Task Name Start Date

Setup New Lab 5-Jan


Buy Ammoniacal Nitrogen Testing Equipment and Testing 16-Jan
Buy BOD testing equipment 5-Feb
(Incubator, Bod bottles etc)
Training lab attendant
( Test Bod and ammonia) 8-Feb

Fire drill 14-Mar


Buy Suspended Solid testing equipment (vacuum 19-Apr
pump etc)
Desludging Cooling Pond no.2 and no.3 30-Apr
Training lab attendant 4-May
( Test Suspended Solid)
Training lab attendant 23-May
( Procedure take sampling and sampling point)
Training lab attendant 29-May
( Procedure key in data and logbook)

Implementation Scheduled & Monitoring


5-Jan 24-Feb 15-Apr 4-Jun

Setup New Lab

Buy Ammoniacal Nitrogen Testing Equipment and Testing

Buy BOD testing equipment (Incubator, Bod bottles etc)

Training lab attendant ( Test Bod and ammonia)

Fire drill

Buy Suspended Solid testing equipment (vacuum pump etc)

Desludging Cooling Pond no.2 and no.3

Training lab attendant ( Test Suspended Solid)

Training lab attendant ( Procedure take sampling and sampling point)


Buy Suspended Solid testing equipment (vacuum pump etc)

Desludging Cooling Pond no.2 and no.3

Training lab attendant ( Test Suspended Solid)

Training lab attendant ( Procedure take sampling and sampling point)

Training lab attendant ( Procedure key in data and logbook)


Duration (days)
40
20

18

14

90

15

13

entation Scheduled & Monitoring


Jan 24-Feb 15-Apr 4-Jun 24-Jul 12-Sep

Duration (days)
Start Date