INTRODUCTION

This presentation is intended to be an overview of the basic elements


of moving project cargo, heavy lift and over dimensional cargo

Elements we will cover:

ROADS
SHIPS

BRIDGES
CUSTOMS CLEARANCE

PORTS
SAFETY
Do you want to manage Global Logistics Operations?
ROADS

To Analyze during Road and Route


Surveys:

•Tunnels

•Bridge Construction Design Limits, Age and Condition

•Shoulder Strength

•Ground Bearing Pressure Limits

•Construction / Maintenance

•Power, Communication and Signal Lines

•Traffic Congestion
ROADS

To Analyze during Road and Route


Surveys:

•Grade

•Security

•Seasonal Weather Conditions

•Drainage and Culvert System Passovers

•Retaining Walls (GBP / Inverted Cone Effect)

•Erosion and Ground Stabilization Effect

•Surface Conditions
ROADS
Note: Ground Bearing Pressure (GBP)
and Cold Eye Review Team

What to consider:
•Weight distribution of your load
•Areas adjacent to existing embankments
•Underground Utilities (Water, Gas, Fiber Optics, Drainage)
•Areas of unstable Ground
•Areas of weak or compressible soil
Example of a Heavy Haul / Over Dimensional Movement on SPMT
EXAMPLE OF A TRANSPORT CONFIGURATION PLAN
BRIDGES
BRIDGES

Look Out Above and Look Out Below !

SURVEYS --What to consider:

• Condition Rating System – Rate from 0 – 9 (9 is in best condition)

• Three Categories to Survey and Inspect

1. Deck

2. Super Structure

3. Sub-Structure
BRIDGES

Mind the Traffic During Survey !

WHAT TO LOOK FOR:

• Placard with Construction Data (year / weight limitations / type)

• Signs of Settlement on the Embankment and Sub-Structure

• Gaps and Cracks, Signs of Stress

• Corrosion, Oxidation and Fragmentations of Cement

• Aspalt Patches used to ramp a difference of road and bridge


BRIDGES

Don’t Pretend to be an Expert !

Do’s and Don’ts:

• Bridge Integrity is not always visible. If in any doubt, Hire a


Professional

• Photograph document everything, different angles; top, bottom and


Approach

• For Security purposes, carry identification and wear a company logo,


you may be questioned by authorities as to why you are
photographing the bridge.
EXAMPLE OF BRIDGE DESIGN AND DETAILS
PORTS

What to Look For and Consider

•Availability of Deep Water

•Presence of floating cranes

•Specialized Service Providers •Strategic Location


•Multi-purpose Capabilities •Tidal Fluctuation
•Storage and Laydown •Contingency Planning

•Experienced Labor

Don’t let your lack of Planning become the Project’s Emergency!


SHIPS

Considerations:

•Draft

•Experienced crew

•Availability and Dependability

•Ballast Calculations, third party survey and review

•Contingency plan in case of gear failure

•Ship’s gear lifting capacity


SHIPS

Considerations:

•Stability

•Port rotation

•Charter Party agreement and Roles/


Responsibilities Clearly Agreed

•Ro/Ro vs lift on/off

•Mooring Calculations and availability


lines, buoys, bollards, etc

•Age of the Vessel


CUSTOMS CLEARANCE and REGULATIONS

Considerations:

•Clearance on arrival or Pre-Clearance

•Percentage of full inspections

•Industrialized / Developing / Third World Countries

•Graft / Corruption / Bribery

•Process and Checklist

•Payment of Duties

•Custom Brokerage

Potrebbero piacerti anche