Construction
§ Changes in the work
§ Subsurface geological and geotechnical conditions
§ Site access
§ Level of detail design delivered by the owner
§ Late drawings and instructions
§ Availability of resources
§ Accidents (such as collision, fire and so on)
§ Damage to persons or property
§ Defective design
§ Cost of tests and samples
§ Actual quantities of work
§ Equipment Commissioning
§ Financial and economic
§ Inflation
§ Funding
Performance
§ Productivity of labour
§ Productivity of equipment
§ Suitability of materials
§ Defective work
§ Conduct hindering performance of the work
§ Labour Disputes
Security
§ Vandalism
§ Terrorism
§ Corruption
§ Assaults
§ Negligence
§ Intrusion
Contractual and legal
§ Delayed dispute resolution
§ Delayed payment on contracts and extras
§ Change order negotiation
§ Insolvency of contractor or a subcontractor
Physical
§ Subsurface geology geotechnical conditions
§ Conditions
§ Subsurface conditions and ground water
§ Topography
§ Natural catastrophes
Political and societal
§ Soil availability for construction
§ Environmental pressures
§ Regulations (safety or labour laws)
§ Public disorder
§ Strike
Technical risks
Design Process
Owner involvement in design
Inadequate and incomplete design
Change in seismic criteria
Errors or in completion of structural / geotechnical / foundation
Wrong selection of materials
Take off data (traffic demand, water consumption demand, etc.)
Need for design exceptions
Construction risks
Inaccurate contract time estimates
Construction procedures
Construction occupational safety
Work permissions
Utilities
Late surveys, incomplete or wrong
Delayed deliveries and disruptions
Worker and site safety
Innovative projects
Unsuitable equipment and materials
Environmental risks (such as projects close to a wild river, floodplain, coastal zone, high sensitivity
for palaeontology area, and so on)
Environmental factors
Environmental analysis incomplete or wrong
Offsite and onsite wetlands
Hazardous waste preliminary site investigation wrong
Lack of specialised staff (biology, anthropology archaeology etc)
§ Inaccurate assumptions on technical issues in the planning stage
§ Fact sheet requirements (exception to standards)
External risks
Contractual relations
Landowners unwilling to sell
Priorities change on existing program
Funding changes for fiscal year
Stakeholders request late changes
New stakeholders
Additional needs requested by stakeholders
New information required for permits
Inconsistent costs, time, scope, and quality objectives
Permits and licences
Force majeure factors
Political factors change (political interference)
Political climate
Economic instability
Market conditions
Exchange rate fluctuation
Public safety regulation
Social factors
Local communities pose objections
Environmental factors
Environmental regulations change (for example in water quality)
Water quality issues
New information required for permits
Environmental impact statement required
Historic site, endangered species, or wetlands present
Pressure to compress the environmental schedule
Organisational risks
§ Inexperienced staff assigned
§ Losing critical staff at crucial point of the project
§ Insufficient time to plan
§ Unanticipated project manager workload
§ Not enough time to plan
§ Priorities change on existing program
§ Inconsistent cost, time, scope, and quality objectives
Project Management Risks
§ Project purpose definition, needs, objectives, costs, deliverables are poorly defined or understood
§ No control over staff priorities
§ Too many projects
§ Consultant or contractor delays
§ Estimate and/or scheduling errors
§ Communication breakdown with project team
§ Lack of coordination/communication
§ Inexperienced workforce/inadequate staff / resource availability