HPCL·Mittal Energy Ltd. I HPCL· Mittal Pipelines Ltd.

Rev ision 01

~
Issue Date 05-J un-2Q18
Lockout, Tagout & Tryout Procedure
HMEL
Ne:« Review 04.Jun·2{)21
9111·000·HSE·OO6·00003 Page 14 or16

ANNEXURE·3
Sequenc e of providing LOCK during Eleclrica ll so lation and its remova l

Sce nario: Mechanical & Electrical PM on same equipment

P",m" R~"~I by M~h,"'",'~ / p,~, R,q"~1 by EI~,"",'

?artmen~

Ele",,'o' ';o'ohoo F"",1, fo, ~ 7 Foem2, ro,,'oc'oco' dept

Both request sent to electrical substation for LOTO by Operations

C t
1"lock : = > - Electrical Operation will de-energize the panel & place lock as per form -1 & 2

C 2"d lock ~
t
~ Then opertaion department place his lock as per form- 1 &2
. t
C 3,d & 4. lOCk:=> ~ Followed by mechanical (Form-1) Electrical (Form-2)
&
t
Electrical maintenance now placed his lock
t
After LOTO, Operation issue the permit to mechanical & electrical dept.
t
OP","""'Od7fO~mb"g Ih,~,k,

After completion of electrical maintenance, electrical


d,., _It ",0" h', ""mit ,""bmlt ~ 7'
After completion of mechanical maintenance, mechanical
petm' & ;ohmlt ro Opet_"

After receiving both electrical isolation forms & closing all permits,
Operation will send both the forms to Substation, with the request of energization

~
Remove LOTO locks in tile reverse sequence (First 4th lock, then 3,d & 2nd lock)

~
Electrical operation from substation check the records to ensure, that all isolation
request has been closed & all the locks are removed from the panel before
removing his lock & energizing the panel

Format No. 9111 ·000·PCT·FRM-00006 Rev·OO