BERTAMBAH

MUTU

300 600 300


A HOT DIP GALVANISED
-
75 75 M.S. GRATING KERAJAAN MALAYSIA
PROJECT TITLE:
GL 34.50
CONSTRUCTION AND COMPLETION OF LIGHT RAIL
300 2000 300 TRANSIT LINE 3 (LRT3) FROM
BANDAR UTAMA TO JOHAN SETIA
PROJECT PACKAGE:
T10-200

T20-150 T20-150 EASTERN CORRIDOR


T10-200

T16-150 T16-150
SUPERVISING AGENCY :
600mm DIA.
INCOMING PIPE FROM OSD S U R U H A N J A Y A
P E N G A N G K U T A N AW A M D A R A T
L A N D PUBLIC TRA NSPORT
HOT DIP GALVANISED M.S GRATING
75 600 75
SPAD C O M M I S S I O N
SURUHANJAYA PENGANGKUTAN AWAM DARAT
I.L. 30.58
IBU PEJABAT
CBP WALL BLOCK D,PLATINIUM SENTRAL

75
JALAN STESEN SENTRAL 2
KUALA LUMPUR SENTRAL
50470 KUALA LUMPUR, MALAYSIA

600
T16-200 TOP AND BOTTOM (BOTHWAYS)
Tel: 603-27267000 Fax: 603-27267100
PROJECT OWNER :

75
PRASARANA MALAYSIA BERHAD ( 467220-U )
B-20-1, LEVEL 20, MENARA UOA BANGSAR,
PLAN NO. 5 JALAN BANGSAR UTAMA 1,
59000 KUALA LUMPUR.
SCALE 1:25

Tel: 603-22991999 Fax: 603-22991919

NOTES: PROJECT DELIVERY PARTNER :


1. GENERAL NOTES OF CONTIGUOUS BORED PILE:
a) ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN METRES.
b) AVERAGE ESTIMATED LENGTH OF PILE FROM REDUCED LEVEL IS AS STATED IN DRAWINGS,
UNLESS HARD ROCK IS ENCOUNTERED, PRIOR TO REACHING THE STATED DEPTH. IF HARD
ROCK IS ENCOUNTERED PRIOR TO STATED DEPTH, THE DDC OR HIS REPRESENTATIVE MRCB GEORGE KENT SDN BHD
SHALL BE NOTIFIED FOR DECISION ON THE LENGTH OF PILE.
c) PILE CUT-OFF-LEVEL SHALL BE AS PER RELEVANT DRAWINGS. LEVEL 3 MENARA MRCB NO. 2, JALAN
d) TYPES OF CEMENT SHALL BE PORTLAND-SLAG CEMENT (CEMII/B-S) OR BLASTFURNACE
MAJLIS 14/10, 40000, SHAH ALAM,
CEMENT (CEMIII/A) COMPLYING WITH EN197-2000 AND CONCRETE FOR BORED PILE AND
CAPPING BEAM SHALL BE GRADE 40. SELANGOR DARUL EHSAN
e) REINFORCEMENT BAR SHALL BE AS FOLLOWS:
Tel: 603-50336888 Fax: 603-50336999
i) HIGH YIELD DEFORMED BARS - fy = 460N/mm2.
ii) MILD STEEL BARS - fy = 250N/mm2.
g) CONCRETE COVER TO REINFORCEMENT SHALL BE 75mm.
LEAD CONSULTANT :
h) LAP LENGTH FOR REINFORCEMENT SHALL BE 45 TIMES DIAMETER OF BAR.
i) THE INSTALLATION OF PILE SHALL COMPLY WITH THE FOLLOWING TOLERANCES:
i) DEVIATION FROM DESIGN POSITION < 75mm.
ii) DEVIATION FROM VERTICAL < 1 IN 75.
MINCONSULT SDN. BHD.
(Company No. : 58835-P)
j) TEMPORARY STEEL CASING SHALL BE USED TO STABILIZE THE PILE BORE. IF ANY OTHER LOT 6, JALAN 51A / 223,
METHOD IS PROPOSED BY THE WPC, THE SAME SHALL BE SUBJECT TO APPROVAL OF minco
46100 PETALING JAYA, SELANGOR, MALAYSIA.
THE DDC OR HIS REPRESENTATIVE. STARTER BAR
FROM CBP
k) THIS DRAWING SHALL BE READ IN CONJUNCTION TO THE FOLLOWING
GEOTECHNICAL INSTRUMENTATION AND MONITORING GS01:- Tel : 603-79545757 Fax : 603-79547373
* KVLRT3-MRCBGK-GS01-EC-GEO-INS-LOD-160200 603-79525757 603-79547575
* KVLRT3-MRCBGK-GS01-EC-GEO-INS-GN-160201
* KVLRT3-MRCBGK-GS01-EC-GEO-INS-DTL-160202
* KVLRT3-MRCBGK-GS01-EC-GEO-INS-LOP-160203 DESIGN CONSULTANT :
* KVLRT3-MRCBGK-GS01-EC-GEO-INS-LOP-160204 RIVER BED
* KVLRT3-MRCBGK-GS01-EC-GEO-INS-LOP-160205
* KVLRT3-MRCBGK-GS01-EC-GEO-INS-LOP-160206
* KVLRT3-MRCBGK-GS01-EC-GEO-INS-LOP-160207

2. THE WPC IS RESPONSIBLE FOR THE DESIGN, CONSTRUCTION AND MAINTENANCE OF ALL
TEMPORARY WORKS.
3. PILE INTEGRITY TEST USING SONIC LOGGING METHOD SHALL BE CARRIED OUT FOR PILES
SELECTED BY PDP OR HIS REPRESENTATIVE. THE NOS OF SONIC LOGGING TEST SHALL BE
10% OF TOTAL BORED PILES.
4. INCLINOMETER SHALL BE INSTALLED IN 10% OF TOTAL BORED PILES.
5.THE WPC IS TO SUBMIT ALL SHOP DRAWINGS AND CALCULATIONS FOR TEMPORARY WORKS TO
THE DDC OR HIS REPRESENTATIVE FOR REVIEW BEFORE COMMENCEMENT OF WORKS.
Rev Date Description Desg Check Appr
6. THE WPC IS TO ADHERE STRICTLY TO THE CONDITIONS STIPULATED BY M.B.P.J. IN THE EXECUTION W00 13/10/2017 ISSUED FOR CONSTRUCTION NA NFS TSH
OF WORK ESPECIALLY WITH REGARD TO SAFETY, CLEANLINESS, NOISE POLLUTION AND APPROVED
WORKING HOURS.

7. CONTIGUOUS BORED PILING WORKS:


a) SITE VERIFICATION
SECTION A
THE WPC SHALL VERIFY ALL DIMENSIONS ON SITE AND RESOLVE ALL DISCREPANCIES WITH
SCALE 1:25 -
THE THE DDC OR HIS REPRESENTATIVE BEFORE COMMENCEMENT OF WORK. ALL
DIMENSIONS SHOWN ARE IN MM. UNLESS OTHERWISE STATED. LEVELS ARE IN METERS.
b) CASTING LEVEL OF PILES
CONCRETE SHALL BE CAST TO NOT LESS THAN 300mm ABOVE CUT OFF LEVEL TO ENSURE
THAT ALL CONCRETE AT AND BELOW CUT OFF LEVEL IS HOMOGENEOUS AND FREE OF Designed By : ZATUL
LAITANCE AND DELETERIOUS MATTER. TABLE-1 CBP WALL DETAILS (RIGHT SIDE-ONE UTAMA STATION): Drawn By :
c) PILING SHIHA
THE ACTUAL VOLUME OF CONCRETE USED FOR EACH PILE MUST BE CHECKED WITH THE CBP WALL DETAILS
FROM CH TO CH Checked By : DR. LIM
CALCULATED VOLUME REQUIRED. IF THE DIFFERENCE BETWEEN THE TWO INDICATES A D1 D2 CENTRE TO CENTRE SPACING PENETRATION LENGTH FROM PILE CUT-OFF LEVEL LENGTH OF NOS OF MAIN
POSSIBLE ERROR, THE WPC SHALL PROPOSE REMEDIAL ACTIONS SUBJECT TO THE THE BETWEEN BORED PILE OF RL30.0m INCLUDING SOCKETING LENGTH IN ROCK SOCKETING IN ROCK REBAR Approved By : TSH / Ir. STEVEN FOO
DDC OR HIS REPRESENTATIVE APPROVAL. THE COST OF THE REMEDIAL ACTION APPX 10m-190m 1.0m 1.15m 1.1m 15.5m - 24T32 CAD file no : KVLRT3-MRCBGK-GS01-EC-CIL-RIW-STD-132337_W00
INCLUDING PROVISION OF ANY ADDITIONAL PILES SHALL BE BORN BY THE WPC. 190m-250m 1.0m 1.15m 1.1m 11.7m 2.0m 24T32 Scale : AS SHOWN
d) EXISTING SERVICES
THE WPC SHALL ENSURE THAT ANY OF THE EXISTING SERVICES (WHETHER SHOWN IN THE 250m-290m 1.0m 1.15m 1.1m 13.6m 1.1m 24T32 Date : 13/10/2017
DRAWING OR NOT) IS NOT DAMAGED WHILE CARRYING OUT THE WORK. THE WPC SHALL 310m-APPX 350m 0.8m 0.95m 0.9m 12.4m - 14T32 Drawing Title :
BE HELD RESPONSIBLE FOR ANY DAMAGE TO THE EXISTING SERVICES DURING THE
PROGRESS OF THE WORKS AND SHALL MEET ALL COSTS OF REPAIRS AND KVLRT3 BUJS PKG GS01
REINSTATEMENT DUE TO SUCH DAMAGE.
RIVER IMPROVEMENT WORKS
8. ALL OPENINGS ARE SUBJECT TO CHANGE BASED ON AUTHORITY APPROVAL. FOR SG. KAYU ARA
CBP WALL DETAIL FOR CULVERT OUTLET
0 25 50 75 100 125mm
FROM STATION OSD
Drawing No : Rev
SCALE 1 : 25 (A1) 1 : 50 (A3) NOTE: THIS DRAWING SHALL BE SUBJECT TO CHANGES AS PER TERMS, CONDITIONS AND / OR APPROVAL OF THE RELEVANT AUTHORITY ISSUED FOR CONSTRUCTION KVLRT3-MRCBGK-GS01-EC-CIL-RIW-STD-132337 W00
LRT3GS01\10.DOC.CONTROL\3- TECHNICAL DRAWING\3.1 ISSUED FOR CONSTRUCTION (IFC DRAWINGS GS01)\AT GRADE WORKS\3.3 DRAINAGE\SURFACE WORKS - ACAD\ACAD\RIVER IMPROVEMENT WORKS\STD TITLE BLOCK FOR GS01_W00.DWG ; 22-Sep-16 ; 09:05:21 ; PLOTTED BY : MCB01

Potrebbero piacerti anche