Rev No-02
Filed At: Elect. Maintenance Main Plant
1. Electrical shock
2. Falling from height
3. Exposure to dust
4. Suffocation due to inadequate air
1. Use of safety glass, hand gloves and dust mask are mandatory with other
general PPEs.
2. All isolations are to be made as in isolation procedure.
3. Discharge of stored charge with the help of discharge rod.
Isolation procedure
1. General T & P
2. 5KV electronic/Motorised Megger
3. Source of 220V supply.
4. Healthy discharge rod.
5. Insulated spanners of specified type.
6. Insulated gloves of 11/33KV grade
7. Cotton hand gloves.
8. Safety belts.
9. Oxygen measuring instrument for measurement of oxygen.
10. Instrument for measurement of toxic gases (CO, CO2 etc)
1. Take PTW.
2. Ensure generator is on barring gear.
3. Open the SPVT bellow cover.
4. Clamp the discharge rod to ground making it ready to use
5. Discharge the stored energy from generator by touching generator phase
side link terminal by discharge rod.
6. Open the Excitation transformer door.
7. Make temporary earthing of the system by connecting discharge rod in
transformer links.
SMP - Maintenance of 24 KV bus duct 3/5
8. Open the SPVT links from bottom.
9. Open NGT cubicle door. Open NGT link from top.
10. Open the generator link terminal box cover (phase side) of all the three
phases.
11. Open the generator phase side links from top ensuring supply of air &
adequate light (24volts) inside bus duct during work.
12. Open the generator link terminal box cover (neutral side) of all the three
phases.
13. Open the generator neutral side links from top ensuring supply of air &
adequate light (24volts) inside bus duct.
14. Take 5 KV electronic megger.
15. Take the megger reading of bus duct & confirm the IR value of bus duct.
16. If the megger value of bus duct is LOW, drying of bus duct to be carried
out by blowing hot air inside the bus duct till desired IR value of is
achieved.
17. If IR value is still low to check individual sections open the links of GT
LV side and near TG wall seal off bushing.
18. Find the section of bus duct where IR value is low.
19. Remove each insulators of each section. Inspect and measure IR value of
each insulator & refit the insulators.
20. Replace the damaged/low IR value insulator.
21. Inspect the generators seal off bushings.
22. Replace the damaged/low IR value seal off bushings.
23. After the desired IR value of all the sections achieved reconnect the links.
24. Reconnect the GT LV side links & links near TG wall seal off bushing.
25. Reconnect the generator phase & neutral side links tightly & close phase
& neutral side terminal box cover.