Sei sulla pagina 1di 138

LOAD PATH & MAINTENANCE

TESCO TRAINING
DEPARTMENT

ELECTRIC
TOP DRIVE TRAINING

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

ECI (S)
ELECTRIC
COMPACT
INTEGRATED
SWIVEL

© 2013 Tesco Corporation. All rights reserved. 3


LOAD PATH & MAINTENANCE

ECIS 900 – ELECTRIC

• 500 Ton and 650 Ton


• 900 HP
• Standard Gear Ratio 18.61:1
• Max Drill Torque 36,700
ft./lbs.
• Max Make Up Torque 45,000
ft./lbs.
• Max Breakout Torque 56,000
ft./lbs.
• Max Speed 193 RPM.
© 2013 Tesco Corporation. All rights reserved.
LOAD PATH & MAINTENANCE

LOAD PATH

© 2013 Tesco Corporation. All rights reserved. 6


LOAD PATH & MAINTENANCE

LOAD PATH TOP DRIVE TRAINING

AT THE COMPLETION OF THIS SECTION YOU WILL BE


ABLE TO :

 IDENTIFY LOAD PATH AND OTHER COMPONENTS


 IDENTIFY COMPONENT INSPECTION FREQUENCY

© 2013 Tesco Corporation. All rights reserved. 7


LOAD PATH & MAINTENANCE

LOAD PATH

LOAD PATH IS ANY PART OF THE TOP DRIVE THAT


CARRIES THE LOAD OF THE DRILL STRING.

TWO DIFFERENT LOAD PATHS:

1) DRILLING
2) TRIPPING

© 2013 Tesco Corporation. All rights reserved. 8


LOAD PATH & MAINTENANCE

IDENTIFYING ECI LOAD PATH


COMPONENTS

THREADED NON THREADED


COMPONENTS COMPONENTS

• QUILL • LOAD COLLAR


• MUD SAVER VALVE • LOAD NUT
(STABBING VALVE) ASSEMBLY
• SAVER SUB • ELEVATOR LINK
• CROSSOVER SUB ASSEMBLY (BAILS)
• ELEVATORS
© 2013 Tesco Corporation. All rights reserved. 9
LOAD PATH & MAINTENANCE

LOAD PATH
COMPONENTS
QUILL

LOAD COLLAR

LOAD NUT

MUD SAVER VALVE

SAVER SUB
ELEVATOR BAILS

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

INSPECTION

NDT: NON DESTRUCTIVE TESTING

TWO TYPES

• WFMPI, WET FLOURESCENT MAGNETIC


PARTICLE INSPECTION
• MPI, MAGNETIC PARTICLE INSPECTION

© 2013 Tesco Corporation. All rights reserved. 11


LOAD PATH & MAINTENANCE

INSPECTION
The Three types of inspection are:
• A: Visual inspection for:
– Wear
– Deformation
– Cracks
– Corrosion
– Galling
– Heat damage
– Other irregularities
© 2013 Tesco Corporation. All rights reserved. 12
LOAD PATH & MAINTENANCE

INSPECTION

• B: Perform MPI or WFMPI for cracks. All cracked


components should be referred to TESCO Engineering
for disposition.

• C: Return to a TESCO authorized service center for


complete dimensional, visual, WFMPI/MPI inspection
for recertification.

© 2013 Tesco Corporation. All rights reserved. 13


LOAD PATH & MAINTENANCE

WFMPI EXAMPLES
WFMPI, WET FLOURESENT
MAGNETIC PARTICLE
INSPECTION

CRACKS
© 2013 Tesco Corporation. All rights reserved.
LOAD PATH & MAINTENANCE

WFMPI EXAMPLES

CRACKS

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

LOAD PATH THREADED RECOMMENDED


MINIMUM SAFETY INSPECTION

• All threaded connections are subject to Wet fluorescent


Magnetic Particle Inspection (WFMPI) by a qualified
inspector for surface defects with specific attention to
the thread profiles of the box and pin connections
every 60 operating days (any part of an operating day is
considered one day).

• *Note* the above inspections should also be conducted


after excessive rough drilling, excessive jarring or any
other occurrences which can dramatically increase
fatigue failure (at operators discretion).
© 2013 Tesco Corporation. All rights reserved. 16
SWIVEL QUILL
LOAD C
ECIS SWIVEL BAIL

ECI LOAD COLLAR LOAD N


LOAD PATH SWIVEL RETAIN
INSPECTION FREQUENCY
SWIVEL SUB SWIVEL PIN

60 DAYS (WFMPI)
LOAD NUT LOAD N
RETAINER COLLA
60
500DAYS
DAYS(VISUAL)
(MPI)
QUILL
SWIVEL QUILL
LOAD NUT SPLIT TRIPPING LOAD PATH
COLLAR MUD S
STABB
LOAD COLLAR
DAILY (VISUAL) LOAD COLLAR

ELEVAT
MUD SAVER/
LOAD NUT
RETAINER VALVE
STABBING LOAD NUT
RETAINER
SAVER
LOAD NUT SPLIT
ELEVATOR
COLLAR LINKS
LOAD NUT SPLIT
COLLAR

TH SAVER SUB
MUD SAVER/ ELEVAT
STABBING VALVE
MUD SAVER/
STABBING VALVE
ELEVATOR LINKS
ELEVATOR LINKS
ELEVATOR
SAVER SUB CHECK DIE LOCK CLAMP
BOLTS DAILY (550 ft/lbs) SAVER SUB

ELEVATOR
ELEVATOR

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

ECI-900 QUILL

• A: Visual inspection
• B: MPI or WFMPI for cracks
• C: Recertification

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

ECI-900 QUILL

• A: Visual inspection
• B: MPI or WFMPI for cracks
• C: Recertification

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

ECI

QUILL (PIN X PIN)

ECIS

QUILL WITH INTEGRATED SWIVEL

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

BREAKING OUT JOINTS

• Stabilize top drive when breaking out swivel connections


(thread top drive into heavy weight pipe or cross chain
off grabber leg).
• Use of heat allowed only if normal breakout procedures
fail (warm up box end quickly and evenly thickest part to
thinnest part of box *approx. 250 deg °F/ 121 deg °C*.
• Caution - never exceed 300 deg °F/ 149 deg °C or severe
damage can be done (the quill can become hard and
brittle).

© 2013 Tesco Corporation. All rights reserved. 21


LOAD PATH & MAINTENANCE

BREAKING OUT JOINTS

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

SWIVEL SUB

CHECK THREADED CONNECTIONS

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

CROSSOVER SUB

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

MUD SAVER VALVE

• A: Visual inspection
• B: MPI or WFMPI for cracks
• C: Recertification

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

MUD SAVER VALVE

CHECK THREADS & MATING


SURFACES & MINIMUM
DIMENSION FROM SEAL
FACE TO LOCK RING
© 2013 Tesco Corporation. All rights reserved.
12.95cm MIN

1O.67cm MIN

14.29cm

15.875cm MIN
13.27cm MIN

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

SAVER SUB

• A: Visual inspection
• B: MPI or WFMPI for cracks
• C: Recertification

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

CHECK THREADS &


SAVER SUB MATING SURFACES

MIN.
8”/20.32cm

CHECK LOWER THREADS DAILY (DO


© 2013 Tesco Corporation. All rights reserved.
NOT TURN OVER END FOR END)
LOAD PATH & MAINTENANCE

SAFETY CLAMS
CHECK DIE LOCK CLAMP BOLTS DAILY (550 ft./lbs.)

SPLINE LOCK

DIE LOCK

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

LOAD PATH NON THREADED


RECOMMENDED MINIMUM SAFETY
INSPECTION

• All remaining components of the load path are subject to


Magnetic Particle Inspection (MPI) by a qualified inspector
for surface defects every 250, 500, 750, and 1000
operating days (any part of an operating day is considered
one day). Removal of paint is required for inspection.

© 2013 Tesco Corporation. All rights reserved. 31


LOAD NUT AND LOAD COLLAR

• Load nut to load collar mating surfaces should be


checked for scoring (machining is needed if galling is
present)
• *Clearance between mating surfaces must be less*
than *the clearance between the bottom of the load
collar to the top of the spring retainer* (drill string
load would then be transferred to the pipe handler
frame)
• Check for broken load collar stop bolts and contact
between load nut and pipe handler frame (quill may
have endplay)
© 2013 Tesco Corporation. All rights reserved. 32
LOAD PATH & MAINTENANCE

LOAD COLLAR

LOAD COLLAR ASSEMBLY • A: Visual inspection


• B: MPI or WFMPI for cracks
• C: Recertification

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

LOAD COLLAR
CHECK FOR WEAR

CHECK FOR BROKEN BOLTS ON (OLD


STYLE)
© 2013 Tesco Corporation. All rights reserved.
LOAD PATH & MAINTENANCE

LOAD COLLAR
CHECKING LOAD COLLAR CHECKING LOAD COLLAR
CLEARANCE (OLD STYLE) CLEARANCE (NEW STYLE)

1/8” GAP AT THIS POINT ON BOTH SIDES


© 2013 Tesco Corporation. All rights reserved.
LOAD PATH & MAINTENANCE

LOAD COLLAR

LOAD COLLAR

SPRING RETAINER

LOAD NUT

QUILL

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

LOAD NUT

• A: Visual inspection
• B: MPI or WFMPI for cracks
• C: Recertification

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

LOAD NUT

OUTER LOAD
NUT RETAINER

LOAD NUT SPLIT


HALVES

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

LOAD COLLAR AND LOAD NUT

X: Load collar to load nut Y: Load collar to spring retainer

X X
Y

Y>X

CHECKING CLEARANCES BETWEEN LOAD COLLAR AND LOAD NUT


© 2013 Tesco Corporation. All rights reserved.
LOAD COLLAR TO LOAD NUT
LOAD COLLAR TO SPRING RETAINER

BOTTOM OF
LOAD COLLAR

SPRING RETAINER TOP OF LOAD NUT

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

LOAD COLLAR AND LOAD NUT

Top of load nut damage


from rotating with weight
on bails, side of load nut
damage from contacting
pipe handler frame, caused
from endplay in gearbox.

© 2013 Tesco Corporation. All rights reserved.


BOTTOM OF LOAD COLLAR WITH DAMAGE FROM ROTATING WITH
WEIGHT ON BAILS

CHECK THIS AREA FOR WEAR

© 2013 Tesco Corporation. All rights reserved.


BOTTOM OF LOAD COLLARS
QUILL WITH DAMAGE FROM
CONTACTING LOAD COLLAR
ASSEMBLY (GEARBOX ENDPLAY)

PIPE HANDLER FRAME WITH


DAMAGE FROM CONTACTING LOAD
NUT ASSEMBLY (GEARBOX
ENDPLAY)
© 2013 Tesco Corporation. All rights reserved.
LOAD PATH & MAINTENANCE

INTEGRATED SWIVEL

• A: Visual inspection
• B: MPI or WFMPI for cracks
• C: Recertification

© 2013 Tesco Corporation. All rights reserved.


INTEGRATED SWIVEL

CHECK PINS AND PIN HOLES FOR WEAR

© 2013 Tesco Corporation. All rights reserved.


CHECK PIN HOLES,HOOK AREA FOR WEAR
AND BAIL FOR WARPING OR BENDING.
© 2013 Tesco Corporation. All rights reserved.
LOAD PATH & MAINTENANCE

ELEVATOR LINKS

• A: Visual inspection
• B: MPI or WFMPI for cracks
• C: Recertification

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

ELEVATOR LINKS

(117 cm)

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

ELEVATOR

• A: Visual inspection
• B: MPI or WFMPI for cracks
• C: Recertification

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

ELEVATOR
HAVE INSPECTED AT THE MANUFACTURERS
RECOMMENDED INTERVAL

CHECK PINS, INSERTS, AND LATCH ASSEMBLY FOR WEAR.


© 2013 Tesco Corporation. All rights reserved.
LOAD PATH & MAINTENANCE

NON LOAD PATH RECOMMENDED INSPECTION

Remaining components of the top drive that may be


affected by the load path should be inspected for any
defects on a regular basis. This would be up to the
operators discretion. These components are still subject
to the 250 day inspections.

© 2013 Tesco Corporation. All rights reserved. 51


LOAD PATH & MAINTENANCE

TORQUE TRACK

• A: Visual inspection
• B: MPI or WFMPI for cracks
• C: Recertification

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

TORQUE TRACK

© 2013 Tesco Corporation. All rights reserved.


TORQUE TRACK

TORQUE BEAM & T-BAR

© 2013 Tesco Corporation. All rights reserved.


TORQUE BUSHING & EXTEND FRAME

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

PIPE HANDLER
ROTATION SYSTEM

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

PIPE HANDLER
ROTATION SYSTEM
PIPE HANDLER LOCK SEGMENT

© 2013 Tesco Corporation. All rights reserved.


CHECK FOR WEAR ON TEETH
LOAD PATH & MAINTENANCE

PIPE HANDLER LOCK

• The pipe handler lock is a hydraulic cylinder with a gear


segment installed on the end of the ram.
• It is mounted vertically and engages the segment with
the slewing bearing outer race, locking the pipe
handler frame in any 360 degree position to the main
frame.
• It may be unlocked to allow for pipe handling
capability.

© 2013 Tesco Corporation. All rights reserved. 58


CHECK FOR WEAR ON SLEWING
BEARING GEAR TEETH
CHECK ALL GUIDE BLOCK MOUNTING BOLTS
AND LOCKING DEVICES

© 2013 Tesco Corporation. All rights reserved.


NOT APPROVED LOCKING
METHOD FOR BOLTS

© 2013 Tesco Corporation. All rights reserved.


OLD STYLE

PIPE HANDLER LOCK ASSEMBLY


© 2013 Tesco Corporation. All rights reserved.
LOAD PATH & MAINTENANCE

SLEWING BEARING

• The slewing bearing is located between the mainframe


and pipe handler frame.
• The slewing bearing allows 360 degrees rotation of the
pipe handler frame independent of the mainframe.
• This allows for pipe handling capability.
• The external race of the bearing has teeth that engage
with the pipe handler lock, to hold the 2 frames locked
in position.

© 2013 Tesco Corporation. All rights reserved. 62


LOAD PATH & MAINTENANCE

SLEWING BEARING

© 2013 Tesco Corporation. All rights reserved. 63


LOAD PATH & MAINTENANCE

CHECK SLEWING BEARING

• Check mounting bolts (loose or broken).

• Check gear teeth for wear.

• ** Caution** If replacing slewing bearing *measure inside


race thickness ( 2 sizes) 56mm requires lockwashers on
bolts mounting bearing to mainframe 62mm only requires
bolts (no lockwashers) *Loctite on all bolts*.

© 2013 Tesco Corporation. All rights reserved. 64


MAINFRAME

PIPEHANDLER
LOCK PIVOT
PIPEHANDLER
LOCK ARM
SLEWING BEARING

BEARING/PIPEHANDLER
BOLTS

BEARING/MAINFRAME
BOLTS PIPEHANDLER

© 2013 Tesco Corporation. All rights reserved.


CHECKING SLEWING BEARING INSIDE RACE THICKNESS

© 2013 Tesco Corporation. All rights reserved.


CHECKING SLEWING BEARING INSIDE RACE THICKNESS

MOUNTING THIS BEARING TO MAIN FRAME WOULD REQUIRE


LOCKWASHERS
© 2013 Tesco Corporation. All rights reserved.
CHECK SLEWING BEARING TO PIPE HANDLER FRAME BOLTS

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

CHECK SLEWING BEARING TO


MAINFRAME BOLTS

© 2013 Tesco Corporation. All rights reserved.


BROKEN SLEWING BEARING BOLTS (LOAD TRANSFERRED TO PIPE
HANDLER FRAME AND BEARING INSTEAD OF QUILL)
© 2013 Tesco Corporation. All rights reserved.
LOAD PATH & MAINTENANCE

ENDPLAY CHECK
(GEARBOX BEARING PRELOAD)

• If no movement of dial indicator needle, preload is


present.
• Movement of dial indicator needle, endplay is
present and preload will have to be adjusted.
• Check bearing retainer bolts before proceeding (are
the bolts loose or broken??).
• Check for any movement in the ringfeder
components (is the spring seized??).

© 2013 Tesco Corporation. All rights reserved. 71


LOAD PATH & MAINTENANCE

GEARBOX PRELOAD SPECIFICATIONS

PRELOAD is the amount of compression between the


upper and lower quill hub bearings.

• ECI 900 NEW BEARING PRELOAD (.008”- .010”)

• ECI 900 USED BEARING PRELOAD (.000” - .005”)

© 2013 Tesco Corporation. All rights reserved. 72


CAUTION** MAKE SURE RINGFEDER ASSEMBLY IS TIGHT
TO QUILL AND GEARBOX HUB
PRELOAD (END PLAY) CHECK
(TOP)

SHIM LOCATION

MAKE SURE BEARING RETAINER BOLTS ARE TIGHT (LOOSE OR


BROKEN?)
© 2013 Tesco Corporation. All rights reserved.
PRELOAD (END PLAY) CHECK
(BOTTOM)

MAKE SURE BEARING RETAINER BOLTS ARE TIGHT (LOOSE


© 2013 Tesco Corporation. All rights reserved. OR BROKEN?)
LOAD PATH & MAINTENANCE

ENDPLAY 0.0” PRELOAD


UP AND DOWN MOVEMENT BEARING CRUSH

0.010” 0.005” 0.005” 0.010”

0.008” 0.008” – 0.010”


DIAL INDICATOR READING NEW SPECIFICATION
In this case, to increased the preload we need to SUBTRACT between 0.016” and 0.018” of shims
© 2013 Tesco Corporation. All rights reserved.
LOAD PATH & MAINTENANCE

QUILL FOR
REFERENCE
S.S. HOSE CLAMP
DUST BOOT

GEARBOX ASSEMBLY
REFERENCE

SHIM LOCATION

LOWER QUILL COLLAR

CAP SCREW

O-RING

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

QUILL RINGFEDER DISASSEMBLY

• Remove boot and check for grease around lower


compression ring (4 grease zerks on the lower gearbox
hub). supply grease to the gearbox hub and quill
splines
• Remove the compression bolts and check for proper
machined ends, clean, lube and reinstall bolts.
• Tighten bolts down evenly until shim can be removed .

**CAUTION** if spring set sticks do not hit with hammer


if upper quill collar is removed.
© 2013 Tesco Corporation. All rights reserved. 77
LOAD PATH & MAINTENANCE

**CAUTION** CHECK THAT SPRING IS NOT SEIZED BEFORE DISASSEMBLY,


IF SO, DO NOT REMOVE UPPER QUILL COLLAR UNTIL SPRING IS FREE

COMPRESSION BOLT QUILL FOR


REFERENCE
CAP SCREW
UPPER QUILL COLLAR

THRUST RING
THRUST RING SHIM
UPPER COMPRESSION RING

RINGFEDER SPRING

CAP SCREW

LOWER COMPRESSION RING

**CAUTION** MAKE SURE RINGFEDER ASSEMBLY IS TIGHT TO QUILL AND


GEARBOX HUB
© 2013 Tesco Corporation. All rights reserved.
LOAD PATH & MAINTENANCE

Upper quill collar


Thrust ring
Thrust ring shim
Upper compression ring
Ringfeder spring
Lower compression ring
Bearing retainer
Upper hub bearing

Hub

© 2013 Tesco Corporation. All rights reserved.


BOLT PUSHES ON UPPER
BOLT GOES THROUGH COMPRESSION RING
UPPER QUILL COLLAR COMPRESSING SPRING

SPRING ASSEMBLY

SHIM IS INSERTED OR
REMOVED

BOLT IS THREADED THROUGH UPPER


QUILL COLLAR THRUST RING
© 2013 Tesco Corporation. All rights reserved.
UPPER COMPRESSION RING
THRUST RING SHIM

LOWER QUILL COLLAR

SPRING SET

LOWER COMPRESSION RING


© 2013 Tesco Corporation. All rights reserved.
UPPER QUILL COLLAR THRUST RING

THRUST RING SHIM

UPPER QUILL COLLAR


© 2013 Tesco Corporation. All rights reserved.
SPECIAL GREASE FOR SPRING SET ASSEMBLY

SPRING SET
© 2013 Tesco Corporation. All rights reserved.
CUT LOCKWIRE

© 2013 Tesco Corporation. All rights reserved.


TIGHTEN BOLTS DOWN EVENLY
(AFTER CHECKING)
© 2013 Tesco Corporation. All rights reserved.
REMOVE 2 PIECE SHIMS

© 2013 Tesco Corporation. All rights reserved.


THRUST RING SHIMS

© 2013 Tesco Corporation. All rights reserved.


GAP AFTER SHIMS REMOVED

© 2013 Tesco Corporation. All rights reserved.


*CAUTION* DO NOT REMOVE UPPER
QUILL COLLAR IF THE SPRING SET
STICKS

UPPER QUILL COLLAR

BOLTS REMOVED

© 2013 Tesco Corporation. All rights reserved.


REMOVING UPPER QUILL COLLAR BOLTS

© 2013 Tesco Corporation. All rights reserved.


REMOVING UPPER QUILL COLLAR

© 2013 Tesco Corporation. All rights reserved.


REMOVING LOWER COMPRESSION RING BOLTS
© 2013 Tesco Corporation. All rights reserved.
WHEN INSTALLING INTEGRATED SWIVEL, THESE PIECES MUST BE SLID
ON QUILL BEFORE INSTALLING IN GEARBOX HUB.

LIFT & TIE UP ONE PIECE RINGFEDER COMPONENTS


© 2013 Tesco Corporation. All rights reserved.
UPPER BEARING RETAINER

REMOVING LOWER COMPRESSION RING


© 2013 Tesco Corporation. All rights reserved.
LOAD PATH & MAINTENANCE

Upper quill collar


Thrust ring
Thrust ring shim
Upper compression ring
Ringfeder spring
Lower compression ring
Bearing retainer
Upper hub bearing

Hub

© 2013 Tesco Corporation. All rights reserved.


LOAD PATH & MAINTENANCE

QUILL REMOVAL PROCESS


• Hook up lifting nubbin to take load of quill.
• Remove ,or tie up, ringfeder assembly pieces (note
assembly position).
• Lower quill enough to remove lower quill collar
• Then lower quill more to allow removal of load nut spiral,
2 inch snap rings, and “dog” set screws *** caution do
not allow the weight of the quill to rest on the rotary
seal**.
• Lift outer load nut retainer up enough to remove split
collar halves *** caution if outer load nut seized be
careful not to damage by hammering ***.
• Lift quill out , being careful not to damage load collar seal.
© 2013 Tesco Corporation. All rights reserved. 96
LOWER QUILL COLLAR

© 2013 Tesco Corporation. All rights reserved.


REMOVING LOWER QUILL COLLAR BOLTS

© 2013 Tesco Corporation. All rights reserved.


GREASE NIPPLES
GEARBOX HUB
QUILL
SEALANT FOR BOTTOM OF HUB

REMOVING LOWER QUILL COLLAR

© 2013 Tesco Corporation. All rights reserved.


ROTARY SEAL LOCATION

*CAUTION* DO NOT REST QUILL ON


ROTARY SEAL WHEN LOWERING

© 2013 Tesco Corporation. All rights reserved.


LOAD COLLAR

SPRING RETAINER

LOAD NUT

QUILL

© 2013 Tesco Corporation. All rights reserved.


QUILL

REMOVING SPIRALOX FROM BOTTOM OF LOAD NUT

© 2013 Tesco Corporation. All rights reserved.


REMOVING SNAP RINGS

© 2013 Tesco Corporation. All rights reserved.


REMOVING “DOG” SET SCREWS

DOG SET SCREW


© 2013 Tesco Corporation. All rights reserved.
QUILL

LIFTING OUTER LOAD NUT

SPLIT COLLAR HALVES

© 2013 Tesco Corporation. All rights reserved.


REMOVING SPLIT COLLAR HALVES

*NOTICE* LOAD NUT GROOVE TAPER

© 2013 Tesco Corporation. All rights reserved.


CLEAN AND INSPECT: LIGHTLY LUBE (RUST INHIBITOR)

© 2013 Tesco Corporation. All rights reserved.


REMOVING OUTER LOAD NUT

© 2013 Tesco Corporation. All rights reserved.


O-RING FROM TOP OF LOAD NUT

© 2013 Tesco Corporation. All rights reserved.


ROTATING QUILL TO LINE UP GEAR BOX HUB & QUILL SPLINES
© 2013 Tesco Corporation. All rights reserved.
QUILL SPLINES

REMOVING QUILL

© 2013 Tesco Corporation. All rights reserved.


MAINTENANCE
AND SERVICE

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

DAILY INSPECTION AND LUBRICATION

The following visual inspection and lubrication have


to be performed AT LEAST ONCE EVERY OPERATING
DAY. More frequent inspections might be required if
you are operating the top drive in harsh or
demanding drilling environments.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Check the Top Drive gearbox oil level. Should be just


visible in the sight tube (cold).

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Hydraulic and coolant hoses and connections. Inspect


for wear and leakage.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Check the Saver Sub. Check the threads and the


seal face

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Check Grabber dies and keepers. The should all


be secure and in good condition.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Grease all hydraulic cylinders. Extend, link tilt,


elevator, pipe handler lock, and mud valve actuator.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Lower and upper bearing retainers of gearbox.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Slew bearing. A single point on the mainframe provides


access to both nipples.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Load collar.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Rotary seal.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Quill Drive Hub.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Elevator.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Mud saver valve. Ensure the automatic grease


feeder is full.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

DAILY GREASE LUBRICATION

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

RECOMMENDED LUBRICANTS

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

WEEKLY INSPECTION AND LUBRICATION

• Auxiliary manifold (general condition).


• Connection locking clams. Correct location, and
tightness.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Coolant hoses and connections on the top drive.


Check for leaks and deformation.
• Counter-balance system. Correct installation and
function.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Load collar. Check adequate load ride height on


the spring.
• Mud saver valve. Correct function; manually
operate to confirm function.

X Y

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

MONTHLY INSPECTION AND LUBRICATION

• Gearbox oil. Abnormalities (take sample to test


for water, metal particles, etc., every 900
operating hours).

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Roto-actuator sleeve. General condition;


disassemble, clean, grease, coat with corrosion
inhibitor and reinstall.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Correct grabber height. Check and reset if


necessary.

1. PH manifold accumulator.
2. Grabber lift needle valve.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Counter-balance system. Correct cushion height


if necessary.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Pipe handler manifold. Correct nitrogen pre-


charge in the accumulator for the PH manifold.

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Grabber-open. Correct nitrogen pre-charge in


the grabber-open accumulator.
Grabber-open
accumulator

© 2013 Tesco Corporation. All rights reserved.


TOP DRIVE SERVICE REQUIREMENTS

• Motor termination boxes for the DRS drive.


Check for moisture and bold torque.

© 2013 Tesco Corporation. All rights reserved.


1000 DAY RECERTIFICATION

 TESCO OFFERS COMPLETE 1000 DAY INSPECTIONS


AND RECERTIFICATIONS.

 CONTACT YOUR LOCAL TESCO REPRESENTATIVE


FOR COMPLETE INFORMATION.

© 2013 Tesco Corporation. All rights reserved. 138


QUESTIONS

© 2013 Tesco Corporation. All rights reserved. 139

Potrebbero piacerti anche