Doc No: GC-SHE-F-04

SHE DEPARTMENT Page: Page 1 of 4


Version: 0.0
Approval Date:
ANALISIS KESELAMATAN PEKERJAAN (AKP) Author: Mgr SHE
JOB SAFETY ANALYSIS (JSA)

Nama Pekerjaan TOWER CRANE Disusun oleh /Developed. by XIE JUN AKP No.
/Task Title /JSA No.
Departemen/Seksi MECHANICAL Persetujuan ZHANG GUOXIAO Dibuat Tanggal 2014-1-17
/Dept/Section DEPARTMENT /Approval /Issued on
Divisi /Unit Usaha HENAN/FUZHOU Revisi Tanggal 2014-1-20
/Division/BU /Revision date
Perusahaan SINOMA No AKP Terkait
/Company /Relevant JSA No..
Alat Pelindung Diri (APD) yang harus Dipakai /Required Personal Protective Equipment (PPE)

URUTAN PEKERJAAN BAHAYA YANG BISA TIMBUL TINDAKAN PENCEGAHAN ATAU PROSEDUR YANG DIREKOMENDASIKAN
SEQUENCE OF TASK POTENTIAL HAZARDS RECCOMMENDED PREVENTION ACTION OR PROCEDURE

1 workers preparation acrophobia、hypertension and During worker preparation, taking the physical examination of the workers in the clinic, excluding the
so on which could result in acrophobia、hypertension workers.
dropping from height ;
lacking of height working Training the healthy workers about the working at height and notify them safety risks of tower crane
experience, relative installation
education, which also could
resulting in height dropping
and machinery injury

2 vehicle, tools preparation using wear-out steel rope Checking the tools , make sure all the tools are in good condition, thus security the workers and
causing height dropping and equipment shelter from hazards
crane side turning over
Using the proper crane, insure the hoisting capacity meet the lifting requirement .
using improper crane causing
side turning over and
machinery injury

3 ppe wearing no safety belts, safety Provide PPE as per the job assignment after training .making sure each worker know how to using PPE
shoes causing height dropping, to protect themselves.
machinery injury and so on.

THIS DOCUMENT IS UNCONTROLLED IN HARDCOPY FORMAT


Doc No: GC-SHE-F-04
SHE DEPARTMENT Page: Page 2 of 4
Version: 0.0
Approval Date:
ANALISIS KESELAMATAN PEKERJAAN (AKP) Author: Mgr SHE
JOB SAFETY ANALYSIS (JSA)

URUTAN PEKERJAAN BAHAYA YANG BISA TIMBUL TINDAKAN PENCEGAHAN ATAU PROSEDUR YANG DIREKOMENDASIKAN
SEQUENCE OF TASK POTENTIAL HAZARDS RECCOMMENDED PREVENTION ACTION OR PROCEDURE

4 assembly Improper using vehicles and Properly using crane, assemble the standard parts with the equipment manufacturer directions onsite.
direct workers resulting in
machinery injury and hit by The speed of truck must be under 20km/h, the operator must alarm when making a turn.
object.

5 material moving Road bumpy, slope gradient The moving materials are tall and big equipment, therefore should using chain to tie the tower crane and
steep could causing machinery vehicle as a whole. Prevent the material hit the worker and damage the tower crane during the moving.
harm, equipment dropping, hit
by object.

6 erection

6.1 tower crane foundation part installation machinery injury and hit by Using the proper crane, with the rigger directions. The crane operator must operator slowly.
object

6.2 tower crane jacking frame installation machinery injury and hit by Using the proper crane, with the rigger directions, when it winds, the crane operator must operator
object slowly, and the wind rope should tie with the hoisting material.

6.3 Tower crane standard part installation machinery injury and hit by Using the proper crane with the rigger directions, when it winds, the wind rope should tie with the
object、falling hoisting material. fasten the standard part need worker working at height, before climbing , the superior
object、dropping from height should notify the workers the working procedures and taking the physical examination . warning line
should be set within the working area, forbidding irrelevant personnel entering, avoid falling bolts,
thumb latch may hurt person.

6.4 hoisting of tower crane rotation part machinery injury and hit by Using the proper crane with the rigger directions, when it winds, the wind rope should tie with the
object、falling hoisting material. Fasten the standard part need worker working at height, before climbing , the superior
object、dropping from height should notify the workers the working procedures and taking the physical examination . warning line
should be set within the working area, forbidding irrelevant personnel entering, avoid falling bolts,
thumb latch may hurt person.

6.5 hoisting of balance boom machinery injury and hit by Using the proper crane with the rigger directions. The balance boom belong the over length part must
object、falling using the wind line to tie. Making sure the rail fix when working at height. When fix the balance boom,
object、dropping from height the workers should tie the safety belt with the safe points. Warning line should be set within the working
area, forbidding irrelevant personnel entering, avoid falling bolts, thumb latch may hurt person.

THIS DOCUMENT IS UNCONTROLLED IN HARDCOPY FORMAT


Doc No: GC-SHE-F-04
SHE DEPARTMENT Page: Page 3 of 4
Version: 0.0
Approval Date:
ANALISIS KESELAMATAN PEKERJAAN (AKP) Author: Mgr SHE
JOB SAFETY ANALYSIS (JSA)

URUTAN PEKERJAAN BAHAYA YANG BISA TIMBUL TINDAKAN PENCEGAHAN ATAU PROSEDUR YANG DIREKOMENDASIKAN
SEQUENCE OF TASK POTENTIAL HAZARDS RECCOMMENDED PREVENTION ACTION OR PROCEDURE

6.6 hoisting of main boom machinery injury and hit by Using the proper crane with the rigger directions. The main boom belong the over length part must using
object、falling the wind line to tie. The drag pole of tower cap should connect with the main boom, it will need the
object、dropping from height height working, and the workers should tie their safety belts on safe points. Warning line should be set
and oversize part hoisting within the working area, forbidding irrelevant personnel entering, avoid falling bolts, thumb latch may
could damage the nearby hurt person.
equipment and foundation.

7 commissioning

7.1 rotation commissioning electric shock、machinery Before rotation commissioning ,workers should check if any variant is involved in the rotation gear,
injury making sure the electric motor and cable are fine without electrical leakage.

7.2 jacking frame commissioning machinery injury and dropping making sure the hydraulic oil in hydraulic cylinder reach the standard line, with professional staff
from height direction when jacking.

URUTAN PEKERJAAN BAHAYA YANG BISA TIMBUL TINDAKAN PENCEGAHAN ATAU PROSEDUR YANG DIREKOMENDASIKAN
SEQUENCE OF TASK POTENTIAL HAZARDS RECCOMMENDED PREVENTION ACTION OR PROCEDURE

7.3 Windlass commissioning twisting harm、machinery checking the steel rope without knots ,before windlass moving it should check if each fix pints are in
harm good condition

8 Inspection the whole tower crane hit by object, falling object after installation , inspect the whole tower crane to make sure all the machine and tools clear away ,
avoid falling objects from the tower crane when jacking.
Petunjuk Umum /General Guidelines:
1. Sebutkan secara berurutan hanya langkah-langkah pokok tugas yang harus dikerjakan. Gunakan kalimat aktif secara jelas dan singkat /Describe in sequence only the main steps of the task to be performed. Use
active sentences.

2. Gunakan frasa singkat untuk mendeskripsikan Bahaya-bahaya Potensial, seperti: Terjepit di antara daun pintu dan kerangka mesin, dll. /Use simple phrases to describe identified
potential hazards, such as: Pinched between the door and the machine, etc.
1. Terpukul oleh ... / Struck by ... 6. Terperangkap dalam … / Caught in … 11. Terpapar oleh … / Exposure to …
2. Membentur ... / Struct against ... 7. Terjepit di antara … / Caught between  Menghirup … / Inhaling …
3. Terkena oleh ... / Contacted by ... 8. Terpeleset … / Slip …  Kulit tubuh terkena … /Absorbing
4. Kontak dengan ... (listrik, kimia) ... / 9. Jatuh … / Fall …  Menelan … / Swallowing …
Contact with ... (Electrical, chemical) 10. Terlalu memforsir tenaga / Overexertion

THIS DOCUMENT IS UNCONTROLLED IN HARDCOPY FORMAT


Doc No: GC-SHE-F-04
SHE DEPARTMENT Page: Page 4 of 4
Version: 0.0
Approval Date:
ANALISIS KESELAMATAN PEKERJAAN (AKP) Author: Mgr SHE
JOB SAFETY ANALYSIS (JSA)

5. Terkait pada … / Caught on …

3. Sebutkan Tindakan atau Prosedur yang Direkomendasikan secara jelas dan singkat, dengan menggunakan kalimat aktif /Describe the recommended action or procedure in brief, using active sentence

THIS DOCUMENT IS UNCONTROLLED IN HARDCOPY FORMAT