POLAVARAM IRRIGATION PROJECT

Card No. ……………………… Dt: ……………………

O.K. CARD FOR CONCRETE

Name of Work: Grade of Concrete:


Contractor: (All grades of concrete to be poured)
Location/ Structure: Estimated Quantity to be Poured:
R.D./ Chainage from: Lift Elevation: From…………….… To…………………
Ref Drawing No. Methodology of concreting:
i. Civil (i.e, Telebelt/ Boom Placer/ Agitor/ TM)
ii. HM Methodology of Compaction (i.e, by vibrator/ …………...)

Free Hand Sketch of form work for the above estimated quantity of concrete is shown on overleaf indicating
(L x B x H) and the levels etc

Comments
Sl. Rep. of
Description Rep. of GoAP Remarks
No. Contractor
YES NO YES NO
A) Pre Pour Checks
1) General
a) Survey line/ Centre line Position marked
b) Surface/ Joints/base preparation (placement of
rubber stopper etc kept in place)
c) Adequacy of construction aids/tools/ vibrators
available/ arrangements/ access etc
2) Form Work
a) Alignment Centering checked
b) Level marked/ checked
c) Vertically/ Slope Checked
d) Support/ Stability checked
e) Cleaning & applying oil etc
3) Reinforcement
a) Type/ diameter of bar
b) Spacing/ No. of bars
c) Cover
d) Extra reinforcement, if any
e) Deviation from drawing (if any)
f) Placement/ Alignment
g) Clean up
h) Welding/ Binding/ Lapping
4) Embedded Parts (EP)
a) Total No. of EP/ Structure/ Block outs
i. Civil
ii. HM
b) Position of EP
c) Arrangement for protection during Concrete

O.K./ Not O.K. for Concreting O.K./ Not O.K. for Concreting

(Sign of Rep. of Contractor) (Sign of Rep. of GoAP - Civil) (Sign of Rep. of GoAP - HM)