0 valutazioniIl 0% ha trovato utile questo documento (0 voti)
7 visualizzazioni3 pagine
The document appears to be a bill of quantities for construction materials and labor. It lists 19 line items with descriptions of work, their item numbers, rates, quantities in cubic feet or tons, and percentages. The totals for each line item are calculated by multiplying the rate by the quantity. The grand total for all items is Rs. 419,300.80.
The document appears to be a bill of quantities for construction materials and labor. It lists 19 line items with descriptions of work, their item numbers, rates, quantities in cubic feet or tons, and percentages. The totals for each line item are calculated by multiplying the rate by the quantity. The grand total for all items is Rs. 419,300.80.
The document appears to be a bill of quantities for construction materials and labor. It lists 19 line items with descriptions of work, their item numbers, rates, quantities in cubic feet or tons, and percentages. The totals for each line item are calculated by multiplying the rate by the quantity. The grand total for all items is Rs. 419,300.80.