Project: 140913 PHYSICAL REFINING

Vacuum Load

Design Data
Capacity TPD 400
Flow rate kg/hr 16667
Feed FFA 5.00%

Air Leak Basis


Air Leak via Feed Stock kg/ton 0.20
Air Leak via Cooling Water kg/m3 0.02
Air Leak via Gasket kg/m 0.10
Air Leak via Bleaching Earth Dosing kg/ton 0.10
Air Leak via Agitator kg/Agitator 0.50
Air Leak via Bellow Seal Globe Valve kg/valve 0.20

Bleaching Section
Moisture Content 0.0% As per contract: Specification of feedstock
Bleacher Sparging kg/ton 0 As per contract : Steam for Bleacher agitation
Bleaching Earth kg/ton 0 As per contract : 10 - 25 kg (choose the highest )
Moisture in Bleaching Earth 10.0%

Cooling Water m3/ton 0 As per contract: barometric / Cooling water for vaccum system
Total Gasket Length m 0 Estimation : Roughly figure will do like 30
No of Agitator 0 Refer P&ID: any Mixer or Agitator (M680 & M686)

Bleaching Vapor Load kg/hr 0 To be sent for supplier for quotation. No additional margin is requ
Bleaching Air Leak kg/hr 5 To be sent for supplier for quotation. No additional margin is requ

Deodorizer Section
Moisture Carry Over to Deodorizer 0.5% Only Deod plant
Deodorizer Sparging kg/ton 5 As per contract : Steam for Stripping
Final Heat Sparging kg/ton 0.5 As per contract : if specified
Economizer Sparging kg/ton 0.5 As per contract : if specified

Cooling Water m3/ton 3.5 As per contract: Cooling water for vaccum system
Total Gasket Length m 40 Estimation : Roughly figure will do like 40
No of Bellow Seal Valve @ Deodorizer 0 Refer P&ID to check for bellow (5 bellows per 1 kg/hr air leak); re

Deodorizing Vapor Load kg/hr 184 To be sent for supplier for quotation. No additional margin is requ
Deodorizing Air Leak kg/hr 9 To be sent for supplier for quotation. No additional margin is requ
Deodorizing FFA kg/hr 8.3 To be sent for supplier for quotation. No additional margin is requ
ystem

n is required. 146
n is required. 10

leak); refer past project to get the bellow number of doedorizer bellow

n is required.
n is required.
n is required.
Project: PHYSICAL REFINING
Vacuum Load

Design Data
Capacity TPD 400
Flow rate kg/hr 16667
Feed FFA 5.00%

Air Leak Basis


Air Leak via Feed Stock kg/ton 0.20
Air Leak via Cooling Water kg/m3 0.02
Air Leak via Gasket kg/m 0.10
Air Leak via Bleaching Earth Dosing kg/ton 0.10
Air Leak via Agitator kg/Agitator 0.50
Air Leak via Bellow Seal Globe Valve kg/valve 0.20

Bleaching Section
Moisture Content 0.5% As per contract: Specification of feedstock
Bleacher Sparging kg/ton 3 As per contract : Steam for Bleacher agitation
Bleaching Earth kg/ton 25 As per contract : 10 - 25 kg (choose the highest )
Moisture in Bleaching Earth 10.0%

Cooling Water m3/ton 1.8 As per contract: barometric / Cooling water for vaccum sy
Total Gasket Length m 30 Estimation : Roughly figure will do like 30
No of Agitator 1 Refer P&ID: any Mixer or Agitator (M680 & M686)

Bleaching Vapor Load kg/hr 175 To be sent for supplier for quotation. No additional margin
Bleaching Air Leak kg/hr 9 To be sent for supplier for quotation. No additional margin

Deodorizer Section
Moisture Carry Over to Deodorizer 0.1%
Deodorizer Sparging kg/ton 5 As per contract : Steam for Stripping
Final Heat Sparging kg/ton 0.5 As per contract : if specified
Economizer Sparging kg/ton 0.5 As per contract : if specified

Cooling Water m3/ton 3.5 As per contract: Cooling water for vaccum system
Total Gasket Length m 40 Estimation : Roughly figure will do like 40
No of Bellow Seal Valve @ Deodorizer 0 Refer P&ID to check for bellow (5 bellows per 1 kg/hr air l

Deodorizing Vapor Load kg/hr 117 To be sent for supplier for quotation. No additional margin
Deodorizing Air Leak kg/hr 9 To be sent for supplier for quotation. No additional margin
Deodorizing FFA kg/hr 8.3 To be sent for supplier for quotation. No additional margin
her agitation
ose the highest )

ing water for vaccum system

(M680 & M686)

on. No additional margin is required. 146


on. No additional margin is required. 10

vaccum system

bellows per 1 kg/hr air leak); refer past project to get the bellow number of doedorizer bellow

on. No additional margin is required.


on. No additional margin is required.