This document contains a table listing 34 areas of a cement plant and specifying the illumination level, maintenance factor, and type of lighting fixture for each area. The table includes areas like the limestone crusher house, bag filter, conveyor ways, screening buildings, compressor house, raw material feed bin, and more. Calculation methods and types of lighting fixtures like high pressure sodium lamps and fluorescent lamps are also noted.
This document contains a table listing 34 areas of a cement plant and specifying the illumination level, maintenance factor, and type of lighting fixture for each area. The table includes areas like the limestone crusher house, bag filter, conveyor ways, screening buildings, compressor house, raw material feed bin, and more. Calculation methods and types of lighting fixtures like high pressure sodium lamps and fluorescent lamps are also noted.
This document contains a table listing 34 areas of a cement plant and specifying the illumination level, maintenance factor, and type of lighting fixture for each area. The table includes areas like the limestone crusher house, bag filter, conveyor ways, screening buildings, compressor house, raw material feed bin, and more. Calculation methods and types of lighting fixtures like high pressure sodium lamps and fluorescent lamps are also noted.
No. Area Calculation Illumination Level (Lx) Maintenance Type of
Method Ave. Min. Factor Lighting Fixture 1 Limestone Crusher House A 100 50 0.65 S, F 2 Bag Filter P 50 20 0.65 F 3 Conveyor Conveyor head Wallk P 100 50 0.65 F Way (Main Walk 4 Way) Conveyor Wallk P 20 5 0.65 F Way (Sub Walk 5 Way) P 5 2 - - 6 Siltstone Crusher House A 100 50 0.65 S, F 7 Bag Filter P 50 20 0.65 F 8 Conveyor Conveyor head Wallk P 100 50 0.65 F Way (Main Walk 9 Way) Conveyor Wallk P 20 5 0.65 F Way (Sub Walk 10 Way) P 5 2 - - 11 Siltstone Screening Building P 100 50 0.65 F 12 Limestone Screening Building P 100 50 0.65 F 13 Compressor House for Crushing A 100 50 0.7 F 14 Raw Material Feed Bin A 100 50 0.65 F 15 Other Floor A 20 5 0.65 F 16 Raw Meal Grindi Conveyor P 20 5 0.65 F 17 Building A 100 50 0.65 S, F 18 Outside P 50 20 0.65 S 19 Raw Material Homogenizing Silo 20 Under A 100 50 0.65 F 21 Top P 50 20 0.65 S 22 Preheater Tower A 100 50 0.65 S, F 23 Kiln Walk Way P 50 20 0.65 F 24 Drive P 100 50 0.65 S 25 Main Bag House P 100 50 0.65 S, F 26 Bypass Bag House P 100 50 0.65 S, F 27 Clinker Cooler Conveyor Head P 100 50 0.65 F 28 Building A 100 50 0.65 S, F Conveyor Wallk Way (Main Walk 29 Way) P 20 5 0.65 F Conveyor Wallk Way (Sub Walk 30 Way) P 5 2 0.65 - 31 Clinker Silo Top P 50 20 0.65 S 32 Compressor House A 100 50 0.7 S, F