Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
A4 A5 A6 A8 A9 A10
A3 A11 A12
A2
A13
A1
2 A14
AX V
B14
7
B1
B13
B2
B12
B4 B5 B6 B8 B10 B11
B3 B9
INCLINE BEAM
BEAM
DRAWING REFERENCE
4
-
1
NOTE:
FIRST STEP IS FLOOR MOUNTED.
2nd STEP TO 12th STEP IS OPEN THREAD STEEL 01 2
23
& WOODEN LEDGE BELOW.
REMAINING 11 STEPS ARE CONCRETE. NEXT Engineering
01 1 Date:
23 Consultants
WOW Hotel and Hotel Apartments
A No Objection
No Objection subject to incorporation
B of all comments as noted
C Revise and Resubmit
D Rejected
Corrections or comments made relative to submittals during this review does not relieve the
contractor from compliance with the requirement of his contract, drawings and specifications.
This review is only in respect and general conformance with the design intent of the project
and general compliance with the information given the contract documents. The contractor
remains responsible, among other things, for the design of the project or such parts of the
project he has design responsibility for (if design forms part of the contract) confirming and
correlating all quantities of construction, coordinating his work with that of other trades, and
performing his work in a safe and satisfactory manner, all in accordance with the contract.
A4
ISSUES
(LEVEL-C)