ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME: MUDASSAR IDRIS RAUT EMP# ZA1007 Cost Centre: PUNE DESIGNATION: MECHANICAL ENGINEER
Date: 17-Nov-17 (No. of Hrs,)
PROJECT DETAILS
36.LOC.668
Job#JRM1514
Details of hrs. to be
DATE Details of work done chargeable to
Customers/Other
RIYADH METRO RIYADH METRO Dept.
TUNNEL 3E2- REVB2 Miscelaneous
VENTILLATION

13-Nov-17 Plumbing Supply estimation of revised Drgs of Stn 3E2 9


14-Nov-17 Plumbing Supply estimation of revised Drgs of Stn 3E2 9
Plumbing Supply estimation of revised Drgs of Stn 3E2:
15-Nov-17
Plumbing Drainage Review fo Akif Work 9
Plumbing Supply estimation of revised Drgs of Stn 3E2:
16-Nov-17
Plumbing Drainage Review fo Akif Work 9
Riyadh Metro Tunnel Ventillation Review of HVAC done by peers
17-Nov-17
Preparation of Quality Assurance /Quality Checklist documents 5 0 4
18-Nov-17 Saturday 0
19-Nov-17 Sunday 0
Total No. of Hrs. 0 0 5 36 4 0 0 45

Prepared by:
Reviewed by:
Name of employee

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME: MUDASSAR IDRIS RAUT EMP# ZA1007 Cost Centre: PUNE DESIGNATION: MECHANICAL ENGINEER
Date: 27-Nov-17 (No. of Hrs,)
PROJECT DETAILS
36.LOC.668
Job#JRM1514
Details of hrs. to be
DATE Details of work done chargeable to
Customers/Other
Dept.
Egypt Hospital

20-Nov-17 FF Estimation of Egypt hospital 9


21-Nov-17 FF Estimation of Egypt hospital 9
Caculation of Fire Suppression of FM200 Gas facility in Egypt hospital; FF
22-Nov-17
Estimation of Egypt hospital 9
23-Nov-17 Caculation of Fire Suppression of co2 Gas facility in Egypt hospital, 9
24-Nov-17 Finalizinf fo Fire Fighting BOQ of Egypt Hospital, Al Farabi Documentation 9
25-Nov-17 Saturday 0
26-Nov-17 Sunday 0
Total No. of Hrs. 0 0 0 45 0 0 0 45

Prepared by:
Reviewed by:
Name of employee

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME: MUDASSAR IDRIS RAUT EMP# ZA1007 Cost Centre: PUNE DESIGNATION: MECHANICAL ENGINEER
Date: 1-Dec-17 (No. of Hrs,)
PROJECT DETAILS
36.LOC.668
Job#JRM1514
Details of hrs. to be
DATE Details of work done chargeable to
Customers/Other
Dept.
Jeddah Art Gallery Misscelaneous

Folder Movement from old Project Folder to New Project Folders:


Initial Study of HVAC System in Jeddah Art Gallery Project; Study of all
27-Nov-17 design Specs I HVAC System. 7 2
Till 7:00 PM finished parking Ventillation Layout except Parking
Accessories

28-Nov-17 Detailed Estimation of HVAC work in Jeddah Art Gallery 9


29-Nov-17 Detailed Estimation of HVAC work in Jeddah Art Gallery 9
Detailed Estimation of HVAC work in Jeddah Art Gallery, BOQ Finalization
30-Nov-17 & cross verification with Akif Work of his Jeddah Art Gallery Work 9
estimation.
1-Dec-17 Project history study of 1F4 after Lunch Hrs 8 1
2-Dec-17 Saturday 0
3-Dec-17 Sunday 0
Total No. of Hrs. 0 0 0 42 3 0 0 45

Prepared by:
Reviewed by:
Name of employee

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME: MUDASSAR IDRIS RAUT EMP# ZA1007 Cost Centre: PUNE DESIGNATION: MECHANICAL ENGINEER
Date: 8-Dec-17 (No. of Hrs,)
PROJECT DETAILS
36.LOC.668
Job#JRM1514
Details of hrs. to be
DATE Details of work done chargeable to
Customers/Other
Dept.
Shauiba Plant 3 1F4- Riyadh Metro Naval Base Plumbing Leave

MEP case study for Project 1F4 in Riyadh Metro Project as per
4-Dec-17 ADDENDUM-01 6 3
2. Initial Study of Naval Project in Bangladesh

5-Dec-17 Drainage Estimation - 1F4 - BUS STATION 9


6-Dec-17 Shuabah HVAC design revision of RO Electrical Bldg & 1 Additional Bldg 9
7-Dec-17 Leave 9
8-Dec-17 Leave 9
9-Dec-17 Saturday 0
10-Dec-17 Sunday 0
Total No. of Hrs. 0 0 9 15 3 18 0 45

Prepared by:
Reviewed by:
Name of employee

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

1-Jan-18

2-Jan-18

3-Jan-18

4-Jan-18

5-Jan-18

6-Jan-18
7-Jan-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

5-Jan-18

Details of work done

PLUMBING CONCEPTUAL DESIGN & ESTIMATION


HVAC CONCEPTUAL DESIGN & ESTIMATION - FINALIZATION OF BOQ

PLUMBING CONCEPTUAL DESIGN & ESTIMATION

PLUMBING CONCEPTUAL DESIGN & ESTIMATION

PLUMBING CONCEPTUAL DESIGN & ESTIMATION


FINALIZATION OF BOQ

HOLIDAY

Saturday
Sunday
Total No. of Hrs.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS
36.LOC.668
Job#JRM1514

BAISH RAMADA Leave

9
0
0
0 0 0 36 9
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

1-Jan-18

2-Jan-18

3-Jan-18

4-Jan-18

5-Jan-18

6-Jan-18
7-Jan-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

15-Jan-18

Details of work done

HVAC & PLUMBING CONCEPTUAL DESIGN & ESTIMATION

HVAC & PLUMBING CONCEPTUAL DESIGN & ESTIMATION

HVAC & PLUMBING CONCEPTUAL DESIGN & ESTIMATION

HVAC & PLUMBING CONCEPTUAL DESIGN & ESTIMATION

HVAC & PLUMBING CONCEPTUAL DESIGN & ESTIMATION

Saturday
Sunday
Total No. of Hrs.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS
36.LOC.668
Job#JRM1514

Naval , Bangladesh Leave

9
0
0
0 0 0 45 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

22-Jan-18

23-Jan-18

24-Jan-18

25-Jan-18

26-Jan-18

27-Jan-18
28-Jan-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

22-Jan-18

Details of work done

PLUMBING ESTIMATION OF AJDAN HIGH RISE - JEDDAH

PLUMBING ESTIMATION OF AJDAN HIGH RISE - JEDDAH

PLUMBING ESTIMATION OF AJDAN HIGH RISE - JEDDAH: 1st Delivery of


BOQ _Plumbing of Entire Hotel

leave

holiday - republic day

Saturday
Sunday
Total No. of Hrs.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS
36.LOC.668
Job#JRM1514

AJDAN HIGH RISE - Leave


JEDDAH

9 0

9
0
0
0 0 45 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

22-Jan-18

23-Jan-18

24-Jan-18

25-Jan-18

26-Jan-18

27-Jan-18
28-Jan-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

29-Jan-18

Details of work done

PLUMBING ESTIMATION OF AJDAN HIGH RISE - JEDDAH

PLUMBING ESTIMATION OF AJDAN HIGH RISE - JEDDAH

PLUMBING ESTIMATION OF AJDAN HIGH RISE - JEDDAH: 1st Delivery of


BOQ _Plumbing of Entire Hotel

leave

holiday - republic day

Saturday
Sunday
Total No. of Hrs.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS
36.LOC.668
Job#JRM1514

AJDAN HIGH RISE - Leave


JEDDAH

9 0

9
0
0
0 0 45 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

29-Jan-18

30-Jan-18

31-Jan-18

1-Feb-18

2-Feb-18

3-Feb-18
4-Feb-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

2-Feb-18

Details of work done

HVAC Ducting Estn of Ajdan High rise from HVAC team


Mentoring workshop on QA/QC of Plumbing Engg to entire team

HVAC Ducting Estn of Ajdan High rise from HVAC team

Work Log Sheet update


Revision of Plumbing QA/QC docs
HVAC Ducting Estn of Ajdan High rise from HVAC team

Attended Plumbing Design training from Ejaz.


Work planning & distribution for Entire Plumbing sow in 1F5 package

Plumbing - Drainage Side Estimation on 1F5- ON B03 ,B02, B01 level

Saturday
Sunday
Total No. of Hrs.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS
36.LOC.668
Job#JRM1514

RFQRD1856 - 1F5
Ajdan High Rise Leave
Metro Station

9
0
0
0 24 16 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

5 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

12-Feb-18

13-Feb-18

14-Feb-18

15-Feb-18

16-Feb-18

17-Feb-18
18-Feb-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

9-Feb-18

Details of work done

Alba Potline #6 - HVAC BOQ Finalization of Billet Mould Shop Bldg


#2 - 1F4 Plumbing BOQ update as per urgent requesr

Saturday
Sunday
Total No. of Hrs.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

Riyadh Metro
Alba Potline # 6 Leave
1F4

6 3

0
0
0 6 3 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 9

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

12-Feb-18

13-Feb-18

14-Feb-18

15-Feb-18

16-Feb-18

17-Feb-18
18-Feb-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

16-Feb-18

Details of work done

Alba Potline #6 - HVAC BOQ Finalization of Billet Mould Shop Bldg


#2 - 1F4 Plumbing BOQ update as per urgent request

Alba Potline #6 - HVAC BOQ Finalization of Billet Mould Shop Bldg


#2 - 1F4 Plumbing BOQ update as per urgent request
#3 - 3E2 - Plumbing classification of work & discussion

#1. BOQ preperation of 5 Nos bldgs in ALBA Potline #6

#1.Applying QA/QC for ALBA Bahrain & updating all BOQ


#2. SWRO III technical Discussion.
#3. BOQ preperation of 1 Nos bldgs in ALBA Potline #6

#1. 1F4 - Plumbing Adden 04 - Initial Study of changes in Adden#4.

Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

Riyadh Metro Riyadh Metro


SWRO III Alba Potline # 6 Leave
1F4 3E2

6 3

1 6 2

1 8

9
0
0
1 24 18 2 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

19-Feb-18

20-Feb-18

21-Feb-18

22-Feb-18

23-Feb-18

24-Feb-18
25-Feb-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

23-Feb-18

Details of work done

ALBA - NSH PROJECT

COSTING TRAINING FROM ENG.. MAHMOOD

COSTING TRAINING FROM ENG.. MAHMOOD

#1.ALBA - NSH PROJECT - Final Delivery of 3 bldgs with QC


#2. Overview on Official Meetings with Mr. Rahmuttah Shaikh Sir & Mr.
Abdul Bari Sir

Studying Plumbing Costing Template from Mahmood

Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

Riyadh Metro Riyadh Metro


SWRO III Alba Potline # 6 Leave
1F4 3E2

0
0
0 19 0 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

26 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

26-Feb-18

27-Feb-18

28-Feb-18

1-Mar-18

2-Mar-18

3-Mar-18
4-Mar-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

1-Mar-18

Details of work done

ALBA - NSH PROJECT

ALBA - NSH PROJECT


Supply Estimation of EEC- Auditorium Bldg

Supply Estimation of EEC- Auditorium Bldg

Drainage Estimation of EEC- Auditorium Bldg


Costing of Plumbing Fixtures

HOLIDAY - HOLI

Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

EEC Auditorium Riyadh Metro


SWRO III Alba Potline # 6 Leave
Bldg 3E2

5 4

9
0
0
0 14 22 0 9
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

5-Mar-18

6-Mar-18

7-Mar-18

8-Mar-18

9-Mar-18

10-Mar-18
11-Mar-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

9-Mar-18

Details of work done

EEC AUDITORIUM - DAMMAM- COSTING OF WATER SUPPLY SYSTEM

NSH ALBA POTLINE DESIGN MODIFICATION, BOQ UPDATE &


SUMMARISING

NSH ALBA POTLINE DESIGN MODIFICATION, BOQ UPDATE &


SUMMARISING

NSH ALBA POTLINE DESIGN MODIFICATION, BOQ UPDATE &


SUMMARISING

NOVOTEL - PLUMBING ESTIMATION

Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

Riyadh Metro
EEC AUDITORIUM Alba Potline # 6 Novotel Leave
3E2

9
0
0
9 27 9 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

12-Mar-18

13-Mar-18

14-Mar-18

15-Mar-18

16-Mar-18

17-Mar-18
18-Mar-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

15-Mar-18

Details of work done

#1. Plumbing Supply Side Estimation on Novotel Hotel

#1. Plumbing Supply Side Estimation on Novotel Hotel

#1. 3E2 - Heat Load Estimate @22.4 level for FCU

#1. 3E2 - Heat Load Estimate @22.4 level for FCU


#2. ALBA potline Design modification

#1. 3E2 - Heat Load Estimate @22.4 level for FCU

#1. 3E2 - Heat Load Estimate @22.4 level for FCU


Sunday
Total No. of Hrs.

.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

Riyadh Metro
EEC AUDITORIUM Alba Potline # 6 Novotel Leave
3E2

4.5 4.5

8.5 0.5

9
0 9
0
0 8.5 22.5 23 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 54

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

9-Apr-18

10-Apr-18

11-Apr-18

12-Apr-18

13-Apr-18

14-Apr-18
15-Apr-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

26-Mar-18

Details of work done

Ducting Layout Estimation

Ducting Layout Estimation

Ducting Layout Estimation

Chilled Water Pipe Estimation

Chilled Water Pipe Estimation & REF Pipe Estimation & Pipe Sizing

Sunday
Total No. of Hrs.

.
EMP# ZA1007 Cost Centre: PUNE

PROJECT DETAILS

Prince Sultan, AL Riyadh Metro


EEC AUDITORIUM Alba Potline # 6 Leave
hassa 1C3

9
0
0
0 0 0 45 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

9-Apr-18

10-Apr-18

11-Apr-18

12-Apr-18

13-Apr-18

14-Apr-18
15-Apr-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

13-Apr-18

Details of work done

Ducting Layout Estimation

Ducting Layout Estimation

Ducting Layout Estimation

Chilled Water Pipe Estimation

Chilled Water Pipe Estimation & REF Pipe Estimation & Pipe Sizing

Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

Prince Sultan, AL Riyadh Metro


EEC AUDITORIUM Alba Potline # 6 Leave
hassa 1C3

9
0
0
0 0 0 45 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

16-Apr-18

17-Apr-18

18-Apr-18

19-Apr-18

20-Apr-18

21-Apr-18
22-Apr-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

23-Apr-18

Details of work done

Heat Load Estimate of Maiden Substation

SLD of Ductign & Design of Air side Ducting system preperation &
Ducting Estimation

BOQ of Maiden Project

Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.
Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

1C3 : Ducting Estimation


Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

1C3 : Ducting Estimation


Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

1C3 RIYADH
EEC AUDITORIUM Maiden Substation Al Moosa Hospital Leave
METRO

4 5

4.5 4.5

4.5 4.5

0
0
0 22 9 14 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45

Reviewed by:
Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

23-Apr-18

24-Apr-18

25-Apr-18

26-Apr-18

27-Apr-18

28-Apr-18
29-Apr-18

Prepared by:
Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

27-Apr-18

Details of work done

Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

Auditorium Estimation

Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

Auditorium Estimation

Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

Auditorium Estimation

Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

Auditorium Estimation

Al- Moosa Plumbing Supply side Design Study & Specs understanding for
detailed designing & LEED Complaince.

Auditorium Estimation

Saturday
Sunday
Total No. of Hrs.
.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

1C3 RIYADH
EEC AUDITORIUM Auditorium Al Moosa Hospital Leave
METRO

4.5 4.5

4.5 4.5

4.5 4.5

4.5 4.5

4.5 4.5

0
0
0 22.5 0 22.5 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Dept.
Missceleneous /Training

0 0 45
Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

30-Apr-18

1-May-18

2-May-18

3-May-18

4-May-18

5-May-18
6-May-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

4-May-18

Details of work done

PERSONNEL LEAVE

GOVT HOLIDAY

Detailed design in SWCC Main Pump house building based on Indirect


Evap Cooling & revised estimation of entire SWCC based on revised
notification
Detailed design in SWCC Main Pump house building based on Indirect
Evap Cooling & revised estimation of entire SWCC based on revised
notification
Detailed design in SWCC Main Pump house building based on Indirect
Evap Cooling & revised estimation of entire SWCC based on revised
notification
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

EEC AUDITORIUM Auditorium SWCC Al Moosa Hospital Leave

9
0
0
0 0 27 0 9
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Dept.
/Training/Public Holiday

9 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

14-May-18

15-May-18

16-May-18
17-May-18
18-May-18
19-May-18
20-May-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

4-May-18

Details of work done

LEED V4 complaince of Plumbing system, highlighting the difference with


existing & LEED compliance design requirement

LEED V4 complaince of Plumbing system, highlighting the difference with


existing & LEED compliance design requirement

Arab Open university - Plumbing Estimation


heat load estimate of Al Moosa Hospital- 2 floors
heat load estimate of Al Moosa Hospital- 2 floors
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

EEC AUDITORIUM Arab Open University SWCC Al Moosa Hospital Leave

4.5 4.5
9
9
0
0
0 4.5 0 40.5 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Dept.
/Training/Public Holiday

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

21-May-18

22-May-18

23-May-18
24-May-18
25-May-18
26-May-18
27-May-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

25-May-18

Details of work done

heat load estimate of Al Moosa Hospital- 3rd floors

heat load estimate of Al Moosa Hospital- 3rd - 5th floors

heat load estimate of Al Moosa Hospital- 5th floors


heat load estimate of Al Moosa Hospital-9th floors
heat load estimate of Al Moosa Hospital- 10th floors
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

EEC AUDITORIUM Arab Open University SWCC Al Moosa Hospital Leave

9
9
9
0
0
0 0 0 45 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Dept.
/Training/Public Holiday

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

28-May-18

29-May-18

30-May-18
31-May-18
1-Jun-18
2-Jun-18
3-Jun-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

1-Jun-18

Details of work done

heat load estimate of Al Moosa Hospital- 11rd floors

heat load estimate of Al Moosa Hospital- 12th floors

heat load estimate of Al Moosa Hospital- 13th floors


heat load estimate of Al Moosa Hospital-14th floors
heat load estimate of Al Moosa Hospital- 15th floors
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

EEC AUDITORIUM Arab Open University SWCC Al Moosa Hospital Leave

9
9
9
0
0
0 0 0 45 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Dept.
/Training/Public Holiday

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

4-Jun-18

5-Jun-18

6-Jun-18
7-Jun-18
8-Jun-18
9-Jun-18
10-Jun-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

8-Jun-18

Details of work done

Plumbing Estimation of Boiler Bldg

Plumbing Estimation of Boiler Bldg

Plumbing Estimation of Boiler Bldg


3E2 - FLOORWISE/ROOM WISE HVAC ESTIMATION DISTRIBUTION
3E2 - FLOORWISE/ROOM WISE HVAC ESTIMATION DISTRIBUTION
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

3E2 - RIYADH
EEC AUDITORIUM Arab Open University Medical Center Leave
METRO

9
9
9
0
0
0 0 18 27 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Dept.
/Training/Public Holiday

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME: MUDASSAR IDRIS RAUT EMP# ZA1005 Cost Centre: PUNE DESIGNATION: MECHANICAL ENGINEER

Date: 22-Jun-18 (No. of Hrs,)


PROJECT DETAILS

Details of hrs. to be
DATE Details of work done chargeable to
Customers/Other
1z1- RIYADH 1y1- RIYADH Missceleneous Dept.
EEC AUDITORIUM New Egypt Hospital METRO METRO Leave /Training/Public Holiday

18-Jun-18 Personnel leave 9

19-Jun-18 New Egypt Hopital : HVAC BOQ review of Renovation Bldg. 9

20-Jun-18 1Z1 - Supply side Plumbign Estimation 9


21-Jun-18 1Z1 - Supply side Plumbign Estimation 9
22-Jun-18 1Z1 - Supply side Plumbign Estimation 5 4
23-Jun-18 Saturday 0
24-Jun-18 Sunday 0
Total No. of Hrs. 0 9 23 4 9 0 0 45

Prepared by:
. Reviewed by:
Name of employee

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

25-Jun-18

26-Jun-18

27-Jun-18
28-Jun-18
29-Jun-18
30-Jun-18
1-Jul-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

29-Jun-18

Details of work done

New Egypt hospital - BOQ preparation as per AHRAE Healtch Care stds
170-2008 & ASHRAE Health Care guidelines

HVAC Room Wise estimation in 3E2

Plumbing Costing Data Gathagering


Plumbing Costing Data Gathagering
Plumbing Costing Data Gathagering
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

1z1- RIYADH 3E2- RIYADH


EEC AUDITORIUM New Egypt Hospital Leave
METRO METRO

0
0
0 9 0 9 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Dept.
/Training/Public Holiday

9
9
9

27 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

2-Jul-18

3-Jul-18

4-Jul-18

5-Jul-18
6-Jul-18
7-Jul-18
8-Jul-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

6-Jul-18

Details of work done

Plumbing Costing Data Gathagering

Plumbing Costing Data Gathagering


Variation Analysis of 1A1 for missing details
Ducting Estimation of Muhammed Bin Zayed mall - Egypt

Variation Analysis of 1A1 for missing details


Ducting Estimation of Muhammed Bin Zayed mall - Egypt
Ducting Estimation of Muhammed Bin Zayed mall - Egypt
Ducting Estimation of Muhammed Bin Zayed mall - Egypt
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

1A1- RIYADH 3E2- RIYADH


EEC AUDITORIUM New Egypt Hospital Leave
METRO METRO

0
0
0 0 9 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Plumbing Cost Dept.
/Training/Public Holiday Data gathering

5
9
9

23 13 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

16-Jul-18

17-Jul-18

18-Jul-18

19-Jul-18

20-Jul-18
21-Jul-18
22-Jul-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

20-Jul-18

Details of work done

NEW EIC 380KW - 380 KV GIS Bldg design & Estimation.

NEW EIC 380KW - 380 KV GIS Bldg design & Estimation.

NEW EIC 380KW - 115 KV GIS Bldg design & Estimation.

Revit Plumbing estimation & BOQ preperation as per Revit Estimation.

NEW EIC 380KW - cable tunnel design & Estimation


Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

1C4- RIYADH 3E2- RIYADH


NEW EIC 380KW New Egypt Hospital Leave
METRO METRO

9
9
9
0
0
36 0 9 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Plumbing Cost Dept.
/Training/Public Holiday Data gathering

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

30-Jul-18

31-Jul-18

1-Aug-18
2-Aug-18
3-Aug-18
4-Aug-18
5-Aug-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

27-Jul-18

Details of work done

HARADH GAS COMPRESSION PLANT

HARADH GAS COMPRESSION PLANT

HARADH GAS COMPRESSION PLANT


Al Futtaim - City Center CHW Estimation
Al Futtaim - City Center CHW Estimation
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

HARADH GAS 1C4- RIYADH 3E2- RIYADH


AL Futtain City Center Leave
COMPRESSION PLANT METRO METRO

9
9
9
0
0
45 0 0 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Plumbing Cost Dept.
/Training/Public Holiday Data gathering

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

30-Jul-18

31-Jul-18

1-Aug-18
2-Aug-18
3-Aug-18
4-Aug-18
5-Aug-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

3-Aug-18

Details of work done

HARADH GAS COMPRESSION PLANT

HARADH GAS COMPRESSION PLANT

HARADH GAS COMPRESSION PLANT


Al Futtaim - City Center CHW Estimation
Al Futtaim - City Center CHW Estimation
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

HARADH GAS 1C4- RIYADH 3E2- RIYADH


AL Futtain City Center Leave
COMPRESSION PLANT METRO METRO

9
9
9
0
0
18 27 0 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Plumbing Cost Dept.
/Training/Public Holiday Data gathering

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

6-Aug-18

7-Aug-18

8-Aug-18

9-Aug-18

10-Aug-18

11-Aug-18
12-Aug-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

10-Aug-18

Details of work done

Al Futtaim - City Center CHW Estimation

SWCC- DESIGN & ESTIMAITON OF ARAFAT, RABIGH & HOUSING


COMPOUN

SWCC- DESIGN & ESTIMAITON OF ARAFAT, RABIGH & HOUSING


COMPOUN
SWCC- DESIGN & ESTIMAITON OF ARAFAT, RABIGH & HOUSING
COMPOUN
SWCC- DESIGN & ESTIMAITON OF ARAFAT, RABIGH & HOUSING
COMPOUN
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

1C4- RIYADH 3E2- RIYADH


AL Futtain City Center SWCC Leave
METRO METRO

9
9
9
0
0
9 36 0 0 0
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Plumbing Cost Dept.
/Training/Public Holiday Data gathering

0 0 45

Reviewed by:

Engineering in charge
ZAMIL PROJECTS

EMPLOYEEWISE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

EMP.NAME:

Date:

DATE

13-Aug-18

14-Aug-18

15-Aug-18

16-Aug-18

17-Aug-18
18-Aug-18
19-Aug-18

Prepared by:

Name of employee
SE, JOBWISE ACTUAL MAN HOUR REPORT - WEEKLY

MUDASSAR IDRIS RAUT

17-Aug-18

Details of work done

Drainage, after 3G2 Ramp to E. Depot, RFQ_REv.01


Drainage Estimation

Drainage, after 3G2 Ramp to E. Depot, RFQ_REv.01


Drainage Estimation

Drainage, after 3G2 Ramp to E. Depot, RFQ_REv.01


Drainage Estimation
Drainage, after 3G2 Ramp to E. Depot, RFQ_REv.01
Drainage Estimation
Sick Leave
Saturday
Sunday
Total No. of Hrs.

.
EMP# ZA1005 Cost Centre: PUNE

PROJECT DETAILS

3E2- RIYADH
AL Futtain City Center SWCC RIYADH METRO Leave
METRO

9
9
9
0
0
0 0 36 0 9
DESIGNATION: MECHANICAL ENGINEER

(No. of Hrs,)
DETAILS

Details of hrs. to be
chargeable to
Customers/Other
Missceleneous Plumbing Cost Dept.
/Training/Public Holiday Data gathering

0 0 45

Reviewed by:

Engineering in charge