Sei sulla pagina 1di 1
E IAN HAS PRAKUAL PREQUALIFICATION RESULT ANNOUNCEMENT No. 11-A/S/PRA/SMO/2018 sd |. INFORMASI TENDER / TENDER INFORMATION ‘No. Pengummuman Prakualifkasi/ Prequalification Announcement No. + lu/s/eRa/sMo/2018 JudulPrakualifkasi/ Prequotification Title General Hazardous Waste Handling, Transportation, Processing, and Disposal Services Pelaksana Tender / Tender Executor PT. Cheveon Pacific Indonesia |. HASIL PRAKUALIFIKASI / RESULT OF PREQUALIFICATION Peserta yang lulus prakualifikasi/ Participant who passed prequalfication Nol _Peserta Tender / Bidder 1 Integra Oilfield Services, PT - Suryamulia Gitagraha, PT - Sumber | Surya Kalvari, PT Consortium 2 |Prasadha Pamunan Limtah Industri, PT 3. |Wastec International, PT - Swadaya Abdi Manunggal, PT Consortium Peserta yang tidak lulus prekualifikai/ Particinant who foiled in prequalification No. (Calon Peserta Tender / sidderCondidate ‘Alasan / Reason 11 Gema Putra Buana, PT - Darma Persada, PT - Semen Tidak memenuli persyaratan prakualifikasi K3LL/ Does not meet Padang, PT Consortium HES prequalification requirement ‘SVARAT-SYARAT DAN KETENTUAN-KETENTUAN/ TERMS AND CONDITIONS 3. Pengumuman ini merupakan pemberitahuan resmi/ This is an offical notification. 2. Pertanyaan tentang ketidaklulusan pada tahap Prakualifkasl, hanya dapat diajukan oleh Peserta yang tidak lulus Prakuelifikas, paling lambat 2 (dua) hari kerja setelah pengumuman hasil Prakvaifikasi ini. Pertanyaan diajuken secara tertulis kepada Pengelola Pengadaan dan ditandatangani oleh yang memillki kewenangan dari Peserta / Questions regarding foilure in Prequolifcation stage, may only be submitted by Bidder Candidate(s) that is (are) failed in Prequalification, no later than two (2) working doys after this Prequalification announcement result: Questions must be submitted in writing to the Procurement and signed by person who has the authority of Participant. Rumbai, 04 September 2018 PENGELOLA PENGADAAN/ PROCUREMENT Loft

Potrebbero piacerti anche