These can only focus on the construction stage in progress 5.3.1 The quality system documentation submitted to the
during the survey. It is to the responsibility of the inspection Society is to include the information required in [3.1] and in
department of the yard to present to the Surveyor any the Rule Note NR320 as amended.
defects noted during the construction of the ship.
5.4 Manufacturing, testing and inspection
5 Alternative survey scheme for plan (MTI plan)
production in large series 5.4.1 For each type of hull, the manufacturing, testing and
inspection plan is to detail specifically:
5.1 General • Materials:
Special requirements of the supplier (storage conditions,
5.1.1 Where the hull construction is made in large series, type of checks to be performed on incoming products
an alternative survey scheme may be agreed with the Soci- and properties to be tested by the yard before use).
ety for hull to be surveyed as far as Classification is con-
cerned or hull to be certified by the Society on voluntary • Storage conditions:
basis. Information about storage sites (ventilation condi-
tions to avoid condensation, supplier data sheets
5.1.2 The general requirements for the alternative survey specifying the storage conditions, listing documents
scheme, BV Mode I, are given in the Society's Rule Note to record arrival and departure dates for consign-