CHENNAI
MAINTENANCE PROGRAM
(Based on Cessna Citation 560XL
Maintenance Manual – Rev. 31 Dated Oct 1, 2011 and Engine
Maintenance Manual – Rev. 34 Dated Jun 25, 2010)
MAINTENANCE PROGRAM
PAGE: ii
INTRODUCTION TO AIRCRAFT
The following are the Details of the aircraft as required by CAR-M, AMC M.A. 302, Appendix-1
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PAGE: iii
RECORD OF AMENDMENTS
Rev. No. Date Part Page Amended Date
by
Revision to this manual will be marked with a sideline on the affected pages. The
revision number and the date of revision at the bottom will reflect the revision status of
that page.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PAGE: iv
DISTRIBUTION LIST
S.No. of
Address of the holder
Controlled Copy
1 ACCOUNTABLE MANAGER / MANAGING DIRECTOR
4 MAINTENANCE MANAGER
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PAGE: v
CONTENTS
PART NO SUBJECT
1 INTRODUCTION
2 MAINTENANCE PROGRAM
5 CONDITIONAL INSPECTIONS
7 PRIMARY PHASES
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PAGE: viii
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PAGE: ix
REVISION HIGHLIGHTS
S/N Rev No. Reason for change
1. Revision 1 - Page i: Changed the cover page to mention the new AMM
Revision.
- Page vi & vii: Revised LEP
- Page ix: Added details of Revision-1 in the revision highlights.
- Page 2-6: change in Phase 9 time limit
- Page 2-7: Deleted Phase 54 i.a.w AMM Rev.31
- Page 3-1: Deleted 180 days Radio inspection as it is not a CAR
Mandatory Task.
- Page 4-7: Added Chapter 34, Item No.7
Revised Chapter 35, Item 1 & 2 i.a.w AMM Rev.31
- Page 4-8 & 4-9: Editorial change
- Page 4-10: Added Chapter 54, forward engine beam inspection
i.a.w AMM Rev. 31
- Page 6-1: Revised COSL i.a.w AMM Rev.31
- Page 7-6: Revised Item No. 72 i.a.w AMM Rev.31
- Page 7-12: Added Flight Data Recorder System (Item No. 155)
i.a.w AMM Rev.31
Issue : 1 Revision : 1
Date : Dec, 2011 Date : Apr, 2012
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART – 1
INTRODUCTION
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
INTRODUCTION
The RAINBOW AIR PRIVATE LIMITED has been established with a view to provide
safe air charter services (Passengers) to various domestic destinations utilizing Cessna
Citation 560XL type of aircraft. Later on it is planned to bring in more other type of aero
planes with the permission of Government Aviation authorities.
This Maintenance Program explains the basic principles followed in the maintenance of
aircraft and procedures followed in specific occasions.
This manual will be distributed as per the distribution list. Similarly, any amendment to
this manual will also be distributed to them.
No pages of this manual shall be removed / deleted / altered without the specific
approval of CAMO Manager and the Regional Airworthiness office.
Master copy of this Manual will be retained in the CAMO Department and shall be
available for inspection by the officers of DGCA.
This manual is prepared for the particular part number of the components installed at
various locations on the aircraft operated by this organization. When an alternative part
number is allowed by IPC or any modified part number is allowed by the Manufacturer,
if installed, then those specific instructions meant for those situations should be
incorporated.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
ABBREVIATIONS
TASK ABBREVIATIONS
LU Lubrication
SV Servicing
OP Operational Check
IN Inspection
FC Functional Check
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART – 2
MAINTENANCE PROGRAM
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
C. Instructions given by certain Major Aviation Authorities such as FAA for this type
of aircraft are also being followed with the instructions from the DGCA.
GENERAL
Rainbow Air Pvt. Ltd will outsource the maintenance of Cessna Citation 560XL aircraft
to an approved CAR 145 organization.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
A. The five primary phases (Phases 1 through 5) are the core of the continuous
inspection program. The inspection tasks for these phases will be done as per
approved schedules prepared i.a.w Aircraft Maintenance Manual. The remaining
phases, which have the higher time inspection requirements, are not included in
the Phases 1 through 5 continuous inspection cycles.
B. The five primary phases (Phases 1 through 5) constitute the core of the
continuous inspection program.
1. Phases 1 through 4, totally has an interval of 300 hours and they are
designed to be accomplished in a continuous, repetitive 300-hour cycle.
C. The remaining phases are to be accomplished when due or at any time earlier to
coincide with a convenient inspection or maintenance downtime.
D. The calendar time limits (such as 36 calendar months in Phase 5) must be taken
into consideration for airplanes accumulating less than the specified hours in the
calendar period.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Pratt & Whitney Canada’s maintenance philosophy for the PW545A engine provides the
operator with a flexible maintenance plan with two basic options; ‘‘The Fixed TBO’’ or
‘‘The Continuous Maintenance’’ plans.
‘‘Fixed TBO’’ requires that the engine be overhauled after a specified operating interval.
When both engines, installed on a single aircraft, have the same operating hours, an
additional100 hours of normal operation beyond the Fixed TBO interval is available to
provide the necessary time to schedule the overhaul of one engine, prior to the removal
of the second engine.
The recommended TBO interval for the PW545A engine is 5000 hours. The
recommended HSI frequency for all PW545A engines is 2500 hours. An additional 50
operating hours is available for scheduling purposes. When scheduling an HSI
concurrently with an overhaul, an additional 100 operating hours is available for
scheduling purposes instead of 50.
This manual is only a guideline to the technical staff. Though this manual covers
all the applicable maintenance tasks, still the staff are advised to refer the
relevant pages of AMM of aircraft and engine manufacturers before undertaking
any work.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Cessna Citation 560 XL inspections are divided into the following groups.
3. Component overhaul.
Depending on the availability of special tools and other necessities these inspections
will be undertaken at this organization or at any other approved organization with the
approval of Regional Airworthiness office.
Phase Inspections which are out of the coverage of the organization’s scope of
approval will be carried out as and when due only with prior concurrence of DGCA with
enhancement to the scope of approval of the organization as necessary.
1. PREFLIGHT INSPECTION:
This inspection schedule is required to be carried out BEFORE EVERY FLIGHT. The
inspection will be carried out by an appropriately licensed AME / Approved Pilot-in-
Command. It has been prepared as per AFM.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
This inspection shall be carried out at base and out stations after every arrival of the
aircraft from flight. This consists of only walk around inspection to ascertain that
nothing abnormal has taken place during the last flight.
As per the AMM, Phase 1 through 4, totally having an interval of 300 hrs / 24 months,
are designed to be accomplished in a continuous repetitive 300 hrs cycle by one of the
three different methods. i.e.
(ii) Combine phase 1 & 2 and accomplished at 150 hrs intervals (12 months) with
phase 3 & 4 being performed at next 150 hrs interval at total 24 month calendar time.
(iii) Combine all phases 1 through 4 together and perform at 300 hrs interval or 24
months.
NOTE: If all the phases are combined and carried out at 300 hrs, accomplish phase B
inspection at 150 hrs interval. (Details of phase ‘B’, inspection given separately in
AMM).
Rainbow Air Pvt. Ltd. has chosen the second method and will perform these
inspections as follows.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 1
Date : Dec, 2011 Date : Apr, 2012
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
18. Phase 52 : Every 600 hrs or 12 months whichever occurs first and
every 200 hrs or 3 calendar months thereafter (part of
COSL).
19. Phase 53 : Every 900 hrs or 12 months whichever occurs first (part
of COSL).
20. Phase 49 : Every 6 yrs/ 2400 hrs and every 1200 hrs / 36 months
thereafter whichever occurs first (part of COSL).
22. Phase 59 : Every 600 hrs or 12 months whichever occurs first (part
of COSL).
23. Phase 60 : First 2400 hrs then every 1200 hrs (part of COSL).
Issue : 1 Revision : 1
Date : Dec, 2011 Date : Apr, 2012
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
26. Phase 67 : Every 400 hrs or 12 months whichever occurs first (part
of COSL).
28. Phase MB : First 3000 hrs then every 1500 hrs (part of COSL).
29. Phase MD : First 6000 hrs / 10 yrs then every 2400 hrs / 10 yrs
whichever occurs first (part of COSL).
31. Phase MF : First 7500 hrs then every 1400 hrs (part of COSL).
32. Phase MG : First 6500 hrs then every 3000 hrs (Not applicable).
33. Phase MH : First 11000 hrs then every 6000 hrs (Not applicable).
34. Phase MI : First 5000 hrs then every 2500 hrs(Not applicable).
36. Phase MK : First 11500 hrs then every 9000 hrs (Not applicable).
37. Phase ML : First 11500 hrs then every 3300 hrs (part of COSL).
38. Phase MM : First 11000 hrs then every 4200 hrs (part of COSL).
39. Phase MN : First 9000 hrs then every 3400 hrs (part of COSL).
40. Phase MO : First 12500 hrs then every 6100 hrs (part of COSL).
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
2. Over speed - Speed that is more than the placard speeds of the flaps or landing
gear speed that is more than the airplane's design speeds.
5. Lightning strike.
7. Airplane towed with a large fuel unbalance or high drag / side loads because of
ground handling.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
A book consists of sector pages are made where the flight information’s are
recorded.
d) PROCEDURE SHEETS:
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
2. Trouble shooting.
3. Defect rectification.
5. Minor repairs and modifications which do not require extensive disassembly and
can be accomplished by simple means.
a) Phase 1,2,3,4,5,7,51,60.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART – 3
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 1
Date : Dec, 2011 Date : Apr, 2012
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART- 4
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PHASE INSPECTIONS LISTED IN THIS DOCUMENT WHICH ARE OUT OF THE COVERAGE OF THE
ORGANISATION’S SCOPE OF APPROVAL WILL BE CARRIED OUT AS AND WHEN DUE ONLY
WITH PRIOR CONCURRENCE OF DGCA WITH ENHANCEMENT TO THE SCOPE OF APPROVAL
OF THE ORGANISATION AS NECESSARY.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 1
Date : Dec, 2011 Date : Apr, 2012
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 1
Date : Dec, 2011 Date : Apr, 2012
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 1
Date : Dec, 2011 Date : Apr, 2012
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 1
Date : Dec, 2011 Date : Apr, 2012
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART- 5
CONDITIONAL INSPECTIONS
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
Events that require a conditional inspection include (but are not limited to ) the following:
2. Over speed - Speed that is more than the placard speeds of the flaps or landing
gear speed that is more than the airplane's design speeds.
5. Lightning strike.
7. Airplane towed with a large fuel unbalance or high drag/side loads because of
ground handling.
For the above inspections, refer the items of inspections as given in currently amended
AMM 5-50-00 pages, as the occasion araises.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART- 6
COSL / TBO
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
COSL:
This has been prepared taking various inspection requirements specified by the
manufacturer. This covers component requirements and Phase inspection numbers 6,
8, 9, 18, 20, 21, 22, 23,28, 30, 47, 48, 49, 51,52, 53, 58,59, 60, 63, 66, 67, 68 and
phase MB , MD, ME, MF, MJ, ML, MM, MN and MO. The life limits as per the
limitations specified in chapter 4 of AMM should not be extended.
Issue : 1 Revision : 1
Date : Dec, 2011 Date : Apr, 2012
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART- 7
PRIMARY PHASES
(PHASE 1 , 2, 3 , 4, 5)
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART NO. /
SL. REMARKS /
DESCRIPTION ITEM CODE PHASE
NO. MM REF.
NO.
Cockpit Voice Recorder System
Complete an operational
1. (Fairchild A200S) B237002 1 test.
Task 23-70-00-710
Overvoltage System.
2. B243003 1 Perform Functional Test.
Task 24-41-02-710
Brake Master Cylinders (Airplanes - Inspect for leaks and
security. Inspect hoses for
3. 5001 thru -5500) A324011 1 chafing and evidence of
Refer : AMM Ch: 32-40-00 damage.
Emergency Lighting System Task
4. B335001 1 Operational Check
33-50-00-710
Emergency Exit Lights Inspect for security of
5. A335002 1
Refer: AMM Ch: 33-50-02 installation.
Door Locks
6. C521000 1 Lubricate lock tumblers.
Refer: AMM Ch: 52-90-00
Inspect for security of
Cabin Door Inflatable Seal,
installation, wear,
7. Secondary Seal A521001 1
deterioration and evidence
Refer: AMM Ch: 52-10-04
of damage.
Door Warning System.
8. B527001 1 Perform operational check.
Task 52-70-00-710
Inspect airplane
Moisture Drain Holes unpressurized area drain
9. A530002 1
Refer: AMM Ch: 53-10-05 holes for obstruction and
evidence of corrosion.
Inspect for missing
Radome Surface Mounted Lightning segments, corrosion,
10. Diverter Strips A531015 1 damage and electrical
Refer: AMM Ch: 53-10-10 continuity to airplane
structure.
11. Radome - Task 53-10-10-760 B531017 1 Check electrical bond.
Windshield Humpseal
12. A561003 1 Detailed Inspection
Task 56-11-00-210
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART NO. /
SL. REMARKS /
DESCRIPTION ITEM CODE PHASE
NO. MM REF.
NO.
Inspect windows for
Cabin Windows
13. A562001 1 scratches, cracks, crazing
Refer: AMM Ch: 56-20-00 and deformities.
Aileron Trim Tab Actuator Task 12-
14. C271001 2 Lubricate.
21-01-640
Aileron Trim Tab
15. B271001 2 Functional Test (Free Play)
Task 27-10-00-220
Rudder and Rudder Trim Tab - Task
16. A272001 2 Inspect.
27-20-00-223
Rudder Trim Tab Actuator Task 12-
17. C272002 2 Lubricate.
21-01-640
Elevator Trim Tab Actuators - Task
18. C273002 2 Lubricate.
12-21-01-640
Pneumatic Deice System
19. B301002 2 Perform operational test.
Task 30-12-00-710
Inspect for security of
Deice Boots, Empennage
20. A301003 2 installation and evidence of
Refer: AMM Ch: 30-12-01 damage.
Landing Gear Extension and
21. B320001 2 Perform functional test.
Retraction. Task 32-01-00-720
22. Main Gear. Task 32-10-00-210 A321001 2 Inspect.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART NO. /
SL. REMARKS /
DESCRIPTION ITEM CODE PHASE
NO. MM REF.
NO.
Check brake wear. Refer to
Main Gear Wheel Brakes.
28. A324003 2 manufacturer's component
Refer: AMM Ch: 32-42-01
maintenance manual.
Inspect hinge for corrosion
Main Landing Gear Door
29. A528001 2 and doors for evidence of
Refer: AMM Ch: 52-00-00
damage.
Inspect doors for evidence
Nose Landing Gear Door. 2
30. A528002 of damage and signs of tire
Refer: AMM Ch: 52-00-00 rub.
Horizontal Stabilizer.
31. A551001 2 External Inspection
Task 55-10-01-210
Visually inspect for
Horizontal and Vertical Stabilizer Aft
separation of the bond
32. Edge. Refer: AMM Ch: 55-10-01 & A551002 2
between the skin and
55-30-01
doubler.
Vertical Stabilizer External Examination -
33. A553001 2
Task 55-30-01-210 Inspect.
Check drain holes for
34. Flaps - Task 57-50-04-211 A575002 2 obstruction
Fuel Control Unit (FCU) Throttle
Lever Cutoff (Airplanes-5001 thru -
35. A761101 2 Functional Test
5196 Not Incorporating SB560XL-76-
03) Task 76-10-00-620
Inspect for security of
installation. Inspect
terminal block and
Starter-Generator
36. A801001 2 electrical connections for
Refer: AMM Ch: 80-10-00 cleanliness and evidence of
damage from heating and
arcing.
Flap Rollers.
37. C275001 3 Lubrication
Perform Task 12-21-01-643
Emergency Pressurization System.
38. B215001 4 Operational Check
Task 21-51-00-712
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART NO. /
SL. REMARKS /
DESCRIPTION ITEM CODE PHASE
NO. MM REF.
NO.
Main Gear Wheel Brakes - Refer: Check parking brake for
39. B324003 4
AMM Ch: 32-42-01 operation.
Inspect the upper and
lower cowls, inlet, aft
Nacelle and Cowling cowling, inboard cowling,
40. Refer: AMM Ch: 71-60-00 & 71-11- A711001 4 oil filler door and access
00 panels for failed fasteners,
security of installation and
evidence of damage.
41. Engine - Task 71-00-00-210 A720003 4 Perform general inspection
Fuel Control Unit (FCU) Throttle
Lever Cutoff (Airplanes -5197 thru -
42. 6000, and Airplanes -5001 thru -5196 A761102 4 Functional Check
Incorporating SB560XL-76-03) Task
76-10-00-620
Thrust Reversers
43. A783012 4 Inspect
Task 78-31-00-210
Thrust Reverser System
44. B783030 4 Functional Check
Task 78-90-30-720
Cleanliness and erosion
Every 300 hours ± 50
Spark Igniters
45. 05-11-00 4 (Pre-SB30340)
EMM CH: 74-31-00-710 Every 600 hours ± 50
(Post-SB30340)
Lubrication (WC-393 Non-
Thrust Reverser
46. C783101 7 Aerosol Spray Lubrication
Task 78-31-00-640 Method)
Required Interior and Exterior
5 Examine for security of
47. Placards and Decals A110001 installation and legibility.
Task 11-00-00-210
Cabin Air Distribution Check Valves
48. A212002 5 Detailed Inspection
Task 21-22-00-210
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART NO. /
SL. REMARKS /
DESCRIPTION ITEM CODE PHASE
NO. MM REF.
NO.
Pressurization System
49. B213000 5 Functional Check
Task 21-30-00-721
Cabin Altitude Pressure Switch
50. B213002 5 Functional Test
Task 21-31-05-720
Outflow Valve Particulate Trap.
51 D213003 5 Inspect and clean
Task 21-30-00-170
Environmental System
52. B215000 5 Perform operational check.
Task 21-51-00-710
Nose Avionics Cooling Fan
53. B216001 5 Perform operational check.
Task 21-25-00-710
Nose Avionics Cooling Fan
54. A216001 5 Inspect.
Task 21-25-00-210
Instrument Panel Cooling
55. B216002 5 Perform operational check.
Task 21-24-00-710
Cockpit Zone Temperature
56. A216002 5 Inspect.
Assembly. Task 21-61-00-710
Cabin Zone Temperature Assembly.
57. A216003 5 Inspect.
Task 21-61-00-711
Aspirator Refer: AMM Ch: 21-51-00 Inspect nozzle for heat or
58. A217002 5
(Water Separator Nozzle) other damage.
Aileron Servo Mount and Actuator.
59. A221001 5 Inspect.
Task 22-11-01-210
Rudder Servo Mount and Actuator.
60. A221002 5 Inspect.
Task 22-11-01-211
Elevator Servo Mount and Actuator.
61. A221003 5 Inspect.
Task 22-11-01-211
Autopilot Disengagement and
62. Warning System. B221004 5 Perform operational test.
Task 22-11-03-710
High Frequency Antenna and
63. Tensioning Unit. A231001 5 Inspect.
Task 23-11-00-210
Static Discharging System
64. A236001 5 Functional Check
Task 23-90-60-720
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART NO. /
SL. REMARKS /
DESCRIPTION ITEM CODE PHASE
NO. MM REF.
NO.
Nose Area Electrical Components.
65. A242001 5 Inspect.
Task 24-00-00-210
Side Console Equipment Panel.
66. A245002 5 Inspect.
Task 24-50-02-211
Aft Power Junction Box.
67. A245003 5 Inspect.
Task 24-50-03-210
Interior Junction Box Components.
68. A245005 5 Inspect.
Task 24-50-05-210
Crew and Cabin Seats.
69. A251001 5 Inspect.
Task 25-11-01-210
Pilot and Copilot Seat Track Stops. Inspect for damage and
70. A251002 5
Refer: AMM Ch: 25-11-01 security of installation.
Fire Extinguishing System
71. B262010 5 Perform functional test.
Task 26-21-00-720
72. Aileron and Aileron Trim Tab Examine for security of
A271001 5 Installation
Task 27-10-00-211
Aileron and Trim Tab
73. B271002 5 Check Travel.
Task 27-10-00-221
Aileron Outboard Wing Control
74. A271004 5 Functional Test
Cable. Task 27-10-00-212
Check rudder and rudder
75. Rudder. Task 27-20-00-221 B272003 5 trim tab travel.
Rudder Pedals
76. A272004 5 Inspect.
Task 27-20-00-224
Elevator and Elevator Trim Tab
77. A273001 5 External Visual Inspection.
Task 27-31-00-211
Elevator and Elevator Trim Tab -
78. B273003 5 Check travel.
Task 27-31-00-221
Elevator Trim Tab. Check elevator trim tab free
79. B273004 5
Task 27-31-00-220 play.
Control Column.
80. A273007 5 Examine.
Task 27-31-02-210
Elevator Linkage
81. A273009 5 Inspect.
Task 27-31-00-212
Issue : 1 Revision : 1
Date : Dec, 2011 Date : Apr, 2012
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART NO. /
SL. REMARKS /
DESCRIPTION ITEM CODE PHASE
NO. MM REF.
NO.
Takeoff Warning System Sensors -
82. B274001 5 Operational check.
Task 27-40-00-712
Horizontal Stabilizer Actuator Oil leakage acceptance
83. C274002 5
Reservoir - Task 12-21-01-641 criteria and oil level check.
Two Position Horizontal Stabilizer -
84. B274002 5 Operational check.
Task 27-40-00-710
Flap Drive System
85. A275001 5 Inspect.
Task 27-51-00-210
86. Flaps. Task 27-51-00-220 B275003 5 Check flap travel.
Flap Approach Warning Switch
87. B275004 5 Perform operational check.
Task 27-51-00-710
Speed Brake System
88. A276001 5 Detailed Inspection
Task 27-61-00-210
Inspect for security of
Control Lock Assembly
89. A277002 5 installation, wear and
Refer: AMM Ch: 27-71-00 corrosion.
Control (Gust) Lock System
90. B277003 5 Operational Check
Task 27-71-00-710
Fuel Storage System
91. A281001 5 Detailed Inspection
Task 28-10-00-210
Fuel Boost Pump and Scavenge
92. B282001 5 Perform operational test.
Ejector Pump - Task 28-20-00-710
Low Fuel Warning System
93. B284001 5 Functional Test
Task 28-42-00-710
Hydraulic Panel Assembly and
94. A291001 5 Inspect.
Components - Task 29-11-06-210
Hydraulic System Filters
95. D291002 5 Discard
Task 29-11-04-901
Bleed Air Anti-Ice Systems
96. (Airplanes -5001 thru -6000) B301001 5 Operational Check
Task 30-11-00-710
Deice Control Valves Inspect for corrosion,
97. A301004 5
Refer: AMM Ch: 30-12-02 security of installation.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART NO. /
SL. REMARKS /
DESCRIPTION ITEM CODE PHASE
NO. MM REF.
NO.
Inspect for corrosion,
Deice Pressure Switches security of installation and
98. A301005 5
Refer: AMM Ch: 30-12-02 damaged electrical
components.
Nose Compartment Over
99. temperature Switch B304001 5 Functional Test
Task 30-40-00-710
Instrument Panel Area
100. A311001 5 Inspect.
Task 31-10-00-210
Emergency Extension System
101. A323002 5 Inspect.
Cables. Task 32-30-08-210
Emergency Gear Release Rigging.
102. A323003 5 Functional Check.
Task 32-30-08-720
Brake Reservoir (Airplanes -5001
103. A324005 5 Visual Inspection
thru -5500) - Task 32-42-00-210
Brake Reservoir Air Filter (Airplanes -
104. D324006 5 Replacement
5001 thru -5500) Task 32-42-00-902
Reservoir Supply Line Filter Task 32- Cleaning (Airplanes -5001
105. D324007 5
42-00-131 thru -5500)
Hydraulic Pack Assembly Filter Task Replacement (Airplanes -
106. D324008 5
32-42-00-901 5001 thru -5500)
Antiskid System (Airplanes -5001
107. B324009 5 Functional Test
thru -5500) - Task 32-42-00-710
Emergency Brake System
108. B324010 5 Perform operational test.
Task 32-42-09-710
Nose Steering Arm and Support Inspect for security, wear,
109. Bracket, Bungee and Bellcrank A325001 5 corrosion, failed fasteners
Refer: AMM Ch: 32-50-00 and evidence of damage.
Nose Steering Cables.
110. A325002 5 Inspect.
Task 32-50-00-730
Inspect high voltage wiring
Indirect Cabin Fluorescent Lighting
above headliner for security
111. (Airplanes -5001 thru -5349) A332001 5
of installation and condition
Refer: AMM Ch: 33-20-01
of electrical wire.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART NO. /
SL. REMARKS /
DESCRIPTION ITEM CODE PHASE
NO. MM REF.
NO.
Emergency Lighting Battery Packs.
112. A335001 5 Inspect.
Task 33-50-00-210
Perform Self-Test
Angle-of-Attack System. Procedure and the Landing
113. B341005 5
Task 34-14-01-720 Gear Extended and Squat
Switch Logic Test.
Magnetic Compass Inspection Examine for correct
(Airplanes -5001 thru -5500, and installation, a clean
surface, and signs of
114. Airplanes -5501 thru -6000 A342001 5 damage. Make sure that
Incorporating SB560XL-34-61) the current compass card is
Refer: AMM Ch: 34-24-01 installed.
AHRS, Standby HIS-315 and
115. Standby Magnetic Compass B342001 5 Perform Accuracy Check
Task 34-21-01-710
Inspect for security of
installation, corrosion,
Oxygen Cylinder, Supply Pressure
cleanliness of the area and
116. Regulator and Shutoff Valve A351001 5
evidence of damage. Verify
Refer: AMM Ch: 35-01-00
valve is safetied in the ON
position.
Passenger Oxygen System
117. B351001 5 Functional Test
Task 35-01-00-710
Inspect masks and hoses
Crew Oxygen Mask for deterioration,
118. A351002 5
Refer: AMM Ch: 35-10-01 cleanliness and proper
stowage.
Cabin Door Particulate Trap
119. D361001 5 Restoration (Cleaning)
Refer:AMM Ch:36-15-00
Drain Lines. Perform an operational
120. B383003 5
Task 38-30-00-710 check
Inspect for cracks, loose or
failed fasteners damaged
Cabin Door and Door frame locking pins, worn or
121. A521003 5
Refer: AMM Ch: 52-10-00 damaged receptacles and
indications of structural
damage.
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART NO. /
SL. REMARKS /
DESCRIPTION ITEM CODE PHASE
NO. MM REF.
NO.
Cabin Door.
122. A521004 5 Detailed Inspection
Task 52-10-00-210
Emergency Exit Door.
123. A522001 5 Detailed Inspection
Task 52-20-00-210
Tailcone Access Door Inspect for proper operation
124. A524001 5
Refer: AMM Ch:5-40-00 and evidence of damage.
Nose Compartment Doors Inspect for security of
125. A524002 5
Task 52-40-01-210 installation.
Pressurized Area Moisture Seals.
126. A530001 5 Inspect.
Task 53-10-05-160
Aft Tailcone Components Task 53-
127. A531004 5 Inspect.
10-12-210
Forward Tailcone Components
128. A531005 5 Inspect.
Task 53-10-12-211
Fuselage Internal Components
129. A531006 5 Inspect.
Task 53-10-11-210
Inspect for cracks, loose or
Emergency Exit Door frame failed fasteners and any
130. A531009 5
Refer:AMM Ch: 52-20-00-210 indication of structural
damage.
Inspect all structures for
Nose Area
131. A531011 5 security of installation,
Refer: AMM Ch:53-10-10 cracks, corrosion.
132. Control Pedestal -Task 53-20-02-210 A531012 5 Inspect.
Inspect for security of
Stinger Assembly
133. A531013 5 installation, corrosion and
Refer : AMM Ch: 53-10-15
evidence of damage.
134. Radome - Task 53-10-10-210 A531016 5 Inspect.
Inspect nose landing gear
attach fittings, supporting
structure and remainder of
135. Nose Gear Wheel Well A532002 5
wheel well for cracks, failed
fasteners, corrosion and
evidence of damage
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART NO. /
SL. REMARKS /
DESCRIPTION ITEM CODE PHASE
NO. MM REF.
NO.
Inspect main landing gear
attach fittings, supporting
structure and remainder of
136. Main Gear Wheel Well A532003 5
wheel well for cracks, failed
fasteners, corrosion and
evidence of damage.
Inspect for cracks, loose or
Fuselage Exterior Skin failed fasteners and
137. A533001 5
Refer : AMM Ch: 53-90-00 evidence of structural
damage.
Inspect for damage,
Nacelle Firewall
138. A541001 5 deteriorated firewall sealant
Refer : AMM Ch: 54-50-01 and corrosion.
Inspect for failed fasteners,
Pylon evidence of structural
139. A541002 5
Refer : AMM Ch: 54-50-01 damage and pylon skin
cracks.
Horizontal Stabilizer. Internal Examination -
140. A551003 5
Task 55-10-01-211 Inspect
Horizontal Stabilizer Scissor Fitting
141. C551003 5 Perform Lubrication
Bolts. Task 12-21-01-642
Inspection (Airplanes -5001
thru -5020) (This inspection
Vertical Spar Pivot Fitting Lower is necessary for Airplanes
142. A553002 5
Flange and Clip Task 55-30-01-211 that have not replaced the
one-piece clip with a two-
piece assembly.)
Vertical Stabilizer. Internal Examination –
143. A553003 5
Task 55-30-01-212 Inspect
Inspect the elevator attach
Horizontal Stabilizer
144. A555001 5 points and carry-thru for
Refer : AMM Ch: 55-10-01
evidence of damage.
Inspect the rudder and
Vertical Stabilizer vertical stabilizer attach
145. A555002 5
Refer : AMM Ch: 55-30-01 points for evidence of
damage.
Cockpit Windshield and Side Detailed Inspection
146. A561001 5
Windows - Task 56-11-00-212 (Delamination)
Issue : 1 Revision : 0
Date : Dec, 2011 Date : Dec, 2011
RAINBOW AIR PVT., LTD, CHENNAI
MAINTENANCE PROGRAM
PART NO. /
SL. REMARKS /
DESCRIPTION ITEM CODE PHASE
NO. MM REF.
NO.
Windshield Retainer Screws Functional Test (Torque
147. A561002 5
Task 56-11-00-280 Inspection)
Inspect external skin and
Wings access panels for cracks,
148. A573001 5
Refer : AMM Ch: 57-10-00 failed fasteners and
evidence of damage
Flaps and Flap Tracks
149. A575003 5 Inspect.
Task 57-50-04-210
150. Flaps - Task 57-50-04-212 A575004 5 Perform coin tap inspection
Upper Cowling Camloc Hole
151. A711002 5 Detailed Inspection
Task 71-11-00-220
Forward and Aft Upper Cowling Edge
152. A711003 5 Detailed Inspection
Task 71-11-00-221
Thrust Reverser Electrical Junction
153. A783018 5 Inspect.
Box - Task 78-31-00-211
Starter Disengage System
154. B801004 5 Perform operational test
Task 80-10-00-710
155 Flight Data Recorder System
B313004 5 Functional Check
Task 31-90-30-720
Issue : 1 Revision : 1
Date : Dec, 2011 Date : Apr, 2012