ADMINISTRAÇÃO DOS PORTOS DE TIMOR-LESTE, I.P.

THE DEMOCRATIC REPUBLIC OF TIMOR-LESTE

CONTRACT DOCUMENTS
FOR
THE PROJECT FOR URGENT RELOCATION OF FERRY TERMINAL IN DILI PORT

DRAWINGS

JUNE 2017

JOINT VENTURE OF IDES INC.

AND JAPAN PORT CONSULTANTS, LTD.


THE PROJECT FOR URGENT RELOCATION OF FERRY TERMINAL IN DILI PORT

LIST OF DRAWINGS (1)

DWG. NO. TITLE DWG. NO. TITLE DWG. NO. TITLE


1. GENERAL INFORMATION 4. PLATFORM
GI-01 SITE LOCATION MAP JE-13 RUBBER BEARING DRAWING PF-01-01 PLATFORM STRUCTURAL DRAWING
GI-02 GENERAL PLAN OF DILI PORT JE-14 EXPANSION DEVICE DETAIL DRAWING (1) PF-02 LAYOUT OF LANDING PLATFORM (1)
GI-03 GENERAL PLAN OF FERRY TERMINAL JE-15 EXPANSION DEVICE DETAIL DRAWING (2) PF-03 LAYOUT OF LANDING PLATFORM (2)
JE-16 EXPANSION DEVICE DETAIL DRAWING (3) PF-04 DETAIL OF PILE HEAD (1)
2. SITE CONDITIONS JE-17 EXPANSION DEVICE DETAIL DRAWING (4) PF-05 DETAIL OF PILE HEAD (2)
SC-01 TOPOGRAPHIC AND BATYMETRIC DATA OF THE SITE JE-18 DETAIL OF PAVEMENT PF-06-01 DETAIL OF PILE HEAD (3)
SC-02 CROSS SECTIONAL DATA OF TOPOGRAPHY AND BATHYMETRY (1) JE-19 ERECTION PLAN VIEW OF PC GIRDER (FOR REFERENCE) PF-07 BAR ARRANGEMENT OF LANDING PLATFORM (1)
SC-03 CROSS SECTIONAL DATA OF TOPOGRAPHY AND BATHYMETRY (2) JE-20 LAYOUT OF PIER-1 PF-08 BAR ARRANGEMENT OF LANDING PLATFORM (2)
SC-04 CROSS SECTIONAL DATA OF TOPOGRAPHY AND BATHYMETRY (3) JE-21 LAYOUT OF PIER-2,3 PF-09 BAR ARRANGEMENT OF LANDING PLATFORM (3)
SC-05 LOCATION OF BOREHOLE JE-22 LAYOUT OF PIER-4,5 PF-10 BAR ARRANGEMENT OF LANDING PLATFORM (4)
SC-06 N VALUES OF BORING JE-23 LAYOUT OF PIER-6 PF-11 BAR ARRANGEMENT OF LANDING PLATFORM (5)
SC-07 BORING LOG (BH-1) JE-24 DETAIL OF PILE HEAD(1) PF-12 BAR ARRANGEMENT OF LANDING PLATFORM (6)
SC-08 BORING LOG (BH-2) JE-25 DETAIL OF PILE HEAD(2) PF-13 BAR ARRANGEMENT OF LANDING PLATFORM (7)
SC-09 BORING LOG (BH-3) JE-26 BAR ARRANGEMENT OF PIER-2~5 (1) PF-14 BAR ARRANGEMENT OF LANDING PLATFORM (8)
SC-10 BORING LOG (BH-4) JE-27 BAR ARRANGEMENT OF PIER-2~5 (2) PF-15 BAR ARRANGEMENT OF LANDING PLATFORM (9)
SC-11 ASSUMPTION DRAWING OF THE GROUND JE-28 BAR ARRANGEMENT OF PIER-2~5 (3) PF-16 BAR ARRANGEMENT OF LANDING PLATFORM (10)
JE-29 BAR ARRANGEMENT OF PIER-2~5 (4) PF-17 BAR ARRANGEMENT OF LANDING PLATFORM (11)
3. JETTY JE-30 BAR ARRANGEMENT OF PIER-2~5(5) (POST-CONCRETE) PF-18 BAR ARRANGEMENT OF LANDING PLATFORM (12)
JE-01-01 GENERAL VIEW OF JETTY JE-31 BAR ARRANGEMENT OF PIER-2~5(6) (TOTAL WEIGHT OF STEEL BARS) PF-19 BAR ARRANGEMENT OF LANDING PLATFORM (13)
JE-02 UPPER WORK LINEAR DRAWING (1) JE-32 BAR ARRANGEMENT OF PIER-1,6 (1) PF-20 BAR ARRANGEMENT OF LANDING PLATFORM (14)
JE-03 UPPER WORK LINEAR DRAWING (2) JE-33 BAR ARRANGEMENT OF PIER-1,6 (2) PF-21 BAR ARRANGEMENT OF LANDING PLATFORM (15)
JE-04 UPPER WORK LINEAR DRAWING (3) JE-34 BAR ARRANGEMENT OF PIER-1,6 (3) PF-22 BAR ARRANGEMENT OF LANDING PLATFORM (14)
JE-05 UPPER WORK LINEAR DRAWING (4) JE-35 BAR ARRANGEMENT OF PIER-1,6 (4) PF-23 BAR ARRANGEMENT OF LANDING PLATFORM (17)
JE-06 UPPER WORK LINEAR DRAWING (5) JE-36 BAR ARRANGEMENT OF PIER-1,6 (5) PF-24 BAR ARRANGEMENT OF LANDING PLATFORM (18)
JE-07 STRUCTURE GENERAL DRAWING (1) JE-37 BAR ARRANGEMENT OF PIER-1,6 (6) PF-25 BAR ARRANGEMENT OF LANDING PLATFORM (19)
JE-08 STRUCTURE GENERAL DRAWING (2) JE-38 BAR ARRANGEMENT OF PIER-1,6 (7) (TOTAL WEIGHT OF STEEL BARS) PF-26 BAR ARRANGEMENT OF LANDING PLATFORM (20)
JE-09 BAR ARRANGEMENT DRAWING OF MAIN GIRDER PF-27 BAR ARRANGEMENT OF LANDING PLATFORM (21)
JE-10 BAR ARRANGEMENT DRAWING OF WHEEL GUARD (1) PF-28 LAYOUT OF PLATFORM [SEA SIDE]
JE-11 BAR ARRANGEMENT DRAWING OF WHEEL GUARD (2) PF-29 BAR ARRANGEMENT OF PLATFORM [SEA SIDE] (1) (LEFT SLAB)
JE-12 DETAILED VIEW OF WATERPROOF BRIDGE SURFACE PF-30 BAR ARRANGEMENT OF PLATFORM [SEA SIDE] (2) (RIGHT SLAB)
THE PROJECT FOR URGENT RELOCATION OF FERRY TERMINAL IN DILI PORT

LIST OF DRAWINGS (2)

DWG. NO. TITLE DWG. NO. TITLE DWG. NO. TITLE


6. FACILITIES
PF-31 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](3) (LEFT SLAB) PF-61 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (14) (BEAM) FT-01-01 MOORING FACILITES ARANGMENT
PF-32 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](4) (RIGHT SLAB) PF-62 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (15) (BEAM) FT-02 DETAIL OF BOLLARD
PF-33 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](5) (SLAB) PF-63 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (16) (BEAM) FT-03 DETAIL OF FENDER (FOR REFERENCE)
PF-34 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](6) (SLAB) PF-64 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (17) (BEAM) FT-04-01 LIGHT BEACON
PF-35 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](7) (LEFT BEAM) PF-65 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (18) (BEAM) FT-05 BAR ARRANGEMENT OF CONCRETE KERB
PF-36 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](8) (RIGHT BEAM) PF-66 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (19) (PILE HEAD)
PF-37 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](9) (LEFT BEAM) PF-67 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (20) (LEFT FLAT SLAB)
PF-38 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](10) (RIGHT BEAM) PF-68 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (21) (RIGHT FLAT SLAB)
PF-39 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](11) (LEFT BEAM) PF-69 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (22) (LEFT FLAT SLAB) 7. MOVABLE RAMP
PF-40 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](12) (RIGHT BEAM) PF-70 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (23) (RIGHT FLAT SLAB) MR-01 MOVALE RAMP
PF-41 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](13) (BEAM) PF-71 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (24) (LEFT FLAT SLAB) MR-02 ERECTION DRAWNIG
PF-42 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](14) (BEAM) PF-72 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (25) (RIGHT FLAT SLAB) MR-03 DETAIL (1)
PF-43 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](15) (BEAM) PF-73 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (26) (FLAT SLAB) MR-04 DETAIL (2)
PF-44 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](16) (BEAM) PF-74 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (27) (FLAT SLAB) MR-05 DETAIL (3)
PF-45 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](17) (PILE HEAD) PF-75 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (28) (FLAT SLAB) MR-06 DETAIL (4)
PF-46 BAR ARRANGEMENT OF PLATFORM [SEA SIDE](18) (TOTAL WEIGHT OF STEEL BARS) PF-76 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (29) (FLAT SLAB) MR-07 DETAIL (5)
PF-47 LAYOUT OF PLATFORM [LAND SIDE] PF-77 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (30) (FLAT SLAB) MR-08 DETAIL (6)
PF-48 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](1) (LEFT SLAB) PF-78 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (31) (FLAT SLAB) MR-09 DRIVE SYSTEM SUPPOR GENERAL DRAWING
PF-49 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](2) (RIGHT SLAB) PF-79 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (32) (TOTAL WEIGHT OF STEEL BARS) MR-10 DRIVE SYSTEM SUPPOR DETAIL (1)
PF-50 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](3) (LEFT SLAB) PF-80 BAR ARRANGEMENT OF PLATFORM [LAND SIDE] (33) (TOTAL WEIGHT OF STEEL BARS) MR-11 DRIVE SYSTEM SUPPOR DETAIL (2)
PF-51 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](4) (RIGHT SLAB) MR-12 DRIVE SYSTEM SUPPOR DETAIL (3)
PF-52 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](5) (SLAB) 5. PILE MR-13 DRIVE SYSTEM SUPPOR DETAIL (4)
PF-53 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](6) (SLAB) PI-01 PILE LAYOUT MR-14 ACCESSORIES DETAIL (1)
PF-54 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](7) (SLAB) PI-02-01 DETAIL OF STEEL PIPE PILE MR-15 ACCESSORIES DETAIL (2)
PF-55 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](8) (LEFT BEAM) PI-03 STRUCTURE OF P.C PILE D800 (FOR REFERENCE) MR-16 ACCESSORIES DETAIL (3)
PF-56 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](9) (RIGHT BEAM) PI-04 STRUCTURE OF PC PILE TOP MR-17 ACCESSORIES DETAIL (4)
PF-57 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](10) (LEFT BEAM) PI-05-01 CATHODIC PROTECTION SYSTEM PIER-1 TO PIER-6 MR-18 ACCESSORIES DETAIL (5)
PF-58 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](11) (RIGHT BEAM) PI-06-01 CATHODIC PROTECTION SYSTEM PLATFORM MR-19 ACCESSORIES DETAIL (6)
PF-59 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](12) (LEFT BEAM) PI-07 ALUMINUM ALLOY ANODE MR-20 HYDRAULIC PIPING DETAILED DRAWING (1)
PF-60 BAR ARRANGEMENT OF PLATFORM [LAND SIDE](13) (RIGHT BEAM) PI-08-01 DETAIL OF F.R.P. COVER MR-21 HYDRAULIC PIPING DETAILED DRAWING (2)
THE PROJECT FOR URGENT RELOCATION OF FERRY TERMINAL IN DILI PORT

LIST OF DRAWINGS (3)

DWG. NO. TITLE DWG. NO. TITLE DWG. NO. TITLE


10. OTHER FACILITIES (REFERENCE)
MR-22 HYDRAULIC PIPING DETAILED DRAWING (3) MR-52 STEEL DOOR DETAILED DRAWING,WINDOW MADE BY ALUMINUM・DETAILE OF-01 LAYOUT PLAN OF TEMPORARY YARD
MR-23 HYDRAULIC PIPING DETAILED DRAWING (4) MR-53 SINGLE SWING WINDOW MADE BY ALUMINUM OF-02 WITHDRAWAL DRAWING
MR-24 HYDRAULIC PIPING DETAILED DRAWING (5) MR-54 DOORS AND WINDOWS
MR-25 GUIDE ROLLER MR-55 PARTICULAR SPECIFICATION 1 (STRUCTURE)
MR-26 TRUNNION BEARING ASSEMBLING DRAWING MR-56 SLAB AND BEAM FRAMING PLAN、FRAMING ELEVATION
MR-27 TRUNNION BEARING DETAILED DRAWING MR-57 LIST OF SECTIONS
MR-28 GUIDE RAIL STRUCTURE MR-58 REINFORCEMENT FRAME
MR-29 REFRACTION TYPE SIGNAL POST
MR-30 PIPING PIT STRUCTUAL DRAWING
MR-31 HYDRAULIC PIPING ASSEMBLY DRAWING (1)
MR-32 HYDRAULIC PIPING ASSEMBLY DRAWING (2)
MR-33 PLUMBING WIRING DIAGRAM 8.ELECTRIC AND WATER SUPPLY
MR-34 HYDRAULIC CIRCUIT EW-01-01 LOAD TABLE OF DISTRIBUTION BOARD
MR-35 HYDRAULIC UNIT EXTERNAL FORM EW-02-01 PLAN FOR POWER SUPPLY SYSTEM
MR-36 SCHEMATIC DRAWING EW-03 PLAN FOR LIGHTING AND SOCKET SYSTEM
MR-37 CONTROL PANEL OUTLINE DRAWING (FOR REFERENCE) EW-04 MAIN FEEDER AND LIGHTING SYSTEM LAYOUT AND UNDERGROUND CABLE TYPICAL CROSS SECTIONS

MR-38 CONTROL PANEL ONE-LINE DIAGRAM EW-05 LIGHTING DETAILS


MR-39 DRIVING FLOW CHART EW-06 CCTV SYSTEM LAYOUT AND UNDERDROUND CABLE TYPICAL CROSS SECTIONS

MR-40 HYDRAULIC CYLINDER OUTLINE DRAWING EW-07 SITE PLAN FOR WATER SUPPLY AND FIRE FIGHTING SYSTEM
MR-41 HYDRAULIC CYLINDER SECTION VIEW EW-08 DETAIL FOR WATER SUPPLY AND FIRE FIGHTING SYSTEM
MR-42 RESTING DEVICE
MR-43 TILTMETER
MR-44 CONTROL ROOM PLAN VIEW 9. REVETMENT
MR-45 PLAN VIEW、CEILING PLAN、ROOF PLAN RE-01 STRUCTURAL DRAWING OF REVETMENT
MR-46 ERECTION VIEW RE-02 FERRY TERMINAL BUILDING (FOR REFERENCE)
MR-47 DEVELOPMENT VIEW
MR-48 CROSS SECTION
MR-49 DETAIL PLAN VIEW
MR-50 DETAIL SECTION DRAWING
MR-51 ELECTRIC SHUTTER PART DETAIL