NOMBRE DE TAREAS

ESTRUCTURAS
OBRAS PROVICIONALES
CASETA ADICIONAL P/GUARDIANIA Y/O DEPOSITO
CERCO DE OBRA C/MANTA DE POLIETILENO
CARTEL DE IDENTIFICACION DE OBRA DE 3.60X2.40M CON GUGANTOGRAFIA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS
DEMOLICION DE MUROS DE ADOBE
ELIMINACION DEL MATERIAL DE DEMOLICION CON ESPONJAMIENTO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRA
CORTE DEL MATERIAL SUELTO
EXCAVACION DE ZANJAS CIMIENTOS ZAPATAS
RELLENO CON MATERIAL PROPIO
ACARREO DE MATERIAL EXCEDENTE D=30MTS
MATERIAL GRANULAR COMPACTADO
NIVELACION INT. PARA PISO
OBRAS DE CONCRETO SIMPLE
SOLADO E=0.10
CIMIENTO CORRIDO MEZCLA C.H 1:10 +330%P.G
SOBRECIMIENTO CORRIDO
CONCRETO FC=140KG/CM2
ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO CORRIDO
FALSO PISO ESP:2"
MATERIAL FINO ARENA GRUESA E=0.15
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO FC=210 KG/CM2 PARA ZAPATAS
ACERO GRADO 60 ZAPATAS
VIGAS DE CIMENTACION
CONCRETO FC=210KG/CM2 PARA VIGAS DE CIMENTACION
ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION
ACERO GRADO 60 EN VIGAS DE CIMENTACION
SOBRECIMIENTO ARMADO
CONCRETO FC=175KG/CM2 PEN CIMIENTO REFORZADO
ENCOFRADO Y DESENCOFRADO PEN CIMIENTO ARMADO
ACERO GRADO 60 CIMIENTO ARMADO
COLUMNAS
CONCRETO FC=210KG/CM2 PARA COLUMNAS
ENCOFRADO Y DESENCOFRADO EN COLUMNAS
ACERO GRADO 60 EN COLUMNAS
VIGAS
CONCRETO FC=210KG/CM2 PARA VIGAS
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
ACERO GRADO 60 EN VIGAS
ESCALERA
CONCRETO FC=210KG/CM2 PARA ESCALERA
ENCOFRADO Y DESENCOFRADO DE ESCALERA
ACERO GRADO 60 EN ESCALERA
LOSAS ALIGERADAS
CONCRETO FC=210KG/CM2 PARA LOSA ALIGERADA
ENCOFRADO Y DESENCOFRADO EN LOSA ALIGERADA
ACERO GRADO 60 EN LOSA ALIGERADA
LADRILLO HUECO DE ARCILLA DE 15X30X30 CM PARA TECHO
JUNTA DE DILATACION CON TECNOPORT E=1" Amax=25cm
ALBAÑILERIA
MURO LADRILLO K.K 18 HUECOS CABEZA 1
MURO LADRILLO K.K 18 HUECOS SOGA 01
MURO LADRILLO K.K 18 HUECOS SOGA CARAVISTA
ACERO DE REFUERZOEN MUROS
ESTRUCTURAS DE MADERA Y COBERTURAS
TIJERAL
SUMINISTRO Y MONTAJE DE CORREAS 3" X 4"
SUMINISTRO Y MONTAJE DE TEJA ANDINA 1.14 X 0.72
SUMINISTRO Y MONTAJE DE CUMBRERA TEJA ANDINA
FLETE TERRESTRE
FLETE TERRESTRE DE MATERIAL (CAJAMARCA-CORTEGANA)
FLETE RURAL
FLETE TERRESTRE RURAL (CORTEGANA-YAGEN)
CAPACITACION DOCENTE
CAPACITACION DOCENTE
MITIGACION AMBIENTAL
MITIGACION AMBIENTAL
ARQUITECTURA
CIELORRASOS
CIELO RASO CON triplay Lupuna C/C 4mm 1.22 x 2.44mm
VESTIDURA DE FONDO DE ESCALERA
REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO FROTACHADO C:A, 1:5 EN MUROS INTERIORES
TARRAJEO SUPERFICIE DE VIGAS
TARRAJEO FROTACHADO C:A, 1:5 EN VIGAS INTERIORES
REVESTIMIENTO FROCHADO C:A, 1:5 DE SUPERFICIE DE VIGAS EXTERIORES
TARRAJEO SUPERFICIE DE COLUMNAS
TARRAJEO FROTACHADO DE COLUMNAS INTERIORES C:A, 1:5
TARRAJEO FROTACHADO DE SUPERFICIE DE COLUMNAS EXTERIORES C:A, 1:5
VESTIDURA DE DERRAMESEN PUERTAS, VENTANAS
ZOCALOS Y CONTRAZOCALOS
CONTRAZOCALO ENCHAPADO CERAMICO ANTIDESLIZANTE H=0.20
CONTRAZOCALO DE ESCALERA CEMENTO PULIDO S/COLOREAR (H=0.10)
ZOCALO DE CERAMICO 40 X 40
PISOS Y PAVIMENTOS
CONTRAPISO DE 4"
PISO CEMENTO PULIDO Y/O FROTACHADO e=2"
PISO DE CERAMICA 40 X 40
FORJADO Y REVESTIM. DESCANSO DE ESCALERAC. PULIDO S/COLOREAR
VEREDAS
AFIRMADO Esp=15 cm veredas de circulacion
VEREDA 4" DE CIRCULACION DE CONCRETO F'C=140 KG/CM2
ENCOFRADO Y DESENCOFRADO DEVEREDAS (INC:SARDINEL Y JUNTAS)
JUNTA DE DILATACION CON RELLENO ASFALTADO e=1"
CARPINTERIA DE MADERA
PUERTAS DE MADERA CEDRO DE TABLEROS REBAJADOS DE 4.5 mm
PUERTA DE MELAMINE DE 18 mm
CARPINTERIA METALICA
VENTANA C/PERFIL LIVIANO (inc. Acabado en esmalte)
CERRAJERIA
BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 3"
BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3"
MANIJA DE BRONCE 4"
CERROJE DE ALUMINIO DE 3"X3"
CERRADURA EXTERNA TIPO FORTE 02 GOLPES C/JALADERA DE BRONCE
CERRADURA EXTERNA POMO COLOR CROMO OXIDADO
PINTURA
PINTURA LATEX VINILICO EN CIELO RRASO
PINTURA LATEX SUPERMATE EN INTERIORES
PINTURA LATEX SUPERMATE EN EXTERIORES
VIDRIO CRISTALES Y SIMILARES
VIDRIOS DOBLES NACIONALES inc. Suministro, instalacion y accesorios
VARIOS
PIZARRA ACRILICA DE 3.00X1.20M
TAPA JUNTA SISMICA C/PLATINA 4"X4"X1/8" FIJADO
URINARIO CORRIDO ACABADO EN CERAMICA SEGÚN DETALLE
UND METRADO REND DURACION 10 PERSONAS

0.70
M2 40.00 50 0.80 0.08
M2 288.00 50 5.76 0.58
UND 1.00 2.50 0.40 0.04
1.23
M2 719.00 150 4.79 0.48
GLB 1.00 0.5 2.00 0.20
M2 215.70 200 1.08 0.11
M3 674.06 250 2.70 0.27
M2 1319.00 750 1.76 0.18
13.85
M3 1300.00 250 5.20 0.52
M3 294.95 3 98.32 9.83
M3 150.22 24 6.26 0.63
M3 180.91 10 18.09 1.81
M3 59.95 9 6.66 0.67
M2 399.66 100 4.00 0.40
1.18
M3 205.29 80 2.57 0.26
M3 184.43 20 9.22 0.92
6.22
M3 13.27. 10 1.32 0.13
M2 149.84 12 12.49 1.25
M2 384.89 8 48.11 4.81
M3 3.14 10 0.31 0.03
0.00
1.42
M3 52.32 15 3.49 0.35
KG 2142.16 200 10.71 1.07
2.11
M2 15.39 10 1.54 0.15
M2 92.02 12 7.67 0.77
KG 2370.59 200 11.85 1.19
1.58
M3 22.51 10 2.25 0.23
M2 285.76 50 5.72 0.57
KG 1645.15 210 7.83 0.78
7.23
M3 55.81 10 5.58 0.56
M2 583.06 50 11.66 1.17
KG 11010.71 200 55.05 5.51
6.60
M3 49.51 9 5.50 0.55
M2 358.82 10 35.88 3.59
KG 9838.97 400 24.60 2.46
0.70
M3 5.32 10 0.53 0.05
M2 33.34 6 5.56 0.56
KG 230.11 250 0.92 0.09
1.70
M3 11.34 10 1.13 0.11
M2 126.8 15 8.45 0.85
KG 1125.2 200 5.63 0.56
UND 1125.2 1600 0.70 0.07
M 55.77 50 1.12 0.11
12.40
M2 253.09 6.5 38.94 3.89
M2 196.19 9.45 20.76 2.08
M2 494.45 8 61.81 6.18
KG 531.82 210 2.53 0.25
0.51
GLB 1 5 0.20 0.02
M 966.65 500 1.93 0.19
UND 1,188.00 500 2.38 0.24
PAR 163 300 0.54 0.05
0.62
KG 369,222.00 60000 6.15 0.62
0.41
KG 2,039,938.51 500000 4.08 0.41
0.10
GLB 1 1 1.00 0.10
0.10
GLB 1 1 1.00 0.10
0.00
3.29
M2 447.6 15 29.84 2.98
M2 30.78 10 3.08 0.31
6.08
M2 912.61 15 60.84 6.08
0.39
M2 223.98 75 2.99 0.30
M 52.1 60 0.87 0.09
2.04
M2 102.23 15 6.82 0.68
M2 81.25 12 6.77 0.68
M 95.4 14 6.81 0.68
2.14
M 192.81 13 14.83 1.48
M 14.01 12 1.17 0.12
M2 42.84 8 5.36 0.54
3.05
M2 141 100 1.41 0.14
M2 193.65 20 9.68 0.97
M2 199.71 12 16.64 1.66
M2 13.88 5 2.78 0.28
6.59
M2 107.46 4 26.87 2.69
M2 122.8 5 24.56 2.46
M2 27.26 4 6.82 0.68
M 153.5 20 7.68 0.77
1.87
M2 27.3 2 13.65 1.37
M2 10.08 2 5.04 0.50
3.87
M2 154.82 4 38.71 3.87
5.31
UND 53 3 17.67 1.77
UND 24 1 24.00 2.40
UND 19 5 3.80 0.38
UND 18 5 3.60 0.36
UND 13 5 2.60 0.26
UND 7 5 1.40 0.14
10.88
M2 500.7 7 71.53 7.15
M2 58.61 4 14.65 1.47
M2 226.39 10 22.64 2.26
1.97
P2 1968.82 100 19.69 1.97
0.66
UND 8 6 1.33 0.13
M 209.15 50 4.18 0.42
M2 1.12 1 1.12 0.11
TAREAS TAREAS PREDECESORA TIEMPO
ESTRUCTURAS 54.00
OBRAS PROVICIONALES A - 1.00
TRABAJOS PRELIMINARES B A 1.00
MOVIMIENTO DE TIERRA C B 14.00
OBRAS DE CONCRETO SIMPLE D C 1.00
OBRAS DE CONCRETO ARMADO E D 22.00
ESTRUCTURAS DE MADERA Y COBERTURAS F D,E 1.00
FLETE TERRESTRE G A 1.00
FLETE RURAL H A 0.40
CAPACITACION DOCENTE I F 0.10
MITIGACION AMBIENTAL J I 0.10
ARQUITECTURA 49.00
CIELORRASOS K F 3.00
REVOQUES, ENLUCIDOS Y MOLDURAS L K 6.00
TARRAJEO SUPERFICIE DE VIGAS M L 0.50
TARRAJEO SUPERFICIE DE COLUMNAS N M 2.00
ZOCALOS Y CONTRAZOCALOS O N 2.00
PISOS Y PAVIMENTOS P B 3.00
VEREDAS Q P 7.00
CARPINTERIA DE MADERA R L 2.00
CARPINTERIA METALICA S L 4.00
CERRAJERIA T R,S 5.00
PINTURA U L 11.00
VIDRIO CRISTALES Y SIMILARES V U 2.00
VARIOS W V 1.00

P=3
E=22

A=1 B=1 C=14 D=1


1 2 3 4 5

G=1

3 3
H=0.40

RUTA CRITICA 73 DIAS


10
Q=7

14

S=4

16
13
16
13 R=2

M=0.5
L=6
17
6
12
U=11
20
F=1

K=3

I=0.10
7 J=0.1
8 9
11

14 T=5 15

16
16

N=2 O=2 19
17 18
73

W=1 22
20 21
V=2
NOMBRE DE TAREAS
ESTRUCTURAS
OBRAS PROVICIONALES
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRA
OBRAS DE CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
ALBAÑILERIA
ESTRUCTURAS DE MADERA Y COBERTURAS
FLETE TERRESTRE
FLETE RURAL
CAPACITACION DOCENTE
MITIGACION AMBIENTAL
ARQUITECTURA
CIELORRASOS
REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO SUPERFICIE DE VIGAS
TARRAJEO SUPERFICIE DE COLUMNAS
ZOCALOS Y CONTRAZOCALOS
PISOS Y PAVIMENTOS
VEREDAS
CARPINTERIA DE MADERA
CARPINTERIA METALICA
CERRAJERIA
PINTURA
VIDRIO CRISTALES Y SIMILARES
VARIOS
10 PERSONAS MES 1

54.00 SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4 SEMANA 5


1.00
1.00
14.00
1.00
22.00
12.00
1.00
1.00
0.40
0.10
0.10
49.00
3.00
6.00
0.50
2.00
2.00
3.00
7.00
2.00
4.00
5.00
11.00
2.00
1.00
MES 2 MES 3
SEMANA 5 SEMANA 6 SEMANA 7 SEMANA 8 SEMANA 9 SEMANA 10 SEMANA 11
MES 3 MES 4
SEMANA 11 SEMANA 12 SEMANA 13 SEMANA 14 SEMANA 15 SEMANA 16
MES 5
SEMANA 16 SEMANA 16
Cr

Ítem PARTIDA

01 CONSTRUCCIÓN DE INFRAESTRUCTURA

1.00 ESTRUCTURAS

01.02 OBRAS PROVICIONALES

01.03 TRABAJOS PRELIMINARES

01.04 MOVIMIENTO DE TIERRA

01.05 OBRAS DE CONCRETO SIMPLE

01.06 OBRAS DE CONCRETO ARMADO

01.07 ALBAÑILERIA

01.08 ESTRUCTURAS DE MADERA Y COBERTURAS

01.09 FLETE TERRESTRE

01.10 FLETE RURAL

01.11 CAPACITACION DOCENTE

01.12 MITIGACION AMBIENTAL


01.12 MITIGACION AMBIENTAL

2.00 ARQUITECTURA

2.01 CIELORRASOS

2.02 REVOQUES, ENLUCIDOS Y MOLDURAS

2.03 TARRAJEO SUPERFICIE DE VIGAS

2.04 TARRAJEO SUPERFICIE DE COLUMNAS

2.05 ZOCALOS Y CONTRAZOCALOS

2.06 PISOS Y PAVIMENTOS

2.07 VEREDAS

2.08 CARPINTERIA DE MADERA

2.09 CARPINTERIA METALICA

2.10 CERRAJERIA

2.11 PINTURA

2.12 VIDRIO CRISTALES Y SIMILARES

2.13 VARIOS

TOTAL PRESUPUESTO PROYECTO


PORCENTAJE VALORIZADO MENSUAL
PORCENTAJE DE AVANCE ACUMULADO
Cronográma Físico - Financiero

MES 1 M

PRESUPUESTO SEMANA

1 2 3 4 5
236060.42 28

1,303,995.63
18.10% 2

1,067,526.34

8434.61
8,434.61
100.00%
34433.85
34,433.85
100.00%
6029.09 8731.79 6029.09
20,789.98
29.00% 42.00% 29.00%
60849.36
60,849.36
100.00%
25497.74 86054.88 86054.88
318,721.78
8.00% 27.00% 27.00%

89680.28

89,702.38

110,766.60

305,990.78

15574.03

12582.69
12582.69

236,469.29

2,807.32

20,314.70

11,592.60

11,157.81

6,679.75

33308.57

9,500.32

16,199.24

52,897.35

4364.59

9695.25

29,689.81

28,261.98

PROYECTO 236,060.42 28
DO MENSUAL 18.10% 21
ACUMULADO 18.10% 3
MES 2 MES 3

NA

6 7 8 9 10 11 12
281603.79 638477.97

21.60% 48.96%

86054.88 35059.40

27.00% 11.00%
29594.49 44840.14 15245.65

33.00% 50.00% 17.00%


89702.38

100.00%
110766.60

100.00%
305990.78

100.00%
15574.03

100.00%
12582.69
100.00%

926.42 1880.90

33.00% 67.00%
13610.85 6703.85

67.00% 33.00%
11592.60

100.00%
11157.81

100.00%
3339.88 3339.88

50.00% 50.00%
33308.57

100.00%
2755.09

29.00%

281603.79 638477.97
21.60% 48.96%
39.70% 88.66%
MES 4 MES 5

13 14 15 16 17
89029.08 58824.36 1,303,995.63

6.83% 4.51% 100.00%

8434.61

100.00%
34433.85

100.00%
20789.98

100.00%
20789.98

100.00%
318721.78

100.00%
89680.28

100.00%
89702.38

100.00%
110766.60

100.00%
305990.78

100.00%
15574.03

100.00%
12582.69
100.00%

2807.320

100.00%
20314.70

100.00%
11592.60

100.00%
11157.81

100.00%
6679.75

100.00%
33308.57

100.00%
6745.23 9500.32

71.00% 100.00%
16199.24 16199.24

100.00% 100.00%
52897.35 52897.35

100.00% 100.00%
2618.75 1745.84 4364.59

60.00% 40.00% 100.00%


3490.29 5332.39 872.57 9695.25

36.00% 55.00% 9.00% 100.00%


29689.81 29689.81

100.00% 100.00%
28261.98 28261.98

100.00% 100.00%

89029.08 58824.36
6.83% 4.51%
95.49% 100.00%
OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK
OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK