AIR VALVE
HAND RAILING
DOUBLE FLANGE
BEND & BOTH SIDE DN350mm DI PIPE
A
FLANGE ADAPTORS B -
DN150mm DI PIPE FLANGE ADAPTORS
-
RESTRAIN SOCKETED RESTRAIN SOCKETED
R O A D
1500
THRUST BLOCK PIPE SUPPORT(AT 1500mm CRC) THRUST BLOCK
STEPPED COUPLING STEPPED COUPLING
A
B -
-
DN 350mm DI
KUMBUKKAN OYA SOCKTED PIPE
DOUBLE ORIFICE
FLOW DN350mm DI PIPE AIR VALVE
DN150mm DI PIPE
PIER 1 PIER 2 PIER 3 PIER 4
GUARD RAIL PIPE SUPPORT
AT 1500mm CRC
PEDESTRIAN WAY
THRUST BLOCK
R O A D
B R I D G E STEPPED COUPLING
FROM TO
BUTTALA MONARAGALA
PLAN VIEW
SCALE 1 : 200
EMPLOYER : CONTRACTOR : DESIGNER : PROJECT : REV DESCRIPTION BY DATE SCALE AS SHOWN SUBMITTED APPROVED
IMPLEMENTATION OF MONARAGALA,BUTTALA INTEGRATED WATER SUPPLY PROJECT 001 REVISION 05/10/15
DESIGNED UMESHA
NATIONAL WATER SUPPLY
& DRAINAGE BOARD BESIX
CONTRACT NO: DRAWING TITLE : DRAWN SHASHIKALA DATE. 05.10.2015
NO:157/4-2, MUIBUN TOWERS, P&P/WS/BELGIUM/M&BIWSP/2010/01 YASELA
DETAIL OF PIPE BRACKET DESIGN AT KUMBUKKAN OYA BRIDGE CHECKED DRG. NO. MWSP/S/D/002/001
DHARMAPALA MAWATHA , COLOMBO - 7
SUBMITTED PAGE. NO. 01