United Dynamics Vo l um e 1 , I ss ue 1

Advanced Technologies Corporation Ju l y 20 1 0

THE I NSPECTIONEER POST The Name Behind The Flame

Fueling the Minds of Electricity

INSIDE THIS ISSUE: I N S P E C T I O N P R E PA R A T I O N A N D P R O C E D U R E S


FOR HIGH TEMPERATURE REHEATER CIRCUITS COLUMBIA UNIT #1

Building Blocks 1 FRONT REHEAT PENDANT


70 FRONT REHE
COUNTED LEFT
SIDEWALL
Preparation/Procedures 1 The action of performing an
1021'
The current environmental Continued Page22"2OD INLET HDR
1019'10" 10 FRONT REHE
IN FRONT SECT
efficient, consistent, thorough, concerns and loss 2" ODofx .150"MW
energySA 210-A1 FROM FRONT T
Maximize Inspection - and cost effective inspection demand nationwide
1016' have
2-1/2" OD x .180"MW SA 210-A1 10 FRONT REHE
on a high temp reheat circuit changed the playing field
to 2" that
IN REAR SECTI
Efficiency 1
starts with a few fundamental
2-1/2" OD OD swage FROM REAR TO
we are used to dealing with in
building blocks: 1011'
regard to component ROOF
Biomass Concerns 1
1) Proper research on inspections.
component failure history 1007'
10 Recommendations for - 2) Proper preparation of Platen SH rear REARWALL
By following the fundamental HANGERS
inspection team tools illustrated in this post,
High Temp Reheat Insp 2 1002'
3) Utilizing the proper you will be able to maximize R11
999'4"
equipment to perform efficiency and optimize the
inspections operation997'
of the high temp
4) Taking the time neces- reheat circuit.
Special points of interest: sary to perform the 992'
inspection The key is to maximize your
• Proper inspection preparation. 5) Understanding the high
989'
effort utilizing
987'
minimal R12
priority areas within the resources.2-1/2"
TheODmore efficient
x .150"MW SA-213TP 304H
• Fundamental building blocks
component you become, the more 1 5 10 5 1
for performing a High Temp
6) Understanding ID resources982'become available to
Reheat Inspection.
concerns as well as be utilized on remaining high
OD concerns temp as well as low temp
977' R3
7) Understanding tube metal components throughout the 977'4"

temperature ranges boiler. Understand and utilize


the fundamental building
8) Utilizing a set criteria and 973'
blocks listed, and take your
holding firm to the time to perform the best
guidelines component 968'inspection
967'4" R4

9) Understanding priority possible.


964'10"
assignment

BIOMASS CONCERNS
Biomass has been the focus of much storage space would it circulate across the industry. The BTU heat release for
many conversations within our require to operate on 100% biomass fuel in comparison
industry over the last few years. biomass? to our conventional coal is
Many utilities have
experimented with biomass substantially less. This heat
Questions raised include: Will our existing coal feeding blending, and others have release difference can be a
equipment, including mills attempted complete biomass source for potential problems
require upgrades to handle the burn to see if load could be within the boiler cavity during
Can we meet load burning operation. Extensive research
biomass material? maintained and would be
biomass? is recommended if Biomass
sustainable.
is on the discussion board at
All of these questions seem to your facility.
If we can get it to work, how
U n i t e d D y n am i c s
A d v a n c e d T e c h n ol o g i es 16th Annual All Users Conference
Corporation
Key West, FL
January 12—14, 2011
2681 Coral Ridge Road
Brooks KY, 40165

Phone: 502-957-7525
Co
Co--Existence
Fax: 502-957-5441
E-mail: Sales@udc.net Coal-Fired & Combined Cycle - Problems & Solutions
Casa Marina Resort
1600 Reynolds Street
Visit on the web Key West, FL 33040
888 318-4237
www.udc.net
The Name Behind The Flame

UDC promotes recycling...


Recycling utilizes materials
which would otherwise become
waste and turns them into an
opportunity to be a valuable CONTINUED FROM PAGE 1
resource. Collecting used
bottles, cans, and newspapers Some tips on things to look for including a remaining wall path may cause more harm
and taking them to a collection during your High Temp Reheater thickness) from channeled erosion
facility generates financial, inspection: 7) Inspect all circuits for long than having no shield at all
social, and environmental term and short term over- (record shielding location
returns. In our break room we heating indications (Record and length).
1) Misaligned tubes and/or
collect aluminum cans for elements (record severity of any discoloration, tube
recycling. We also return empty alignment concern) swelling, exfoliation, and/or The 10 preceding recommenda-
printer toner cartridges in an cracking present at these tions listed are presented as tips
2) Bowed tube sections (Record
effort to promote recycling. Our locations) for your benefit, and should be
greatest point of deflection)
environment benefits when 8) Inspect all DMW’s if present observed as an aid rather than
everyone does their part to pitch 3) Alignment clip integrity
for integrity and percentage your complete inspection plan.
in and recycle the things we can (Record cracked and/or
through wall if cracked, pay There are many inspection
reuse and preserve. fatigued clips) close attention to the last 2 practices that have been proven
4) Verify alignment clip material feet of material up stream effective, and items to look at in
Recycling ... 5) Inspect for soot blower just before a material family regard to inspecting your High
 Reduces the need for land erosion on all tubes that can upgrade (Record percent Temp Reheater circuits.
filling and incineration be affected by the soot through wall, and tube
 Prevents pollution from the blowing steam pattern material condition before the
manufacturing of products (record all damaged tubes transition)
from virgin materials including a remaining wall 9) Inspect for abrasion/fretting
 Saves energy thickness) of tubes that intersect each
 Decreases emissions of 6) Inspect for fly ash erosion at other (Record abrasion
greenhouse gases that all pertinent locations location with a depth of
contribute to global climate throughout the circuit, pay wear)
change close attention to the roof 10) Inspect damaged shielding Written By:
 Conserves natural intersection as well as members for holes and over-
resources Jon Santino Cavote
crossover intersections heating. A hole in a shield
 Sustains the environment (Record all damaged tubes located within a soot blower (Chief Operating Officer)
for future generations