROJECT LIMITS BID AMOUNT


Burkhardt Road Lloyd Expwy. - Virginia St. $4,142,050.67
Burkhardt Road Virginia St. - Maxwell Rd. $4,870,286.04
Burkhardt Road Maxwell Rd. - Interchange Road South $2,142,212.95
Burkhardt Road Interchange Road South - Lynch Rd. $2,655,047.67
Burkhardt - Virginia Intersection Shopping Center Access Drive - Columbia $1,394,870.98
Cross Pointe Boulevard Virginia St. - SR 62 $6,098,088.20
Green River Road Lynch Rd. - Millersburg Rd. $26,128,495.50
Green River Road Millersburg Rd. - Kansas Rd. $5,305,000.00
Green River Road Kansas Rd. - Boonville New Harmony Rd. $6,706,971.90
Heckel Road Oak Hill Rd. - Green River Road $3,782,000.00
Millersburg Road Hedden Rd. - Green River Road $2,521,808.43

TOTAL: $65,746,832.34