Sei sulla pagina 1di 22
1 Technip ceo am oe Guioe pocuMeNT one INSTRUMENTATION, CONTROL SYSTEMS AND TELECOMMUNICATION tae DESIGN CHECKING PROCEDURE APPENDIX: ICS & T CHECK LISTS CHECK LIST W* APPLICATION ICS &T SPECIFICATIONS 2 3 INSTRUMENT LISTS, J} LISTS. ALARM 8 TRIP LISTS AND LTELECOMMUNICATION EQUIPUENT LISTS INSTRUMENT DATA SHEETS _ INSTRUMENT / TELECOM CABLE ROUTING DRAWINGS INSTRUMENT LOCATION LAYCUT DRAWINGS. INSTRUMENT / TELECOM CABLE SCHEDULES INSTRUMENT / TELECOM WIRING / CABLING BLOCK DIAGRAMS INSTRUMENT LOOP DIAGRAMS INSTRUMENT HOOKUP DIAGRAMS 10 1" INSTRUMENT / TELECOM MATERIAL TAKE-OFF ‘SYSTEM ARCHITECTURE DIAGRAMS MATERIAL REQUISITIONS 8 4 MISCELLANEOUS DOCUMENTS / DRAWINGS (FOR ANY TECHNICAL BID EVALUATIONS DRAWING / DOCUMENT WHICH COULD NOT BE COVERED |UNDER THE ABOVE 13. STANDARD CHECKLISTS) CONTROL ROOM/ TECH, ROOM EQUIP. LAYOUT INST. AIR PIPING HOOK-UP DRAWING (AIR SUPPLY & PNEUMATIC SIGNAL) INSTRUMENT PROCESS HOOK-UP DRAWING FIRE & GAS LOCATION LAYOUT Tt TELECOM EQUIPMENT LAYOUT | [INSTRUMENT CABLE ROUTING LAYOUT | UNDERGROUND STUB-UP CONDUIT PIPE LAYOUT | Technip Ge Aur ‘ouiDe bocument an INSTRUMENTATION, CONTROL SYSTEMS AND TELECONMUNICATION so DESIGN CHECKING PROCEDURE IeS & T CHECK LISTS CHECK LISTIN: 4 For Document Type IeS & T SPECIFICATIONS, Document N° Rev. Document Title A Necessary Documents Docume Tle Donne Decurnt Regster_ ICS &T Bass of Design “Conte & Shutdown Prison, 1B. _ Checks tobe performed Descipion [Ghee et Appicabe| Format of Document ‘raving Tle, Drawing Number and FRovison as br Document Raster ‘Aecordaca with bass of design ‘ecordance wth Conta & Shutdoam Prison Acrrsone wi Gent Speciation Checked by Name (LE) Signature Date NOTE! : Document Ragstr number and ion shal bsp Jano ab sua package Technip Ge Am oot uive bocumeNT ve INSTRUMENTATION, CONTROL SYSTEMS AND TELECOMMUNICATION son DESIGN CHECKING PROCEDURE ies 1sTS (CHECK LIST" For Document Type: INSTRUMENT DATA SHEETS: Document N° Rov. Document Tile [A Necessary Documents ‘ocument Tie L Decumant Repster instrument 8255 of Beslan nsrument spectiaton | Process data shoots ote) | ais (ete) ‘aielaton Notes Level Study (Level stiches) Piping Matrl Spcricion (Note 2) Vendor drawings 8 Checks tobe performed Deseison Checked Format of Dseument - Drawing Tie, Orawing Number and Revision as por Document Reger ‘Accordance wth bass of design and instrument spectator Proeass date vansposed corecty — Trsirument/ data sheat ype corrector | eoneaion me - Tn cordance wih leva Skichos spose ane — | sto spor eter han ig mse Lee _ eckee by Name (=) Sorauwe Date NOTE! = uae Rares los ph se dan NOTE ~ The sacar non pub thr doe dame hl bea pe

Potrebbero piacerti anche