MODULE 30
REFRIGERATION
MODULE 30 COMPRESSOR
EXPANDER/COMPRESSOR SKID 1, TRAIN 1
SYSTEM SKID 2,TRAIN 1 PD-207
D PD-205 N Make Up D
PD-207A
PD-205A PD-207B
PD-207C

Vent / Boil Off Gas

MODULE 40
LIQUEFACTION
TRAIN 1
PD-206

MODULE 70
LNG STORAGE MODULE 70
MODULE 10 MODULE 20
PD-210 LNG PUMP &
PIPE LINE GAS METERING Reception & Purification
PD-210A TRUCK LOADING
4 Inch Carbon Steel SKID Pressure Control PD-202
C PD-201 PD-203 PD-210B C
PD-210C PD-211

3 X 15,600 Gallons 300 GPM

ZEUS GAS METERING SKID

Start Up Fuel MODULE 90


& Fuel Mixing
Makeup Fuel MODULE 90
Skid
FLARE SYSTEM MODULE 45
PD-212A
PD-213 LIQUEFACTION
TRAIN 2
A PD-216

NO FLOW EXPECTED TO FLARE

Module 90
NG GENERATOR 1

1,200 kW MODULE 35
MODULE 35 REFRIGERATION MODULE 60
EXPANDER COMPRESSOR NITROGEN
/ SYSTEM SKID 1, N Make Up GENERATOR
B COMPRESSOR TRAIN 2 B
PD-208
SYSTEM SKID 2, PD-217 PD-209
TRAIN 2 PD-217A PD-209A
PD-215 PD-217B PD-218
MODULE 50 PD-215A PD-217C
MODULE 90
NG GENERATOR 2 Power Distribution

1,200 kW 2,900 kW
4,1960 V
49-80V

MODULE 90
DIESEL
GENERATOR 3

500 kW

Power Plant - Flesan


UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
CAD GENERATED DRAWING

INTERPRET DIMENSIONS AND TOLERANCES PER


DO NOT MANUALLY UPDATE OKRA ENERGY
ASME Y14.5-1994
A A
TITLE
THIRD ANGLE PROJECTION
REVISIONS DO NOT SCALE DRAWING
NOTES: COLAN 30K LNG FACILITY & PLANT
1. RED LINES ARE FUEL GAS LINES. REV. DESCRIPTION DRAWN BY PROCESS MECH EIC MAN DATE BLOCK PROCESS FLOW DIAGRAM
2. LIGHT BLUE LINES ARE NITROGEN LINES FOR REFRIGERATION. A DRAFT DFG 10-MAR-18
DRAWN: DATE:
3. ORANGE LINES ARE VENT/BLOW-OFF GAS FROM THE FLASH VESSEL 40-2302. 0
THE PLANT WILL BE OPERATED FROM TO MINIMIZE GAS IN THIS STREAM. 1
DFG 10 MAR 18 SIZE DWG NO. REV.
4. DASHED GREY LINES ARE POWER LINES TO MODULE 50.
5. DURING NORMAL OPERATION GENERATOR #1 & #2 WILL BE RUNNING. CHECKED: DATE: D PID-XXXX-XXX-XXX 0
GENERATOR #3 WILL BE USED FOR START-UP & TRANSIENT LOADS ONLY. XXXX 00 XXX 00 SCALE SHEET