2 .1 DESIGN OF COMPONENTS
2.1.1.1 SPECIFICATIONS
❖ The deck slab is proposed to have the following dimensions as shown in the figure.
❖ The deck slab is designed for a clear span of 20m.
❖ The dimensions are thus 20m x 8m x 0.75m
❖ Two lanes each having a width of 4m are considered.
❖ The overall depth of the deck slab in 750mm and a clear cover of 40mm is adopted and
thus the effective depth is 700mm.
❖ Kerb slabs are designed to support the pedestrian pathway , having width of 1.5m on
either side of the deck slab. The depth of kerb slab is assumed as 1.05m
(750mm+300mm).
❖ Both the deck slab and kerb slab are made out of reinforced concrete of grade M40 and
the reinforcement used are of grade Fe 415.
❑ IRC 21: 2000- Standard specifications and code of practice for road bridges
=741 KNm
Dead load SF = wl/2 = 14.26×20.45
2
= 145.8 KN
STEP-3 : Live load BM & SF
Class A train of vehicles is taken into consideration.The maximum axle loads of 11.4 tonnes are
taken into consideration so as to produce the maximum bending moment
B+L
= 4.5 / (6+20.4)
= 0.170
For 2 wheels = ( 1.31 /2 ) + 1.2 + (1.31 /2 )
= 2.51m
Effective width of dispersion perpendicular to span
Allowing for overlaps, the effective width of dispersion is obtained as 11.115m. Since, this value
is more than the width of deck, the effective width of dispersion perpendicular to span is limited
to 11.0m
2×114×1.170
Intensity of loading including impact per meter width = = 9.68kN/m2
11×2.51
2.51 2.51
Maximum bending moment at midspan= (9.68× ×10.2)-(9.68×2.51× )
2 2 4
= 116.29kN/m2
=741+116.29
=857.29kNm
STEP 4: Design of slab
Use M40 concrete grade and Fe415 bars
𝑀
Effective depth, d=√𝑄𝑏
857.29×1000000
=√( )
1.894×1000
=672.78mm
Take d=700mm
D=700+50=750mm
Ast= M/ (σst*j*d)
857.29×1000000
Ast=
200×0.894×700
=6849mm2
=71.67≈70mm
6849
Number of bars=𝜋 =14 bars
×25×25
4
𝜋
Actual area of steel=14× ×252
4
=6872mm2
=(0.3×116.29)+(0.2×741)
=183.08kNm
=682mm
183.08×1000000
Area of steel=
200×0.894×682
=1501.37mm2
1501.37
=𝜋
×16×16
4
= 8bars
𝜋
Actual ast=8× 4 ×162=1608mm2
BATCH 3
TEAM MEMBERS :