Sei sulla pagina 1di 13

Zona (PXT)

Sayatan Sayatan
Top Soil Limonit Transisi Saprolit Bedrock
1 445.9040 142.6878 0 0 622.1586 1
2 361.5518 30.0591 0 92.0208 603.7454 2
3 524.9537 71.406 0 202.5000 758.3727 3
4 325.867 0 43.3129 608.8305 882.1586
5 393.3006 0 0 95.0989 1115.732 Z
6 282.5497 0 0 574.3895 820.3816 Top Soil
7 370.8472 36.6029 0 25.8442 571.7923 17158.43575
8 329.0442 303.2557 157.0046 154.4257 755.6869 18838.241875
9 444.9479 337.3008 351.6725 264.3128 739.7095 18079.939875
10 503.7651 404.6986 187.5005 290.8259 793.4712 15282.3115
11 986.1280 174.3633 289.9564 645.7813 584.6893 14361.818875
12 10072.1365 453.0601 140.5204 605.5377 838.2183 13884.684125
13 134.2304 0 184.5858 771.3559 580.2656 14872.69225
14 888.0505 0 118.5045 616.0303 549.1841 16447.332125
15 1079.2673 346.2534 60.625 305.5592 632.5776 20160.15125
16 1251.1966 510.4842 0 116.5616 400.1005 31660.228375
17 758.653 105.2558 13.0099 182.5909 306.1871 234988.120625
18 1087.4069 85.4094 172.7219 193.2388 462.4036 216885.296625
19 259.1867 228.6848 205.8046 157.5192 450.6335 21723.469125
20 513.7305 555.0757 110.528 728.5886 481.5417 41805.50325
21 163.5536 138.7017 0 146.4356 389.9064 49522.357875
22 392.2367 0 0 368.8258 244.1654 42709.304
23 693.4062 51.9788 516.7845 0 218.3558 39228.772875
24 552.4382 0 68.1824 437.7046 195.5424 28615.114
25 490.5780 182.9963 61.1865 158.0215 289.5075 16424.4905
26 972.2176 348.6096 129.3372 326.2315 339.7385 14392.287125
27 559.7127 226.4915 77.4802 49.9062 210.072 11810.543875
28 463.9232 50.5030 0 0 73.6076 23069.911625
29 678.315 90.1922 293.7730 0 187.7866 26474.1935
30 721.9074 64.0181 0 0 440.3064 22164.09425
31 781.6193 186.1375 0 0 365.7385 31084.4065
32553.518875
21752.262875
24272.56175
luas tertambang 29754.726
sayatan
Saprolit Limonit Transisi top soil 31949.942375
1
1,141,926.71
2 45.2299 110.5231
3 145.9335 13.682 95.4385
4 650.6166 9.1389 206.9441
5 85.471 29.7835
6 440.8254 218.9187
7 33.6887 51.6986
8 279.9325 229.5125 127.6264 331.44
9 181.8467 199.4079 258.0767 446.4194
10 875.5635
11 712.5102
12 761.1111
13 605.9105
14 391.3599
15 385.7554
16 275.4014
17 184.8218
18 213.3425
19 374.1158
20 876.3358
21 125.5109
22 170.3874
23 250.0606
24 333.0476
25 139.7393
26 408.2081
27 142.1337
28
29 195.5115
30
31 145.978
Zona (LXT)
Jarak antar Penampang
Top Soil Limonit Transisi Saprolit Bedrock
3042.8413 239.6556 280.4980 431.0536 2298.831 125
1286.2446 443.9637 266.1813 862.3297 1410.601 125
574.6278 166.8628 126.4314 500.283 539.7196 125

Zona (Ton)
Limonit Transisi Saprolit Bedrock
3454.938 0 1610.364
2029.302 0 5154.114
1428.12 812.1169 14198.28
0 812.1169 12318.76
0 0 11716.05
732.058 0 10504.09
6797.172 2943.836 3154.723
12811.13 9537.696 7327.924
14839.988 10109.49 9714.927
11581.238 8952.317 16390.63
12548.468 8071.44 21898.08
9061.202 6095.741 24095.64
0 5682.943 24279.26
6925.068 3358.678 16127.82
17134.752 1136.719 7387.114
12314.8 243.9356 5235.169
3813.304 3482.471 6577.02
6281.884 7097.372 6138.265
15675.21 5931.236 15506.89
13875.548 2072.4 15312.92
2774.034 0 9017.075
1039.576 9689.709 6454.452
1039.576 10968.13 7659.831
3659.926 2425.667 10425.21
10632.118 3572.319 8474.428
11502.022 3877.826 6582.41
5539.89 1452.754 873.3585
2813.904 5508.244 0
3084.206 5508.244 0 1743797.459625
5003.112 0 0
198392.546 119343.4 284134.8 1743797.459625
601,870.75
1,743,797.46

Rp 7,824,319,698.00

1,743,797.46
95
601870.746
50155.8955
271.1129486486
backhoe yg digunakan dump truck yg digunakan adala Hino FM 285 JD
komatsu pc 200 lebar total = 2.46 m

tinggi bench = 5 m m

lebar bench = 2R + JP + C + JA
dimana, R= Radius Putar = 2.75 = 5.5 m
JP = Jangkauan Penumpahan = 3.2 = 3.2 m
C= Lebar Alat Angkut = 2.46 = 2.46 m
JA = jarak aman = 1 = 1m
= 12.16 m
= 12.5 m

5.7
tinggi rata" 6.9
6.3
Sifat Fisik Simbol Hasil ϒ 1.92
Bobot Isi (Ton/m3) ϒ 1.92 = (kg/cm3) c 2.8
Tan 32 0.62
Sifat Mekanik Hasil H 4
Kohesi (ton/m2) c 2.8 = (kg/cm2)
Sudut Geser Dalam Ф 32 = 0.62

Dimensi Hasil
Tinggi Jenjang (m) H 4
Lebar Jenjang (m) 14
ϒ 1.92
c 2.8
Tan 32 0.62
H 5

Berdasarkan perhitungan, pada chart 2 lereng


aman di kemiringan 80 ̊.
Namun untuk memperbanyak bahan galian
diambil PT. Mahadaya Nickel menggunakan

Sumber : Permen No.22 Tahun 2007


Kemiringan c/ϒHTanФ TanФ/F c/ϒHF chart ϒ 1.92
90 ̊ 0.58803763 1.319149 1.139322917 1 c 2.8
80 ̊ 0.58803763 1.907692 1.804867987 Tan 32 0.62
90 ̊ 0.58803763 1.107143 1.808333333 2 H 8
80 ̊ 0.58803763 1.675676 1.166666667
70 ̊ 0.58803763 2.066667 2.196285141
90 ̊ 0.58803763 1.631579 1.302083333 3
90 ̊ 0.58803763 1.56962 1.65719697 4
90 ̊ 0.58803763 1.589744 1.283333333 5

Kemiringan c/ϒHTanФ TanФ/F c/ϒHF chart


90 ̊ 0.47043011 1.050847 3.441666667 1
80 ̊ 0.47043011 1.589744 1.918859649
90 ̊ 0.47043011 1 0.998858447 2
80 ̊ 0.47043011 1.55 1.535087719
90 ̊ 0.47043011 0.861111 0.914315569 3
80 ̊ 0.47043011 1.44186 1.465661642
90 ̊ 0.47043011 1.47619 1.388888889 4
90 ̊ 0.47043011 1.44186 1.388888889 5
80 ̊ 0.47043011 1.589744 1.3125
70 ̊ 0.47043011 1.823529 1.166666667
60 ̊ 0.47043011 2.066667 1.020833333

18 ̊ 0.47043011 0.496 0.012280702 2


Kemiringanc/ϒHTanФ TanФ/F c/ϒHF chart
90 ̊ 0.294019 0.775 0.759549 1
80 ̊ 0.294019 1.192308 1.139323
70 ̊ 0.294019 1.47619 1.402244
90 ̊ 0.294019 0.751515 2.916667 2
80 ̊ 0.294019 1.180952 1.139323
70 ̊ 0.294019 1.44186 1.380997
90 ̊ 0.294019 0 #DIV/0! 3
80 ̊ 0.294019 1.44186 0.916039
90 ̊ 0.294019 1.47619 0.868056 4
90 ̊ 0.294019 1.44186 0.868056 5
sift siang
kerja istirahat kerja
t 07:00-12:00 12:00-13:00 13:00-18:00
nt 5 1 5
Σ waktu terjadwal (jam) 11
Σ waktu kerja efektif (jam) 10

hari libur perusahaan


bulan hari libur kalender hari hujan libur perusahaan
januari 5 6 6
februari 4 5 5
maret 5 4 5
april 7 7 7
mei 7 8 8
juni 9 8 9
juli 5 5 5
agustus 5 5 5
september 6 7 7
oktober 5 3 5
november 4 5 5
desember 8 3 8
Σ libur perusahaan 75
Σ hari kerja perusahaan 290
Lebar Jalan Lurus dan Tikungan
Simbol Keterangan Satuan Data Jalan Sekmen
n Jumlah jalur m 1 D-E
Wt Lebar Alat Angkut Total m 2.46 C-D
Fa Julur Depan m 1.925 B-C
Fb Julur Belakang m 1.855 A-B
Lm Lebar Jalan Lurus m 4.92
dibulatkan jadi m 5
W Lebar Jalan Tikungan m 8.700
dibulatkan jadi m 9

Lebar Jalan Tikungan Menurut Sumber

Simbol Keterangan Satuan Nilai


JD Jejak Depan m 1.925
JB Jejak Belakang m 1.855
LJD Lebar Jejak Depan m 0.535
LJB Lebar Jejak Belakang m 0.605
U Lebar Jejak Roda m 0.605 Lebar jejak roda menggunakan lebar jejak p
Fa Julur Depan m 1.925
Fb Julur Belakang m 1.855
C Lebar Antara Kendaraan m 2.193 julur depan + julur belakang
Z Lebar Bagian Tepi Jalan m 2.193
W min Lebar Jalan Angkut Minimum m 15.3475
= m 15.5
Grade Jalan Lurus
ΔX ΔH Grade Sekmen
256.5873 15 5.8459635376 A
352.8415 15 4.2512006099 ABC
283.3802 15 5.2932420825 BCD
469.1277 15 3.1974236439 CDE
Grade Rata-rata 4.6469574685

Perhitungan Menurut PT. MN

a menggunakan lebar jejak paling panjang yaitu LJB

ulur belakang
Sudut
77 ̊
70 ̊
28 ̊
41 ̊
sayatan cadangan cadangan tertambang

Potrebbero piacerti anche