Cell Count
Action Update (10/07/2017)
FPDCH reduction done. Request Raised for Hard expansion 3
(7/10/2017)
IPM feasibility to be checked 2
Grand Total 8
North
Cell Count
Action Update (10/07/2017)
3rd Carrier propsed on Wk-27, Power degrow proposed for
U900 cell on WK-28.Trx addition CR will be implemented on 2
7/14/2017
Grand Total 33
Proposed
Current TRX(Utiliz Capacity_
BSC Name SiteName CellName RRUS Sector TRX Count ation Remark
<180)
Hard
MGEBS02 MG0920 MG0920B RRU01 B 3 5 Expansion
Hard
SHEBS01 SH0237 SH0237C RRU01 C 3 5 Expansion
Hard
SHEBS01 SH0761 SH0761C RRU01 C 3 5 Expansion
Additional Remarks Action Update (10/07/2017)
FPDCH reduction will be done . If still blocking FPDCH reduction done. Request Raised for
persist, RRU Upgrade Reqd.ARFCNs Reqd for Hard expansion (7/10/2017)
Expension.
FPDCH reduction will be done . If still blocking
persist, RRU Upgrade Reqd.ARFCNs Reqd for FPDCH reduction done. Request Raised for
Expension.Expension will be completed by WK- Hard expansion (7/10/2017)
27
2
FPDCH reduction will be done . If still blocking persist, RRU Upgrade
Hard Expansion Reqd.ARFCNs Reqd for Expension.
2
Soft TRX Expansion ARFCNs Reqd for Expension and will be completed by Wk-27
2
Soft TRX Expansion ARFCNs Reqd for Expension and will be completed by Wk-27
2 FPDCH reduction will be done.Feasiblity of IPM activation is being
checked for Mix mode else RRU Upgrade required if blocking is not
removed post data TS reduction .ARFCNs Reqd for Expension and is
expected to be completed by WK-27
1
Soft TRX Expansion ARFCNs Reqd for Expension and will be completed by Wk-27
Action Update (10/07/2017)
U900 Cell - ARFCN Req for TRX Addition.Power degrow will be done
in U900.Both Power degrow and TRX addition is expected by WK-27 MO0326
3rd carrier addition will be proposed in U2100.
U900 Cell - ARFCN Req for TRX Addition.Power degrow will be done
in U900.Both Power degrow and TRX addition is expected by WK-27 MO0471
3rd carrier addition will be proposed in U2100.
Action Update (10/07/2017)
3rd Carrier propsed on Wk-27, Power degrow proposed for U900 cell
on WK-28.Trx addition CR will be implemented on 7/14/2017
3rd Carrier propsed on Wk-27, Power degrow proposed for U900 cell
on WK-28.Trx addition CR will be implemented on 7/14/2017
Current TRX
site trx test Current Total
NE Name Site Name Cell Name Clutter Mini Cluster U900 Power RRU Count (Configured)
(Operational)
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
1 Remove 1 PDCH
2Remove 1 PDCH & 1 SDCCH
2Remove 1 PDCH & 1 SDCCH
4Remove 1 PDCH & 2 SDCCH
3 Remove 2 SDCCH
4 Remove 2 SDCCH
3 Remove 2 SDCCH
3 Remove 2 SDCCH
3 Remove 2 SDCCH
4 Remove 2 SDCCH
2 Remove 3 PDCH
2Remove 3 PDCH & 1 SDCCH
1
1
1