PAGE 1
PROCESS
INFO. AS NEEDED
OTHER DISC.
APPROVAL OF PROCESS
DESIGN CRITERIA
CLIENT
PREPARE
PROCESS DATA PROCESS DATA MECH.
ELECT.
FOR LONG LEAD
EQUIPMENT
Continued on page 2
ACTIVITY OUTPUT
INPUT
Continued on from page 1
CLIENT, INST.,
ACTIVE PARTICIPATION HAZOP REPORT
MECH. & HAZOP REVIEW CLIENT
PROJECT
Continued on page 3
INPUT TO LINE
LIST & TIE-IN LIST
UPDATE
OPTIONAL HAZOP
REVIEW
PIPING ARRANGEMENTSDRAWINGS
PIPING
CONFIRM FINAL CONTROL VALVE SLELECTION INST.
MECH.
HYDRAULICS
PUMP & COMPRESSOR VENDOR DATA
MECH.
COMMISSIONING
START-UP
ASSISTANCE &
PERFORMANCE
RUN
DESIGN
CRITERIA
FOR PIPING
INFORMATION ELECT.
PROJECT DEFINE JOB SCOPE PROJECT
PROCESS
INST.
CIVIL
MSD FOR
DESIGN
PFD'S
PROCESS PREPARE MSP FOR FILE
DISCI- PROCESS
PLINE
INSTRUMENTATION
PIPING
ELECTRICAL
APPROVAL PROJECT
CLIENT
INPUT TO DBM CLIENT
DISC.
CLIENT
APPROVAL
INPUT TO HAZOP
ISSUE PFD'S AND P&ID'S FOR INFORMATION
PROCESS PROJECT
CLIENT
EQUIPMENT LIST
PIPING
ELECT
PROCESS
PROJECT FOR INFORMATION
INST.
CLIENT REQUIREMENTS CIVIL
PROCESS
REQUIREMENT
PROCESS
PROCESS DATA
PROCESS
FOR INFORMATION
MECHANICAL PIPING
PROCESS
CALCULATIONS
PIPING
NOZZLE LOADS
MECHANICAL
PROCESS DATA, DATA SHEETS FOR QUOTATION PROCUREMENT
PROCESS VENDOR
UTILITY DATA
(ROTATING AND PURCHASE
EQUIPMENT)
INST.
FOR INFORMATION ELECT.
ALARMS & SHUTDOWNS PROCESS
INST. CIVIL
CONTROL REQUIREMENTS PIPING
Continued on page 2
INST.
INSTR. NOZZLE EQUIPMENT)
DATA
INST.
FOR INFORMATION CIVIL
PROCESS
PIPING
GROUNDING CLIP
ELECT.
NOZZLE LOCATIONS/
DRAWINGS
ELEVATION LADDER/ (VESSEL
PLATFORM FOR QUOTATION PROCUREMENT
PIPING REQUIREMENTS
CONTROL VENDOR
DRAWINGS
HVAC) FOR INFORMATION & PIPING
DESIGN ELECT
BUILDING DATA INST.
STRUCTURAL DESIGN CIVIL
CIVIL CRITERIA PROCESS
NOZZLE LOCATIONS/
ELEVATION , HVAC
CONTROL
INST.
REQUIREMENTS
PREPARE INPUT
PROJECT PREPARE VENDOR LIST, PARTNERING INTO FOR PURCHASING
PROCUREMENT
CLIENT REQUIREMENTS
PURCHASING
STRATEGIES
Continued on page 3
MATERIALS, PERFOMRANCE
CURVES, UTILITY CONSUMPTIONS,
TRAY DATA, PERFOMRANCE DATA
PROCESS
FOR PACKAGED EQUIPMENT
EQUIPMENT SIZES/DIMENSIONS,
NOZZLE LOCATIONS/ELEVATIONS/
LOAD ACCESSORIES (LADDERS/
PLATFORMS, INTERNALS)
PIPING
SKID EDGE PIPING CONNECTIONS
FOR PACKAGED EQUIPMENT
INSTR. NOZZLES-
LOCATIONS/ELEVATIONS
INSTRUMENTATION
INST. DETAILS FOR PACKAGED
EQUIPMENT CONTROLS
MECHANICAL
PROJECT CLIENT
PREPARE
P&ID'S IFC
CONTROL PHILOSOPHY
CONSTRUCTION
INSTRUMENT- WORK
ATION PACKAGES
LAYOUT
PIPING ALL DISC.
FOR INFO
CLIENT REQUIREMENTS
CLIENT
ASSIST
CONSTRUCTION
IN FIELD
SUPERVISION
CHECKOUT AND
TESTING
INPUT
ACTIVITY OUTPUT
DEFINE JOB SCOPE, PROVIDE PROJECT BASIS OF WRITE FOR REVIEW & APPROVAL PROJECT
CLIENT INSTRUMENTATION CLIENT
DESIGN SPECIFICATIONS(INCL. CLIENT SPECS)
DESIGN CRITERIA
INPUT TO DBM
INPUT TO PEP
PREPARE
ISSUE PROCESS FLOW DIAGRAM & PROCESS TRANSMIT PRELIM. CONTROL ROOM SIZE REQUIREMENTS
CONTROL REQUIREMENTS
PRELIMINARY SIZING ENVIRONMENTAL (HVAC) REQUIREMENTS CIVIL
& QUANTITY MECHANICAL
ELECTRICAL
INFORMATION (I/O,
SIZING, ETC.)
DEFINE
PROCESS ISSUE PRELIMINARY P&iD & PROCESS INFO. FOR REVIEW INSTRUMENTATION RETURN P&ID FOR MARKUP
PROCESS
ON P&ID/CONTROL
SCHEME
ADD
TRANSMIT P&ID INSTRUMENT FOR DESIGN ISSUE
PROCESS
NUMBERS TO
P&ID
START INSTR.
SUMMARY
Continued on page 2
SPECIALIST
WRITE
ISSUE PIPING MATERIAL FOR ORIENATION OF VESSEL NOZZLES &
PIPING ENGINEER/ SPECIFICATION
INSTRUMENT DATA DRAWING OF LEVEL INSTRUMENT ISOMETRICS
CALCULATIONS &
SPECIFICATIONS
DESIGN/CONTROL
SCHEME PROCESS
COMMENTS ON
P&IDS
VENDOR
CLIENT
COMPLETE
PIPING PIPING MATERIAL DETAIL SHUT DOWN
INSTR. CONST.
SPEC/MTO DRAW INSTRUMENT KEY APPROVE & ISSUE
SUMMARY TO FIELD
GROUP LOOP DIAGRAMS &
LOCATION PLAN
CONST.
CONST.
DRAW INSTRUMENT
PROCUR.
INSTALLATION
DETAILS
DOCUMENT
MANUALS
MTO BULK
MATERIALS
ELECTRICAL
ENVIRON. REQUIREMENTS
GROUP
DESIGN BASIS
PROCESS
INPUT TO PEP
PERFORM SYSTEM
EQUIPMENT LIST ANALYSIS & FOR REVIEW & POWER COMPANY CONSIDERATION PROJECT
MECH. CLIENT
MOTOR LIST & MOTOR LOADS PREPARE DESIGN
BRIEFS
POWER REQUIREMENTS
CLIENT
POWER
COMPANY
INSTRUMENT LOADS
INSTRUMENTS
INST.
FOR REVIEW PIPING
PROVIDE HAZARD INFORMATION(PFD'/P&ID_ MECH.
PROCESS PREPARE AREA PROCESS
CLASSIFICATION
DRAWINGS FOR REVIEW & APPROVAL
CLIENT
DEFINE LEAKAGE SOURCES
MECH.
COORDINATION
REVIEW
REGULATORY WITH REGULATORY CLIENT
PROJECT
AGENCIES AGENCIES AND
POWER COMPANY
Continued on page 2
ELECTRICAL
MECH.
AGENCY
DEFINE PACKAGES
PROJECT
PREPARE INPUT FOR
FOR REVIEW
MECHANICAL MECH.
PACKAGE
SKID/PACKAGE LAYOUT
PIPING
VENDOR DWG.
REVIEW &APPROVAL
FACTORY
ACCEPTANCE TESTS
OF ELECT. EQUIP.
Continued on page 3
ELECTRICAL
CIVIL
SUPPORT
PREPARE
INTERCONNECTION FOR REVIEW & COORDINATION
INSTRUMENT INDEX & LOCATION DWGS
INST. DRAWINGS AND INST.
PIPING
MECH.
LIGHTING..)
INST.
P & ID's
PROCESS PROCESS
REVIEW
INSTR.
INST.
PLOT PLAN
PIPING CLIENT
ISO & LINE LISTS
PREPARE LAYOUT FOR REVIEW & APPROVAL
FOUNDATION LOCATION,
DRAWINGS (POWER,
PIPEWAY & PROCESS INSTR., ISSUE FOR ESTIMATE PROJECT
CIVIL CONTROLS
BUILDING DRAWINGS GROUNDING,LIGHTING
SUBSTATIONS, ISSUE TO FIELD
SWITCHGEAR BLDG...)
INST. INDEX, LOOP DIAGRAMS,
CONTROL PANEL & INST.
INST. CONST.
LOCATION DRAWINGS
Continued on page 4
ELECTRICAL
CONST.
TYPE OF PROTECTION
PERFORM RELAY
POWER RELAY SETTINGS & PROGRAM
COMPANY COORDINATION
& PROGRAMMING
POWER
COMPANY
PROJECT
CONTROLS
PREPARE MATERIAL
FOR COSTING & PURCHASING
TAKE-OFF
(MTO/BOM)
PROCUREMENT
(BULKS)
PREPARE SCOPE OF
WORK FOR FOR CONSTRUCTION
CONST.
CONSTRUCTION
PACKAGES
ASSIST IN
CONSTRUCTION
SUPERVISION &
FIELD CHECKOUT &
TESTING
DRAFT COPY
DOC. CONT.
PIPING
INPUT ACTIVITY OUTPUT
PREPARE
PIPING SCHEDULE MANPOWER LOADING
PROCESS CRITERIA EXECUTION PROJECT
PROCESS PLAN
/PFD'S /DATA SHEETS
PREPARE
DESIGN INPUT REVIEW & APPROVAL
CONCEPTUAL PROJECT
CIVIL/ELECT. CLIENT
PLOT PLANS
3D MODELS
EQUIPMENT LIST
MECH.
LINE LIST
DEVELOP CRITERIA
STANDARDS,
PROJECT/ CLIENT STD'S/SPECS INFORMATION PROJECT
GUIDES, CLIENT
CLIENT
PROCEDURES,
SPECIFICATIONS
PRELIMINARY P&IDS/
LINE LIST
PROCESS CLIENT
DEVELOP PIPING
REVIEW & APPROVAL
STUDIES,
TRANSPOSITIONS
EQUIP,
ORIENTATIONS,
DETAILED MODEL ALL DISC.
EQUIP. DWGS
CATALOG INFO. DEVELOPMENT
MECH.
PREPARE
STRESS MECHANICAL
SKETCHES
PREPARE
PRELIMINARY MTO PROCUR.
RFQ LIST
REQUISITION COST
CONTROL
IDENTIFY LONG
DELIVERY ITEMS
Continued on page 2
P & ID
ROLES PREPARE
EQUIPMENT ALL DISC.
LOCATION PLAN
PREPARE
ALL DESIGN PRELIMINARY DWGS/DESIGN SKETCHS
PIPING SQUAD CHECK
DISCIPLINES ALL DISC.
ARRANGEMENT
CLIENT STRESS ANALYSIS
DRAWINGS
IFC PROJECT
CHECKING OF CLIENT
DISCIPLINES
ALL DESIGN APPROVED DWGS PIPING
DISCIPLINES VENDOR DRAWINGS
ARRANGEMENTS
IFC
DWGS
FIELD
(IF REQ'D)
ELECTRICAL
EHT
ISOMETRIC
DRAFTING &
IFC ISOS FABRICATOR
PROCESS CHECKING CONST.
(FAB SHOP
COORDINATION)
P&ID COMMENTS
PROCESS
Continued on page 3
FINAL
PROCUREMENT
PIPING FINAL MTO SUMMARY REPORT COST CONTROL
PROCUREMENT
RECONCILIATION & CONST.
TRACING
MATERIAL
DESIGN/
TECHNICAL
SUPPORT PROJECT DISC.
DURING
CONSTRUCTION
AS BUILT
PROJECT CONSTRUCTION
DRAWINGS
INPUT TO CLOSE
OUT REPORT
HAND OVER OF
DOCUMENTS/
ELECTRONIC
FILES TO CLIENT
OUTPUT
INPUT ACTIVITY
CLIENT
PROSPECTIVE SITES ASSIST IN SITE RECOMMENDATION
PROJECT
CLIENT
PRELLIM. PLOT PLAN
SELECTION
INFORMATION
REVIEW & CLIENT
ACCEPTANCE
OF SURVEY
SURVEY REPORT
REPORT PROJECT
CONSULTANT INFO
INCORPORATE PIPING
ELECT.
SURVEY INTO
PLOT PLAN
INFO COST
CONTROL
CONST.
INFORMATION
CLIENT
REVIEW &
ACCEPTANCE
GEOTECHNICAL REPORT
OF
CONSULTANT
GEOTECHNICAL
REPORT
INFO PROJECT
ELECT.
CONST.
Continued on page 2
ENVIRONMENTAL,
OH &S etc.
CODES/REGULATIONS
LOCAL AUTHORITIES
REVIEW & APPROVAL CLIENT
PROJECT
PREPARE
BASIC DESIGN DATA DESIGN
CLIENT
CRITERIA PIPING
REVIEW & COMMENT MECH
ELECT.
INST.
PIPING, MECHANICAL & IDENTIFY MAJOR ENV.
PROJECT
SITE CONDITIONS INPUT TO APPROVAL
CLIENT
CLIENT PLANT CONDITIONS AND EQUIPMENT DBM DISC.
PROCESS/MECH.
APPROVAL
CLIENT
INPUT TO
PEP
INFORMATION & SCHEDULE PROJECT
DISC.
CLIENT
REVIEW & COMMENT PROJECT
CIVIL DISC.
SPECIFICATIONS LEAD
CLIENT MODIFY AND
PREPARE INFORMATION
PROCUREMENT
PROJECT
VECO GENERAL SPECIFICATIONS
SPECIFICATIONS INFORMATION
PIPING
MECH,
ELECT.
CONST.
Continued on page 3
SOIL IMPROVEMENT
ROADS
SITE SURVEY & BRIDGES & CULVERTS
SITE TOPOGRAPHY INFO & COMPLIANCE COST
GEOTECHNICAL FENCING CONTROL
& SOILS DATA
REPORT UNDERGROUND SEWER
LINES (SANITARY, STORM
& OIL WATER)
REVIEW & COMMENT SAFETY
INST.
PIPING
GEOTECHNICAL SOILS DATA REVIEW & COMMENT ELECT.
CONST.
REPORT DESIGN & DRAFTING ENV.
OF STRUCTURES &
FOUNDATIONS
PLOT PLAN, EQUIPMENT
PIPING, MECH., DETAILS
INFO & COMPLIANCE COST
ELECT., & INSTR. CONTROL
FORCES & VENDOR INFO
MATERIAL PROCUR.
TAKE-OFFS
INPUT TO INFORMATION
PROCUR.
BIDDER LIST
Continued on page 4
CONSTRUCTIION
TENDER PACKAGE,
CLIENT, PROJECT & REQUIREMENTS SCOPE OF WORK,
PROCUREMENT STRATEGY DRAWINGS, &
SPECIFICATIONS RFQ PROCUREMENT
SHOP DRAWINGS
SHOP DRAWING APPROVAL COMMENTS & CHANGES
STEEL
STEEL VENDOR VENDOR
REVIEW
PREPARE
FINAL VENDOR INFO. FINALIZED IFC
PROCUREMENT CONSTR.
CONST.
PACKAGE
PIPING,
INFORMATION DRAWINGS ONLY MECH.
ELECT.
INST.
SAFETY
DESIGN/
TECHNICAL CONSTRUCTION
SUPPORT COST CONTROL
DURING
CONSTRUCTION
INPUT TO
INPUT TO DATA BOOKS
CLOSE OUT CLIENT
FINAL
REPORT
PIPELINE ENGINEERING
INTER-DISCIPLINE COORDINATION
WORK FLOW DIAGRAM
INPUT ACTIVITY OUTPUT
CONTROLS
ENVIRONMENTAL
PROTECTION
ENVIRON. AGENCY
GROUP
REVIEW &
APPROVAL
CLIENT
DESIGN
PROJECT,
INFORMATION
ALL
DISC.
PRELIMINARY HYDRAULIC
STUDY, DESIGN CRITERIA
PROCESS
PRELIMINARY LOCATION
OF FACILITIES,
INVESTMENT CRITERIA
CLIENT
CONTINUATION
TO PAGE 2
PIPELINE ENGINEERING
INTER-DISCIPLINE COORDINATION
WORK FLOW DIAGRAM
CONTINUATION
FROM PAGE 2
REGULATORY PIPELINE
GUIDELINES ROUTE/
REGULATORY FACILITY SITE
ENVIRONMENT E. I. A. SELECTION
PIPELINE
PROJECT
FOR FURTHER DESIGN WORK ENVIRONMENT
COSTING DATA
PROJECT
CONTROLS
APPROVED OPTIMIZATION
STUDY & ROUTE
CLIENT
ALL
DISCIPLINES
CONTINUATION
TO PAGE 3
PIPELINE ENGINEERING
INTER-DISCIPLINE COORDINATION
WORK FLOW DIAGRAM
CONTINUATION
FROM PAGE 2
REGULATORY
STRATEGY CONTRIBUTE TO
PROJECT
REGULATORY REGULATORY CLIENT
APPLICATIONS
INFORMATION SUPPORT
REQUESTS CLIENT
PROJECT REGULATORY PROJECT
PROCESS
APPROVAL
REGULATORY REQUIREMENTS ENGINEERING REVIEW & FURTHER
CIVIL
AGENCIES SURVEYS WORK
FOR LAND
ACQUISITION CLIENT
OR
PROCESS PIPELINE DESIGN LAND
DETAILS PIPELINE
MECHANICAL
ALIGNMENT
CIVIL
DRAWINGS
ENVIRONMENT REGULATORY
AGENCIES
APPROVAL
APPROVAL REGULATORY
GEOTECHNICAL AGENCIES
CRITERIA PIPELINE
CIVIL CROSSING
DESIGN
CONSTR.
REVIEW & CONSTRUCTION
PLANNING
CONTINUED
ON PAGE 4
CONTINUATION
FROM PAGE 3
CLIENT
SOIL CATHODIC
RESISTIVITY PROTECTION
SURVEY SYSTEM DESIGN
PROJECT
CONTRIBUTE
TO
CONTRACTS PROJECT
CONSTUCTION
DOCUMENTS
CONSTRUCTION
SPECIFICATIONS, IFC
REQUEST FOR DRAWINGS, SPECIAL
TECHNICAL INPUT ENGINEERING
STUDIES
PROJECT FOR PURCHASING
CONSTRUCTION
CONSTRUCTION
RECORDS FINAL REVIEW DRAWINGS & DATA BOOKS CLIENT &
CONSTRUCTION
& AS-BUILDING PROJECT