Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
HIDROLOGIA SUPERFICIAL
METODO PROMEDIO ARITMETICO
REGION: CAÑADA FECHA: 2 DE MARZO 2018
CUENCA 1-2
CUENCA 3-4-5-6
CUENCA 7
ESTACION PRECIPITACION H= 438.7 MM
3 1497.9
7 695.6
2193.5
CUENCA 8
ESTACION PRECIPITACION H= 710.32 MM
1 414.9
2 1578.1
4 694.8
5 471.9
16 391.9
3551.6
INSTITUTO TECNOLOGICO DE POCHUTLA
HIDROLOGIA SUPERFICIAL
METODO POLIGONOS DE THIESSEN
REGION: CAÑADA FECHA: 2 DE MARZO 2018
CUENCA 1
CUENCA 2
CUENCA 3
ESTACION PRECIPITACION AREA LLUVIA PONDERADA MM-KM2
12 438.9 23698861.3959 10401430266.6605
11 512.2 14814229.2276 7587848210.37672
17 390.8 12344017.7441 4824042134.39428
1341.9 50857108.3676 22813320611.4315
CUENCA 4
ESTACION PRECIPITACION AREA LLUVIA PONDERADA MM-KM2
11 512.2 10862356.6834 5563699093.23748
17 390.8 31333846.6783 12245267281.8796
10 854.5 14814229.2276 12658758874.9842
1757.5 57010432.5893 30467725250.1013
CUENCA 5
ESTACION PRECIPITACION AREA LLUVIA PONDERADA MM-KM2
8 1805 9340159.0279 16858987045.3595
11 512.2 5798201.9105 2969839018.5581
16 391.9 77599299.2704 30411165384.0698
2709.1 92737660.2088 50239991447.9874
CUENCA 6
ESTACION PRECIPITACION AREA LLUVIA PONDERADA MM-KM2
9 512.7 28198327.5961 14457282558.5205
8 1805 38970574.1089 70341886266.5645
17 390.8 16608047.5155 6490424969.0574
2708.5 83776949.2205 91289593794.1424
CUENCA 7
ESTACION PRECIPITACION AREA LLUVIA PONDERADA MM-KM2
7 695.6 11758159.646 8178975849.7576
3 1497.9 4504864.7691 6747836937.63489
18 382.2 6006311.0914 2295612099.13308
6 2300.8 16751558.0902 38541984853.9322
4876.5 39020893.5967 55764409740.4577
CUENCA 8
ESTACION PRECIPITACION AREA LLUVIA PONDERADA MM-KM2
7 695.6 11758159.646 8178975849.7576
3 1497.9 4504864.7691 6747836937.63489
18 382.2 6006311.0914 2295612099.13308
6 2300.83 16751558.0902 38542487400.6749
4876.53 39020893.5967 55764912287.2004
PONDERADA MM-KM2 H= 5.7889E-04
85929668877
4132968616.8634
780253897.10292
1.1984E+11
CUENCA 1
PRECIPITACI
ON ISOYETA
MEDIA mm AREA km² SUME AREA km²
CUENCA 2
PRECIPITACI
ON ISOYETA
MEDIA mm AREA km² SUME AREA km²
CUENCA 3
PRECIPITACI
ON ISOYETA
MEDIA mm AREA km² SUME AREA km²
CUENCA 4
PRECIPITACI
ON ISOYETA
MEDIA mm AREA km² SUME AREA km²
PRECIPITACI
ON ISOYETA
MEDIA mm AREA km² SUME AREA km²
CUENCA 5
PRECIPITACI
ON ISOYETA
MEDIA mm AREA km² SUME AREA km²
CUENCA 6
PRECIPITACI
ON ISOYETA
MEDIA mm AREA km² SUME AREA km²
429846781.805
1269581268.285
1247699694.56
14228209901.36
17175337646.01
hp x Area mm x km²
hp x Area mm x km²
hp x Area mm x km²
hp x Area mm x km²
hp x Area mm x km²
HP: 644.612534
3427245856.6
17629468735.9
24653112623.9
1779598191069.7
1825308018286.0
hp x Area mm x km²
7644226566.795
71028995072.58 HP: 486.057233
61542104374.41
5979202481.85
146194528495.635
hp x Area mm x km²
26290348869.365
9370951795.485 HP: 433.302365
13889136736.585
2026528695.685
2614086577.65
1567319317.745
762670490.09
56521042482.605
HP: 591.120814
hp x Area mm x km²
1124409798.47
85630204190.88
25646582896
306291416238.535
8501624769.3
427194237893.185
INSTITUTO TECNOLOGICO DE POCHUTLA
HIDROLOGIA SUPERFICIAL
METODO DE CHOW
REGION: CAÑADA FECHA: 22 DE MARZO 2018
CUENCA 1
Qm= qm*Pe 55249137.008 Qm= 2000
Z = (qm * d ) / (2.78 * A) 0.074820144 qm= 488930.416
Qm = (2.78 * A * Z * Pe) / d 55249137.008 d= 12
X = Peb / d 166.6666666667 Pe= 113
Y = (2.78 * P) / Pb 0.000001946 P= 0.00007
Qm = A * X * Y * Z 684.5025824 Pb= 100
Peb= 2000
A= 28207524
CUENCA 2
Qm= qm*Pe 55249137 Qm= 4700
Z = (qm * d ) / (2.78 * A) 0.02232547 qm= 488930.416
Qm = (2.78 * A * Z * Pe) / d 55249137 d= 12
X = Peb / d 166.666667 Pe= 113
Y = (2.78 * P) / Pb 1.2973E-06 P= 0.00007
Qm = A * X * Y * Z 456.335055 Pb= 150
Peb= 2000
A= 94532889
CUENCA 3
CUENCA 4
Qm= qm*Pe 61837693.7 Qm= 650
Z = (qm * d ) / (2.78 * A) 0.01449178 qm= 588930.416
Qm = (2.78 * A * Z * Pe) / d 61837693.7 d= 12
X = Peb / d 208.333333 Pe= 105
Y = (2.78 * P) / Pb 1.1347E-06 P= 0.00002
Qm = A * X * Y * Z 600.949404 Pb= 49
Peb= 2500
A= 175419801
CUENCA 5
Qm= qm*Pe 61837693.7 Qm= 450
Z = (qm * d ) / (2.78 * A) 0.00089777 qm= 588930.416
Qm = (2.78 * A * Z * Pe) / d 61837693.7 d= 12
X = Peb / d 208.333333 Pe= 105
Y = (2.78 * P) / Pb 8.4242E-07 P= 0.00003
Qm = A * X * Y * Z 446.159406 Pb= 99
Peb= 2500
A= 2831635940
CUENCA 6
Qm= qm*Pe 61837693.7 Qm= 2000
Z = (qm * d ) / (2.78 * A) 0.00845195 qm= 588930.416
Qm = (2.78 * A * Z * Pe) / d 61837693.7 d= 12
X = Peb / d 208.333333 Pe= 105
Y = (2.78 * P) / Pb 8.4242E-07 P= 0.00003
Qm = A * X * Y * Z 446.159406 Pb= 99
Peb= 2500
A= 300776367
CUENCA 7
Qm= qm*Pe 61837693.7 Qm= 4550
Z = (qm * d ) / (2.78 * A) 0.01948863 qm= 588930.416
Qm = (2.78 * A * Z * Pe) / d 61837693.7 d= 12
X = Peb / d 208.333333 Pe= 105
Y = (2.78 * P) / Pb 1.1232E-06 P= 0.00004
Qm = A * X * Y * Z 594.879208 Pb= 99
Peb= 2500
A= 130442497
CUENCA 8
Qm= qm*Pe 61837693.7 Qm= 2750
Z = (qm * d ) / (2.78 * A) 0.2242641 qm= 588930.416
Qm = (2.78 * A * Z * Pe) / d 61837693.7 d= 12
X = Peb / d 208.333333 Pe= 105
Y = (2.78 * P) / Pb 1.3142E-06 P= 0.000052
Qm = A * X * Y * Z 696.008673 Pb= 110
Peb= 2500
A= 11335499.7
[
2 DE MARZO 2018