Sei sulla pagina 1di 3

ASAD ALI

Riyadh-Saudi Arabia
Contact No:+966 581104237 ,Email: Asad.723@gmail.com
CAREER SUMMARY
Detailed oriented and highly motivated Mechanical Engineer with 7 Years of Professional experience in large industrial
projects aided by technical and Project Management exposure with a solid track record of successful coordination and
completion of projects.Reputation for collaborating effectively with peoples of diverse backgrounds and levels for
developing high performance teams

PROFESSIONAL EXPERIENCE
National Project Managers PVT (LTD) From Nov 2016 till Present
Working as a Principal Service Engineer for Developing & managing core teams to evaluate customer requirements and
producing technical responses to formal requests and proposals to our potential customers, Main Project includes:
 Retrofitting of Diverter damper with Improved sealing air & Lemellas design with G+H at QCCPP-II
 Thermocouples Sleeves Replacement for Main Steam line at Marafiq –Jubail.
 Catanery curve measurement for Steam Turbine at Shoaiba SWCC- Jeddah
 Overhauling of Wash water system at Shedgum Power plant
 Steam Turbine upgradation at Yanbu-SWCC with GE.
 Air intake and media filter replacement at PP-11
 Upgradation of Brine recirculation system at pp-11
 Major Overhauling of Steam Turbine (ALSTOM –D350) at PP-12 Riyadh

Beaudrey Cie (Middle East) From Aug 2015 to Aug 2016


Worked as a Field Service Engineer (TA) for managing all the site services for the Middle East Projects with major scope
of equipment breakdown and troubleshooting activities along with the technical Site Support for equipment Installation and
Commissioning.
 Murafiq Power Station (Yanbu-KSA)
o Support EPC (Bilfinger) for the technical Evaluation feasibility on Debris Filter on Main cooling water line.
o Installation of Continuous Tube Cleaning Skid insatlled at the Brine heater and Evaporator inlet.
o Coordination with the Site and EPC team during installation and Commissioning Phases
 Al-HIID Power Station (Bahrain)
o Troubleshooting for the 12 No. Dual Flow Travelling Band Screens ,12 No.s Trash racks and Stoplog gates.
o After sales and site coordination for spare parts during retrofit job of Band screen performed at site.
 South Jeddah Thermal Power Plant (Jeddah-KSA)
o Installation of 12 No. (Out to In Drum Screens with its wash water System.
o Troubleshooting and commissioning for 2 No.s Mobile Trash rack
o Preparation of IQP and O&M manuals for the installed Equipment's.
o FLQ reporting for the technical failure during workshop testing.
o Performed SAT (Site Acceptance Test) for Drum screen and Teash rack
 Shuqaiq-II Thermal Power Plant (Shuqaiq,KSA)
o Supervision of the Installation and preparation of IQP (on-going) and highlighting Punchlist Points during Erection
o Technical Evaluation for the Drum Screens , Trash Rack ans Stop log guides.
o PLC modification for Greaser Pannels and Mobile Trash Units
 EGA/ DUBAL (Dubai-UAE)
o Sizing and Proposal for DN W-type Debris filter.
o Supervision for the Retrofitting of old filter with a new.
o Handling all the Spare and after sales for the Project
 Maaden Phosphate Company (Maaden ,KSA)
o Site / Equipment Audit for 8 No. Travelling band Screens , 2 No.s Mobile Trash rack and Stop log gates.
o Supporting Engineering for Modifications and advacements

QURAYYAH COMBINED CYCLE POWER PLANT, KSA From Feb 2012 to Aug 2015

Worked as a Lead Startup & Commissioning Engineer with Arabian Bemco for combined cycle power, delivering
over 4,300MW net power with 18 GE 7FA Gas turbine, 18 Triple reheat vertical HRSGs, and 6 GE D-11 Steam
turbines,with successful Execution and commercial startup along with Maintenance support to the Plant,
Commissioning Activities
 HRSG`s chemical cleaning and Steam blowing of HP, CRH, HRH, IP & LP steam piping.
 Hydraulic, Lube oil, Water, Air, Co2, Nitrogen & Hydrogen system flushing / purging / blowing.
 HRSG Systems commissioning i.e. HP/HRH/LP Bypass, Diverter Damper, HPU skids, BFPs etc.
 STG Auxiliary Systems Commissioning i.e Lube oil, Seal Oil, Lift Oil, Vacuum, Cooling water etc.
 Motor solo runs, Pump test runs, Equipment first starts
 Functional testing’s of various power block equipment.
 Startup of Demin-Remin Plant of 1035 cm3/h capacity.
 Maintenance and operation of Pre-Filtration system (Rack screen & Drum screen type)
 Operation of Closed cooling water system (12 X 37 cm3/h) capacity
 Electro chlorination system of 640 Kg/h Cl2 production.
 Start-up of 3X 180 cm3 /h flow MSF / Desalination system
 3X25 GPM EDI / Water treatment / water De-ionization system
 Commissioning for the Fire Detection and fire protection system for over all the plant utilities in correspondence
with NOVEC 1230, FM 200 and Deluge Sprinkler system for critical areas.
 Reviewing and preparation of Commissioning Procedures, Method Statements, Testing procedure and
Operational Procedure for improving plant reliability and performance.
Maintenance Activities
 Troubleshooting operational issues and conditioning monitoring of various plants equipment’s using “Bently Nevada-
System1”and local condition monitoring tools i.e. vibration meter, temperature gun.
 Reviewing maintenance methodologies and activities performed on Steam turbine, Boiler Feed Pumps, Condensate
Extraction Pumps and other plant rotary and stationary equipment.
 Prepare PM plans and attending CM activities for operating plant
 Analyze condition monitoring reports.
 Supervised the maintenance and troubleshooting problems related to following rotary & static equipment’s;
o GE Frame D11 (256 MW), standard & DLN 1.0 gas turbines.
o Heavy duty Multi Stage Centrifugal Boiler feed Pumps of flow 182.4Kg/Cm2
o Single and multi-stage Pumps
o Actuators and Valves
o 973 TPH capacity Heat Recovery Steam Generators
o Drum Screen Trash racks and Wash water Pumps.
o 330 x 3 MW multi stage LP, HP pumps for Feed Water System.

3. ENAR PETROLEUM REFINING FACILITY pvt. Ltd (since January 2012 to Dec 2012)

JOB: Worked as a Trainee Maintenance Engineer in EPRF-II, Mangopir


Description & Responsibilities:
 Vibration monitoring for pumps & compressors on daily basis.
 periodic maintenance for centrifugal pumps
 Worked in close coordination with workshop for plant maintenance activities during shutdowns
 Performed hands-on maintenance of Furfural Extraction & Utilities Instrument Air compressors and multi-stage
pump for Oil Terminal Pumping Station
 Carried out technical evaluations for local suppliers for items as per standard specifications.
 Made cost estimation, engineering and As-built drawings of new modifications.
CERTIFICATIONS
 PLC training for SIEMENS S7-300
• Pro-Engineering
 AUTO CAD 2D/3D • MS-Project / Primavera p6
 NEBOSH International General Certification Health and Safety • IOSH Managing Safely

QUALIFICATIONS
1. Post-Graduation Diploma (Project Management Professional –PMP ) (2012)
National University of Science & Technology (NUST) –Karachi-Pakistan
2. Bachelors of Science (Mechanical Engineering) 74.5 % (2007-2010)
Quaid-E-Awam University of Engineering & Technology -Pakistan
3. Intermediate (HSC) 70 % A-Grade (2004-2006) Adamjee Govt Science Collage-Karachi
4. Matric (SSC) 78% A+ Grade (2002-2004) Federal Secondary School-Karachi

PROFESSIONAL MEMBERSHIP
 SAE (Society of Automotive Engineers)
 PEC (Pakistan Engineering Council) MECH/24295
 ASME (American Society of Mechanical Engineers)
 ASHRAE (American Society of Heating Refrigerating & Air conditioning)
 SEC (Saudi Engineering Council) (Membership#157885)

OTHER INFORMATION
 Driving License : UAE ,Saudi Arabia, Pakistan ( valid for 10 Years)
 Languages Known : English ,Arabic, Urdu, Sindhi ,Punjabi
 Marital status : Married